Integra Consult A/S November 2005Dhaka, Bangladesh Safety Assessment Projects Dhaka, Bangladesh...

5
November 2005 Dhaka, Bangladesh Integra Consult A/S Safety Assessment Safety Assessment Projects Projects Dhaka, Bangladesh Dhaka, Bangladesh Integra Consult A/S Integra Consult A/S

Transcript of Integra Consult A/S November 2005Dhaka, Bangladesh Safety Assessment Projects Dhaka, Bangladesh...

Page 1: Integra Consult A/S November 2005Dhaka, Bangladesh Safety Assessment Projects Dhaka, Bangladesh Integra Consult A/S.

November 2005 Dhaka, Bangladesh Integra Consult A/S

Safety AssessmentSafety AssessmentProjectsProjects

Dhaka, BangladeshDhaka, Bangladesh

Integra Consult A/SIntegra Consult A/S

Page 2: Integra Consult A/S November 2005Dhaka, Bangladesh Safety Assessment Projects Dhaka, Bangladesh Integra Consult A/S.

November 2005 Dhaka, Bangladesh Integra Consult A/S

RegulatorRegulator

• Regulator will, through the Regulator will, through the Regulatory Framework require that:Regulatory Framework require that:

– The ANSP demonstrate that an The ANSP demonstrate that an acceptable level of safety will be met acceptable level of safety will be met and users have been consulted.and users have been consulted.

Page 3: Integra Consult A/S November 2005Dhaka, Bangladesh Safety Assessment Projects Dhaka, Bangladesh Integra Consult A/S.

November 2005 Dhaka, Bangladesh Integra Consult A/S

Regulatory RequirementsRegulatory Requirements

• Before we startBefore we start– Acceptable levels of safety needs to be agreed Acceptable levels of safety needs to be agreed

(Safety Objective Classification Scheme - SOCS)(Safety Objective Classification Scheme - SOCS)– Appropriate SSA process needs to be agreed Appropriate SSA process needs to be agreed

tailored to the type and complexity of the changetailored to the type and complexity of the change

• HowHow– ANSP proposes an appropriate SSA process and ANSP proposes an appropriate SSA process and

associated SOCS prior to commencement of a associated SOCS prior to commencement of a procurement / change projectprocurement / change project

– Regulator approveRegulator approve

Page 4: Integra Consult A/S November 2005Dhaka, Bangladesh Safety Assessment Projects Dhaka, Bangladesh Integra Consult A/S.

November 2005 Dhaka, Bangladesh Integra Consult A/S

Regulatory RequirementsRegulatory Requirements

• When we finishWhen we finish– ANSP demonstrates that an acceptable ANSP demonstrates that an acceptable

level of safety will be achieved considering:level of safety will be achieved considering:•EquipmentEquipment

•PeoplePeople

•ProceduresProcedures

– ANSP demonstrates that measures are in ANSP demonstrates that measures are in place for post-implementation monitoringplace for post-implementation monitoring

Page 5: Integra Consult A/S November 2005Dhaka, Bangladesh Safety Assessment Projects Dhaka, Bangladesh Integra Consult A/S.

November 2005 Dhaka, Bangladesh Integra Consult A/S

Regulator

ANSP

User

Project

RegulatoryRequirement

SSATargetsProcess

RegulatoryApproval

Procedure

SMS

FHA PSSA SSA

SystemReq.

Systemdesign

Imple-mentation

Accep-tance

SystemSafetyCase

RegulatoryApproval

SystemSafety

Endorsement

Transition

TransitionSafetyCase

RegulatoryApproval

SystemCertifi-cation

SSAPlan

FHAReport

PSSAReport

ICAOProvisions

2.26.2 As of 27 November 2003, the acceptable level ofsafety and safety objectives applicable to the provision of ATSwithin airspaces and at aerodromes shall be established by theState or States concerned.

2.26.5 Any significant safety-related change to the ATC system, including the implementation of a reduced separation minimum or a new procedure, shall only be effected after a safety assessment has demonstrated that an acceptable level of safety will be met and users have been consulted.

When appropriate, the responsible authority shall ensure that adequate provision is made for post-implementation monitoring to verify that the defined level of safety continues to be met.