Infra ICD Leads
• By T0Description of current INFRA
IF Identified (bullet list of requirements) using template
• By T0=12W (RR)– IF Driver Requirements Defined
• By PDRSigned off ICD under Config
INFRA:Dish
• Issues– Final Array Layouts– Loadings and Mechanical Interface– Responsibility for Bolt cage assembly (DISH?)– Power per antenna– Fibre / sleeve IF to DISH (INFRA or SaDT)– UPS for stowing (Dish or INFRA?)– Separate enclosure for Survey (RFI shielded)– Assume 10% of array can fail?
ICD INFRA and DSH...
• Issue– No major IF issues– Control room location?
INFRA:MGR
• By T0Description of current INFRA
IF Identified (bullet list of requirements) using template
• By T0=12W (RR)– IF Driver Requirements Defined
• By PDRSigned off ICD under Config
INFRA:MGR
• Issues– Scale of SDP (Qty racks, power)– RSA : Location study– Power trade off (efficiency)– Power Quality, Redundancy– SDP technology selection timeline
INFRA:SDP
• By T0RSA Location study done
IF Identified (bullet list of requirements) using template
• By T0=12W (RR)– IF Driver Requirements Defined
• By PDRSigned off ICD under Config
INFRA:SDP
Issues– Location of Super computer centre (RSA) – Use of existing Fibre links -AIV– Special requirements for Masers?– INFRA.COMMS data over network
ICD INFRA and SaDT.....
• By T0IF Identified (bullet list of requirements) using
template– Location of RSA SDP study
By T0=12W (RR)– IF Driver Requirements Defined
• By PDRSigned off ICD under Config
INFRA: SADT
• Issues– 250 racks for Pulsar search (RSA)– Rack requirements for LFAA/Survey (AUS)– CSP Distances (Survey)
ICD INFRA and CSP
• By T0Description of current INFRA
IF Identified (bullet list of requirements) using template
By T0=12W (RR)– IF Driver Requirements Defined
• By PDRSigned off ICD under Config
INFRA:CSP
• Issues: – Power system design (Solar?)– Beamformer Bunker
ICD INFRA and LFAA....
• Array configuration
• Firm requirements
• Con Ops
• RFI ITT
• Construction supervision
• Support Concept
• Close loop on Costs
• Scope of Hosting agreements
System Level issues