IBL 15 May 2012 J.Godlewski PH-DT-PO 1
Insertable B Layer Cooling System
Services
Jan Godlewski
Bart Verlaat
Power supply Water cooling Compressed air Vacuum IBL flushing
IBL 15 May 2012 J.Godlewski PH-DT-PO 2
Power supply Total need of power for IBL cooling station has been estimated
to 20 kW This include:
Chiller compressor Heaters Electrical and control system components
We will ask for UPS for IBL cooling system Statement from Wieslaw Iwanski:
Atlas has enough reserve in existing UPS to feed the 20 kW pump of the IBL cooling system. However, there is no actually possibility to connect such a circuit to existing UPS distribution as all available breakers in UPS switchboards in USA15 are already in use. Atlas will therefore order and install during the LS1 a new switchboard fed from the UPS network in USA15 to address this situation.
It’s assumed that this switchboard will provide a standard monitoring of all breakers i.e. ‘on/off’ and ‘electrical fault’ sensors without possibility to turn on/off breakers by external systems
IBL 15 May 2012 J.Godlewski PH-DT-PO 3
Nitrogen flushing from gas room in USA15
IBL 15 May 2012 J.Godlewski PH-DT-PO 4
IBL nitrogen flushing
IBL will be flushed with nitrogen using existing system in USA15 gas room
PH/DT Gas group will take care about additional equipment and modification in the ID flushing rack
Goal is to reach dew point in IBL volume below -60 C ATLAS TC will install copper pipe between ID rack in USA15
gas room and IBL volume 8 mm OD copper pipe
IBL 15 May 2012 J.Godlewski PH-DT-PO 5
Mixed water for the chiller
Chiller for IBL cooling station will have water cooled condenser
Amount of water is around 20 l/min Close to proposed cooling unit location there exist piping for
primary, mixed and chilled water Necessary amount of water will be taken from mixed or primary
water circuit
IBL 15 May 2012 J.Godlewski PH-DT-PO 6
Chiller
Water cooled condenser
Vacuum and compressed air
Vacuum pump for vacuum insulated transfer lines will be installed in UX15 on HS level 7.
Compressed air for CO2 cooling units will be delivered from evaporative system air compressors situated in USA15 CV room.
IBL 15 May 2012 J.Godlewski PH-DT-PO 7