INPRO Dialogue Forum 8 Proposal to apply the INPRO ... · INPRO Dialogue Forum 8 2 . Nuclear Energy...
Transcript of INPRO Dialogue Forum 8 Proposal to apply the INPRO ... · INPRO Dialogue Forum 8 2 . Nuclear Energy...
INPRO Dialogue Forum 8
Proposal to apply the INPRO Methodology-
Economics, for the case of Mexico
Federico Puente Espel
26-29 August 2014
IAEA, Vienna, Austria
Outline
• Nuclear Energy in Mexico
• Mexico current situation o Power Mix, population, energy, economic, and social indicators
o Energy Outlook 2013-2027
o National Energy Strategy 2013-2027
• Proposal to apply the INPRO Methodology
2 INPRO Dialogue Forum 8
Nuclear Energy in
Mexico
3 INPRO Dialogue Forum 8
4 INPRO Dialogue Forum 8
Mexico: Nuclear Power
One NPP: Laguna Verde Two GE BWR-5 reactors 4% installed capacity
1600 MWe (after the uprate)
5 INPRO Dialogue Forum 8
Mexico: Nuclear Sector
Nuclear Research Institute
Regulatory Body
Operator / Utility
Electricity Sector
Outlook 2013-2027
6 INPRO Dialogue Forum 8
7 June 2014
Ref. http://www.inegi.org.mx/,
http://www.oecd-ilibrary.org/
INPRO Dialogue Forum 8
Mexico’s current situation
8 Ref. Electricity Information 2013. International Energy Agency
Installed Electric Energy Capacity, OECD members 2010 (GW)
9 August 2014 INPRO Dialogue Forum 8
Mexico’s electricity prices
Ref. Electricity Information 2013. International Energy Agency
17th place (OECD) with the
highest electricity prices
for industry
Lowest electricity prices for
households
5.87 US$ above OECD average (108.86
US$/MWh)
10 August 2014 INPRO Dialogue Forum 8
Mexico’s current situation
Ref: Prospectiva del Sector Eléctrico 2013-2027
& CFE
11 August 2014 INPRO Dialogue Forum 8
Mexico’s current situation
Ref: Prospectiva del Sector Eléctrico 2013-2027
& CFE
12 August 2014 INPRO Dialogue Forum 8
Mexico’s current situation
Ref: Prospectiva del Sector Eléctrico 2013-2027
& CFE
13
Ref: Prospectiva del Sector Eléctrico
2013-2027
INPRO Dialogue Forum 8
Statistical regionalization
14 Ref: Prospectiva del Sector Eléctrico
2013-2027
INPRO Dialogue Forum 8
Fuel Prices
Uranium
National coal
Pacific & Golf coal
Gas
National Fuel Oil
Imported Fuel Oil
National Energy Strategy
2013-2027
15 INPRO Dialogue Forum 8
16
Ref. ENE 2013-2027, SENER
2013
INPRO Dialogue Forum 8
National Energy Strategy 2013-2027
• Ley para el Aprovechamiento de las Energías Renovables y el
Financiamiento de la Transición Energética (LAERFTE)
• Law on the Use of Renewable Energies and Financing of
Energy Transition (LAERFTE)
17 INPRO Dialogue Forum 8
Electricity Sector Outlook 2013-2027
18 INPRO Dialogue Forum 8
Ref: Prospectiva del Sector Eléctrico 2013-2027
Electricity Sector Outlook 2013-2027
• Estimated total electric energy to be satisfied 465.1 TWh
• Self supply & Non-technical losses 62.5 TWh
• Electric Power Savings 39.2 TWh
• Estimated federal electric energy to be satisfied 363.4 TWh
19 INPRO Dialogue Forum 8
Estimated additional required capacity
20 INPRO Dialogue Forum 8
47,503 MW
Ref: Prospectiva del Sector Eléctrico 2013-2027
Electricity Sector Outlook Planning vs. Alternative
21 INPRO Dialogue Forum 8
Ref: Prospectiva del Sector Eléctrico 2013-2027
Proposal to apply the INPRO
Methodology for NES
22 INPRO Dialogue Forum 8
Proposal to apply the INPRO Methodology for NES
• Evaluation of a national nuclear energy system
based on its long term sustainability.
• Evaluation of the financial figures of merit:
attractiveness of investing in nuclear power.
• Assessment whether nuclear power is competitive
with alternatives considering economic conditions
in the country.
23 INPRO Dialogue Forum 8
Proposal to apply the INPRO Methodology for NES
• INPRO Methodology (these will be analyzed for the
case of Mexico and described)
o One basic principle (BP).
o Four user requirements (UR).
o Eight criteria (CR).
24 INPRO Dialogue Forum 8
Proposal to apply the INPRO Methodology for NES
• Situation considered for Mexico (four situations
considered in the INPRO Methodology):
o Deployment of additional units of the same basic type of NPP.
• Case of Mexico: nuclear power will be compared with
fossil fuelled plants and hydro.
• It is not a deregulated market: centralized decision-
making process.
• The values of CN and CA and financial figures of merit.
o Comparison of the LUEC for CN with those for alternatives, CA
25 INPRO Dialogue Forum 8
Proposal to apply the INPRO Methodology for NES
26 INPRO Dialogue Forum 8
Ref: COPAR 2012. Generación. Sub
Programación. CFE
Proposal to apply the INPRO Methodology for NES
27 INPRO Dialogue Forum 8
Ref: COPAR 2012. Generación. Sub
Programación. CFE
Proposal to apply the INPRO Methodology for NES
28 INPRO Dialogue Forum 8
Ref: COPAR 2012. Generación. Sub
Programación. CFE
Proposal to apply the INPRO Methodology for NES
29 INPRO Dialogue Forum 8
Ref: COPAR 2012. Generación. Sub
Programación. CFE
Next step is to apply the INPRO Methodology for
NES
30 INPRO Dialogue Forum 8
Thank you!
31 INPRO Dialogue Forum 8