Intro to MagTraC - ISCWSA16:27:42 25-5-2010 BtotalwhileDrilling demo // May 24 2010 Oxy-Qatar...
Transcript of Intro to MagTraC - ISCWSA16:27:42 25-5-2010 BtotalwhileDrilling demo // May 24 2010 Oxy-Qatar...
Preliminary Risk Estimate
(B) Bit Clearance
E.O.U.2E.O.U.1
Convergence Angle (A)
C
“Risk” = P( C ) X [ 1 – P (detection) ]
30ppf casing weight 200nT BtotalDip interference threshold2m bit clearance before contact* indicates MWD-ranging available w/o added shots
Significant improvement in detection with 30 degree approach (v 40deg)
Monitor sidetrack from window
Detect out-of-design
Offset wellbore re-positioned after safe “drill-by” with proximity detection
Continuous MWD/gMWD monitoring in top hole section
1. Continuous monitor total field interference in top hole section-compare with design.
2. Proximity to closest well is positively detected by MWD-ranging when gyro survey well-path or surveys are not as designed.
3. Decision to drill ahead or plug back based on known location of closest well
250 ft per division
1500ft
4000ft
16:27:42 25-5-2010 BtotalwhileDrilling demo // May 24 2010 Oxy-Qatar Btotal-Dip /Az
600
700
800
900
1000
1100
1200
1300
1400
1500
1600
42058.0 43058.0 44058.0 45058.0
as built and design continous Btotal
Dep
th
Eventually 3-d graphics (of course)Specify casing size to detectSpecify “noise” levelResult is area where NO POSSIBLE CASING THIS SIZE (or larger) can be present