PRE - FEASIBILITY REPORT
For
PROPOSED BULK DRUGS AND
INTERMEDIATES MANUFACTURING UNIT (MANUFACTURING CAPACITY 75 TONNES/MONTH)
at
SY NO: 11/2B , POCHAMPALLY VILLAGE ,
JAGGAIAHPET MANDAL,
KRISHNA DISTRICT, ANDHRA PRADESH By
AJAY LABS PRIVATE LIMITED Plot No No: 90, Vivekananda Nagar, Kukatpally,
Hyderabad-500072
January, 2019
Contents
S. No. Description Page no.
1.0 Executive Summary 1
2.0 Introduction of The Proposed Project 2
2.1 Project Proponent 2
2.2 Brief description of nature of the project. 2
2.3 Need for the project and its importance to the country and
or region 2 -3
2.4 Demand-Supply Gap. 3
2.5 Employment Generation(Direct and Indirect) due to the project
3 -4
3.0 Project description 4
3.1 Product and Production Capacity 7
3.2 Raw materials required and Quantities 7
3.3 Manufacturing Process 7 - 8
3.4 Resource – Utilize and Recycling 8
3.4.1 Water 9
3.4.2 Power Requirement 9
3.4.3 Fuel Requirement 9
3.5 Quantity of wastes to be generated 9
3.5.1 Waste Water Generation and utilization 9
3.5.2 Solid waste generation and Disposal 10
3.6 Schematic representations of the feasibility drawing which give information of EIA purpose.
10
4.0 Site Analysis 11
4.1 Connectivity 11
4.2 Land Form, Land use and Land ownership. 11
4.3 Existing Infrastructure 11
4.4 Soil classification 11
4.5 Climatic data from secondary sources. 11
4.6 Social Infrastructure available. 12
5.0 Planning brief 12
6.0 Proposed infrastructure 12
6.1 Industrial Area 12
6.2 Residential Area 12
6.3 Green Belt: 12
6.4 Social Infrastructure 12
6.5 Water management 13
6.6 Sewerage System 13
6.7 Industrial Waste Management 13
7.0 Rehabilitation and Resettlement (R&R) Plan 13
8.0 Project Schedule and Cost estimates 13
9.0 Analysis of project 13
LIST OF TABLES
LIST OF FIGURES
Figure No Description Page no.
1.1 Location Map 5
1.2 Google Earth Map Showing Ajay Labs Private Limited 6
LIST OF FLOW CHART
Table No Description Page no.
2.1 Details of Proposed Employment for Proposed Project. 4
3.1 Proposed Products and Quantities & By Products Details
7
3.2 Water Requirement Details 8
3.3 Wastewater generation and Treatment Method 9
3.4 Solid and hazardous waste generation and Disposal 10
8.1 Project Cost 13
Flow Chart No
Description Page no.
3.1 Generalized Flow Chart for Bulk Drug Manufacturing 8
Pre Feasibility Report
Ajay Labs Private Limited Page 1
1.0 EXECUTIVE SUMMARY
Ajay Labs Private Limited is proposing to establish Bulk Drugs and Intermediates
Manufacturing unit at Sy No: 11/2B , Pochampally Village , Jaggaiahpet Mandal,
Krishna District, Andhra Pradesh. The proposed production quantity is 60
Tonns/Month.
S. No Parameter Description
1 Project Location Sy No: 11/2B , Pochampally Village , Jaggaiahpet
Mandal, Krishna District, Andhra Pradesh
2 Category of Project as per EIA
Notification & Amendments 5(f) “A”
3 Project cost 6.4 Crores
4 Area Acres 2. 62 Cents / 10602.76 Sq meters
5 Proposed Products Proposed Products List is mentioned in section
3.1
6 Resources
7 (I)Electricity Requirement 900 KVA
Source of electricity
Andhra Pradesh Southern Power Distribution
Company Limited (APSPDCL)
D. G. Sets 320 KVA X 2 no’s
8 (II)Water consumption 119 KLD
Source of water Ground Water
Waste water generation 39.26 KLD
9 (III)Boiler 4.0 TPH Coal Fired Boiler
10 (IV)Fuel Coal – 12 MT /Day for proposed boiler
Requirement
11 Mode of disposal Zero Liquid Discharge System
12 Solid waste generation Mentioned in Para 3.5.2 of report
13 Nearest Highway Hyderabad – Vijayawada National Highway –
1.0 Km (NE)
14 Nearest Railway Station Motumari Railway Station – 19 Kms (ENE)
15 Nearest Airport Vijayawada International Airport - 78 Kms
(ESE)
Pre Feasibility Report
Ajay Labs Private Limited Page 2
2.0 INTRODUCTION OF THE PROPOSED PROJECT
The objective of this pre- feasibility study is to provide information for the proposed
Bulk Drugs and Intermediates Manufacturing unit by Ajay Labs Private Limited at Sy
No: 11/2B, Pochampally Village, Jaggaiahpet Mandal, Krishna District, Andhra
Pradesh.
Ravi Ajay Chand is the Director of the company. He did B. Pharmacy and having 6
years experience in Bulk Drug and Intermediates manufacturing company and wants
to become an entrepreneur.
R Venu is the Director of the company. She did B.Sc and having 32 years
experience in various Pharma companies in the Production and Administrative
Departments.
2.1 Brief description of nature of the project.
Ajay Labs Private Limited is proposing to manufacture Bulk Drugs and intermediates
at Sy No: 11/2B, Pochampally Village, Jaggaiahpet Mandal, Krishna District, Andhra
Pradesh.
2.2 Need for the project and its importance to the country and or region
Ajay Labs Private Limited intended to start a Bulk Drugs and Intermediates
manufacturing unit at Sy No: 11/2B, Pochampally Village, Jaggaiahpet Mandal,
Krishna District, Andhra Pradesh.
Availability of the well-connected road and railway network for easy
transportation of the construction equipments and materials, Raw materials
and finished products.
Easy availability of skilled and unskilled labor for construction of Plant and its
operation.
Increase in population rate and continuous change in lifestyle and physical
environment is increasing the demand of drugs, medicines to address the wellbeing
of human kind. The sustainable development of Indian Pharmaceutical Industry is
important in order to make India one of the largest global providers of quality
medicines at reasonable prices.
The market of Pharmaceutical Drugs has fast progressing growth and there is ample
opportunity in indigenous as well as export market. With the ever increasing world
market demand for Pharmaceutical Drugs, the management having expertise in the
Pre Feasibility Report
Ajay Labs Private Limited Page 3
same field and has decided to enhance its manufacturing capacity. The project is
proposed with all required infrastructural facilities.
It is well known that Pharma industry in India as at a developing phase. The industry
is not tapped its fullest growth level. India has got great resources for drug
manufacturing. Drugs and medicine manufacturing Industry is going to grow with a
very high pace in the country. Globalization has opened doors and in future medicine
industry is seems to be having very bright in India.
Recognizing the scope of the potentials the Govt. of telangana has put more
emphasis on the development of Pharma industry and announced series of
incentives and subsidies. This scenario is helping to setup new manufacturing units.
It is pertinent to notice that, various industrial authorities of India that there is evenly
increase in knowhow about pharmaceutical products manufacturing in India, it is
seen that there is demand for pharmaceutical products in India as the substantial
population of globe resides in Asia itself.
2.3 Demand-Supply Gap
There is a quite considerable gap between supply and demand for, fine chemicals,
bulk drugs and intermediates. Very few players are in the market who can offer
continuous supply. The company wants to bridge this gap between demand and
supply by expanding the production capacity and thereby, making good business.
Company's marketing edge comes from its direct and close contact with the
customers. Their products are major strength of their customers. Each stage of their
product is been monitored /checked for their quality to ensure quality product
reaches their customer. They plan to launch new products every year to satisfy the
need of their customers as per the market demand.
2.4 Employment Generation (Direct and Indirect) due to the project
Approximate employment generation due to proposed proposal is 60. Apart from this
there will be significant non estimated employment generation at the supplier firms
and service industry providing services to the company. Company shall be giving
preference to people from economically weaker sections for employment in various
semi-skilled/unskilled jobs thereby contributing to their upliftment.
Pre Feasibility Report
Ajay Labs Private Limited Page 4
Table 2.1: Details of Proposed Employment for Project
Sl. No. Manpower Total No.
1 Un-Skilled 20
2 Skilled 35
3 Managerial &Supervisory 5
3.0 Project Description
Ajay Labs Private Limited is proposing to Manufacture Bulk Drugs and
Intermediates with production capacity of 75 TPM
The Location map is shown at Figure - 3.1 and Google earth map showing Ajay
Labs Private Limited plant is shown at Figure - 3.2.
The site coordinates are
Latitude: 16°51'47.57"N
Longitude: 80°10'13.01"E
The project site does not offer any negative impact on the local area, but rather has
a positive impact on socio economic conditions of the habitants around it because of
employment to locals.
The Ajay Labs Private Limited is 1.0 Kms away from away from Hyderabad –
Vijayawada National Highway and 18 Kms from Motumari Railway Station.
Pre Feasibility Report
Ajay Labs Private Limited Page 5
FIGURE 1.1: LOCATION MAP
Pre Feasibility Report
Ajay Labs Private Limited Page 6
FIGURE 1.2: GOOGLE EARTH MAP SHOWING AJAY LABS PRIVATE LIMITED
PRE FEASIBILITY REPORT
Ajay Labs Private Limited Page 7
3.1 Product and Production Capacity
Ajay Labs Private Limited proposing to produce below mention products with
Manufacturing Capacity of 75 TPM and the list of products and by-products are
shown in Table 3.1.
Table 3.1: Proposed Product and Quantity
S. No
Name of the Product CAS No Thereputic Categeory
Quantity in
Kg/Month
1 Atorvastatin Calcium Trihydrate 344423-98-9
Lipid-Lowering Agent
5000
2 Darunavir 206361-99-1 Antiretroviral 5000
3 Levetiracetam 102767-28-2 Anticonvulsant 10000
4 Montelukast Sodium 151767-02-1 Antasthmatic 10000
5 Tri Ethyl Ortho Formate 122-51-0 Drug Intermediate
20000
6 Di Cyclohexyl Carbo Di Imide
538-75-0 Drug Intermediate
20000
7 Curcumin 458-37-7
Anti-Inflammatory And Anti-Oxidant
5000
Total 75000.00
Table 3.1: List of By-products
S. No Name of the
Product Name of the By-Product
Quantity in
Kg/Batch
Quantity in Kg/Day
1 Darunavir Isobutene 60.36 20.12
1-Hydroxy-pyrrodiline-2,5-dione 107.60 35.86
3.2 Raw materials required and Quantities
All the raw materials required for manufacturing of above products will be sourced
from local market. The products wise required raw materials and quantities are
enclosed in additional information.
3.3 Manufacturing Process
The manufacturing process of bulk drugs consists of chemical synthesis extending
to stages of processing involving different type of chemical reactions. The
generalized Flow chart for bulk drug manufacturing is shown in Flow chart 3.1.
PRE FEASIBILITY REPORT
Ajay Labs Private Limited Page 8
Flow Chart 3.1: Generalized Flow Chart for Bulk Drug Manufacturing
3.4 Resource – Utilize & Recycling
3.4.1 Water
Water requirement of the project for domestic and industrial activity during operation
phase will be 119 KLD. The water requirement will be met through Ground water
Supply. The detailed water requirement shown in below Table 3.2
Table 3.2: WATER REQUIREMENT DETAILS
S. No. Purpose Water Requirement
in KLD
1 Process 16
2 Floor & Reactor Washings 6
3 Boiler make up 23
4 Cooling towers make up 63
5 Domestic 4
6 Scrubber 4
7 Gardening 3
Total 119
PRE FEASIBILITY REPORT
Ajay Labs Private Limited Page 9
3.4.2 Power Requirement
Power requirement of proposed project will be made available through Andhra
Pradesh Southern Power Distribution Company Limited (APSPDCL) .The total power
requirement for the unit is 900 KVA respectively
Two numbers of D.G. set with 320 KVA will be proposed to install to meet the
emergency power requirement of the plant.
3.4.3 Fuel Requirement
The company proposed to install 4.0 TPH Coal fired Boiler. The total Coal
requirement will be around 12 TPD and it will be procured from local sources.
3.5 Quantity of wastes to be generated
3.5.1 Waste Water Generation and utilization
Total effluent generated in the project is 39.26 KLD. The treated water will be reused
for plant operations.
The HTDS waste water from Process after neutralization taken for treatment in
stripper followed by MEE and ATFD. LTDS waste water including domestic sewage,
floor Washes, Utilities waste water taken along with Vapour Condensate from MEE &
ATFD for Biological Effluent Treatment plant. Treated effluent from ETP sent to RO
and RO permeate water is recycled and RO rejects are sent to MEE followed by
ATFD for evaporation. Evaporation salts collected and sent to TSDF. MEE & ATFD
vapour condensate reused along with RO permeate.
Table 3.3: Wastewater generation and Treatment Method
S. No. Purpose Water Requirement
in KLD
1 Process 16
2 Floor & Reactor Washings 6
3 Boiler make up 23
4 Cooling towers make up 63
5 Domestic 4
6 Scrubber 4
7 Gardening 3
Total 119
3.5.2 Solid / Hazardous waste generation and Disposal
The types of Solid and Hazardous wastes generated from the project, method of
disposal is shown in below table 3.4.
PRE FEASIBILITY REPORT
Ajay Labs Private Limited Page 10
Table 3.4: Solid / Hazardous waste generation and Disposal
S. No Name of the
Hazardous Waste Quantity Kg/Day
Disposal Method
1 Organic Solid Waste 1086
Sent to Cement Industries
2 Spent Carbon 12
3 Solvent distillation residue 148
4 Organic distillate from Stripper
166
5 ETP Sludge 100 Sent to TSDF
6 MEE Salts 1306
7 Inorganic solid waste 2305
8 Used Oils 300
Ltrs/Annum
SPCB Authorized Agencies for Reprocessing/Recycling
9 Detoxified Container/liners 600
No's/Month
After Detoxification sent back to suppliers/sent to outside Parties
10 Used Lead Acid Batteries 4 No's /Annum Sent back to suppliers on buyback basis
11 Fly ash from boiler 5600 Sent to Brick Manufacturers
3.6 Schematic representations of the feasibility drawing which give
information of EIA purpose.
The applicability of the S.O 1533 for the proposed project was explored by
considering different possibilities & provision made in the said notification.
Considering the products & project location of the proposed project it is noticed that
the proposed project falls under Category 5 (f) “A” of the Schedule-I of EIA
Notification SO 1533.
As per the provision of the SO 1533, it is necessary to get Environmental Clearance
by applying to MoEF & CC along with the Environmental Impacts Assessment Study
Report for the proposed project prior to commissioning of the project activities.
Therefore the EIA is required to conduct to comply with provisions of SO 1533 made
for Category 5(f) “A” of schedule –I of the notification.
4.0. Site Analysis
4.1 Connectivity
The nearest habitation from the site is Gauravaram at a distance of 2.5 Kms
(E).
PRE FEASIBILITY REPORT
Ajay Labs Private Limited Page 11
The nearest railway station is at Motumari Railway Station at a distance of 19
Kms (ENE) from the site.
The nearest airport is Vijayawada International Airport at a distance of 78 Km
(ESE)
The Nearest road ways is Hyderabad – Vijayawada National Highway – 1.0 Km (NE)
4.2 Land Form, Land use and Land ownership.
The land use of the Acres 2. 62 Cents / 10602.76 Sq meters will be permanently
changed to industrial purpose.
4.3 Existing Infrastructure.
The proposed project is a Greenfield project which Hyderabad – Vijayawada
National Highway – 1.0 Km (NE) and Mandal head quarters Jaggaiahpet is 7.0 Km
(NW) from the site.
4.4 Soil classification
The predominant soils in the district are
Red soils Black soils Alkaline soils Alluvium
4.5 Climatic data from secondary sources.
Temperature Maximum: 47.1 oC
Minimum: 9.3 oC
Average Annual Rainfall:982 mm
(Source: IMD- Nandigama)
4.6 Social Infrastructure available.
Well developed social infrastructure facilities are available at nearby Habitations.
5.0 Brief Planning
Proposed plant activities will be started after getting statutory clearance form related
authorities. The project will be completed within two years.
Further proposed project activities will take care of all the rules and regulations of
statutory authorities and provide the control measure and devices to achieve the
standard norms
PRE FEASIBILITY REPORT
Ajay Labs Private Limited Page 12
6.0 Proposed Infrastructure
6.1 Industrial Area
The infrastructure and other facilities are already well developed in Jaggaiahpet
which is a Mandal head quarters.
6.2 Residential Area
The employees who will work in the industry are from nearby habitations and hence
no proposal for residential area for employees.
6.3 Green Belt:
Proposed to develop green belt in an area of 4449 Sq. mtrs, i.e 42 % out of the total
area 10602.76 Sq. mtrs
6.4 Social Infrastructure:
Facilities like roads, communication: Banks, ATM's and medical facilities are
adequate.
Amenities:
Education- schools including middle, secondary and higher secondary schools,
social welfare hostels.
Medical and Health- Community Health Centre & Primary Health center and all
multispecialty Medical facilities are available at Jaggaiahpet which is 7.0 Kms (NW)
of proposed project site.
Power and water- All the villages are electrified and drinking water facilities are
extended to all villages.
Rail and Road- The project site is very well connected by road at 1.0 kms away from
Hyderabad –Vijayawada National Highway and nearest railway station is Motumari
at a distance of 26 Km
6.5 Water management
Water requirement will be met from ground water supply.
6.6 Sewerage System:
There will be no discharge of industrial effluent as company proposing Zero Liquid
Discharge (ZLD) system. The treated effluent will be reused.
PRE FEASIBILITY REPORT
Ajay Labs Private Limited Page 13
6.7 Industrial Waste Management:
The effluent from cooling and Plant/Equipment washing will be generated and
treated in the well designed Effluent Treatment Plant. The treated effluent will be
reused.
7.0 Rehabilitation and Resettlement (R & R) Plan
Rehabilitation & Resettlement (R&R) plan is not applicable to this proposed project.
8.0 Project Schedule & Cost Estimates
Proposed project activities will be started after getting statutory clearance form
related authorities. The project will be completed within two years. Proposed activity
will provide benefits to the local people in terms of financial and social welfare.
The project cost for proposed activity is 6.4Crores will be used for constructing
additional building, Equipments & misc.
TABLE 8.1: PROJECT COST
S. No Particulars Rs. Crores
1 Land 0.4
2 Civil Works 1.0
3 Plant & Machinery 5.0
Total 6.4
9.0 Analysis of proposal (Final Recommendations)
Local people will get direct financial benefit by way of employment.
Local people will get some contracts of supply and services to get indirect
income.
Company will contribute in improving education and health facilities in nearby
area.