Integrated Subsurface Surface Modelling for Complete Uncertainty … · Roxar METTE™ provided:...

15
Emerson Confidential Integrated Subsurface Surface Modelling for Complete Uncertainty Quantification and Optimum Recovery Hafiz Azmi Senior Reservoir Engineer Intsok - Perth, November 16 th

Transcript of Integrated Subsurface Surface Modelling for Complete Uncertainty … · Roxar METTE™ provided:...

  • Emerson Confidential

    Integrated Subsurface – Surface Modelling for Complete Uncertainty Quantification and Optimum Recovery

    Hafiz Azmi

    Senior Reservoir Engineer

    Intsok - Perth, November 16th

  • 2 Emerson Confidential

    Roxar Is a Brand of Emerson, a Leading Global Solution Provider to The Oil & Gas Industry

  • 3 Emerson Confidential

    Roxar Software Solutions From Reservoir to Process Facility

    Geophysics Reservoir Engineering Production

    Optimization Geomodeling

    TEMPEST RMS

    Petrophysics

    METTE

    ENABLE MORE VIEW

    AHM,Optimization

    Uncertainty Analysis

    Reservoir Flow

    Simulation

    Visualization &

    Post-processing

    A Wide Workflow:

    From Seismic To Flow

    Simulation Modeling

    Roxar RMS™

    Reservoir Engineering

    Throughout the Reservoir Life

    Cycle

    Roxar Tempest™

    Production optimization through

    Pipeline Simulation and

    Integrated Modeling

    Roxar METTE™

  • 4 Emerson Confidential

    Integrated Subsurface – Surface Modelling

    Integrated Production

    Management

    Roxar Software Solutions portfolio expands

    with integrated Production Management

    Production optimization

    Virtual Metering

    Transient simulation

    Seismic Interpretation

    Reservoir Flow Simulation

    Reservoir Modeling

  • 5 Emerson Confidential

    Application Oil field development

    solution

    Roxar METTE™

    SOLUTION

    Gas capped oil field with gas lift; 3 interconnected reservoirs:

    First oil expected in 2016 , and expected lifetime of 20 years

    What is the optimum development scenario?

    Integrated approach mandatory due to tight schedule and

    limited resources

    Artificial lift and pressure boosting effect evaluation inluding

    multiphase pumps with predicted gas lift and power needs

    CHALLENGE

    A comprehensive integrated flow assurance solution, including

    production network optimization

    RESULTS

    Success Story - Integrated Production Management Oil Field – North Sea

  • 6 Emerson Confidential

    Application Oil field development

    solution

    Roxar METTE™ provided:

    Multiple production targets from individual reservoirs under facilities constraint

    Optimized gas lift use - effect of gas lift supply pressure.

    Gas lift service network integrated with production network.

    SOLUTION

    Success Story - Integrated Production Management Oil Field – North Sea

    Project required

    fixed delivery

    pressure at final

    processing facility

  • 7 Emerson Confidential

    Flow Performance Performance analysis for single well and flow line – under any condition

    • Find adequate tubular size • Quantify effect of artificial lift and pressure boosting • Analyze insulation effect on thermal profile • Evaluate impact of parameter changes

    Wellbore modelling

    Application Model phase flows and

    pressure drops

    downhole

  • 8 Emerson Confidential

    Integrated Field Modeling – Life Of Field Simulation Optimal network design and modeling with unique performances

    • Seamless connection to multiple reservoir processes • Realistic life-of-field modeling and optimization • User defined events • Interconnected services and production networks

    Integrated Subsurface – Surface Modelling & Optimization

    Application Simulate fluid flow from

    reservoir across

    topside with underlying

    facilities constraint

  • 9 Emerson Confidential

    • Interpret well flow from sensor for accurate production allocation

    • Validate flow models with reference data • Combine with reservoir models • Optimize production

    Virtual Metering Cost-effective production monitoring

    Production alllocation

    Validate flow models against reference data

    Application Real-time application

    on fluid flow

    measurement

  • 10 Emerson Confidential

    Transient Simulation Full Control of Time-Dependent Behaviors

    • Simulate and test critical procedures like start-up and shut-down

    • Analyze inadvertent events like accidental valves openings or choke collapse

    • Validate / test / establish PID controller parameters

    Get the most out of your reservoir by minimizing downtime

    Keep control of well start-up or shut-down procedures

    Transient modelling

    Application Analyse start-up and

    shut-down conditions

  • 11 Emerson Confidential

    Complete Uncertainty Quantification The Big Loop Solution

    Geophysics Petrophysics Geology Reservoir Engineering

    Uncertainties Uncertainties Uncertainties

    Geophysics Petrophysics Geology Reservoir Engineering

    Uncertainties propagated from where they belong to where they matter

  • 12 Emerson Confidential

    Workflow automation is a foundation and ensures reproducibility

    The Solution

  • 13 Emerson Confidential

    Align Assets From Seismic to Simulation

    Before history match

    History match using

    traditional simulation

    workflow

    History match using both

    the simulation and

    geomodeling tools as part

    of the workflow

    A Collaborative Approach

  • 14 Emerson Confidential 14 Emerson Confidential

    Closing Remarks

    Increase your production, not your costs!

    Respond quickly to

    exceptions and events in

    production conditions

    Operate Safely

    Select the right

    development solution to

    increase efficiency and

    production

    Maximize Production

    Minimize downtime

    without compromising

    productivity

    Reduce Costs

    Honor uncertainties

    across the workflow in

    order to fully understand

    your models and give

    confident predictions

    Increase Confidence

    Share data and

    responsibilities between

    asset teams throughout

    the workflow

    Share Responsibilities

    Save time and money

    with efficient model

    updates from automated

    and repeatable

    workflows

    Improve Efficiency

  • Emerson Confidential

    Thank You!