Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust...

50
Road Number Road Number Road Name Mileage Committed Abbeville 18.370 $4,460,419.38 Pavements 18.370 $4,460,419.38 P030074 0.910 $569,761.04 SC 185 185 S 0.910 $569,761.04 P032435 2.270 $1,358,047.25 SC 185 185 S 1.400 $1,358,047.25 SC 20 CON Hill Rd 0.789 $0.00 SC 20 CON Hwy 28 Bypass 0.081 $0.00 P032436 0.400 $322,403.65 S120 Secession Ave 0.400 $322,403.65 P032443 1.570 $659,428.90 S271 Carwellyn Rd 1.570 $659,428.90 P032444 0.570 $279,682.82 SC 72 W 72 Blvd W 0.140 $0.00 SC 72 W 72 W 0.430 $279,682.82 P034712 0.420 $152,241.21 SC 28 CO2 28 St N 0.019 $0.00 SC 28 CO2 Main St N 0.401 $152,241.21 P036766 5.000 $947,499.75 SC 72 72 E 3.280 $0.00 SC 72 72 W 0.650 $947,499.75 SC 72 Hwy 72 E 0.330 $0.00 SC 72 Hwy 72 W 0.740 $0.00 P036798 6.250 $21,536.67 SC 185 185 N 2.580 $21,536.67 SC 20 20 1.510 $0.00 SC 28 28 S 1.780 $0.00 SC 28 Hwy 28 S 0.380 $0.00 P036883 0.980 $149,818.09 S114 Ellis Rd 0.980 $149,818.09 Road Committed Values are Grouped by Project Project Commitments as of June 30, 2018 Infrastructure Maintenance Trust Fund IMTF Road List to be updated on a periodic basis as additional Projects are committed. Page 1 of 50

Transcript of Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust...

Page 1: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45

Road Number Road Number Road Name Mileage CommittedAbbeville 18.370 $4,460,419.38

Pavements 18.370 $4,460,419.38P030074 0.910 $569,761.04

SC 185     185 S 0.910 $569,761.04

P032435 2.270 $1,358,047.25SC 185     185 S 1.400 $1,358,047.25SC 20 CON Hill Rd 0.789 $0.00SC 20 CON Hwy 28 Bypass 0.081 $0.00

P032436 0.400 $322,403.65S‐ 120     Secession Ave 0.400 $322,403.65

P032443 1.570 $659,428.90S‐ 271     Carwellyn Rd 1.570 $659,428.90

P032444 0.570 $279,682.82SC 72     W 72 Blvd W 0.140 $0.00SC 72     W 72 W 0.430 $279,682.82

P034712 0.420 $152,241.21SC 28 CO2 28 St N 0.019 $0.00SC 28 CO2 Main St N 0.401 $152,241.21

P036766 5.000 $947,499.75SC 72     72 E 3.280 $0.00SC 72     72 W 0.650 $947,499.75SC 72     Hwy 72 E 0.330 $0.00SC 72     Hwy 72 W 0.740 $0.00

P036798 6.250 $21,536.67SC 185     185 N 2.580 $21,536.67SC 20     20 1.510 $0.00SC 28     28 S 1.780 $0.00SC 28     Hwy 28 S 0.380 $0.00

P036883 0.980 $149,818.09S‐ 114     Ellis Rd 0.980 $149,818.09

Road Committed Values are Grouped by Project

Project Commitments as of June 30, 2018

Infrastructure Maintenance Trust Fund

IMTF Road List to be updated on a periodic basis as additional Projects are committed.

Page 1 of 50

Page 2: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45

Road Number Road Number Road Name Mileage Committed

Road Committed Values are Grouped by Project

Project Commitments as of June 30, 2018

Infrastructure Maintenance Trust Fund

Aiken 39.340 $10,600,657.80Pavements 28.340 $7,316,457.65P032512 13.390 $3,798,777.45

SC 19     Edgefield Hwy 4.050 $3,798,777.45US 1     Jefferson Davis Hwy 7.220 $0.00US 1     Richland Ave W 2.120 $0.00

P032530 9.650 $1,978,845.00S‐ 120     W Buena Vista Ave 0.515 $0.00S‐ 120     0.005 $1,978,845.00S‐ 1230     Coral Way 0.129 $0.00S‐ 1230     0.011 $0.00S‐ 1506     Lorraine Dr 0.300 $0.00S‐ 177     Barnwell Ave Ne 1.344 $0.00S‐ 177     Barnwell Ave Nw 1.518 $0.00S‐ 177     0.008 $0.00S‐ 182     Laurens St Sw 0.246 $0.00S‐ 182     0.014 $0.00S‐ 197     Old Edgefield Rd 1.170 $0.00S‐ 3     Park Ave Se 1.880 $0.00S‐ 406     Belair Rd 0.620 $0.00S‐ 511     Hampton Ave Ne 0.260 $0.00S‐ 567     Valley Rd 0.060 $0.00S‐ 79     Banks Mill Rd Se 1.570 $0.00

P034751 3.120 $602,177.46S‐ 281     0.011 $0.00S‐ 281     West Ave 0.769 $602,177.46S‐ 29     Wire Rd 2.180 $0.00S‐ 36     Sweetwater Rd 0.160 $0.00

P034752 1.420 $549,196.04US 78     Charleston Hwy 0.400 $0.00US 78     Richland Ave E 0.020 $0.00US 78     Wagener Rd 0.230 $0.00US 25 BUS Georgia Ave 0.770 $549,196.04

P034753 0.760 $387,461.70SC 230     W Martintown Rd 0.760 $387,461.70

Rural Road Safety 11.000 $3,284,200.15P037068 11.000 $3,284,200.15

US 1     Columbia Hwy N 11.000 $3,284,200.15

IMTF Road List to be updated on a periodic basis as additional Projects are committed.

Page 2 of 50

Page 3: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45

Road Number Road Number Road Name Mileage Committed

Road Committed Values are Grouped by Project

Project Commitments as of June 30, 2018

Infrastructure Maintenance Trust Fund

Allendale 30.830 $2,435,247.82Pavements 30.830 $2,435,247.82P036756 1.660 $1,180,530.14

US 278     Allendale‐Fairfax Hwy 1.660 $1,180,530.14

P036757 1.280 $396,558.78S‐ 22     Bluff Rd 0.670 $0.00S‐ 18     Mixons Corner Rd 0.610 $396,558.78

P036923 3.860 $265,601.39SC 3     River Rd 3.860 $265,601.39

P036926 3.870 $440,955.53US 301     Burtons Ferry Hwy 3.870 $440,955.53

P037010 0.860 $83,561.67S‐ 22     Bluff Rd 0.860 $83,561.67

P036900 19.300 $68,040.31SC 125     Augusta Hwy 19.300 $68,040.31

IMTF Road List to be updated on a periodic basis as additional Projects are committed.

Page 3 of 50

Page 4: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45

Road Number Road Number Road Name Mileage Committed

Road Committed Values are Grouped by Project

Project Commitments as of June 30, 2018

Infrastructure Maintenance Trust Fund

Anderson 45.970 $11,651,561.84Pavements 27.580 $11,577,830.44P030150 6.580 $3,837,412.30

US 76     Belton Hwy 4.185 $3,837,412.30US 76     Anderson St 2.395 $0.00

P032566 3.410 $2,821,993.50SC 81     Highway 81  S 0.430 $2,821,993.50SC 81     Highway 81 S 0.780 $0.00SC 81     S Murray Av 1.570 $0.00US 178     Liberty Hwy 0.630 $0.00

P034707 1.320 $971,712.52US 76     E River St 1.320 $971,712.52

P036808 2.150 $43,041.80SC 28     Pearman Dairy Rd 2.150 $43,041.80

P036813 1.530 $14,598.69S‐ 65     Highway 81 S 0.020 $14,598.69S‐ 65     Masters Blvd 1.510 $0.00

P036822 4.260 $932,188.46US 76     Belton Honea Path Hwy 3.539 $0.00US 76     S Main 0.080 $0.00US 76     S Main St 0.641 $932,188.46

P036885 3.180 $521,034.98S‐ 34     Whitehall Rd 3.180 $521,034.98

P037060 5.150 $2,435,848.19S‐ 29     Lebanon Rd 2.180 $0.00S‐ 29     Concord Rd 0.140 $2,435,848.19S‐ 29     Harris Bridge Rd 2.830 $0.00

Rural Road Safety 18.390 $73,731.40P037078 4.590 $63,731.40

SC 24     Highway 24 1.040 $0.00SC 24     Highway 24  3.550 $63,731.40

P037225 13.800 $10,000.00US 29     Highway 29   N 1.001 $0.00US 29     Highway 29  N 6.052 $10,000.00US 29     Highway 29 N 6.374 $0.00US 29     0.373 $0.00

IMTF Road List to be updated on a periodic basis as additional Projects are committed.

Page 4 of 50

Page 5: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45

Road Number Road Number Road Name Mileage Committed

Road Committed Values are Grouped by Project

Project Commitments as of June 30, 2018

Infrastructure Maintenance Trust Fund

Bamberg 55.510 $3,807,875.64Pavements 55.510 $3,807,875.64P030671 0.640 $327,295.73

US 78     Heritage Hwy 0.640 $327,295.73

P035753 0.750 $553,014.77US 301     Main Hwy 0.450 $553,014.77US 78     Heritage Hwy 0.300 $0.00

P036753 4.390 $1,192,114.62US 78     Heritage Hwy 4.390 $1,192,114.62

P036812 1.960 $594,460.90S‐ 18     Farrells Rd 1.960 $594,460.90

P036948 2.350 $279,579.29US 301     Main Hwy 2.350 $279,579.29

P036950 8.500 $531,087.48SC 64     Low Country Hwy 2.430 $0.00SC 362     Hunters Chapel Rd 6.070 $531,087.48

P037008 3.060 $197,712.13S‐ 86     Char‐Augusta Rd 3.060 $197,712.13

P036951 16.200 $57,746.82SC 362     Hunters Chapel Rd 12.110 $57,746.82SC 70     Barnwell Hwy 3.950 $0.00US 78 CON 0.140 $0.00

P036946 17.660 $74,863.90US 301     Main Hwy 1.610 $74,863.90US 321     Carolina Hwy 2.800 $0.00US 78     Heritage Hwy 13.250 $0.00

IMTF Road List to be updated on a periodic basis as additional Projects are committed.

Page 5 of 50

Page 6: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45

Road Number Road Number Road Name Mileage Committed

Road Committed Values are Grouped by Project

Project Commitments as of June 30, 2018

Infrastructure Maintenance Trust Fund

Barnwell 34.150 $4,405,670.47Pavements 34.150 $4,405,670.47P030404 0.200 $172,332.92

US 78     Dexter St 0.200 $172,332.92

P030575 1.320 $890,039.53SC 3     Solomon Blatt Ave 1.320 $890,039.53

P030672 0.250 $240,628.75US 78     Dexter St 0.250 $240,628.75

P034723 2.920 $790,865.35US 78     Main St 1.412 $790,865.35US 78     Hwy 78 1.508 $0.00

P036797 3.680 $901,449.49S‐ 20     Patterson Mill Rd 3.680 $901,449.49

P036836 1.750 $808,634.79US 278     Dunbarton Blvd 0.200 $808,634.79US 278     Jackson St 1.550 $0.00

P036952 6.290 $387,164.16US 78     Hwy 78 4.859 $387,164.16US 78     Dexter St 1.431 $0.00

P037004 1.030 $126,741.70S‐ 156     Calhoun St 1.030 $126,741.70

P036953 16.710 $87,813.78SC 64     Dunbarton Blvd 3.650 $87,813.78SC 64     Hwy 64 2.330 $0.00US 278     Jackson St 0.120 $0.00US 278     Marlboro Ave 1.150 $0.00US 278     Hwy 278 0.040 $0.00SC 70     Main St 0.800 $0.00SC 70     Allen St 1.060 $0.00SC 70     Hwy 70 6.056 $0.00SC 70     Barnwell Rd 0.694 $0.00SC 70     Denmark Rd 0.810 $0.00

IMTF Road List to be updated on a periodic basis as additional Projects are committed.

Page 6 of 50

Page 7: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45

Road Number Road Number Road Name Mileage Committed

Road Committed Values are Grouped by Project

Project Commitments as of June 30, 2018

Infrastructure Maintenance Trust Fund

Beaufort 16.046 $4,319,202.17Pavements 16.046 $4,319,202.17P033671 2.810 $1,732,955.90

SC 46     May River Rd 2.810 $1,732,955.90

P034691 1.080 $1,010,791.50S‐ 29     Buck Island Rd 1.080 $1,010,791.50

P037152 2.600 $24,670.25US 21     Sea Island Pkwy 1.330 $24,670.25US 21 BUS Carteret St 0.009 $0.00US 21 BUS Sea Island Pkwy 1.261 $0.00

P037153 4.096 $65,780.66US 278     Fording Island Rd 4.096 $65,780.66

P037159 1.740 $817,090.24US 278     Fording Island Rd 1.740 $817,090.24

P037165 1.320 $423,804.55US 21     Sea Island Pkwy 1.320 $423,804.55

P037170 2.400 $244,109.07S‐ 141     Squire Pope Rd 1.300 $244,109.07S‐ 482     William Hilton Pkwy 0.018 $0.00S‐ 482     Gum Tree Rd 1.082 $0.00

IMTF Road List to be updated on a periodic basis as additional Projects are committed.

Page 7 of 50

Page 8: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45

Road Number Road Number Road Name Mileage Committed

Road Committed Values are Grouped by Project

Project Commitments as of June 30, 2018

Infrastructure Maintenance Trust Fund

Berkeley 56.020 $8,164,908.50Pavements 36.020 $7,934,353.58P032296 7.500 $2,741,839.57

S‐ 317     Forest Lawn Av 0.070 $2,741,839.57S‐ 317     Giles Dr 0.566 $0.00S‐ 317     Matheny Dr 0.474 $0.00S‐ 317     Price St 0.400 $0.00S‐ 339     Parish Rd 0.210 $0.00S‐ 403     Henderson Dr 0.330 $0.00S‐ 485     Cranford Rd 0.440 $0.00S‐ 495     Garwood Rd 0.340 $0.00S‐ 50     Oakley Rd 3.010 $0.00S‐ 748     Harbour Lake Dr 0.910 $0.00S‐ 810     Summit Av 0.750 $0.00

P033668 1.690 $991,848.75S‐ 59     Poplar Hill Dr 0.660 $991,848.75S‐ 59     1.030 $0.00

P034706 3.180 $1,848,189.00SC 402     Hwy 402 3.180 $1,848,189.00

P037044 3.510 $929,565.04US 52     N Hwy 52 2.100 $0.00US 52     0.036 $929,565.04US 52     S Goose Creek Blvd 0.774 $0.00US 52     N Goose Creek Blvd 0.600 $0.00

P037096 12.230 $1,030,723.93SC 6     Old Highway 6 6.391 $1,030,723.93SC 6     Ranger Dr 5.100 $0.00SC 6     Trojan Rd 0.079 $0.00SC 6     Hwy 6 0.660 $0.00

P037147 3.450 $337,089.85S‐ 16     Jedburg Rd 3.450 $337,089.85

P037154 4.460 $55,097.44US 52     N Hwy 52 4.460 $55,097.44

Rural Road Safety 20.000 $230,554.92P037071 10.000 $114,320.35

US 17 ALT N Hwy 17A 9.445 $0.00US 17 ALT N Hwy 52 0.555 $114,320.35

P037072 10.000 $116,234.57SC 6     Old Highway 6 6.391 $116,234.57SC 6     Ranger Dr 3.530 $0.00SC 6     Trojan Rd 0.079 $0.00

IMTF Road List to be updated on a periodic basis as additional Projects are committed.

Page 8 of 50

Page 9: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45

Road Number Road Number Road Name Mileage Committed

Road Committed Values are Grouped by Project

Project Commitments as of June 30, 2018

Infrastructure Maintenance Trust Fund

Calhoun 16.140 $2,678,852.71Pavements 16.140 $2,678,852.71P036828 5.450 $992,363.42

SC 267     Mccords Ferry Rd 5.450 $992,363.42

P036897 1.780 $635,345.36S‐ 31     Old Sandy Run Rd 1.780 $635,345.36

P036929 1.970 $497,562.04US 601     Colonel Thomson Hwy 1.970 $497,562.04

P037011 1.300 $134,676.20US 601     Colonel Thomson Hwy 0.384 $0.00US 601     Saint Matthews Rd 0.280 $134,676.20US 601     Harry C Raysor Dr 0.636 $0.00

P037012 4.200 $304,399.31US 176     Old State Rd 3.120 $0.00SC 419     Fort Motte Rd 1.080 $304,399.31

P037052 1.440 $114,506.38S‐ 122     Riley Rd 1.440 $114,506.38

IMTF Road List to be updated on a periodic basis as additional Projects are committed.

Page 9 of 50

Page 10: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45

Road Number Road Number Road Name Mileage Committed

Road Committed Values are Grouped by Project

Project Commitments as of June 30, 2018

Infrastructure Maintenance Trust Fund

Charleston 64.720 $10,105,127.35Pavements 59.300 $9,721,375.46P032295 10.320 $2,573,422.42

S‐ 1187     Midland Park Rd 0.090 $2,573,422.42S‐ 1485     Waites Dr 0.130 $0.00S‐ 1518     Kinglet Dr 0.320 $0.00S‐ 1682     Saul White Blvd 0.150 $0.00S‐ 1687     Minnie St 0.190 $0.00S‐ 176     Chesterfield Rd 0.280 $0.00S‐ 1882     Langston St 0.240 $0.00S‐ 1949     Paulette Dr 0.150 $0.00S‐ 1972     Scott Hill Rd 0.500 $0.00S‐ 216     Fairmont Av 0.480 $0.00S‐ 216     Moultrie St 0.120 $0.00S‐ 2268     Nassau St 0.380 $0.00S‐ 244     E Hudson Av 0.790 $0.00S‐ 244     W Hudson Av 0.150 $0.00S‐ 281     Dobson St 0.250 $0.00S‐ 282     Sumner Av 1.120 $0.00S‐ 306     Briarcliff Dr 0.230 $0.00S‐ 31     Reynolds Av 0.190 $0.00S‐ 311     Pearlott St 0.470 $0.00S‐ 312     Pinckney Park Dr 0.530 $0.00S‐ 604     Kruger Av 0.230 $0.00S‐ 62     W Montague Av 0.830 $0.00S‐ 662     Charlotte St 0.150 $0.00S‐ 664     Market St 0.100 $0.00S‐ 696     Stafford Rd 0.295 $0.00S‐ 696     0.075 $0.00S‐ 733     Evergreen St 0.150 $0.00S‐ 756     Eugene Gibbs St 0.070 $0.00S‐ 798     Shelton St 0.240 $0.00S‐ 877     Limehouse St 0.100 $0.00S‐ 888     Peachtree St 0.150 $0.00S‐ 936     Burlington Av 0.127 $0.00S‐ 936     0.013 $0.00S‐ 940     Hillsboro Dr 0.130 $0.00S‐ 947     William Kennerty Dr 0.510 $0.00S‐ 948     Bur Clare Dr 0.390 $0.00

P033657 5.420 $3,356,377.52US 17     N Highway 17 5.420 $3,356,377.52

P034724 1.790 $1,227,319.96S‐ 13     Remount Rd 1.790 $1,227,319.96

P037143 14.670 $1,198,436.03SC 61     Ashley River Rd 0.810 $1,198,436.03SC 700     Maybank Hwy 13.590 $0.00SC 700     0.010 $0.00SC 700     Folly Road Blvd 0.260 $0.00

IMTF Road List to be updated on a periodic basis as additional Projects are committed.

Page 10 of 50

Page 11: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45

Road Number Road Number Road Name Mileage Committed

Road Committed Values are Grouped by Project

Project Commitments as of June 30, 2018

Infrastructure Maintenance Trust Fund

P037144 3.830 $721,255.86SC 61     Ashley River Rd 1.570 $0.00SC 61     Paul Cantrell Blvd 0.090 $721,255.86SC 61     Saint Andrews Blvd 1.590 $0.00SC 7     Sam Rittenberg Blvd 0.580 $0.00

P037155 3.830 $48,747.51SC 61     Ashley River Rd 1.570 $0.00SC 61     Paul Cantrell Blvd 0.090 $48,747.51SC 61     Saint Andrews Blvd 1.590 $0.00SC 7     Sam Rittenberg Blvd 0.580 $0.00

P037156 12.510 $62,818.32SC 61     Ashley River Rd 0.810 $62,818.32SC 700     Maybank Hwy 11.690 $0.00SC 700     0.010 $0.00

P037160 1.200 $8,894.63S‐ 72     Whipple Rd 1.200 $8,894.63

P037162 5.730 $524,103.21S‐ 72     Whipple Rd 1.200 $0.00S‐ 1032     Steed Creek Rd 4.530 $524,103.21

Rural Road Safety 5.420 $383,751.89P033657 5.420 $383,751.89

US 17     N Highway 17 5.420 $383,751.89

IMTF Road List to be updated on a periodic basis as additional Projects are committed.

Page 11 of 50

Page 12: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45

Road Number Road Number Road Name Mileage Committed

Road Committed Values are Grouped by Project

Project Commitments as of June 30, 2018

Infrastructure Maintenance Trust Fund

Cherokee 23.716 $5,408,402.92Pavements 16.800 $5,271,782.04P030049 1.050 $617,735.55

S‐ 39     S Green River Rd 1.050 $617,735.55

P032477 5.700 $781,054.71SC 198     N Mountain St 2.660 $781,054.71US 221 ALT Cliffside Hwy 3.040 $0.00

P032482 1.610 $226,018.65S‐ 83     Blacksburg Hwy 1.169 $226,018.65S‐ 83     W Carolina St 0.441 $0.00

P032496 1.940 $774,113.41US 29     E Cherokee St 1.940 $774,113.41

P033595 2.620 $1,003,483.57US 29     E Cherokee St 2.620 $1,003,483.57

P033647 2.450 $1,114,247.02S‐ 223     Possum Trot Rd 2.450 $1,114,247.02

P033654 1.430 $755,129.13SC 150     Holland St 0.170 $755,129.13SC 150     Providence Rd 1.260 $0.00

Rural Road Safety 6.916 $136,620.88P037082 6.916 $136,620.88

US 29     Old Georgia Hwy 6.916 $136,620.88

IMTF Road List to be updated on a periodic basis as additional Projects are committed.

Page 12 of 50

Page 13: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45

Road Number Road Number Road Name Mileage Committed

Road Committed Values are Grouped by Project

Project Commitments as of June 30, 2018

Infrastructure Maintenance Trust Fund

Chester 16.600 $8,827,019.69Pavements 16.600 $8,827,019.69P030042 1.570 $2,327,955.97

US 21     Catawba River Rd 1.570 $2,327,955.97

P030050 2.050 $1,113,158.69S‐ 70     Westbrook Rd 2.050 $1,113,158.69

P032473 0.660 $231,719.33SC 9     Lancaster Hwy 0.660 $231,719.33

P032483 1.630 $212,224.03S‐ 194     Hillbright Rd 1.000 $212,224.03S‐ 329     Mccandless Rd 0.630 $0.00

P032497 1.990 $1,499,938.49SC 9     Lancaster Hwy 1.990 $1,499,938.49

P033596 5.640 $2,294,067.10SC 72     West End Rd 5.640 $2,294,067.10

P033648 2.290 $860,563.16S‐ 171     Mtn Lakes Rd 2.290 $860,563.16

P034748 0.770 $287,392.92SC 9     Lancaster Hwy 0.770 $287,392.92

IMTF Road List to be updated on a periodic basis as additional Projects are committed.

Page 13 of 50

Page 14: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45

Road Number Road Number Road Name Mileage Committed

Road Committed Values are Grouped by Project

Project Commitments as of June 30, 2018

Infrastructure Maintenance Trust Fund

Chesterfield 33.177 $12,045,612.23Pavements 29.377 $11,995,612.23P030039 1.630 $3,094,412.46

SC 9     Mcgregor St 0.540 $3,094,412.46US 601     Highway 9 0.110 $0.00US 601     Mcgregor St 0.980 $0.00

P030051 0.430 $275,553.66S‐ 341     Windsor Dr 0.430 $275,553.66

P032324 9.760 $2,190,961.13S‐ 103     Austin Rd 1.820 $2,190,961.13S‐ 105     Dudley Rd 3.710 $0.00S‐ 136     Buddy Sellers Rd 0.590 $0.00S‐ 274     Brewer Cir 0.188 $0.00S‐ 274     Joseph St 0.002 $0.00S‐ 601     Bay Springs Church Rd 1.970 $0.00S‐ 68     Will Evans Rd 1.480 $0.00

P032474 1.110 $388,253.29SC 151     William Harold Ingram 0.300 $388,253.29SC 151     Harold Ingram Hwy 0.804 $0.00SC 151     Highway 151 0.006 $0.00

P032478 1.460 $398,890.77SC 151     William Harold Ingram 0.301 $0.00SC 151     Highway 151 1.159 $398,890.77

P032484 2.240 $109,812.44S‐ 600     Shiloh Acres Rd 2.240 $109,812.44

P032498 2.770 $1,798,031.51SC 9     Market St 0.140 $1,798,031.51US 1     Market St 0.730 $0.00US 1     Seventh St 0.470 $0.00US 1     Highway 1 1.430 $0.00

P033597 3.390 $2,291,806.91SC 9     Highway 9 0.140 $2,291,806.91SC 9     Chesterfield Hwy 2.360 $0.00US 1     Highway 1 0.890 $0.00

P033649 4.870 $1,290,889.49S‐ 71     Airport Rd 4.870 $1,290,889.49

P036786 1.717 $157,000.57S‐ 159     Woodward Mill Rd 1.717 $157,000.57

Rural Road Safety 3.800 $50,000.00P037085 3.800 $50,000.00

SC 9     Highway 9 3.690 $50,000.00SC 9     0.110 $0.00

IMTF Road List to be updated on a periodic basis as additional Projects are committed.

Page 14 of 50

Page 15: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45

Road Number Road Number Road Name Mileage Committed

Road Committed Values are Grouped by Project

Project Commitments as of June 30, 2018

Infrastructure Maintenance Trust Fund

Clarendon 17.620 $3,714,348.57Pavements 17.620 $3,714,348.57P036892 4.090 $1,285,270.39

S‐ 102     Buff Blvd 0.750 $1,285,270.39S‐ 127     Bill Davis Rd 3.340 $0.00

P036910 4.100 $1,173,013.66US 15     Bethel Hwy 1.340 $0.00US 15     Scott Ave 0.180 $0.00US 15     Summerton Hwy 2.480 $1,173,013.66US 15     Summerton Hwy  0.100 $0.00

P037043 7.020 $1,090,773.87US 301     Sumter Hwy 1.170 $0.00US 301     Brooks St 0.150 $1,090,773.87US 521     Sumter Hwy 1.110 $0.00US 521     Sumter Hwy  4.590 $0.00

P037049 2.410 $165,290.65S‐ 345     White Oak Dr 2.410 $165,290.65

IMTF Road List to be updated on a periodic basis as additional Projects are committed.

Page 15 of 50

Page 16: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45

Road Number Road Number Road Name Mileage Committed

Road Committed Values are Grouped by Project

Project Commitments as of June 30, 2018

Infrastructure Maintenance Trust Fund

Colleton 37.667 $6,504,597.13Pavements 14.670 $6,274,787.53P031748 2.920 $1,407,009.77

SC 64     Charleston Hwy 2.153 $0.00SC 64     Hampton St 0.767 $1,407,009.77

P031987 2.230 $1,019,690.83SC 303     Green Pond Hwy 2.230 $1,019,690.83

P032565 1.680 $1,261,378.27SC 64     Hampton St 0.510 $0.00SC 64     Bells Hwy 0.320 $1,261,378.27SC 64     Robertson Blvd 0.850 $0.00

P033688 2.530 $1,119,248.69S‐ 65     Coolers Dairy Rd 2.530 $1,119,248.69

P036895 1.200 $604,567.50SC 303     Green Pond Hwy 1.200 $604,567.50

P037171 2.340 $557,213.60US 17 ALT Cottageville Hwy 1.580 $0.00SC 64 BUS Bells Hwy 0.760 $557,213.60

P037172 1.770 $305,678.87S‐ 754     Tuskegee Airmen Dr 1.770 $305,678.87

Rural Road Safety 22.997 $229,809.60P037079 13.251 $100,000.00

SC 64     Charleston Hwy 13.203 $0.00SC 64     Hampton St 0.048 $100,000.00

P037081 9.746 $129,809.60SC 303     Green Pond Hwy 9.746 $129,809.60

IMTF Road List to be updated on a periodic basis as additional Projects are committed.

Page 16 of 50

Page 17: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45

Road Number Road Number Road Name Mileage Committed

Road Committed Values are Grouped by Project

Project Commitments as of June 30, 2018

Infrastructure Maintenance Trust Fund

Darlington 33.970 $3,846,513.77Pavements 33.970 $3,846,513.77P032400 1.910 $1,162,142.19

SC 34     E Bobo Newsom Hwy 0.500 $1,162,142.19SC 34     Harry Byrd Hwy 1.410 $0.00

P033579 3.420 $1,218,225.92S‐ 23     W Old Camden Rd 3.420 $1,218,225.92

P033622 1.660 $270,071.30US 52     S Main St 1.660 $270,071.30

P033630 2.060 $804,035.45US 15 BUS S Fifth St 2.060 $804,035.45

P033638 24.920 $392,038.91S‐ 102     Fourteenth St 3.020 $392,038.91S‐ 13     S Center Rd 1.230 $0.00S‐ 13     N Center Rd 13.280 $0.00S‐ 35     S Charleston Rd 2.600 $0.00S‐ 65     High Point Rd 1.110 $0.00S‐ 16     Kelleybridge Rd 2.400 $0.00S‐ 54     Southborough Rd 1.280 $0.00

IMTF Road List to be updated on a periodic basis as additional Projects are committed.

Page 17 of 50

Page 18: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45

Road Number Road Number Road Name Mileage Committed

Road Committed Values are Grouped by Project

Project Commitments as of June 30, 2018

Infrastructure Maintenance Trust Fund

Dillon 9.740 $3,293,792.62Pavements 9.740 $3,293,792.62P032401 1.090 $1,269,564.89

SC 38     Hwy 38 W 1.090 $1,269,564.89

P033580 2.610 $791,905.44S‐ 130     S 4Th Ave 0.430 $791,905.44S‐ 39     W Main St 1.310 $0.00S‐ 78     E Calhoun St 0.870 $0.00

P033623 0.920 $389,898.18SC 38     38 E 0.429 $389,898.18SC 38     Hwy 38  E 0.161 $0.00SC 38     Hwy 38 E 0.330 $0.00

P033631 3.380 $559,660.79SC 41     Hwy 41 S 3.380 $559,660.79

P033639 1.740 $282,763.32S‐ 48     Bethel Rd 1.740 $282,763.32

IMTF Road List to be updated on a periodic basis as additional Projects are committed.

Page 18 of 50

Page 19: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45

Road Number Road Number Road Name Mileage Committed

Road Committed Values are Grouped by Project

Project Commitments as of June 30, 2018

Infrastructure Maintenance Trust Fund

Dorchester 27.637 $6,434,737.13Pavements 18.530 $6,332,943.91P030036 1.570 $1,250,270.33

SC 173     School St 1.570 $1,250,270.33

P032301 4.770 $2,035,996.23S‐ 155     E 2Nd St N 0.300 $2,035,996.23S‐ 155     W 2Nd St N 0.640 $0.00S‐ 186     E 4Th St N 0.200 $0.00S‐ 186     W 4Th St N 0.730 $0.00S‐ 188     E 1St St N 0.310 $0.00S‐ 188     W 1St St N 0.620 $0.00S‐ 197     E 3Rd St S 0.200 $0.00S‐ 197     W 3Rd St S 0.200 $0.00S‐ 208     N Magnolia St 0.890 $0.00S‐ 208     S Magnolia St 0.090 $0.00S‐ 357     W 1St St N 0.590 $0.00

P032526 2.140 $1,158,676.98US 78     Johnston Ave 0.524 $1,158,676.98US 78     Badham Dr 1.616 $0.00

P033686 1.960 $822,572.46S‐ 19     Wire Rd 1.960 $822,572.46

P037139 4.410 $534,015.72US 17 ALT S Main St 0.980 $0.00US 17 ALT 0.010 $0.00US 17 ALT Boone Hill Rd 1.550 $534,015.72US 78     W 5Th St N 1.870 $0.00

P037140 3.280 $434,945.04US 178     W Main St 3.280 $434,945.04

P037141 0.400 $96,467.15S‐ 22     Orangeburg Rd 0.400 $96,467.15

Rural Road Safety 9.107 $101,793.22P037073 9.107 $101,793.22

US 17 ALT Us 17‐A Hwy S 9.107 $101,793.22

IMTF Road List to be updated on a periodic basis as additional Projects are committed.

Page 19 of 50

Page 20: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45

Road Number Road Number Road Name Mileage Committed

Road Committed Values are Grouped by Project

Project Commitments as of June 30, 2018

Infrastructure Maintenance Trust Fund

Edgefield 35.360 $9,367,034.77Pavements 26.480 $8,754,675.49P029984 4.300 $2,490,551.85

SC 19     Hill St 0.034 $2,490,551.85SC 19     Hwy 19 4.266 $0.00

P030116 4.670 $1,441,412.83US 25     Hwy 25 N 4.670 $1,441,412.83

P030390 3.120 $1,064,718.91S‐ 39     Old Chappell Ferry Rd 3.120 $1,064,718.91

P032450 2.450 $798,345.85US 25     Hwy 25 N 2.450 $798,345.85

P032451 3.000 $1,476,195.19S‐ 143     Garrett Rd 3.000 $1,476,195.19

P034713 2.320 $866,984.71SC 430     Crest Rd 2.140 $866,984.71SC 430 CON Crest Rd 0.070 $0.00SC 430 CON Meeting St Rd 0.110 $0.00

P036792 3.790 $347,127.60SC 230     W Martintown Rd 3.790 $347,127.60

P036882 2.830 $269,338.55S‐ 35     Walker Rd 2.830 $269,338.55

Rural Road Safety 8.880 $612,359.28P030116 4.670 $320,618.48

US 25     Hwy 25 N 4.670 $320,618.48

P031996 1.760 $122,724.92US 25     Hwy 25 N 1.760 $122,724.92

P032450 2.450 $169,015.88US 25     Hwy 25 N 2.450 $169,015.88

IMTF Road List to be updated on a periodic basis as additional Projects are committed.

Page 20 of 50

Page 21: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45

Road Number Road Number Road Name Mileage Committed

Road Committed Values are Grouped by Project

Project Commitments as of June 30, 2018

Infrastructure Maintenance Trust Fund

Fairfield 13.900 $6,412,957.74Pavements 13.900 $6,412,957.74P030044 2.360 $1,879,052.38

SC 215     State Highway 215 S 2.360 $1,879,052.38

P030052 2.030 $889,852.26S‐ 159     Longleaf Rd 1.250 $889,852.26S‐ 82     W Calhoun St 0.780 $0.00

P032479 3.210 $511,189.72SC 200     State Highway 200 2.770 $511,189.72SC 200     Hwy 200 0.440 $0.00

P032485 0.960 $114,532.94S‐ 30     E Peach Rd 0.960 $114,532.94

P033598 2.590 $1,997,747.94SC 215     State Highway 215 S 2.590 $1,997,747.94

P033650 2.750 $1,020,582.50S‐ 70     Reservoir Rd 2.750 $1,020,582.50

IMTF Road List to be updated on a periodic basis as additional Projects are committed.

Page 21 of 50

Page 22: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45

Road Number Road Number Road Name Mileage Committed

Road Committed Values are Grouped by Project

Project Commitments as of June 30, 2018

Infrastructure Maintenance Trust Fund

Florence 69.760 $10,963,280.30Pavements 69.760 $10,963,280.30P030492 4.090 $1,382,902.97

S‐ 360     Hyman Road 4.090 $1,382,902.97

P032394 3.180 $2,314,448.79US 52     Lancelot Way 0.100 $0.00US 52     N Ron Mcnair Blvd 0.238 $0.00US 52     S Ron Mcnair Blvd 2.665 $2,314,448.79US 52     Us Hwy 52 0.105 $0.00US 52     W Highway 378 Bypass 0.045 $0.00US 52     W Turbeville Hwy 0.027 $0.00

P032402 2.370 $2,199,053.00SC 327     N Williston Road 2.370 $2,199,053.00

P033581 1.420 $2,306,379.49S‐ 12     S Church St 1.420 $2,306,379.49

P033624 48.010 $557,470.89US 378     W Highway 378 Bypass 2.880 $0.00US 378     W Turbeville Hwy 6.684 $557,470.89US 378     Turbeville Hwy 0.196 $0.00US 378     E Highway 378 Bypass 0.740 $0.00US 52     Us Hwy 52 10.012 $0.00US 52     W Highway 378 Bypass 0.008 $0.00US 52     0.570 $0.00US 52     S Tremont Road 0.744 $0.00US 52     S Irby St 5.824 $0.00US 52     E Twin Church Road 0.258 $0.00US 52     E Palmetto St 0.103 $0.00US 52     S Deerfield Road 0.381 $0.00US 76     E Palmetto St 12.520 $0.00US 76     W Palmetto St 6.870 $0.00US 76     Pisgah Road 0.220 $0.00

P033632 5.120 $1,263,053.77US 301     1.700 $0.00US 301     Freedom Blvd 3.420 $1,263,053.77

P033640 4.050 $848,432.58S‐ 358     E Ashby Road 1.800 $848,432.58S‐ 588     Us Hwy 52 0.010 $0.00S‐ 588     Third Loop Road 2.240 $0.00

P037025 1.520 $91,538.81US 76     E Palmetto St 1.520 $91,538.81

IMTF Road List to be updated on a periodic basis as additional Projects are committed.

Page 22 of 50

Page 23: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45

Road Number Road Number Road Name Mileage Committed

Road Committed Values are Grouped by Project

Project Commitments as of June 30, 2018

Infrastructure Maintenance Trust Fund

Georgetown 33.107 $7,595,659.55Pavements 15.870 $7,378,844.26P033625 1.410 $593,850.69

US 521 BUS E Main St 0.380 $0.00US 521 BUS W Main St 1.010 $0.00US 521 BUS E East Main St 0.020 $593,850.69

P033633 3.440 $992,007.13SC 41 BUS S Morgan Ave 1.930 $992,007.13SC 41 BUS N Morgan Ave 1.510 $0.00

P033641 0.980 $269,210.73S‐ 35     Schoolhouse Dr 0.980 $269,210.73

P033582 2.710 $1,304,802.32S‐ 20     E Main St 0.240 $0.00S‐ 161     W Church St 0.790 $1,304,802.32S‐ 449     Martin Luther King Rd 1.480 $0.00S‐ 717     Reservoir St 0.200 $0.00

P031853 3.510 $2,004,456.90US 17 ALT Saints Delight Rd 3.510 $2,004,456.90

P032403 3.820 $2,214,516.49US 17 ALT Saints Delight Rd 3.820 $2,214,516.49

Rural Road Safety 17.237 $216,815.29P037080 7.237 $100,000.00

US 17     Ocean Hwy 0.593 $0.00US 17     Ocean Hwy S 6.644 $100,000.00

P037369 10.000 $116,815.29US 701     N Fraser St 10.000 $116,815.29

IMTF Road List to be updated on a periodic basis as additional Projects are committed.

Page 23 of 50

Page 24: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45

Road Number Road Number Road Name Mileage Committed

Road Committed Values are Grouped by Project

Project Commitments as of June 30, 2018

Infrastructure Maintenance Trust Fund

Greenville 52.538 $19,515,570.67Pavements 26.070 $18,842,474.61P031355 4.190 $610,498.59

S‐ 21     Rutherford Rd 4.190 $610,498.59

P032233 8.670 $9,519,080.77SC 183     Buncombe St 0.440 $9,519,080.77SC 183     E North St 0.218 $0.00SC 183     W North St 0.112 $0.00US 123     Easley Bridge Rd 0.630 $0.00US 123     New Easley Hwy 2.070 $0.00US 25     White Horse Rd 2.570 $0.00US 29     Mills Ave 0.950 $0.00US 29     N Church St 1.130 $0.00US 29     S Church St 0.550 $0.00

P032352 5.680 $4,955,893.91US 25     N 25 Hwy 5.680 $4,955,893.91

P032568 2.760 $2,854,938.85S‐ 149     E Faris Rd 1.500 $0.00S‐ 149     W Faris Rd 1.260 $2,854,938.85

P033661 1.080 $337,002.70US 29     Wade Hampton Blvd 1.080 $337,002.70

P033672 3.690 $565,059.79SC 146     Woodruff Rd 1.760 $565,059.79SC 418     418 Hwy 1.930 $0.00

Rural Road Safety 26.468 $673,096.06P032352 5.680 $406,589.36

US 25     N 25 Hwy 5.680 $406,589.36

P037074 13.388 $256,506.70US 25     N 25 Hwy 13.388 $256,506.70

P037226 7.400 $10,000.00SC 14     N 14 Hwy 7.400 $10,000.00

IMTF Road List to be updated on a periodic basis as additional Projects are committed.

Page 24 of 50

Page 25: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45

Road Number Road Number Road Name Mileage Committed

Road Committed Values are Grouped by Project

Project Commitments as of June 30, 2018

Infrastructure Maintenance Trust Fund

Greenwood 37.550 $6,819,332.27Pavements 23.030 $6,477,199.27P030305 1.840 $818,605.63

S‐ 131     Scotch Cross Rd E 1.840 $818,605.63

P032508 4.860 $2,895,673.94US 221     Hwy 72/221 E 4.860 $2,895,673.94

P032509 3.770 $1,532,697.12S‐ 187     Marshall Rd 2.390 $1,532,697.12S‐ 29     Cambridge Av E 1.380 $0.00

P036799 1.340 $18,872.85US 25     Byp 25 Ne 0.520 $18,872.85US 25     Byp 72 Ne 0.820 $0.00

P036800 0.480 $122,517.57SC 254     Grace St 0.480 $122,517.57

P036831 3.110 $12,553.06S‐ 1     Old Abbeville Hwy 3.110 $12,553.06

P036835 1.520 $296,827.33S‐ 108     Mathis Rd 0.750 $0.00S‐ 108     Mathis St N 0.770 $296,827.33

P036902 6.110 $779,451.77US 178     Hwy 178 N 6.050 $779,451.77US 178     Moorefield St 0.060 $0.00

Rural Road Safety 14.520 $342,133.00P030377 4.030 $332,133.00

US 221     Hwy 72/221 E 4.030 $332,133.00

P037236 10.490 $10,000.00US 25     Hwy 25 N 10.490 $10,000.00

IMTF Road List to be updated on a periodic basis as additional Projects are committed.

Page 25 of 50

Page 26: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45

Road Number Road Number Road Name Mileage Committed

Road Committed Values are Grouped by Project

Project Commitments as of June 30, 2018

Infrastructure Maintenance Trust Fund

Hampton 29.710 $4,561,724.58Pavements 21.030 $3,174,697.57P036765 6.770 $1,388,260.83

US 321     Columbia Hwy 6.720 $1,388,260.83US 321     Columbia Hwy N 0.050 $0.00

P036795 2.150 $766,682.27S‐ 1     Yemassee Hwy 0.050 $766,682.27S‐ 13     Railroad Ave 0.060 $0.00S‐ 13     Salkahatchie Rd 0.300 $0.00S‐ 13     Old Salkehatchie Hwy 1.740 $0.00

P036801 1.910 $450,121.86US 321     Columbia Hwy 0.499 $0.00US 321     Railroad Ave 1.411 $450,121.86

P036967 4.680 $428,102.68SC 3     Browning Gate Rd 2.150 $428,102.68SC 63     Main St 0.890 $0.00SC 63     Walterboro Hwy 1.640 $0.00

P037000 0.840 $110,180.95S‐ 83     Magnolia St 0.840 $110,180.95

P036999 4.680 $31,348.98US 278     Augusta Hwy 0.010 $31,348.98US 278     Elm St 2.670 $0.00US 278     Carolina Ave 1.940 $0.00US 278     W Carolina Ave 0.060 $0.00

Rural Road Safety 8.680 $1,387,027.01P036765 6.770 $1,075,192.06

US 321     Columbia Hwy 6.720 $1,075,192.06US 321     Columbia Hwy N 0.050 $0.00

P036801 1.910 $311,834.95US 321     Columbia Hwy 0.499 $0.00US 321     Railroad Ave 1.411 $311,834.95

IMTF Road List to be updated on a periodic basis as additional Projects are committed.

Page 26 of 50

Page 27: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45

Road Number Road Number Road Name Mileage Committed

Road Committed Values are Grouped by Project

Project Commitments as of June 30, 2018

Infrastructure Maintenance Trust Fund

Horry 89.516 $48,991,591.35Pavements 62.039 $41,226,772.89P033626 6.110 $1,159,922.31

SC 9     Hwy 9 6.110 $1,159,922.31

P033634 9.090 $1,662,989.90US 701     N Hwy 701 4.718 $0.00US 701     Hwy 701 Byp 0.132 $0.00SC 905     N Hwy 905 4.120 $1,662,989.90US 701 BYP Hwy 701 Byp 0.120 $0.00

P033642 5.550 $909,488.85S‐ 102     Daisy Rd 1.620 $909,488.85S‐ 32     Vaught Rd 0.790 $0.00S‐ 548     Four Mile Rd 3.130 $0.00S‐ 548     Hwy 548 0.010 $0.00

P033583 6.180 $2,622,698.12S‐ 196     N Oak St 1.270 $2,622,698.12S‐ 559     Kings Rd 1.890 $0.00S‐ 96     Palmetto St 0.290 $0.00S‐ 99     Lake Swamp Rd 2.730 $0.00

P032404 6.320 $2,028,756.73SC 905     Hwy 905 4.270 $0.00SC 410     S Green Sea Rd 0.610 $2,028,756.73SC 9 BUS N Green Sea Rd 1.440 $0.00

P032395 4.700 $5,789,695.12SC 9     E Hwy 9 4.700 $5,789,695.12

P037425 10.229 $12,798,798.75US 17     N Hwy 17 1.452 $12,798,798.75US 17     Hwy 17 5.057 $0.00US 501     W Hwy 501 2.627 $0.00US 501     Brown Swamp Rd 0.230 $0.00US 501     Noname 0.778 $0.00US 501     Old Dunn Ln 0.085 $0.00

P032396 13.860 $14,254,423.11US 17     Hwy 17 Byp 0.021 $14,254,423.11US 17     N Hwy 17 Byp 6.090 $0.00US 17     71St Ave N 0.690 $0.00US 17     79Th Ave N 0.589 $0.00US 17     Grande Dunes Blvd 0.014 $0.00US 17     Cliffwood Dr 0.156 $0.00US 501     Church St 1.335 $0.00US 501     E Hwy 501 4.163 $0.00US 501     Roberts Rd 0.390 $0.00US 501     Waccamaw Dr 0.245 $0.00US 501     Amber Ln 0.167 $0.00

IMTF Road List to be updated on a periodic basis as additional Projects are committed.

Page 27 of 50

Page 28: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45

Road Number Road Number Road Name Mileage Committed

Road Committed Values are Grouped by Project

Project Commitments as of June 30, 2018

Infrastructure Maintenance Trust Fund

Rural Road Safety 27.477 $7,764,818.46P037075 10.206 $121,250.89

US 701     S Hwy 701 10.206 $121,250.89

P037084 7.271 $105,912.61SC 90     Hwy 90 7.271 $105,912.61

P037142 10.000 $7,537,654.96SC 9     E Hwy 9 Bus 2.070 $0.00SC 9     E Hwy 9 Byp 5.190 $7,537,654.96SC 9     W Hwy 9 2.740 $0.00

IMTF Road List to be updated on a periodic basis as additional Projects are committed.

Page 28 of 50

Page 29: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45

Road Number Road Number Road Name Mileage Committed

Road Committed Values are Grouped by Project

Project Commitments as of June 30, 2018

Infrastructure Maintenance Trust Fund

Jasper 64.690 $21,048,037.40Pavements 24.900 $7,336,517.50P031746 6.760 $3,841,024.77

US 321     Cotton Hill Rd 6.660 $0.00US 321     Deerfield Rd 0.100 $3,841,024.77

P032536 2.550 $1,811,825.38US 278     1.457 $0.00US 278     Independence Blvd 1.093 $1,811,825.38

P033685 0.850 $486,890.54S‐ 119     Sand Hills Rd 0.850 $486,890.54

P037064 5.780 $746,965.71US 17     Jacob Smart Blvd 2.305 $0.00US 17     Smith Xing 0.130 $0.00US 17     Kato Bay Rd 0.205 $0.00SC 462     Coosaw Scenic Dr 3.140 $746,965.71

P037065 2.080 $258,711.51US 17     Kings Hwy 1.480 $258,711.51US 321     Deerfield Rd 0.600 $0.00

P037066 1.140 $134,371.62S‐ 13     Bees Creek Rd 1.140 $134,371.62

P037157 1.480 $14,626.72US 17     Kings Hwy 1.480 $14,626.72

P037158 4.260 $42,101.25US 17     Jacob Smart Blvd 4.130 $42,101.25US 17     Smith Xing 0.130 $0.00

Rural Road Safety 37.540 $11,236,519.90P031746 6.760 $533,829.58

US 321     Cotton Hill Rd 6.660 $0.00US 321     Deerfield Rd 0.100 $533,829.58

P037076 24.480 $100,000.00US 321     Cotton Hill Rd 11.920 $0.00US 321     Deerfield Rd 12.560 $100,000.00

P037218 6.300 $10,602,690.32US 17     Speedway Blvd 5.769 $10,602,690.32US 17     Whyte Hardee Blvd 0.531 $0.00

Bridges 2.250 $2,475,000.00P030260 0.750 $1,375,000.00

I‐ 95 S 0.750 $1,375,000.00

P030481 1.500 $1,100,000.00I‐ 95 S 1.500 $1,100,000.00

IMTF Road List to be updated on a periodic basis as additional Projects are committed.

Page 29 of 50

Page 30: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45

Road Number Road Number Road Name Mileage Committed

Road Committed Values are Grouped by Project

Project Commitments as of June 30, 2018

Infrastructure Maintenance Trust Fund

Kershaw 23.490 $3,867,703.91Pavements 18.700 $3,817,703.91P033677 3.900 $1,452,436.84

SC 261     Boykin Rd 3.820 $0.00SC 261     0.080 $1,452,436.84

P033678 2.730 $1,182,455.79S‐ 15     Old Stagecoach Rd 1.840 $1,182,455.79S‐ 217     Bull St 0.350 $0.00S‐ 542     Roberts St 0.540 $0.00

P036775 4.500 $378,394.85US 1     Jefferson Davis Hwy 0.831 $0.00US 1     Highway 1 N 3.669 $378,394.85

P036776 4.780 $633,263.45SC 97     John G Richards Rd 4.780 $633,263.45

P036777 2.790 $171,152.98S‐ 87     Mill Creek Rd 2.790 $171,152.98

Rural Road Safety 4.790 $50,000.00P037062 4.790 $50,000.00

US 521     Sumter Hwy 4.790 $50,000.00

IMTF Road List to be updated on a periodic basis as additional Projects are committed.

Page 30 of 50

Page 31: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45

Road Number Road Number Road Name Mileage Committed

Road Committed Values are Grouped by Project

Project Commitments as of June 30, 2018

Infrastructure Maintenance Trust Fund

Lancaster 42.957 $13,066,346.19Pavements 20.690 $13,006,346.19P030053 2.280 $1,545,955.28

S‐ 218     N Plantation Rd 0.530 $1,545,955.28S‐ 292     N Plantation Rd 0.690 $0.00S‐ 41     Dobys Bridge Rd 0.830 $0.00S‐ 45     S Wylie St 0.202 $0.00S‐ 45     S S Wylie St 0.028 $0.00

P030275 1.710 $1,085,024.84US 601     Gold Mine Hwy 1.710 $1,085,024.84

P032475 0.540 $295,376.44US 521     Charlotte Hwy 0.540 $295,376.44

P032486 1.320 $69,987.95S‐ 755     W North Corner Rd 1.320 $69,987.95

P032499 2.100 $4,327,733.00SC 9     Chester Hwy 0.324 $4,327,733.00SC 9     Hwy 9 Byp W Byp 1.776 $0.00

P033599 5.290 $3,001,205.37SC 903     Flat Creek Rd 5.290 $3,001,205.37

P033651 0.490 $388,363.41S‐ 2     S Main St 0.315 $388,363.41S‐ 2     N Main St 0.175 $0.00

P034704 5.130 $1,857,492.40S‐ 42     Barberville Rd 2.700 $1,857,492.40S‐ 420     Colony Rd 1.130 $0.00S‐ 836     Burke Duncan Rd 1.300 $0.00

P034750 0.770 $282,546.81US 521     Charlotte Hwy 0.770 $282,546.81

P036794 1.060 $152,660.69S‐ 64     Harrisburg Rd 1.060 $152,660.69

Rural Road Safety 22.267 $60,000.00P037085 10.967 $50,000.00

SC 9     Pageland Hwy 10.967 $50,000.00

P037237 11.300 $10,000.00US 521     Charlotte Hwy 11.300 $10,000.00

IMTF Road List to be updated on a periodic basis as additional Projects are committed.

Page 31 of 50

Page 32: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45

Road Number Road Number Road Name Mileage Committed

Road Committed Values are Grouped by Project

Project Commitments as of June 30, 2018

Infrastructure Maintenance Trust Fund

Laurens 34.010 $6,075,107.34Pavements 21.610 $5,903,040.49P032437 6.150 $3,448,951.33

SC 56     Hwy 56 S 5.890 $3,448,951.33SC 56     Jacobs Hwy 0.260 $0.00

P032438 2.700 $1,316,174.74S‐ 53     Fleming St Ext 1.330 $1,316,174.74S‐ 53     Torrington Rd 1.370 $0.00

P036787 5.510 $56,692.97US 76     E Main St 0.407 $0.00US 76     Hwy 76 E 2.483 $0.00US 76     Hwy 76 W 2.620 $56,692.97

P036789 3.030 $690,267.49SC 72     Hwy 72 W 3.030 $690,267.49

P036881 4.220 $390,953.96S‐ 47     Power House Rd 1.260 $390,953.96S‐ 6     Indian Mound Rd 2.960 $0.00

Rural Road Safety 12.400 $172,066.85P037083 10.000 $172,066.85

US 221     221 S 0.383 $0.00US 221     Hwy 221 S 8.657 $0.00US 221     Hwy 72 W 0.960 $172,066.85

P037236 2.400 $0.00US 25     Hwy 25 2.400 $0.00

IMTF Road List to be updated on a periodic basis as additional Projects are committed.

Page 32 of 50

Page 33: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45

Road Number Road Number Road Name Mileage Committed

Road Committed Values are Grouped by Project

Project Commitments as of June 30, 2018

Infrastructure Maintenance Trust Fund

Lee 8.410 $2,422,908.14Pavements 8.410 $2,422,908.14P033681 1.780 $1,003,786.31

SC 441     Woodrow Rd 0.780 $1,003,786.31SC 527     Elliott Hwy 1.000 $0.00

P033682 3.400 $850,489.80S‐ 28     Manville_St Charles Rd 3.400 $850,489.80

P036781 2.530 $423,043.26US 76     Hwy 76 W 2.530 $423,043.26

P036782 0.700 $145,588.77S‐ 111     Dixon Dr 0.320 $0.00S‐ 111     Dixon Rd 0.380 $145,588.77

IMTF Road List to be updated on a periodic basis as additional Projects are committed.

Page 33 of 50

Page 34: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45

Road Number Road Number Road Name Mileage Committed

Road Committed Values are Grouped by Project

Project Commitments as of June 30, 2018

Infrastructure Maintenance Trust Fund

Lexington 82.450 $61,187,273.70Pavements 37.950 $7,916,171.38P030323 1.920 $838,211.93

S‐ 486     Beechwoods Dr 1.920 $838,211.93

P033675 0.250 $214,483.99US 1     W Main St 0.250 $214,483.99

P033676 6.280 $2,427,255.05S‐ 77     Two Notch Rd 2.150 $0.00S‐ 77     Chinquapin Church Rd 0.330 $0.00S‐ 77     Albion Rd 0.010 $0.00S‐ 113     Counts Ferry Rd 1.990 $2,427,255.05S‐ 73     Fish Hatchery Rd 1.800 $0.00

P033684 0.430 $417,706.78US 21     Charleston Hwy 0.430 $417,706.78

P033687 2.570 $1,274,240.52SC 113     Wagner Hwy 2.570 $1,274,240.52

P036772 3.380 $178,493.33US 1     E Main St 0.943 $178,493.33US 1     Augusta Rd 1.557 $0.00US 321     S Church St 0.500 $0.00US 321     Savannah Hwy 0.380 $0.00

P036773 3.660 $254,263.10SC 692     E 5Th St 0.140 $254,263.10SC 692     Redmond Mill Rd 3.520 $0.00

P036774 15.340 $475,004.40S‐ 70     Two Notch Rd 2.840 $0.00S‐ 243     Nazareth Rd 2.990 $475,004.40S‐ 278     Calks Ferry Rd 6.740 $0.00S‐ 77     Two Notch Rd 2.770 $0.00

P036898 4.120 $1,836,512.28US 1     W Columbia Ave 2.140 $1,836,512.28US 1     E Columbia Ave 1.980 $0.00

Rural Road Safety 33.400 $18,896,771.57P037069 20.000 $12,785,761.37

US 178     Fairview Rd 18.146 $12,785,761.37US 178     Main St 0.850 $0.00US 178     S Pine St 0.440 $0.00US 178     Steedman Rd 0.564 $0.00

P037070 13.400 $6,111,010.20SC 302     Edmund Hwy 7.910 $0.00SC 302     Pine St 5.490 $6,111,010.20

Interstate Upgrade 11.100 $34,374,330.75P027003 11.100 $34,374,330.75

I‐ 20     11.100 $34,374,330.75

IMTF Road List to be updated on a periodic basis as additional Projects are committed.

Page 34 of 50

Page 35: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45

Road Number Road Number Road Name Mileage Committed

Road Committed Values are Grouped by Project

Project Commitments as of June 30, 2018

Infrastructure Maintenance Trust Fund

Marion 10.469 $4,473,229.72Pavements 10.469 $4,473,229.72P032405 1.850 $2,273,914.22

US 501     N Highway 501 0.002 $2,273,914.22US 501     S Highway 501 1.848 $0.00

P033584 2.740 $891,739.88S‐ 19     Bluff Rd 2.740 $891,739.88

P033627 1.450 $359,210.15US 76     E Highway 76 1.450 $359,210.15

P033635 3.080 $684,696.49SC 41     S Highway 41  1.430 $684,696.49US 501 BUS N Highway 501 Bus 1.650 $0.00

P033643 1.349 $263,668.98S‐ 25     Wahee Rd 1.349 $263,668.98

IMTF Road List to be updated on a periodic basis as additional Projects are committed.

Page 35 of 50

Page 36: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45

Road Number Road Number Road Name Mileage Committed

Road Committed Values are Grouped by Project

Project Commitments as of June 30, 2018

Infrastructure Maintenance Trust Fund

Marlboro 11.820 $3,917,260.39Pavements 11.820 $3,917,260.39P032406 2.460 $1,940,016.45

SC 38     Hwy 38 Byp S 0.210 $0.00SC 38     Hwy 38 S 2.250 $1,940,016.45

P033585 1.840 $636,101.54S‐ 50     Zion Rd 1.840 $636,101.54

P033628 1.100 $470,135.66US 1     Hwy 9 W 1.100 $470,135.66

P033636 5.780 $743,284.13US 15     Hwy 15‐401 W 5.780 $743,284.13

P033644 0.640 $127,722.61S‐ 564     Polston Rd 0.640 $127,722.61

IMTF Road List to be updated on a periodic basis as additional Projects are committed.

Page 36 of 50

Page 37: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45

Road Number Road Number Road Name Mileage Committed

Road Committed Values are Grouped by Project

Project Commitments as of June 30, 2018

Infrastructure Maintenance Trust Fund

Mccormick 8.740 $1,832,890.22Pavements 8.740 $1,832,890.22P030825 1.530 $16,732.50

US 221     Clarks Hii Hwy 0.456 $16,732.50US 221     Clarks Hill Hwy 1.074 $0.00

P032453 1.500 $765,412.82SC 28     Hwy 28 N 1.500 $765,412.82

P032454 0.970 $374,495.36S‐ 11     S Main St 0.970 $374,495.36

P036793 3.920 $531,748.24SC 28     Hwy 28 S 3.920 $531,748.24

P036796 0.820 $144,501.30S‐ 22     Whitetown Rd 0.820 $144,501.30

IMTF Road List to be updated on a periodic basis as additional Projects are committed.

Page 37 of 50

Page 38: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45

Road Number Road Number Road Name Mileage Committed

Road Committed Values are Grouped by Project

Project Commitments as of June 30, 2018

Infrastructure Maintenance Trust Fund

Newberry 21.560 $4,110,250.48Pavements 21.560 $4,110,250.48P032456 3.700 $2,077,135.82

US 176     Us176 3.677 $2,077,135.82US 176     0.023 $0.00

P032457 3.100 $1,380,933.00S‐ 38     Jollystreet Rd 3.100 $1,380,933.00

P036825 8.310 $29,263.58SC 34     Sc34 3.740 $29,263.58SC 391     Sc391 4.570 $0.00

P036826 3.170 $12,724.71S‐ 15     Dreher Island Rd 1.160 $12,724.71S‐ 571     Amicks Landing Rd 0.110 $0.00S‐ 571     State Park Rd 1.900 $0.00

P036827 2.150 $269,730.29S‐ 28     Broad River Rd 2.150 $269,730.29

P036830 1.130 $340,463.08SC 34     Dixie Byp 0.022 $0.00SC 34     Dixie Dr 1.080 $340,463.08SC 34     0.028 $0.00

IMTF Road List to be updated on a periodic basis as additional Projects are committed.

Page 38 of 50

Page 39: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45

Road Number Road Number Road Name Mileage Committed

Road Committed Values are Grouped by Project

Project Commitments as of June 30, 2018

Infrastructure Maintenance Trust Fund

Oconee 35.920 $6,803,275.28Pavements 21.720 $6,739,543.88P030145 1.030 $590,492.48

S‐ 155     E South 2Nd St 0.580 $590,492.48S‐ 610     Daniel Ave 0.450 $0.00

P032304 8.440 $596,454.64SC 182     Oakway Rd 3.730 $596,454.64SC 59     Tokeena Rd 4.697 $0.00SC 59     S Oak St 0.013 $0.00

P032308 1.710 $1,588,449.93US 76     Byp 123 1.710 $1,588,449.93

P032415 3.470 $1,940,717.46US 123     Toccoa Hwy 3.470 $1,940,717.46

P032455 0.950 $1,346,816.52S‐ 63     W South 4Th St 0.950 $1,346,816.52

P033658 4.660 $319,874.63S‐ 65     J P Stevens Rd 0.080 $0.00S‐ 65     Martin Creek Rd 3.040 $0.00S‐ 21     Friendship Rd 1.540 $319,874.63

P033664 1.460 $356,738.22US 76     Clemson Blvd 1.460 $356,738.22

Rural Road Safety 14.200 $63,731.40P037078 14.200 $63,731.40

SC 24     West Oak Hwy 14.200 $63,731.40

IMTF Road List to be updated on a periodic basis as additional Projects are committed.

Page 39 of 50

Page 40: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45

Road Number Road Number Road Name Mileage Committed

Road Committed Values are Grouped by Project

Project Commitments as of June 30, 2018

Infrastructure Maintenance Trust Fund

Orangeburg 66.440 $20,732,944.04Pavements 32.710 $9,551,632.91P031747 1.260 $493,798.57

SC 6     Old Number Six Hwy 1.260 $493,798.57

P032057 4.060 $1,299,034.54SC 4     Neeses Hwy 4.060 $1,299,034.54

P036815 4.750 $2,366,240.85US 301     Five Chop Rd 4.750 $2,366,240.85

P036816 10.470 $2,689,213.85SC 3 BUS Springfield Rd 0.280 $2,689,213.85SC 4     Neeses Hwy 5.740 $0.00SC 4     Springfield Rd 0.120 $0.00SC 4     Surrey Race Rd 4.330 $0.00

P036908 0.410 $491,160.94US 15     Five Chop Rd 0.410 $491,160.94

P036911 3.120 $1,375,335.66S‐ 205     Bennett St 0.460 $1,375,335.66S‐ 224     Ellis Ave 1.130 $0.00S‐ 224     Gibson St 0.260 $0.00S‐ 25     Boulevard St 1.270 $0.00

P037048 1.650 $139,218.87SC 6     Old Number Six Hwy 1.650 $139,218.87

P037058 2.330 $354,115.64US 321     Savannah Hwy 2.330 $354,115.64

P037063 4.660 $343,513.99S‐ 104     Dawson St 3.770 $343,513.99S‐ 1091     Brookside Dr 0.350 $0.00S‐ 904     Pinehill Rd 0.170 $0.00S‐ 905     Brookside Dr 0.370 $0.00

IMTF Road List to be updated on a periodic basis as additional Projects are committed.

Page 40 of 50

Page 41: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45

Road Number Road Number Road Name Mileage Committed

Road Committed Values are Grouped by Project

Project Commitments as of June 30, 2018

Infrastructure Maintenance Trust Fund

Rural Road Safety 33.730 $11,181,311.13P030486 4.390 $425,565.88

US 78     0.010 $0.00US 78     Dorange Rd 4.380 $425,565.88

P031747 1.260 $90,968.07SC 6     Old Number Six Hwy 1.260 $90,968.07

P032057 4.060 $241,176.57SC 4     Neeses Hwy 4.060 $241,176.57

P036815 4.750 $342,935.20US 301     Five Chop Rd 4.750 $342,935.20

P036816 10.470 $735,686.24SC 3 BUS Springfield Rd 0.280 $735,686.24SC 4     Neeses Hwy 5.740 $0.00SC 4     Springfield Rd 0.120 $0.00SC 4     Surrey Race Rd 4.330 $0.00

P037220 8.800 $9,344,979.17US 301     Five Chop Rd 8.800 $9,344,979.17

IMTF Road List to be updated on a periodic basis as additional Projects are committed.

Page 41 of 50

Page 42: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45

Road Number Road Number Road Name Mileage Committed

Road Committed Values are Grouped by Project

Project Commitments as of June 30, 2018

Infrastructure Maintenance Trust Fund

Pickens 22.050 $4,459,284.35Pavements 22.050 $4,459,284.35P032416 2.000 $2,468,410.56

US 123     Calhoun Mem Hwy 2.000 $2,468,410.56

P032500 2.130 $1,235,528.33S‐ 160     Old Magnolia Rd 0.187 $1,235,528.33S‐ 160     Jones Mill Rd 1.943 $0.00

P034690 2.600 $176,573.80US 123     Calhoun Mem Hwy 2.600 $176,573.80

P034692 0.740 $199,855.46SC 135     N A St 0.670 $199,855.46SC 135     Dacusville Hwy 0.070 $0.00

P034693 11.950 $83,055.00SC 133     Mt Olivet Rd 2.170 $83,055.00SC 133     Crowe Creek Rd 9.780 $0.00

P034703 2.630 $295,861.20S‐ 18     Eighteen Mile Rd 0.266 $295,861.20S‐ 18     Church St 1.344 $0.00S‐ 91     White Oak Rd 1.020 $0.00

IMTF Road List to be updated on a periodic basis as additional Projects are committed.

Page 42 of 50

Page 43: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45

Road Number Road Number Road Name Mileage Committed

Road Committed Values are Grouped by Project

Project Commitments as of June 30, 2018

Infrastructure Maintenance Trust Fund

Richland 38.924 $12,588,684.98Pavements 25.304 $12,228,684.98P030326 4.800 $1,933,477.04

S‐ 32     R Stoudemayer Rd 1.500 $0.00S‐ 234     Freshly Mill Rd 3.300 $1,933,477.04

P030531 0.860 $153,720.00S‐ 3017     Mount View Rd 0.860 $153,720.00

P033673 2.861 $2,102,289.05US 321     Clarendon St 0.040 $0.00US 321     Fairfield Rd 2.352 $0.00SC 12 SPR Forest Dr 0.387 $2,102,289.05SC 12 SPR Strom Thurmond Blvd 0.082 $0.00

P033674 3.413 $2,322,044.91S‐ 31     Bush River Rd 1.200 $0.00S‐ 54     Heins Rd 0.830 $0.00S‐ 73     Colonial Dr 0.343 $0.00S‐ 3048     Columbiana Dr 1.040 $2,322,044.91

P033683 2.060 $2,005,634.56US 76     Garners Ferry Rd 2.060 $2,005,634.56

P036769 0.860 $817,541.12US 1     Two Notch Rd 0.380 $817,541.12US 21 CON Blossom St 0.480 $0.00

P036770 5.170 $1,013,980.96SC 12     Percival Rd 5.170 $1,013,980.96

P036771 3.590 $803,238.02S‐ 129     Kennerly Rd 2.600 $803,238.02S‐ 217     Kennerly Rd 0.990 $0.00

P036899 1.690 $1,076,759.32US 321     Fairfield Rd 1.690 $1,076,759.32

Rural Road Safety 13.620 $360,000.00P036809 13.620 $360,000.00

US 76     Garners Ferry Rd 10.951 $360,000.00US 76     Hill St 2.240 $0.00US 76     0.429 $0.00

IMTF Road List to be updated on a periodic basis as additional Projects are committed.

Page 43 of 50

Page 44: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45

Road Number Road Number Road Name Mileage Committed

Road Committed Values are Grouped by Project

Project Commitments as of June 30, 2018

Infrastructure Maintenance Trust Fund

Saluda 25.960 $7,283,427.46Pavements 16.960 $6,434,558.47P030304 3.470 $1,565,781.12

S‐ 25     Spann Rd 1.300 $0.00S‐ 107     Pencreek Rd 2.170 $1,565,781.12

P031956 2.910 $1,287,933.95SC 121     Newberry Hwy 2.910 $1,287,933.95

P032503 4.690 $2,051,333.09SC 121     Newberry Hwy 4.690 $2,051,333.09

P032504 2.030 $975,018.16S‐ 25     Spann Rd 2.030 $975,018.16

P036823 2.600 $470,075.50US 378     Columbia Hwy 1.460 $0.00US 378     Travis Av 0.160 $0.00US 378     Travis Hwy 0.980 $470,075.50

P036824 1.260 $84,416.65S‐ 136     Emory Rd 0.365 $84,416.65S‐ 136     Ivory Key Rd 0.895 $0.00

Rural Road Safety 9.000 $848,868.99P031956 2.910 $261,021.01

SC 121     Newberry Hwy 2.910 $261,021.01

P032503 4.690 $442,896.49SC 121     Newberry Hwy 4.690 $442,896.49

P032001 1.400 $144,951.49SC 121     Newberry Hwy 1.400 $144,951.49

IMTF Road List to be updated on a periodic basis as additional Projects are committed.

Page 44 of 50

Page 45: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45

Road Number Road Number Road Name Mileage Committed

Road Committed Values are Grouped by Project

Project Commitments as of June 30, 2018

Infrastructure Maintenance Trust Fund

Spartanburg 33.630 $10,999,493.05Pavements 33.630 $10,999,493.05P032353 2.150 $2,073,013.95

US 176     S Pine St 2.150 $2,073,013.95

P032356 4.550 $4,772,863.59SC 101     Highway 101 S 0.840 $4,772,863.59SC 9     Boiling Springs Rd 1.110 $0.00US 176 CO2 N Church St 0.210 $0.00US 221     Chesnee Hwy 2.390 $0.00

P032470 3.880 $2,357,990.42S‐ 45     Old Pacolet Rd 1.821 $0.00S‐ 45     White Plains Rd 0.079 $0.00S‐ 222     Howell Rd 1.980 $2,357,990.42

P033602 3.850 $368,122.93SC 295     Southport Rd 3.850 $368,122.93

P033617 7.750 $617,718.30SC 11     Highway 11 1.110 $617,718.30SC 11     Highway 11 W 6.479 $0.00SC 11     W Cherokee St 0.161 $0.00

P033655 2.500 $136,457.67SC 295     W Blackstock Rd 1.500 $136,457.67SC 295     E Blackstock Rd 1.000 $0.00

P033659 8.950 $673,326.19S‐ 65     New Cut Rd 2.950 $0.00S‐ 190     Mountain View Rd 1.550 $673,326.19S‐ 74     Riveroak Rd 4.450 $0.00

IMTF Road List to be updated on a periodic basis as additional Projects are committed.

Page 45 of 50

Page 46: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45

Road Number Road Number Road Name Mileage Committed

Road Committed Values are Grouped by Project

Project Commitments as of June 30, 2018

Infrastructure Maintenance Trust Fund

Sumter 47.742 $6,561,415.90Pavements 21.940 $5,600,605.44P033679 8.600 $2,428,871.18

US 76     Broad St 8.600 $2,428,871.18

P033680 3.670 $1,606,914.46S‐ 514     Edgehill Rd 1.290 $1,606,914.46S‐ 81     W Brewington Rd 1.650 $0.00S‐ 94     Britton Rd 0.730 $0.00

P036778 4.340 $709,589.79US 76     Broad St 4.340 $709,589.79

P036779 1.990 $414,389.49US 378     Myrtle Beach Hwy 1.990 $414,389.49

P036780 0.970 $420,840.52S‐ 1074     E Wesmark Blvd 0.400 $420,840.52S‐ 1074     W Wesmark Blvd 0.570 $0.00

P037295 2.370 $20,000.00SC 53     Narrow Paved Rd 2.370 $20,000.00

Rural Road Safety 25.802 $960,810.46P033679 4.300 $206,946.89

US 76     Broad St 4.300 $206,946.89

P036778 4.340 $543,863.57US 76     Broad St 4.340 $543,863.57

P036852 7.800 $160,000.00US 76     Broad St 7.800 $160,000.00

P037062 9.362 $50,000.00US 521     Camden Hwy 6.260 $0.00US 521     Thomas Sumter Hwy 3.102 $50,000.00

IMTF Road List to be updated on a periodic basis as additional Projects are committed.

Page 46 of 50

Page 47: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45

Road Number Road Number Road Name Mileage Committed

Road Committed Values are Grouped by Project

Project Commitments as of June 30, 2018

Infrastructure Maintenance Trust Fund

Union 13.300 $4,634,839.14Pavements 13.300 $4,634,839.14P030054 1.420 $937,333.19

S‐ 137     Rice Av Ex 1.420 $937,333.19

P032480 1.560 $268,556.73SC 9     Jonesville Lockhart Hwy 1.560 $268,556.73

P032487 1.850 $206,134.56S‐ 39     Linersville Rd 1.850 $206,134.56

P032506 1.310 $267,646.00SC 9     Jonesville Lockhart Hwy 1.310 $267,646.00

P033600 2.940 $1,201,973.02US 176     Furman L Fendley Hwy 2.940 $1,201,973.02

P033652 2.720 $986,615.67S‐ 13     Pea Ridge Hwy 2.720 $986,615.67

P034720 1.500 $766,579.97US 176     Furman L Fendley Hwy 1.500 $766,579.97

IMTF Road List to be updated on a periodic basis as additional Projects are committed.

Page 47 of 50

Page 48: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45

Road Number Road Number Road Name Mileage Committed

Road Committed Values are Grouped by Project

Project Commitments as of June 30, 2018

Infrastructure Maintenance Trust Fund

Williamsburg 21.740 $7,447,661.56Pavements 21.740 $7,447,661.56P031967 3.720 $1,741,628.68

US 521     Us 521 Hwy 3.720 $1,741,628.68

P031984 1.620 $971,530.56US 521     Us 521 Hwy 1.620 $971,530.56

P032407 4.240 $2,293,404.63US 521     Us 521 Hwy 4.240 $2,293,404.63

P033586 3.020 $1,155,719.39S‐ 52     Roper Woods Rd 3.020 $1,155,719.39

P033629 2.950 $350,997.87US 378     0.459 $0.00US 378     Turbeville Hwy 1.421 $350,997.87US 52     Williamsburg County Hwy N 1.070 $0.00

P033637 3.840 $578,918.42SC 261     Hemingway Hwy 3.840 $578,918.42

P033645 2.350 $355,462.01S‐ 24     Nesmith Rd 2.350 $355,462.01

IMTF Road List to be updated on a periodic basis as additional Projects are committed.

Page 48 of 50

Page 49: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45

Road Number Road Number Road Name Mileage Committed

Road Committed Values are Grouped by Project

Project Commitments as of June 30, 2018

Infrastructure Maintenance Trust Fund

York 25.150 $10,722,847.79Pavements 22.110 $10,622,847.79P030048 0.970 $660,301.82

SC 324     Mcfarland Rd 0.970 $660,301.82

P030055 2.620 $1,262,017.43S‐ 32     Cameron Rd 0.710 $1,262,017.43S‐ 724     Marshall Rd 1.910 $0.00

P032476 3.400 $1,292,550.86SC 161     Old York Rd 3.400 $1,292,550.86

P032481 3.960 $1,497,153.91SC 161     Old York Rd 3.960 $1,497,153.91

P032488 3.420 $757,927.48S‐ 100     Harris St 0.590 $757,927.48S‐ 64     Lincoln Rd 2.830 $0.00

P033601 3.790 $3,106,815.92US 21     Anderson Rd S 3.790 $3,106,815.92

P033620 0.640 $762,868.40US 21     Anderson Rd S 0.640 $762,868.40

P033653 3.310 $1,283,211.97S‐ 1172     Park Place Rd 1.030 $1,283,211.97S‐ 1451     Billy Wilson Rd 1.190 $0.00S‐ 334     Carson Rd 1.090 $0.00

Rural Road Safety 3.040 $100,000.00P037077 3.040 $100,000.00

SC 72     Saluda Rd 3.040 $100,000.00

IMTF Road List to be updated on a periodic basis as additional Projects are committed.

Page 49 of 50

Page 50: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45

Road Number Road Number Road Name Mileage Committed

Road Committed Values are Grouped by Project

Project Commitments as of June 30, 2018

Infrastructure Maintenance Trust Fund

Statewide 0.000 $1,585,000.00Grand Total 1,578.116 $442,751,580.00

IMTF Road List to be updated on a periodic basis as additional Projects are committed.

Page 50 of 50