Introduction to ICRI and The _______ Chapter

21
Introduction to Introduction to ICRI ICRI and The _______ and The _______ Chapter Chapter

description

Introduction to ICRI and The _______ Chapter. HISTORY AND MISSION OF ICRI. History Organized May 21, 1988 in Naperville, IL, as the International Association of Concrete Repair Specialists. Changed to International Concrete Repair Institute in 1993. Mission - PowerPoint PPT Presentation

Transcript of Introduction to ICRI and The _______ Chapter

Page 1: Introduction to ICRI and The _______ Chapter

Introduction to ICRIIntroduction to ICRI

and The _______and The _______

ChapterChapter

Page 2: Introduction to ICRI and The _______ Chapter

HISTORY AND MISSION HISTORY AND MISSION OF ICRIOF ICRI

• History– Organized May 21, 1988 in Naperville, IL, as the International

Association of Concrete Repair Specialists.– Changed to International Concrete Repair Institute in 1993.

• Mission– The mission of the International Concrete Repair Institute is to be a

leading resource for education and information to improve the quality of repair, restoration, and protection of concrete and other structures in accordance with consensus criteria.

• Overall and Underlying Goal– To improve the quality of concrete repair.

Page 3: Introduction to ICRI and The _______ Chapter

MEMBERSHIPMEMBERSHIP

Growing past 2000 Members

Government Agency, Facility Owner, Union, Government Employee, Educator, Student/Union Apprentice, Honorary Member, Retired Member

Page 4: Introduction to ICRI and The _______ Chapter

SUPPORTING SUPPORTING MEMBERSMEMBERS

35 Supporting Member Companies•A.H. Harris & Sons, Inc.

•Advanced Polymer Technology

•Avanti International

•BASF Building Systems

•Bonded Materials Company

•C.A. Lindman, Inc.

•Concrete Protection & Restoration, Inc.

•Contracting Specialists

•Cortec Corporation

•DeNeef Construction Chemicals (US) Inc.

•Eastern Waterproofing & Restoration Co., Inc.

•The Euclid Chemical Company

•Evonik Industries

•Fibrwrap

•Fox Industries, Inc.

•Futura Builders Group, Inc.

•Kenseal Construction Products Corp.

•Lymtal International, Inc.

•MAPEI Corporation

•Miracote Division of Crossfield Products

•Neogard

•ProSpec/Bonsal American

•Prosoco Inc.

•Quikrete

•Rampart Hydro Services, LP

•Restoration East, LLC

•SealBoss

•Sika Corporation

•Skyline Restoration

•STRUCTURAL

•Technical Construction

•Tecnochem Italiana, S.p.A.

•Tremco

•Vector Corrosion Technologies

•W. R. Meadows, Inc.

Page 5: Introduction to ICRI and The _______ Chapter

WHY JOIN ICRI?WHY JOIN ICRI?

• Member Benefits– Industry recognition– Peer networking– Local chapter membership– ICRI committee participation– Reduced pricing on ICRI products and services– Concrete Repair Bulletin – 25% discount on Concrete Repair Bulletin advertising– “Who’s Who in Concrete Repair” and

ICRI Online Membership Directory

Page 6: Introduction to ICRI and The _______ Chapter

• Concrete Repair Bulletin– Latest news and information on

concrete repair and ICRI– Published bimonthly– Worldwide readership of 18,000– Chapter News

• “Who’s Who in Concrete Repair”– Published annually– Details all ICRI member companies by

specialties and locations– Member companies can place ads

PUBLICATIONSPUBLICATIONS

Page 7: Introduction to ICRI and The _______ Chapter

• Concrete Repair Bulletin– Do you have an idea for an article, a case

study, or project analysis?– ICRI is looking for authors– Submit and outline or an abstract

to [email protected]– 2012 Editorial Schedule

• May/June – Industrial Repairs• July/August – Strengthening & Blast Resistance• September/October – Preservation Engineering – Masonry/Stone/Concrete

PUBLICATIONSPUBLICATIONS

Page 8: Introduction to ICRI and The _______ Chapter

2012 ICRI BOARD 2012 ICRI BOARD OF DIRECTORSOF DIRECTORS

• Executive Officers– President – Garth Fallis, Vector Corrosion Technologies

– President-Elect – William “Bud” Earley, MAPEI Corp.

– Vice President – Michael Tabassi, PE, Tadjer-Cohen-Edelson Associates

– Treasurer – Beth Newbold, Rampart Hydro Services, LP

– Secretary – Katherine Klosowski-Blatz, BASF Building Systems

– Past President – Don Ford, Watertight Systems, Inc.

• Board Members– Fifteen other board members.

– Board term is three years.

– Chapters make nominations to ICRI board.

Page 9: Introduction to ICRI and The _______ Chapter

– 110 – Guide Specifications

– 120 - Environmental Health and Safety

– 130 – Procurement Methods and Relationship Arrangements

– 140 – Life Cycle Performance and Cost

– 150 - ICRI Notes on ACI 562 Code Requirements

– 160 Sustainability

– 210 – Evaluation

– 310 – Surface Preparation

– 320 – Concrete Repair Materials and Methods

– 330 – Strengthening and Stabilization

– 410 – Masonry

– 510 – Corrosion

– 710 – Coatings and Waterproofing

ICRI COMMITTEESICRI COMMITTEES

• Technical Committees

Page 10: Introduction to ICRI and The _______ Chapter

ICRI COMMITTEESICRI COMMITTEES

• Administrative Committees– Executive

– Awards

– Chapter

– Certification

– Education

– Fellows

– Finance

– Marketing

– Meetings and Conventions

– Nominating

– Publications

– Technical Activities

Page 11: Introduction to ICRI and The _______ Chapter

ICRI COMMITTEESICRI COMMITTEES

• ICRI Technical Committees are open and looking for your participation.

• Each Committee strives to balance contractors, engineers and materials suppliers and gather opinions from all sides.

• You are invited to attend any technical or administrative committees that are of interest to you at any of ICRI’s conventions.

• You are welcome to apply for technical committee membership at any time by visiting the ICRI web site.

• Only a very few committees meetings are closed:– Those are Fellows and Nominating.

Page 12: Introduction to ICRI and The _______ Chapter

TECHNICAL TECHNICAL DOCUMENTSDOCUMENTS

• ICRI Technical Guidelines– Sixteen guidelines published– Most popular is No. 03732

Surface Preparation Guide and surface profile chips

– See Publications Catalog for a full listing of guidelines

• Concrete Repair Manual– Includes 80 documents on concrete repair– Now in its 3rd Edition

• Other Documents– ICRI sells other industry documents on concrete repair

Page 13: Introduction to ICRI and The _______ Chapter

2012 PROJECT 2012 PROJECT AWARDSAWARDS

• Entry Deadline will be in May 2012

• Highlight a favorite project

• Get Industry recognition for outstanding achievements

Page 14: Introduction to ICRI and The _______ Chapter

CONVENTIONS CONVENTIONS AND MEETINGSAND MEETINGS

• Spring and Fall Conventions– Technical sessions, committee meetings, and exhibits– Annual Awards Reception (Fall)– Networking opportunities– Installation of Officers and Fellows (Spring)– Chapter Awards (Spring)– Spring 2012 – Preservation Engineering

April 18-20 – Quebec City, QC, Canada– Fall 2012 – Life Cycle Repair – Sustainability

November 7-9 – Rancho Mirage, CA– Spring 2013 - 25th Anniversary

March 20-22 – St. Pete Beach, FL

Page 15: Introduction to ICRI and The _______ Chapter

CONVENTIONS CONVENTIONS AND MEETINGSAND MEETINGS

• Spring and Fall Conventions

– Have an idea for a Technical session?

– We look to our Membership to present at all convention

– Technical presentations must be non-commercial in all respects

– You are encouraged to provide an outline or abstract

– Contact us at [email protected] to let us know you’d like to present

– A special sub-committee has been set up through Technical Activities

to select our speakers for each event.

Page 16: Introduction to ICRI and The _______ Chapter

CONVENTIONS CONVENTIONS AND MEETINGSAND MEETINGS

• WORLD OF CONCRETE– ICRI is a co-sponsoring organization– Register for World of Concrete through ICRI– Receive FREE Exhibit Area Registration– Discounted Seminar Registration– Offer open to all Members and non-members

• Annual Membership Celebration– Held in conjunction with World of Concrete– Monday before WOC begins

Page 17: Introduction to ICRI and The _______ Chapter

WHAT TO LOOK FOR WHAT TO LOOK FOR IN THE FUTUREIN THE FUTURE

• Specialized ICRI Training Program

• ICRI Floor Moisture Testing Certification

– Check the ICRI web site for a list of the 2012 locations

• New Technical Guidelines

– Safety Guideline – No. 120.1-2009

– NDE Methods – 210.4-2009

• Revised ICRI Guidelines

– Estimating – 130.1R-2009

– Materials – 320.2R - 2009

• ICRI Specifications

• 2012 Project Awards

Page 18: Introduction to ICRI and The _______ Chapter

________ CHAPTER________ CHAPTER

• Officers

– President – Name

– President-Elect – Name

– Vice-President – Name

– Treasurer – Name

– Secretary – Name

• Board Members

Page 19: Introduction to ICRI and The _______ Chapter

________ CHAPTER________ CHAPTER

• Activities– Technical meetings and seminars

– Social Outings• Golf outing

• Holiday Party

– Newsletter

Page 20: Introduction to ICRI and The _______ Chapter

________ CHAPTER________ CHAPTER

• Upcoming Events– Event Name – Date – Location

– Event Name – Date – Location

Page 21: Introduction to ICRI and The _______ Chapter

________ CHAPTER________ CHAPTER

• How to Join– Complete a membership application for ICRI– Select the ______ Chapter on the application

• Why Join?– Membership keeps the chapter going– What you put into it is what you get out of it– Only members can serve as chapter officers or directors

• Who to contact– Membership

• Naomi White – 248-848-3809; [email protected]

– Chapter Relations • Dale Regnier – 847-827-0830; [email protected]