    Sl. No. Particulars

    Means of

    Verification/Source of

    Information

    Page

    Reference

    Claim verified and

    certified to be

    accurate by CTSA

    A C D E

    1

    1.1 Sanction Order Reference No. Yes/No

    1.2 Name of Implementation Agency Yes/No

    1.3 Project sanction date Yes/No

    1.4 Project Durat ion Yes/No

    1.5 Project Start Date Yes/No

    1.6Project Start Date/ Project

    Commencement DateYes/No

    1.7 Project End Date Yes/No

    1.8State in which project is to be

    implementedYes/No

    1.9.iCentral Share Yes/No

    1.9.ii State Share Yes/No

    1.9.iii PIA Contribution

    For contribution in kind,

    attach CA certificate. For

    Cash, audited account

    statement

    Yes/No

    1.9.iv Total Cost of the Project From Sanction Order Yes/No

    1.9.v Revision if any to cost of project From Revision order Yes/No/NA

    1.10 In case of Revised Project Cost

    1.10.i Central Share (Revised)

    1.10.ii State Share (Revised) Yes/No/NA

    1.10.iii PIA Contribution (Revised)

    For contribution in kind,

    attach CA certificate. For

    Cash, audited account

    statement

    Yes/No/NA

    1.10.iv Total Revised Cost of the Project From Revision order Yes/No/NA

    ________________________________________________

    ________________________________________________

    ________________________________________________

    From Revision order

    ________________________________________________

    Yes/No/NA

    FORMAT FOR REQUEST FOR FUND RELEASE OF 2ND /3RD /4TH INSTALLMENT OF CENTRAL SHARE OF PROJECTS SANCTIONED UNDER DDU-GKY / ROSHNI

    ________________________________________________

    __ __ / __ __ / __ __ __ __

    ________________________________________________

    From Sanction Order________________________________________________

    ________________________________________________

    ________________________________________________

    Project Information / Details

    ________________ years

    __ __ / __ __ / __ __ __ __

    __ __ / __ __ / __ __ __ __

    From Sanction Order

    Project Commencement

    Certificate from TSA

    All information below has been provided on and is upto date until __________________ (DD/MM/YYYY)

    Details / Observations

    B

    __ __ / __ __ / __ __ __ __

    From Sanction Order

    FORMAT FOR REQUEST FOR FUND RELEASE OF 2ND /3RD /4TH INSTALLMENT OF CENTRAL SHARE OF PROJECTS SANCTIONED UNDER DDU-GKY / ROSHNI (Version 1.0) dated 21st, December, 2015

  • 7/23/2019 Installment Request Checklist IFD Approved

    2/12

    Sl. No. Particulars

    Means of

    Verification/Source of

    Information

    Page

    Reference

    Claim verified and

    certified to be

    accurate by CTSA

    A C D E

    Details / Observations

    B

    1.12 Unit Cost per beneficiary

    Calculate on basis on

    number of candidates to

    be trained (1.10) and

    total cost of project (1.9)

    Yes/No

    Yes/No

    Yes/No

    Yes/No

    Yes/No

    Yes/No

    Yes/No

    Yes/No

    Yes/No

    Yes/No

    Yes/No

    1.14 Provide a list of assets created, if any Attach CA certification Yes/No

    1.15Were the above assets approved in the

    project proposal?Yes/No/NA

    1.16Whether outsourcing has been proposed

    and approved?Sanction Order Yes/No

    ________________________________________________

    Trade Duration of Training (in months)

    1.11

    Quote the original as

    well as the revised

    numbers as per MoU

    and project target. Incase of revisions, attach

    duly signed copies of

    approval

    Yes/No

    1.13

    Total number of beneficiaries

    Trades approved for training in thesanction.

    To be trained To be placed

    Yes/No

    Yes/No

    Agenda & Minutes of

    PAC

    Add additional rows ifmore than 10 trades

    were approved.

    FORMAT FOR REQUEST FOR FUND RELEASE OF 2ND /3RD /4TH INSTALLMENT OF CENTRAL SHARE OF PROJECTS SANCTIONED UNDER DDU-GKY / ROSHNI (Version 1.0) dated 21st, December, 2015

  • 7/23/2019 Installment Request Checklist IFD Approved

    3/12

    Sl. No. Particulars

    Means of

    Verification/Source of

    Information

    Page

    Reference

    Claim verified and

    certified to be

    accurate by CTSA

    A C D E

    Details / Observations

    B

    Yes/No/NA

    Yes/No/NA

    Yes/No/NA

    Yes/No/NA

    Yes/No/NA

    2

    2.1 Has the project period expired? Sanction Order Yes/No

    2.2If project is ongoing, has the project been

    duly approved for extension?Attach Approval letter Yes/No

    2.3

    Is there a requirement for project

    extension?

    If No, Skip to next

    section Yes/No/NA

    2.4 Required Extension Period

    Enclose detailed action

    plan on how this is to be

    achieved

    Yes/No/NA

    2.5 Provide Reason for requiring extension TSA recommendation Yes/No/NA

    2.6Has a detailed action plan been prepared

    to explain how this will be achieved?

    Enclose detailed action

    planYes/No/NA

    2.7Has a detailed action plan been certified

    by TSA?

    Enclose detailed action

    planYes/No/NA

    3

    3.1 Whether signed MoU has beenattached?

    Yes/No

    3.2

    Has the project been implemented as

    per conditions of PAC /EC /Sanction

    Order (as applicable)?

    Stamped

    affadavit/certificate

    required by CEO of PIA,

    or designated authority

    approved by Board of

    Directors

    Yes/No

    ______ in months

    Yes/No/NA

    Yes/No/NA

    Yes/No

    Terms & Conditions

    Yes/No

    Yes/No

    Outsourced Activity Agency Cost of Outsourcing (Per annum)

    Yes/No

    Yes/No

    Project Extension

    1.17List the areas where outsourcing hasbeen done, and to which agency and

    cost of outsourcing (per annum)

    Sanction Order andcontracts with

    outsourcing agencies

    FORMAT FOR REQUEST FOR FUND RELEASE OF 2ND /3RD /4TH INSTALLMENT OF CENTRAL SHARE OF PROJECTS SANCTIONED UNDER DDU-GKY / ROSHNI (Version 1.0) dated 21st, December, 2015

  • 7/23/2019 Installment Request Checklist IFD Approved

    4/12

    Sl. No. Particulars

    Means of

    Verification/Source of

    Information

    Page

    Reference

    Claim verified and

    certified to be

    accurate by CTSA

    A C D E

    Details / Observations

    B

    3.3

    Whether the PIA has complied with the

    provisions of standard Terms &

    Conditions

    Conditions listed in

    Sanction.

    Provide Stamped

    affadavit/certificate

    Yes/No

    3.4Whether the PIA has complied with

    special Terms & Conditions

    Conditions listed in

    Sanction.

    Provide Stamped

    affadavit/certificate

    Yes/No

    4

    3 months 6 months 12 months Total

    Yes/No

    Yes/No

    Total training target required for release

    of installment in case of:

    2nd installment (10% of total target) Yes/No

    3rd installment (67.5% of total target) Yes/No

    4th installment (100% of total target) Yes/No

    9 months1) Total should match

    with numbers provided

    in project details in

    Section 1.

    2) Information should be

    sourced from the MoU.Non-residential

    Residential

    Type of course

    Physical progress in project

    Yes/No

    Total training target for the project

    (in no. of candidates)4.1

    4.2

    Yes/No

    FORMAT FOR REQUEST FOR FUND RELEASE OF 2ND /3RD /4TH INSTALLMENT OF CENTRAL SHARE OF PROJECTS SANCTIONED UNDER DDU-GKY / ROSHNI (Version 1.0) dated 21st, December, 2015

  • 7/23/2019 Installment Request Checklist IFD Approved

    5/12

    Sl. No. Particulars

    Means of

    Verification/Source of

    Information

    Page

    Reference

    Claim verified and

    certified to be

    accurate by CTSA

    A C D E

    Details / Observations

    B

    Total training target categories

    Scheduled Caste/ Scheduled Tribe Yes/No

    Minorities Yes/No

    Women Yes/No

    Other Yes/No

    Total Yes/No

    4.4Has the required training target been

    been achieved in terms of:Yes/No

    4.4.i Targets l isted in 4.2

    4.4.ii Targets listed in 4.3 Yes/No

    4.6 Total number of BPL candidates trained

    4.7Whether the PIA has given training in the

    approved trades?Yes/No

    4.8Has the required placement target been

    achieved?Yes/No

    4.9Has placement met minimum wage

    requirements as per guidelines?

    Provide minimum wage

    act of concerned state(s)

    relevant for each trade

    Yes/No

    Yes/No

    Yes/No

    Yes/No

    Yes/No

    Yes/NoTotal To Be Trained Total Trained

    Yes/NoTotal To Be Trained Total Trained

    Total Trained Percentage Achieved

    Total Trained Percentage Achieved

    3 months course

    Attach MIS generated

    candidate list, plus field

    inspection report by TSA

    Total To Be Trained

    12 months course

    Yes/No

    Percentage Achieved

    9 months course

    Yes/No

    Percentage Achieved

    4.5

    For 4th Installment release,

    list achievement in each course duration

    (in no. of candidates)

    Yes/No

    6 months course

    Yes/No

    Yes/No

    Yes/No

    4.3

    Yes/No

    Yes/No

    -

    Total To Be Trained

    Total no. of candidates to be

    trained for being eligible for

    2nd

    /3rd

    /4th

    Installment

    Total no. of candidates trained

    by PIA

    Whether the shortfall is within 5% of the

    target for the sub-category?

    FORMAT FOR REQUEST FOR FUND RELEASE OF 2ND /3RD /4TH INSTALLMENT OF CENTRAL SHARE OF PROJECTS SANCTIONED UNDER DDU-GKY / ROSHNI (Version 1.0) dated 21st, December, 2015

  • 7/23/2019 Installment Request Checklist IFD Approved

    6/12

    Sl. No. Particulars

    Means of

    Verification/Source of

    Information

    Page

    Reference

    Claim verified and

    certified to be

    accurate by CTSA

    A C D E

    Details / Observations

    B

    Total placement target required for

    release of installment in case of:

    2nd installment (75% of target) Yes/No

    3rd installment (75% of target) Yes/No

    4th installment (75% of target) Yes/No

    4.11Number of placed candidates continuing

    work, as per PIA?Yes/No

    4.12 Physical status of training centresField inspection report

    by TSA.Yes/No

    4.13 Whether the MIS has been updatedRelevant screenshots to

    be attached.Yes/No

    5

    5.1Has the CTSA monitoring report withregard to training and placement under

    previous instalment been attached?

    Yes/No

    5.2

    Whether any complaints have been

    raised regarding implementation of

    project?

    Documentary proof of

    complaintYes/No

    Yes/No/NA

    Yes/No/NA

    Yes/No/NA

    Yes/No/NA

    Yes/No/NA

    Yes/No/NA

    Yes/No/NA

    4.10

    Placement target should

    be at least 75% of

    training target

    Yes/No

    Details of Complaint Compliance by PIA

    Performance Monitoring

    Yes/No

    TSA observation and

    compliance report and

    documentary proof ofcomplaints. Add rows if

    required

    5.3 Provide details of complaints

    Proposed Action by CTSA

    in case of non-compliance

    _____________________________________

    Yes/No

    FORMAT FOR REQUEST FOR FUND RELEASE OF 2ND /3RD /4TH INSTALLMENT OF CENTRAL SHARE OF PROJECTS SANCTIONED UNDER DDU-GKY / ROSHNI (Version 1.0) dated 21st, December, 2015

  • 7/23/2019 Installment Request Checklist IFD Approved

    7/12

    Sl. No. Particulars

    Means of

    Verification/Source of

    Information

    Page

    Reference

    Claim verified and

    certified to be

    accurate by CTSA

    A C D E

    Details / Observations

    B

    6

    6.1 Total interest earned by PIAAudited account

    statement

    Yes/No

    6.2 Total interest earned by TSA To be filled by TSA Yes/No

    Original

    Value

    Acquisition

    Date

    Yes/No

    Yes/No

    Yes/No

    Yes/No

    Yes/No

    Yes/No

    Yes/No

    Yes/No

    7

    Item 4th instalment Total

    7.1.i Central Share released to PIA (in Rs.) Yes/No

    7.1.ii State Share released to PIA (in Rs.) Yes/No

    7.1.iii PIA Contribution (in Rs.)Audited account

    statementYes/No

    7.1.iv Total funds available to PIA (in Rs.) [7.1. (i+ii+iii)] Yes/No

    7.2 Interest earned by PIA

    Interest earned by PIA

    may be adjusted at the

    time of release of

    instalment as indicated

    in Guidelines.

    Yes/No

    List financial value of permanent assets

    created under project

    AssetDepreciation for

    this periodResidual Adjusted Value

    Depreciation amount

    should be calculated as

    per depreciation for item

    listed in General

    Finance Rules/IT Act.

    Add rows if required for

    additional assets. CA

    certification to be

    attached.

    1st installment 2nd Instalment 3rd instalment

    ________________________________________________

    ________________________________________________

    6.3

    Financial Progress in project

    ________________________________________________

    Information specific to final installment & project closure

    Sanction Order

    FORMAT FOR REQUEST FOR FUND RELEASE OF 2ND /3RD /4TH INSTALLMENT OF CENTRAL SHARE OF PROJECTS SANCTIONED UNDER DDU-GKY / ROSHNI (Version 1.0) dated 21st, December, 2015

  • 7/23/2019 Installment Request Checklist IFD Approved

    8/12

    Sl. No. Particulars

    Means of

    Verification/Source of

    Information

    Page

    Reference

    Claim verified and

    certified to be

    accurate by CTSA

    A C D E

    Details / Observations

    B

    7.3 Total expenditure by PIA (in Rs)

    Sanction references, UC

    duly signed by CA,

    authorized

    representative of PIAand countersigned by

    TSA

    Yes/No

    7.4 Balance Funds available with PIAShould equal

    7.1.(iv)+7.2-7.3Yes/No

    7.5

    Has To/Fro allowance been duly paid to

    students and is this reflected in UC/Audit

    Report?

    UC/Audit Report Yes/No

    7.6 Regarding Post Placement Support:

    7.6.i

    What is the total amount that has been

    paid to students as Post Placement

    Support?

    Yes/No

    7.6.iiIs this amount reflected in UC/Audit

    Report?Yes/No

    7.6.iiiHow many students have been provided

    paid post placement support?Yes/No

    7.7

    For residential students, has lodging and

    boarding been duly paid and is this

    reflected in UC/Audit Report?

    Attach UC/AR Yes/No

    7.8Whether the UC has been countersigned

    by TSA?Attach UC Yes/No

    7.9

    Whether the PIA has been sanctioned

    any other SGSY/Aajeevika Skills project

    in the past?

    Sanction Orders of other

    projectsYes/No

    ________________________________________________

    Yes /No

    ___________________________________________________

    Yes /No

    ________________________________________________

    Yes /No

    UC/Audit Report

    ________________________________________________

    Yes /No

    Yes /No

    FORMAT FOR REQUEST FOR FUND RELEASE OF 2ND /3RD /4TH INSTALLMENT OF CENTRAL SHARE OF PROJECTS SANCTIONED UNDER DDU-GKY / ROSHNI (Version 1.0) dated 21st, December, 2015

  • 7/23/2019 Installment Request Checklist IFD Approved

    9/12

    Sl. No. Particulars

    Means of

    Verification/Source of

    Information

    Page

    Reference

    Claim verified and

    certified to be

    accurate by CTSA

    A C D E

    Details / Observations

    B

    7.10If so, have all UCs have been submitted

    as prescribed in GFR?Yes/No

    7.11

    Whether the Financial/Physical progress

    of previously sanctioned projects has

    been attached?

    For physical progress,attach relevant

    screenshots from

    website. For financial

    progress, attach

    submitted UCs

    Yes/No

    7.12

    Whether the PIA is eligible for fund

    release in terms of financial

    achievement?

    As per Aajeevika Skills

    GuidelinesYes/No

    8

    Was due approval

    granted by Project

    Director?

    Yes/No Yes/No

    Yes/No Yes/No

    Yes/No Yes/No

    Yes/No Yes/No

    Yes/No Yes/No

    9

    9.1Amount for which PIA is eligible as per

    sanction orderSanction Order Yes/No

    Yes /No

    ________________________________________________

    Yes /No

    Yes /No

    Proposal for Approval/ Release

    Deviations

    Details of Deviation from SOP/Guidelines Reason

    Attach Approval letter

    FORMAT FOR REQUEST FOR FUND RELEASE OF 2ND /3RD /4TH INSTALLMENT OF CENTRAL SHARE OF PROJECTS SANCTIONED UNDER DDU-GKY / ROSHNI (Version 1.0) dated 21st, December, 2015

  • 7/23/2019 Installment Request Checklist IFD Approved

    10/12

    Sl. No. Particulars

    Means of

    Verification/Source of

    Information

    Page

    Reference

    Claim verified and

    certified to be

    accurate by CTSA

    A C D E

    Details / Observations

    B

    9.2Amount to be deducted for interest

    earned

    Financial Progress

    SectionYes/No

    Yes/No

    Yes/No

    9.5Total Amount to be deducted on account

    of candidates not trained:Yes/No

    9.5.i As per category wise targets

    Amount to be deducted on account of

    unpaid PPS:9.3

    Yes/No

    Yes/No9.5.i.a SC

    Shortfall in TargetAmount to be deducted for

    each Candidate not trainedTotal Deduction

    9.5.i.b ST

    Shortfall in TargetAmount to be deducted for

    each Candidate not trainedTotal Deduction

    Based on TSA

    verification reports, and

    shortfalls reported in

    physical/financial

    progress sections

    Number of Candidates not paidAmount to be deducted for

    each non-paymentTotal Deduction

    ________________________________________________

    9.4

    Amount to be deducted on account of

    non-payment of Boarding/Lodging for

    candidates trained in:

    Number of Candidates not paidAmount to be deducted for

    each non-paymentTotal Deduction

    ________________________________________________

    FORMAT FOR REQUEST FOR FUND RELEASE OF 2ND /3RD /4TH INSTALLMENT OF CENTRAL SHARE OF PROJECTS SANCTIONED UNDER DDU-GKY / ROSHNI (Version 1.0) dated 21st, December, 2015

  • 7/23/2019 Installment Request Checklist IFD Approved

    11/12

    Sl. No. Particulars

    Means of

    Verification/Source of

    Information

    Page

    Reference

    Claim verified and

    certified to be

    accurate by CTSA

    A C D E

    Details / Observations

    B

    9.7 Any other amount to be adjusted Yes/No

    9.5.i.d Minority

    9.6

    Amount to be deducted on account of

    candidates not placed as per target (only

    applicable in case of project closure/ final

    installment)

    9.5.i.c Women

    Shortfall in TargetAmount to be deducted for

    each Candidate not trainedTotal Deduction

    As per total target

    Shortfall in TargetAmount to be deducted for

    each Candidate not trained

    Yes/No

    Yes/No

    Yes/No

    Shortfall in TargetAmount to be deducted for

    each Candidate not trainedTotal Deduction

    Shortfall in TargetAmount to be deducted for

    each Candidate not placedTotal Deduction

    Yes/No

    9.5.ii

    Total Deduction

    ________________________________________________

    FORMAT FOR REQUEST FOR FUND RELEASE OF 2ND /3RD /4TH INSTALLMENT OF CENTRAL SHARE OF PROJECTS SANCTIONED UNDER DDU-GKY / ROSHNI (Version 1.0) dated 21st, December, 2015

  • 7/23/2019 Installment Request Checklist IFD Approved

    12/12

    Sl. No. Particulars

    Means of

    Verification/Source of

    Information

    Page

    Reference

    Claim verified and

    certified to be

    accurate by CTSA

    A C D E

    Details / Observations

    B

    9.7.iProvide reason(s) for adjusting above

    stated amountYes/No

    9.7.iiProvide calculation(s) used as basis for

    above stated amountYes/No

    9.8Amount for which PIA is eligible after

    adjusting applicable deductionsYes/No________________________________________________

    I, _______________________ (authorized personnel from PIA) hereby certify information provided in this application is accurate and correct as of date _ _ / _ _ / _ _ _ _

    I, _______________________ (authorized personnel from concerned TSA) recommend for approval of fund release for the above project amounting to___________________________________, in respect of installment no. ________

    Reccomendation of Project Director with respect to Project & Fund Releases

    I, _________________________ (authorized personnel from PD) confirm that all the above information has been verified and found to be correct. A total amount of__________________________________ is proposed for release

    Others

    PIA Request for Approval

    Approva s requeste or

    a) Installment No. ______________ for total amount of _____________________________

    b) Extension, if any for a total period of ___________________ up to _ _ / _ _ / _ _ _ _

    c) Relaxations of norms, if any, in respect of the following:

    __________________________________________________________________________________________________________________________________________________________________

    __________________________________________________________________________________________________________________________________________________________________

    __________________________________________________________________________________________________________________________________________________________________

    __________________________________________________________________________________________________________________________________________________________________

    Reccomendation of TSA with respect to Project & Fund Releases

    SC

    ST

    Reccomendation of PD with respect to deviations

    Certification of availability of funds

    Category Head of Account Budget Availability

    FORMAT FOR REQUEST FOR FUND RELEASE OF 2ND /3RD /4TH INSTALLMENT OF CENTRAL SHARE OF PROJECTS SANCTIONED UNDER DDU-GKY / ROSHNI (Version 1.0) dated 21st, December, 2015