Introduction to SPIRAL 2Design goals of the baseline project
Status of the constructionLetters of Intent for SPIRAL 2
Status of SPIRAL 2 NuPECC meeting
Bordeaux October 28th 2006
Marek LewitowiczGANIL
04/18/23 M. Lewitowicz 2
The scientific case of SPIRAL 2
Spins&Shapes
Position ofdrip-lines
N=Z
rp-process
Heavy and Super Heavy Elements
r-process path
Haloes & Structures in the Continuum
Equation of StateRole of Isospin
Spins & Shapes
Shell structure far from stability
r-process path
Spins & Shapes
r-process path
Neutrons for scienceAtomic & solid state physicsRadiobiology & Isotope production
Neutrons for science
ISOSPIN DEGREES OF FREEDOM IN NUCLEAR FORCES
SPIRAL 2 White Book: www.ganil.fr
04/18/23 M. Lewitowicz 3
CIME Cyclotron Acceleration of RI Beams
E < 25 AMeV, 1 - 8 AMeV for FF
CIME Cyclotron Acceleration of RI Beams
E < 25 AMeV, 1 - 8 AMeV for FF
Production Caves:: RNB
C converter+UCx target
1014 fissions/sp- & n-rich RNB (transfer, fusion-evaporation, DIC)
Production Caves:: RNB
C converter+UCx target
1014 fissions/sp- & n-rich RNB (transfer, fusion-evaporation, DIC)
Superconducting LINAC: Stable-Ion beams
E ≤ 14.5 AMeV HI A/q=3, 1mAE ≤ 20 A MeV p,d, 4He (A/q=2 ions), 5mAPossible extension to A/q=6 ions
Superconducting LINAC: Stable-Ion beams
E ≤ 14.5 AMeV HI A/q=3, 1mAE ≤ 20 A MeV p,d, 4He (A/q=2 ions), 5mAPossible extension to A/q=6 ions
Heavy-Ion ECRHeavy-Ion ECR
p,d source p,d source RFQRFQ
LINAG Exp. HallLINAG Exp. Hall
Direct beam line CIME-G1/G2 caves
Direct beam line CIME-G1/G2 cavesExisting GANIL
Exp. Area
Existing GANIL Exp. Area
Existing GANIL AcceleratorsExisting GANIL Accelerators
Low energy RNB DESIR
Low energy RNB DESIR
04/18/23 M. Lewitowicz 4
SPIRAL 2 Layout
GA
NIL
RIB ProductionBuilding
DESIR facility Low energy RIB
LINAG Exp. AreaHigh Intensity stable beams
LINAG Building
04/18/23 M. Lewitowicz 5
Fusion reaction with n-rich beamsFusion reaction
with n-rich beams
Fission products (with converter)Fission products (with converter)
N=Z Isol+In-flightN=Z Isol+In-flight
Transfermiums In-flight Transfermiums In-flight
Fission products (without converter)Fission products (without converter)
High Intensity Light RIBHigh Intensity Light RIB
SHESHE
Deep Inelastic Reactions with RIBDeep Inelastic Reactions with RIB
Regions of the Chart of Nuclei Accessible with SPIRAL 2 Beams
Production of radioactive beams/targets: (n,), (p,n) etc.
Production of radioactive beams/targets: (n,), (p,n) etc.
light beamsheavy ionsRIB induced reactions
light beamsheavy ionsRIB induced reactions
04/18/23 M. Lewitowicz 6
SPIRAL 2 yields of fission fragment after acceleration compared to other RNB facilities (best numbers for all)
Today Today
04/18/23 M. Lewitowicz 7
SPIRAL 2 Budget in M€as stated in the financial agreement signed on Sept. 4th
2006
(manpower)
(additional cost)
Detectors are not included in the investment budget of SPIRAL 2 but France (CEA,CNRS, Region BN) contributes to all equipments constructed at GANIL typically at the level of 30 to 50%.
(Total cost)
04/18/23 M. Lewitowicz 8
SPIRAL 2 Schedule
2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016
Buildingconstruction
ReferenceProject
Def.
Safetyauthorizations
Constructionof LINAG
Under discussion
Reference Planning
Stable ion beams from LINAG
RIB
04/18/23 M. Lewitowicz 9
Project Organisation
Sections:
Labs:
CEA /DSM CNRS/IN2P3
Project direction Scientific
Community
Accelerator
RIB production Infrastructure
GANIL
Scientific Advisory
Committee
Project management
STEERING COMMITTEE
Int. Labs & Partners
National & international Partners
Technical Advisory
Committee
International Agreements Physics & technique
• ISOLDE - Letter of agreement signed in 2005• Romania - MoU signed on 28/02/06• Dubna - MoU signed 14/03/06 • SARAF (Israël) MoU signed in May 2006 • Grant request from the UK community
Direct beam line CIME-G1/G2
• BARC – TIFR (Bombay) MoU in preparation (draft) RF system, software
• LEA* with LNL Legnaro (Italy) in preparation (second draft) MoU (mainly on d->n converter) to be signed in the coming months
• LIA* with RIKEN in preparation (draft)• Poland - LEA in preparation• Triumf - MoU in preparation (first draft)• Argonne MoU in preparation (first draft)• Oak Ridge MoU under discussion• Technical meetings SPIRAL 2 - FAIR
*LEA = Lab. Europ. Associé SPIRAL 2 on the ESFRI list*LIA = Lab. Int. Associé
Introduction to SPIRAL 2Design goals of the baseline project
Status of the constructionLetters of Intent for SPIRAL 2
Status of SPIRAL 2 NuPECC meeting
Bordeaux October 28th 2006
Marek LewitowiczGANIL
04/18/23 M. Lewitowicz 12
Roa
d
DESIRLINAG
Exp. Area
Number of fissions/sNumber and type of
production caves1+ Ion Sources
Parallel-beams operation CIME-G1/G2 direct beam line
Choice of the HI source and injector
GA
NIL
Choice of the baseline project
04/18/23 M. Lewitowicz 13
LINAG Accelerator & Exp. Area
Priorities- Construction of the injector
A/q=3 - Second injector A/q=6
(extension) should be designed as soon as possible
04/18/23 M. Lewitowicz 14
LINAGExperimental Area
PriorityConstruction of 3 hallsand at least S3 hall fullyequipped
S3
n-tof
InterdisciplinaryResearch
LINAGbeam
04/18/23 M. Lewitowicz 15
1+ Ion Sources
Priorities: Selective ion sources- Surface ionisation - Laser (collaborations!)- ECR
RIB productionBuilding Two RIB production caves
1 “red zone” + 1 “yellow zone”
Preserve the possibility to deliver in the future two simultaneous RIB for (DESIR & CIME)
Reserve space for an RFQ cooler and HRS (High Resolution Mass Separator)
04/18/23 M. Lewitowicz 16
Base-line projectSummary of priorities
Choice of the HI source and injector for LINAG Phoenix V2 source - for the beginning of operation + development of metallic
beams Second injector q/A=1/6 should be designed as soon as possible
• LINAG Experimental Area Construction of 3 experimental halls. S3 hall fully equipped
Design goal for number of fiss./second As close as possible to 1014 fiss./s (safety and building cost limitations)
• RIB Production Building Priority for Selective 1+ Ion Sources (IS, laser, ECR) RIB production caves: 1 “red zone” & 1 “yellow zone” Preserve a possibility to deliver in the future two simultaneous RIB for (DESIR
& CIME) Reserve space for the RFQ cooler and HRS (High Resolution Mass Separator)
• DESIR DESIR building included in the SPIRAL 2 buildings construction phase
• CIME-GI/G2 Direct beam line To be constructed before the SPIRAL 2 buildings
Discussed by SC, SAC & TAC
Introduction to SPIRAL 2Design goals of the baseline project
Status of the constructionLetters of Intent for SPIRAL 2
Status of SPIRAL 2 NuPECC meeting
Bordeaux October 28th 2006
Marek LewitowiczGANIL
RFQ prototype
20 kW
38 kW
displacements are < 60µm, (max. allowed ± 100µm)
Vane tip displacements at 20 and 38 kW
CEA / DAPNIA Saclay
CNRS - IPN Orsay: Prototype cavity (beta 0.12)
1,0E+08
1,0E+09
1,0E+10
1,0E+11
0 1 2 3 4 5 6 7 8 9 10 11 12
Eacc (MV/m)
Qo
Spiral-2 operating gradient
6,5
E max = 11 MV/m (Bpeak = 110 mT) (Epeak = 60 MV/m)
acc
Multipacting
Light Field Emission
CEA/DSM/DAPNIA: Prototype cavity (beta 0.07)
SC Cavities
Injector(LEBT lines)
Review06/09/06
Preparation of ContractsDipoles & Q-poles
2006 / 2007
Injector(RFQ)
Review17/10/06
AnnouncementSept 2006
Call for tendersOct/Nov 2006
ContractDec/Jan.
2007
SC Linac(Niobium)
AnnouncementJuly 2006
Call for tenders
Sept/Oct 2006
ContractNov. 2006
SC Linac(QWR A+B)
Review25-26/09/06
QWR A :Announcement
1st Qr 2007
Call for tenders2007
Contract2007
QWR B :Announcement
Sept. 2006
Call for tenders
Sept/Oct 2006
ContractNov. 2006
SC Linac(RF Amplifiers)
(Two qualifyingAmplifiers 10 -
20 KW)
AnnouncementMay 2006
Call for Tenders
July/Sept 2006
ContractOct. 2006
The Driver Accelerator construction has started …
Production Modules (d->n converter + UCx target + ion source
systems)
Recent solution proposed by Thales
Target &ion source
Ganil design
Recent design (under study)
Ganil design
Introduction to SPIRAL 2Design goals of the baseline project
Status of the constructionLetters of Intent for SPIRAL 2
Status of SPIRAL 2 NuPECC meeting
Bordeaux October 28th 2006
Marek LewitowiczGANIL
04/18/23 M. Lewitowicz 23
SPIRAL 2 - Letters of intent (LoI)Towards new detectors for SPIRAL 2
Procedure and schedule:
1. Call for LoI - May 26th 2006 (just after the SP2 SAC meeting on May 17, 2006)
2. Dead-line for LoI: October 2nd, 2006
3. Evaluation of LoI by SAC - October 19&20th 2006
1. Results of the evaluation will be communicated to the proponents by the beginning of November 2006.
§ Call for proposals launched in 2007
§ Signature of MoU by collaborations proposing the construction of new
equipment in 2007-2008
04/18/23 M. Lewitowicz 24
SPIRAL 2 - Letters of intent (LoI)Resume
SPIRAL 2 Letters of Intent in numbers:
19 LoIs submitted
25 oral presentations of the LoIs at the Open session of SAC on October
19th 2006
LoIs signed by 595 physicists (without double counting) (190 from
France, 492 from NuPECC member countries) from 34 countries
Spokespersons: 50% France, 50% foreigners
Written documents of in total 341 pages
04/18/23 M. Lewitowicz 25
List of LoI for SPIRAL 2
1. The DESIR facility (Decay, Excitation and Storage of Radioactive Ions) (B. Blank)2. Decay properties of neutron-rich nuclei (Yu. Penionzhkevich, F. Ibrahim)3. S3: The Super Separator Spectrometer for LINAG Beams (A. Villari, A. Drouart, J. Nolen)4. From actinides to super-heavy elements with SPIRAL 2: reaction dynamics and structure (Paul Greenlees)5. Fusion reactions: A probe of multidimensional tunnelling (A. Navin, R. Raabe, A. Shrivastava)6. Nucleon correlations probed via multiple particle transfer and their influence on sub-barrier fusion (L. Corradi) 7. High-resolution Gamma-ray Spectroscopy at SPIRAL2 (AGATA-EXOGAM II) (W.Korten, B. Wadsworth)
・ Proton drip-line studies and N=Z nuclei (D. Rudolph) ・ Neutron-rich nuclei (A. Gadea) ・ Nuclear shapes and high-spin spectroscopy (A. Görgen)・ Collective modes in the continuum (S. Leoni)・ Nuclear electromagnetic moments (G. Georgiev)・ Spectroscopy of the heaviest elements (P. Greenlees)
8. High-energy -rays as a probe of hot nuclei and reaction mechanisms (J.A. Scarpaci, A. Maj, D. Jenkins)9. Studying the r process nucleosynthesis with direct reactions (O. Sorlin, K. L. Kratz)10. α-capture reactions in inverse kinematics relevant to stellar nucleosynthesis (S. Harissopulos F. De Oliveira)11. Production of radioactive samples for astrophysical interest by (n,p), (n,3He), (n, a) reactions (F. Hammache, M. Heil)12. Production targets of light radioisotopes for nuclear astrophysics and basic nuclear science studies (M. Hass, D. Berkovits, T.Y. Hirsh)13. Improving effective forces, mean field based methods, and predictions: dedicated measurements (M. Bender, K. Bennaceur, S. Péru)14. Direct Reaction Studies of Exotic Nuclear Structure (GASPARD) (D. Beaumel, R. Lemmon, I. Martel )15. Direct and Resonant Reactions with an Active Target (M. Chartier, D. Cortina, P. Roussel-Chomaz )16. Unbound states of neutron-rich isotopes via direct reactions (V. Lapoux)17. Neutrons For Science (X. Ledoux)18. Dynamics & Thermodynamics of exotic nuclear systems (F. Gulminelli, G. Poggi, G. Verde)19. Isospin non-conservation in nuclear states and its implication for the physics beyond the Standard Model (N. Smirnova)
Main Collaborations:
DESIRS3
AGATA & EXOGAM 2-ray CalorimeterGASPARDn-tofFAZIA
04/18/23 M. Lewitowicz 26
SPIRAL 2 Scientific CommunityOrganisation
Steering Committee
Project management- Project Leader- Scientific Coordinator..
SPIRAL 2 France Phys.SPIRAL 2 Scientific Coordinators
in the IN2P3 & CEA Labs
SPIRAL 2Scientific Advisory Committee
Int. Collaborations SP2-DESIR-S3
-GASPARD-…
Existing International Collaborations- NUSTAR - AGATA- EXOGAM- EURONS- EURISOL- FAZIA-…
SP2-NUSTAR WG-Electr. & DAQ-Calorimeter-Tracking detectors-Neutron detectors ?-…
Coordination Committee
04/18/23 M. Lewitowicz 27
SPIRAL 2 on the ESFRI list
Brussels, 19 October 2006
European Research Infrastructures – 35 projects identified
•The ESFRI roadmap (see IP/06/1431) identifies 35 large-scale infrastructure projects at various stages of development. This Memo gives brief details of the projects concerned. The full text of the roadmap, which contains longer descriptions of the projects can be found at: http://cordis.europa.eu/esfri/home.html
• …Isotope beams with SPIRAL 2The project aims at delivering rare (radioactive) isotope beams with intensities not yet available with present machines. SPIRAL 2 will reinforce European leadership in the field of nuclear physics based on exotic nuclei.
Introduction to SPIRAL 2Design goals of the baseline project
Status of the constructionLetters of Intent for SPIRAL 2
Status of SPIRAL 2 NuPECC meeting
Bordeaux October 28th 2006
Marek LewitowiczGANIL
04/18/23 M. Lewitowicz 29
LoI SPIRAL 2 - Participants
LoI SP2: Number of participants/Country
1 39
12
41 3 1 2
10
34
814
34
3
82
2 16
3
36
1
16
2
16
2
24
8 61
35
24
2
190
0
10
20
30
40
50
60
70
80
90
100
AlgeriaAustraliaBelgium
BrasilBulgaria
ChinaCroatia
Czech
DenmarkFinlandFrance
GermanyGreece
Hungary
IndiaIsraelItalyJapanMexico
NetherlaNorwayPolandPortugalRomania
RSARussiaSerbiaSpain
SwedenSwitzerla
Turkey
UKUSA
Vietnam
Country
Number of participants
Total: 595
04/18/23 M. Lewitowicz 30
Priorities1. Phoenix V2 source - for the
beginning of operation + development of metallic beams
2. In 2-3 years a choice of the best next-generation HI source (extension)
0,01
0,1
1
10
100
1000
0 20 40 60 80 100 120 140
A
A-PHENIX A/q=6
A-PHENIX A/q=3
GANIL Today
PHENIX-V2 A/q=3
RIKEN Today
RIKEN RIBF
Choice of the HI source and injector
04/18/23 M. Lewitowicz 31
DESIR, RFQ Cooler & HRS
Cooling/BunchingCooling/Bunching
Spectroscopy Spectroscopy of trapped of trapped
beamsbeamsLaser Laser
SpectroscopySpectroscopy
Decay studiesDecay studies
Other Other purposespurposes
Fundamental Fundamental InteractionsInteractions
1500 m2
Priorities:DESIR building included in the SPIRAL 2 building design phase
DESIR building and equipment as well as RFQ et HRS to be financed by international collaborations (not included in the current construction budget)
DESIR Facility for experiments with low energy RIBs
Production Modules
d->n Converter -> vertical wheel
Bearings under study, toreduce friction Several solutions to be tested
Oven -> measurements with a Tantalum oven and a Carbon target at 1500°C
Next measurements at 2000°Cbefore the end of this year
IPNOrsay-Ganil
UCx target: calculation to reducethe size and weight of UCxSolutions for the waste management under study
162193
1217
15121181 882
797
235
céramique
417
148
235
céramique
417
148