2
Popular Internet companies offer services to millions of users everyday.
These services are hosted in geographically distributed datacenters.
No public information about how they select the locations
Introduction
3
Introduction
AustinPUE: 1.39Land: 0.394 $/SFEnergy: 0.066 kWhWater: 0.40 cents/galCO2: 569 g/kWh
4
Introduction
BismarkPUE: 1.20Land: 0.434 $/SFEnergy: 0.062 kWhWater: 0.32 cents/galCO2: 869 g/kWh
5
Introduction
Los AngelesPUE: 1.41Land: 0.638 $/SFEnergy: 0.099 kWhWater: 0.33 cents/galCO2: 286 g/kWh
6
Introduction
New YorkPUE: 1.29Land: 3.460 $/SFEnergy: 0.096 kWhWater: 0.35 cents/galCO2: 960 g/kWh
7
Introduction
OrlandoPUE: 1.42Land: 0.272 $/SFEnergy: 0.081 kWhWater: 0.23 cents/galCO2: 541 g/kWh
8
Introduction
SeattlePUE: 1.19Land: 0.987 $/SFEnergy: 0.041 kWhWater: 0.65 cents/galCO2: 120 g/kWh
9
Introduction
St. LouisPUE: 1.32Land: 0.264 $/SFEnergy: 0.047 kWhWater: 0.21 cents/galCO2: 806 g/kWh
10
Framework for placement - Parameters
Cost Capital Expenses (CAPEX): investments made upfront and depreciated over the lifetime of the datacenter
– CAP_ind: independent of the number of servers. • Bringing the electricity and external networking.
– CAP_max: maximum number of servers that can be hosted• Land adquisition
• Datacenter construction
• Purchasing and installing power delivery infrastructure
• Cooling infrastructure
• Backup infrastructure
– CAP_act: purchasing the servers and internal networking gear
11
Framework for placement - Parameters
Cost Operational Expenses (OPEX): costs incurred during the operation of the datacenters
– OP_act: maintenance and administration of the equipment and external networking bandwith.• Domined by the staff compensation.
– OP_utl: electricity and water costs involved in running the servers
Lower taxes and incentives
12
Framework for placement - Parameters
Response Time: Latency between a population center and a location.
– Latency(c, d): latency between a location d and a center c.
– Pcd: Number of servers at a location d that serve request from c
– Servers(c): Number of servers required by the center c
Consistency Delay: time required for state changes to reach all mirrors
– Latency (d1, d2): one-way latency between the locations d1 and d2.
Availability: depends on the network avalability of all the datacenters
CO2 emissions: determined by the type of electricity consumed
– Emissions(d): carbon emissions (g/Kwh) at location d.
13
Framework for placement – Formulation
Inputs:– Maximum number of servers – Expected average utilization for the servers– Number of user that each server can accomodate– Amount of redundancy– Latencies and availability constraints– CAPEX and OPEX for each location– Latencies between any population center and each location– Latencies between any two locations
14
Framework for placement – Formulation
Outputs:– Optimal cost
– Maximum number of servers at each location– Number of servers that service a population center at a location
15
Framework for placement – Solutions
Simple linear programming (LP0)– Simplifies the equation to check if a datacenter must be placed at a
location and which centers it provides. Proportionally assigns the max number of servers and computes the network costs with the original one
Pre-set linear programming (LP1)– Presets if a location contains a datacenter and its size and removes
the centers which are provided variable.
Bruteforce (Brute)– Generates all the possibilities and tests them using the LP1
approach
16
Framework for placement – Solutions
Heuristic Based on LP (Heuristics)– Generates 10 possible datacenter networks for each number of
datacenters using LP0 applies the LP1 algorithm and sorts the results in increasing order of cost and finally runs the bruteforce method on a small set of solutions to obtain the most efficient.
Simualted Annealing plus LP1(SA+LP1)– SA starts with a configuration that fulfills the constraints and
evaluates the neighbors obtained using LP1. The solution is selected when there is no cost improvement within an iteration interval.
Optimized SA+LP1(OSA+LP1)– Adjusts the results of the LP1: when no servers are assigned to a
datacenter, it is removed.
17
Placement tool
User only specifies:– Area of interest– Granularity of the potentials datacenters– Location of existing datacenters– Max number of Servers– Ratio of user per server– Max latency between – Max delay– Min availability
The toolkit obtains the missing data to compute the best datacenter network in order to fulfill the user constraints.
18
Placement tool
19
Placement tool60k serversLatency <60msDelay <=85 msAvailability >= 0.99999
31789
22712
5501
20
Exploring datacenter placement tradeoffs
Latency– Latencies > 70 ms have the same cost– Latency = 50 ms is the best tradeoff between latency and cost– Latencies < 35 doubles the cost of 50 ms
Availability– Less level Tier datacenters more datacenters– It’s cheaper to achive an avaiability level with more low-level Tier
datacenters than with less high-level datacenters.– TierII datacenters are the best option
21
Exploring datacenter placement tradeoffs
Consistency delay– Low consistency delays and low latency are conflicting goals– Low consistency delays implies less datacenters and lower costs
Green Datacenters– When latencies can be relatively high, a green datacenter is less
expensive than $100K a month.
Chiller-less datacenters– Water chillers increases energy consumption by 20% and
building costs by 30%. Necessary for locations with an average temperature over 20ºC.
– Avoiding chillers is feasable when latencies are over 70 ms. It reduces costs by an 8%.