Introduction to-site-ici

14
SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN FOUNDATION IN NATURAL AND BUILT ENVIRONMENT INTRODUCTION TO CONSTRUCTION INDUSTRY QSB 30105 FINAL PROJECT: THE PROJECT BRIEF BY: GOH SONG KIT (0322013) CHAN YI FUNG (0323057) CHANG MAY CHEN (0322636) CHERILYN CHIA QIAO XIN (0321986)

Transcript of Introduction to-site-ici

SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN

FOUNDATION IN NATURAL AND BUILT ENVIRONMENT

INTRODUCTION TO CONSTRUCTION INDUSTRY

QSB 30105

FINAL PROJECT:

THE PROJECT BRIEF

TUTOR: PN HASMANIRA MOKHTAR

BY: GOH SONG KIT (0322013)

CHAN YI FUNG (0323057)

CHANG MAY CHEN (0322636)

CHERILYN CHIA QIAO XIN (0321986)

INTRODUCTION

In this final project, in a group of 3-4 members, we were given a task to find a specific empty land to initiate and propose a small construction project. The size of the proposed land should be within 2500 – 3500 m2.

Our proposal should serve one or two of the following purposes:

Recreation area Commercial area Industrial area Agricultural area Tourism area Residential area

THE PROPOSED SITE

Our site is located at Subang Jaya ss16, next to Mesiniaga Tower. The total area of our site is 3381 m2 and the site is surrounded by residential areas, Tenaga Nasional Company, bus stops, KTM station, shopping centre and etc. The site has a great potential to be developed to serve the residents, school children, workers as well as to attract other people from different places.

KEY PLAN

LOCATION PLAN

SITE ANALYSIS AND OBSERVATION

SITE PLAN

Sunlight

The sun rises from the east, which is from the left (Mesiniaga Tower) and sets at the west (Apartment).

Wind

The wind direction is from the west to the east. The wind current is quite strong even though there are high rise buildings towards the west of the site.

Traffic

There is only one way directed towards the site. And there is a fly over next to our site which connect to the Subang Airport, Glandmarie, Ara Damansara and Etc.

KTM STATION (Subang Jaya) TENAGA NASIONAL

SUPERMARKET (AEON)

RESIDENTIALMESINIAGA TOWER

OUR SITE

View

The view from the site is very attractive in the night and the area will be quite crowded. The site is also windy in the night.

The surroundings

Towards the east is the Mesiniaga Tower.

Towards the west is the apartment area.

The walking distance from our site to the KTM station is about 0.4 km and the shopping center is 100m further from the station.

And Next to The Mesiniaga Tower got the Subang Ria Recreation Park.

Utilities

There is an Electrical Generator at the North East of site.

Conclusion

The site have the suitable potential to develop as a Recreation, Commercial and Residential area.

Project Description

This project is a 4 person group project. Student have to find a site with the size 50m x 50m – 50m x 75m. Student have to develop the site into several option given. After choosing the site student have to consider to develop the site into Recreation area, Commercial area Industrial area, Agricultural area, Tourism area, Residential area, student have to consider the surrounding before choosing. After confirm the development student have to produce a proposal about the project. The site for our group is located at Subang Jaya ss16 Selangor Darul Ehsan. The project site is size of 50m x 50m.

Porposal for the project Champion Sport Planet

This project is named Champion Sport Planet. I wan to develop the site into a futsal court. The name of this project is the inspiration from the famous Champion League. The name explained about the passion of Football. The site for the futsal court is located at Subang Jaya ss16 Selangor Darul Ehsan. The project site is size of 50m x 50m.

The reason why I wan to develop the site into a futsal centre. First of all, nearby the area there is no futsal court and now a day people don’t really wan to do sport, they rather stay home with the phone or computer all day. I wan to encourage people to do more sport. By not choosing other project to develop is because the area have existing commercial area, residential area, park. I didn’t develop my site into agricultural area and tourism area is because it is not suitable. The other reason for me to develop my site into a futsal centre the budget for it is not as high as others sport centre for example badminton, tenins, squash.

Benefit of the project

Client

The benefit of building the futsal court on the side of client is definitely about the profit. By earning the profit with futsal court is about renting the futsal court to customer and it depend on the length of time they rent the futsal court. The price is calculate by seasons. Seasons is define as the time whether there is crowd comes and play or there is no people come and play. The price will be more expensive when it is on peak season and it will be cheaper on off seasons. On the other hand, the partially of profit also come from the café inside the Champion Sport Planet. Earning the profit by selling food and drink to the customer.

End user and surrounding community

The benefit of building the futsal court on the side of end user and surrounding community is definitely the facility. I have already did a survey about that area there is no nearby futsal court centre. Nearby community example resident from ss12, ss15 and ss16 can go to Champion Sport Planet for futsal. The nearby community can reach Champion Sport Planet by walking there. Champion Sport Planet provide good quality futsal court for the end user and the parking space are sufficient for the user. Not only that there is a small café in Champion Sport Planet for customer to buy drink. Champion Sport Planet is nearby complex and restaurant, user can have their food after their futsal game. Nearby Champion Sport Planet there is a lot bus stop is easy for user to come over.

Impact of the project

Client

The impact of building the futsal court on the side of client is about after building the futsal court the profit is not as much as they assume. It a risk for the client. Worse to worse is the profit is lower than the output then the futsal court have to close down interm of stop wasting money.

End user and surrounding community

The impact of building the futsal court on the side of end user and surrounding community is the jam cause by the futsal court if there is a competition going on.

Rationale

The area nearby don’t have futsal centre. To encourage the nearby resident to do more sport. Introducing a healthier lifestyle.

Chart flow

Client will enquire quantity surveyor about the project and calculate the cost of the whole project .

Contractor will go bid for the tender.

After getting the tender.

Architect will draw the plane according to site and the client’s order.

Contractor will get the approver from the area authority.

Land surveyor will measure the size of the land.

Civil engineer will calculate the amount of the material should be use.

Contractor will start building the project.

Mechanical and electrical engineer will come in and apply the fire alarm system, water runway, electric wiring.

While the project is running quantity surveyor will pay the expenses on behalf for client depend on the progress of the project.

Contractor have to construct the whole project in the given time.

After finish constructing the whole project contractor will hand up the final product to the client.

Images

Conclusion

In conclusion, the site has potential to develop into a Futsal centre for the nearby resident to play there. Assuming most youngsters (Age 18-25) especially young male adults who take their time to exercise at these futsal courts, it is safe to say that opening a nice café would not only benefit to these young adults, but is highly likely that it is beneficial to the client as it would most definitely generate profit due to its high density of the population around the area. The café will be an ideal attraction to these young adults as they would be searching for a place to either relax or sit down and rest and grab a meal while resting.

As mentioned previously in this report, the futsal court would then again prove to be highly beneficial and will definitely be an attraction to these young adults and therefore being a natural attraction to people who love to spend a game or two for a futsal match. Once again, I would like to emphasise on what this futsal court’s initial aim which is to generate the most profit and the most attraction to the locals around the area for the client to generate a stable growing profit.