Introduce the project Africa IXP (Team 4). Introduce team members.

40
Introduce the project Africa IXP (Team 4)

Transcript of Introduce the project Africa IXP (Team 4). Introduce team members.

Page 1: Introduce the project Africa IXP (Team 4). Introduce team members.

Introduce the project

Africa IXP (Team 4)

Page 2: Introduce the project Africa IXP (Team 4). Introduce team members.

Introduce team members

Page 3: Introduce the project Africa IXP (Team 4). Introduce team members.

Connectivity in Africa• Fibre optic links are few and expensive

Page 4: Introduce the project Africa IXP (Team 4). Introduce team members.

Reliant on Satellite

• High satellite latency = slow speed, high prices• Growth of Internet businesses is inhibited

ISP BISP A

200-900ms

5-20ms

ISP 1

ISP 2

Page 5: Introduce the project Africa IXP (Team 4). Introduce team members.

Research & Education Institutions

• Research and Education Institutions in Africa are part of the people

Page 6: Introduce the project Africa IXP (Team 4). Introduce team members.

Internet Exchange Points

• Interconnection points of the Internet

• Place where ISPs come to interconnect

• Keep local traffic local

Page 7: Introduce the project Africa IXP (Team 4). Introduce team members.

Shortening the Chain

Internet

ISP A ISP B ISP C

IXP

Page 8: Introduce the project Africa IXP (Team 4). Introduce team members.

Grow local bandwidth

ISP A ISP B ISP C

NationalGateway

IXP

256k

512k

12

8k

1M

1M 1M

Page 9: Introduce the project Africa IXP (Team 4). Introduce team members.

Benefits

• Cut down costs– Up to 15%– 400 Million dollars is spent on local traffic that

is exchanged internationally.

• Add Value

• Improve Quality

• New Business and revenue opportunities

Page 10: Introduce the project Africa IXP (Team 4). Introduce team members.

Current Status of IXPs in Africa

• 2 large• 8 small• 4 in progress• 14 out of 53 countries

Page 11: Introduce the project Africa IXP (Team 4). Introduce team members.

Overall Goals

• Solution to the current situation with the IXP

• 3 IXPs in 3 countries???

• Solutions for NREN, how can they connect?

Page 12: Introduce the project Africa IXP (Team 4). Introduce team members.

Stakeholders

• ISPs

Page 13: Introduce the project Africa IXP (Team 4). Introduce team members.

IXP architecture

• Design of IXP– Layer 2 or layer 3 ?– Layer 2 with a router reflector

• Redundancy and load balancing

• Proposed equipment

Page 14: Introduce the project Africa IXP (Team 4). Introduce team members.

IXP architecture

ISP A ISP B ISP C

RouteReflector

Server

Switch 1 Switch 2

Page 15: Introduce the project Africa IXP (Team 4). Introduce team members.

IXP architecture

• IXP services

– WEB server– Secondary and/or primary DNS– Network statistics– Looking glass– …..– Transit traffic

Page 16: Introduce the project Africa IXP (Team 4). Introduce team members.

Resources

•SIDA – Funding of the project

•Cisco – Donation of switches offers training to ISPs

•AFRISPA – Have set up workshops in the countries to help prepare for the IXPs (with assistance from DFID)

•KTH – Use of workrooms, equipment for labs and offer lectures for technical teaching purposes

•Teaching Team & Coaches – Feedback, assistance in project matters

Page 17: Introduce the project Africa IXP (Team 4). Introduce team members.

Working Methodology

Page 18: Introduce the project Africa IXP (Team 4). Introduce team members.

Project Status / Achievements

● Technical proposal and design of IXPs were done for 3 countries: Burundi, Malawi, Zambia

Page 19: Introduce the project Africa IXP (Team 4). Introduce team members.

Training of project members

• BGP training: important topics

• Basic training related to IXP services: ➔ DNS➔ MRTG➔ Looking glass• Presentation training• IXP similation

Page 20: Introduce the project Africa IXP (Team 4). Introduce team members.

Convincing ISPs to connect

● Presenting economical benefits which will save expensive International bandwidth

● Showing how IXP will increase the speed of Internet

● Presenting how IXP will influence Internet applications development and open up web hosting opportunities

Page 21: Introduce the project Africa IXP (Team 4). Introduce team members.

Policy document

• Objectives of IXP

• Organization and management• Members conditions• Responsibilities

Page 22: Introduce the project Africa IXP (Team 4). Introduce team members.

Designed questionnaire for NREN road map

Page 23: Introduce the project Africa IXP (Team 4). Introduce team members.

Problems encountered by team

• Inefficiency in communication with local stakeholders

• Hesitation from stakeholders to join the IXP

• Budget (constraints and delays)

• Procurement procedures and shipping

• Dealing with the African business environment:

Page 24: Introduce the project Africa IXP (Team 4). Introduce team members.

Problems encountered by team

P: Inefficiency in communication with local stakeholders

- Different geographical location

- Absence of face-to-face communication

• S: use the technologies available

Page 25: Introduce the project Africa IXP (Team 4). Introduce team members.

Problems encountered by team

P: Hesitation from stakeholders to join the IXP

• Unawareness of benefits

• Need for a minimum number of members

• Organization of workshops and discussion of benefits

Page 26: Introduce the project Africa IXP (Team 4). Introduce team members.

Problems encountered by team

P: Budget Issues

- Constraints on the amount

- Delay in approval of budget proposal

- S: Proposal of different alternatives / Compromises in design

Page 27: Introduce the project Africa IXP (Team 4). Introduce team members.

Problems encountered by team

Procurement procedures and shipping

-Length and hard process

-Inability to ship some equipment

-Customs and clearing of equipment

S: Proceed immediately after budget approval / Make use of local participants

Page 28: Introduce the project Africa IXP (Team 4). Introduce team members.

Problems encountered by team

Dealing with the African business environment

- Low tolerance for change

- Presence of incumbents

- Size of organizations (very small)

- S: Cope with the cultural differences

Page 29: Introduce the project Africa IXP (Team 4). Introduce team members.

• Problems the team encountered– Delay in communication with local

stakeholders.– Budget (Constraints and delays)– Procurement procedures– Shipping– Multicultural interaction

• What we are currently working on

Page 30: Introduce the project Africa IXP (Team 4). Introduce team members.

“The next step”

• Implementation phase– Finish procurement– Handle shipping and customs clearing– Deploy IXP and testing– Training for local administrators– Policy document– Prepare road map document for NREN– Conclusion phase

• Documentation• Lessons learned

Page 31: Introduce the project Africa IXP (Team 4). Introduce team members.

• Finish procurement– Budget was approved– Compile final list of items– Contact vendors

Page 32: Introduce the project Africa IXP (Team 4). Introduce team members.

• Handle shipping and customs clearing– Clearing procedures different for each country– Tax rates different for each country – Tax customs duty and VAT

Page 33: Introduce the project Africa IXP (Team 4). Introduce team members.

• Training for local administrators– Made contact with cisco– Cisco proposed a train the trainers workshop

Page 34: Introduce the project Africa IXP (Team 4). Introduce team members.

• Deploy IXP and testing– Work with internet service providers– Draw configurations for internet

exchange point– Test configurations– Connect internet service providers

Page 35: Introduce the project Africa IXP (Team 4). Introduce team members.

• Policy document– Policy document will outline management of

IXP– Feedback on policy documents for each

country– Translation to French for Burundi

Page 36: Introduce the project Africa IXP (Team 4). Introduce team members.

• Prepare road map document for NREN– Document to address available infrastructure – Identify available terrestrial links– Recommend links that can be used

Page 37: Introduce the project Africa IXP (Team 4). Introduce team members.

• Documentation– Prepare for each internet exchange point– Services deployed

Page 38: Introduce the project Africa IXP (Team 4). Introduce team members.

• Lessons learned– Purchasing procedure takes considerable

time– Budget preparation should start early– Coordination

Page 39: Introduce the project Africa IXP (Team 4). Introduce team members.

Questions

• Maybe picture of ourselves?

Page 40: Introduce the project Africa IXP (Team 4). Introduce team members.

Thank you for listening

• Bye bye!