For Styles BRT1717GK, BRT2817BSR,BRT2817GK and BRT1717BSR
Installation Guide
Light SourceTools Required
BULB BASE TYPEMedium (E26)
BULB SHAPETYPE A
100WMAX
4 BULBS REQUIREDBULBS NOT INCLUDED
Warnings and CautionsTurn off the electricity at the circuit breaker before installation. Consult a licensed electrician if in doubt about installation.
Turn off power to the fixture and allow the bulbs to cool before replacing.
Crossbar Assemblyx 1
A
Package Contents
PARTS BAG
Fixture Bodyx 1
Crossbar Assembly Fixture Chain Ceiling Canopy BulbTable ofContents
Fixture Height Adjustable 12” to 67”
Fixture Chainx 1
E
Ceiling Canopyx 1
F
Quick Linkx 2
D
Preparation: Identify and inspect all parts before beginning the installation.
Missing or damaged parts? Contact your original place of purchase.
Wiring
Outlet Box Screwx 2
B
Wire Connectorx 3
C
Released Date: 2020-03-01
STEP 3A STEP 4A STEP 6ASTEP 5ASTEP 2A
GFixture Loop Assemblyx 1
H
Assembly Instructions for Chandelier Light
(Step 1A - Step 5A)
BRT2817GK, BRT2817BSR
Assembly Instructions for Semi-flush Light
(Step 1B - Step 4B)
BRT1717GK, BRT1717BSR
Crossbar Assembly BulbWiring
STEP 2B STEP 4BSTEP 3BSTEP 1B
STEP 1A
Fixture Loop
Fixture Body
2 of 5
2020 Quoizel Inc. visit us on-line at www.quoizel.com
STEP 2A
1 2 3Step 1
Install crossbar assembly
Step 2 - 3Test fitting ceiling canopy to nipple
STEP 3A
2Step 2 - 3
Install Fixture Chain
1Step 1
Adjust fixture chain length
3
Suggested Chain Length:8’ ceiling: 16” Chain9’ ceiling: 28” Chain10’ ceiling: 40” Chain
NL
N
L
STEP 1A
Released Date: 2020-03-01
1 2Remove lock balland knurled nut
Install fixtureloop assembly
3 of 5
2020 Quoizel Inc. visit us on-line at www.quoizel.com
STEP 4A
1 2Step 1
Feed the fixture wires through the loop
NL
*Green Ground Screw on crossbar optional
White wire (neutral) from outlet box
Ground wirefrom Fixture
Black or Red wire (hot) from outlet box
Bare or Green ground wire from outlet box
Supply wire from fixtureribbed side or identified
with the Label “N”
supply wire from fixturesmooth side or identified
with the label “L”
STEP 5A
STEP 6A
Released Date: 2020-03-01
4 of 5
2020 Quoizel Inc. visit us on-line at www.quoizel.com
STEP 1B1 2
4
Install crossbar assemblyRemove canopy chain loop,one lock washer and one hex nut
Test fitting ceiling canopy to nipple
STEP 2B
1 2Step 1
Cut supply wires
NL
*Green Ground Screw on crossbar optional
White wire (neutral) from outlet box
Ground wirefrom Fixture
Black or Red wire (hot) from outlet box
Bare or Green ground wire from outlet box
Supply wire from fixtureribbed side or identified
with the Label “N”
supply wire from fixturesmooth side or identified
with the label “L”
10"
Released Date: 2020-03-01
3
Remove lock balland knurled nut