Induction Trg Module

download Induction Trg Module

of 41

Transcript of Induction Trg Module

  • 8/4/2019 Induction Trg Module

    1/41

    Induction training

  • 8/4/2019 Induction Trg Module

    2/41

    FIRESTATION

    ROOM ROOM

    MCCSTATIONFIRE

    HOUSE

    FIREWATERTANK

    ROOMCONTROL

    GATE

    BRIDGE

    DEPT.

    SECTION

    ROOM

    A-301/

    PLANT

    RAW

    BLOWEL

    TOWER

    ROOM

    STO.

    BRIDGE

    WEIGH

    SHED

    DNPT

    COAL HANDLING

    COAL

    STORAGE

    AREAEXPORTGODOWN

    HOUSE AREA

    COAL BOILER

    OPEN

    STEELYARD

    AREA

    ASSEMBLY

    POINT-4

    SAFE

    SCOOTER

    PARKING

    7800

    PIT

    ROOM

    452500

    3 0 0 0 W ID E R O A D

    GATE

    7 5 0 0 W ID E R O A D

    6000

    WIDE

    ROAD

    6000 WIDEROAD

    B-1013E

    B-502E

    B-502

    MCC

    B-520

    B-504

    B-508

    NT/NC DISTILLATION

    TANKFARM

    REBOILER

    C OLUMN

    B-601CB-602

    CRYSTALLISATION

    CHIMNEY

    B -309T B -309

    STO.TANK&E.G.BRINE

    EVAPORATION

    EHA STORAGETANK

    GATEGATE

    B-1024

    GATE

    SECTION

    CHIMNEY(OPEN TOSKY)

    RESORCINOL

    PLANT

    GODOWN

    GODOWN

    ROOMCHNG.

    (OPEN TOSKY)

    DRYERDRYERROOM

    SHEDPULVERAIRJET

    IZERROOM

    ROOMIZER

    PULVER

    EXTN.BLOWEL

    GODOWN BLDG.

    GODOWN

    BLOWEL

    GODOWN

    INST.DEPT.

    BLDG.

    PLANT

    HEXA/DNPT

    CMCH.

    LAGOONTANKPLATFORM

    DGSETROOM

    MPP PHASE III

    PLANT

    DRYERROOM

    SHEDFOR

    MPPPHASEIII

    GATE

    FILLINGSTATIONNITRIC ACID

    ROOMOPTR.

    ROOM

    SUP.ROOM

    PANEL

    GR.I

    ROOMSUP.

    COMMON PLOTNo.1

    TANK FARM AREA

    PLANT

    STRIPPING

    9002

    ST-520

    RT-521

    RE

    SORCINOL

    PLANT

    PROJECT

    ST-522

    ST-910

    ST-910

    ROOM

    ROOM

    OPTR.

    PANEL

    ST-911

    RESORCINOL

    TANK

    TANK

    ENTERANCE

    SECURITY

    TANK

    INCINERATOR

    PIT

    UP

    UP

    UP

    LIME

    NO.1

    N

    EU

    TRALLISER

    SHED

    FRP

    NO.1

    OFFICE SHEDNO.1

    HAZARDO

    OUSWASTE

    STORAGE AREATANK FARM FOR PETROLIUM

    B-1002AB-1002B

    B-1001AB-1001B

    B-1025

    GODOWN

    BOILER

    OPEN TO SKY

    MAINSTORAGEAREA

    B-1107

    B-1020BB-1161

    B-1020AB-1212 B-1020C

    INST.

    B-1620AB-1620BB-1023

    B-1121A B-1151B

    B-1151A

    B-1056B-1055

    (OPEN TOSKY)

    ENT PLANT

    WATERTREATM

    B-1054B

    PUMP

    CRYST.ZATION SECTIONNEW CRYSTALLI

    NEW

    SECTIONTION

    DISTILLA

    SECTION

    ATION

    DISTILL-

    SECTIONIZATIONCRYSTALL

    SECTION

    FLAKING STORAGE

    DRUMMINGAND

    CHLOROBENZENEPLANT

    NITROTOLUNE/

    (OPEN TO

    TANK

    ACID

    PLANT

    MENT

    TREATWATER

    WASTE

    NEW

    NITRATION

    UTILITY BUILDING

    BUILDING

    ADMINISTRATIVE

    WORKSHOP

    ENGINEERING

    TOWER

    COOLING

    PCCROOM

    SUBSTATION

    ROOM

    PANEL11KV

    ROOMROMERTRANSF

    CONTROL

    MCCAND

    ROOM

    CHILLING

    ROOM

    D GSET

    TANKFARM

    SKY)(OPENTO

    PUMP

    B-1007D

    MCBPLANT

    CHLORINE

    OPTR.ROOM

    B-1005BTB-1005A

    T

    CHLORINESHED

    6000 WIDEROAD

    N

    REF. NORTH

    COOLING TOWER

    100 TR.CHILLING

    UNITNO.1&2

    CIVIL G.N.

    GODOWN

    HAHCl

    SODIUM

    GODOWN

    SULPHATE

    GODOWN

    HAS

    COOLINGTOWER

    10 MTR WIDE ROAD

    COMPOUNDWALL

    NTPLANT

    TR

    EATME-

    WATER

    10 MTR WIDE ROAD

    MCC

    PUMP

    HOUSE

    ERTANK

    FIREWATFEED

    TANK

    WATER

    HOUSE

    PUMP

    T-9/NMAINT

    COOLING TOWER

    TOILET

    DATUM " 00"

    TOILETBLOCK

    MULTIPRODUCTPLANTPH-IC

    OMPOUNDWALL

    TANKPLATFORM

    AUTO

    PLANT

    EFFLUENT

    TREATMENT

    EHNITRATIONTANKFARM

    NITRATION

    PLANT

    COOLING

    (OPENTOSKY)

    A201T

    INTERMEDIATESTORAGE

    TANKAREA

    (OPENTO SKY)

    SKY)

    ROOMOPTR.

    CINOL)

    (RESOR-ETPPLANT

    G.D.I.C.

    R

    OA

    D

    171450

    N A N D S A R I, B A R O D A

    D E E P A K N I T R I T E L I M I T E D

    N=283000

    E=90000

    OPENTOSKY

    TANKPLATFORM

    21330

    400CU.MT.

    LAGOON

    SLUDGEPIT

    LAGOON

    NEW

    GATE

    OPTR.ROOM

    BLDG.

    CAUSTICLYE TANK

    E=28000.

    UNDERGROUNDTANK

    XST-001

    XST-002STORAGEOIL

    LUBIC

    BLDG.EXTN.

    XST-003

    XST-004

    E=32000

    AMMONIASTORAGE TANK

    HOUSECOMP.

    HOUSE

    AUXBOILEREXTENSION

    `C' BLDG.

    SCTION

    SALTHANDELLING

    ELECT.

    SUB

    STATION

    SLAT HAND.SECTION

    EXPN.OF A' BUILDING

    ROOMLTMC

    SUMP

    WATER

    OFFICEPLANT

    GODOWNNITRITESODIUM

    GODOWN

    MATERIALSECTION

    DISSOLVING

    SODA

    GODOWN

    SODIUMNITRITE

    MINIADMINBUILDIN

    G

    GATE

    GATE

    LAGOON`A'

    300M

    LAGOON`B'

    PILOT PLANT

    BUILDINGDEVELOPMENT

    NEWCYCLESTAND

    CANTEEN

    CYCLESTAND

    CYCLESTAND

    OFFICE

    CABIN

    WEIGHGATE

    SO2 CYLINDER

    STORAGE AREAFOR

    HAS PLANT

    RO

    OM

    SHED

    PLANT NO.2

    PROJECT

    TOILET

    MULTIPRODUCT

    SUB

    PROJECT1002

    STATION

    SUB-ELECT.

    6

    MTR

    WIDE

    ROAD

    STATION

    SWITCHYARD

    GATE

    GATE

    GAS

    STATION

    6

    MTR

    WIDE

    ROAD

    CHIMN

    EY

    TOCETP

    90

    01TF-2

    TF-1

    BLOCK

    TOILET

    C-4

    OHC

    CENTRAL STORE

    10 MTR WIDE ROAD

    COMPOUNDWALL

    CYCLESTAND

    BUILDING

    RESEARCH&

    CAR PARKING

    6

    MTR

    WIDE

    ROAD

    ADMINISTRATIVE

    BUILDING

    TANK

    POWER

    TANKPLATFORM

    193000

    SAFE ASSEMBLY

    POINT - 3

    `B'

    K E Y P L A N O F S I T E

    SAFEASSEMBLY

    POINT

    SODIUMNITRITE

    GODOWN

    BUILDING

    `C'

    ELECT.

    ROOM

    PANEL

    EH

    CABIN

    A-501

    A-401

    CRYSTALLISATION

    TOWERCOLUMN

    NO.2TANK

    NO.1

    LIMETANK

    SLUDGEBED

    NO.1TO4

    SAFEASSEMBL

    Y

    POINT-1

    FARM

    AMMONIASTORAGE TANK

    ETHYL CHLORIDECYLINDER

    SAFEASSEMBLY

    POINT-2

    Deepak Nitrite Limited - Nandesari

  • 8/4/2019 Induction Trg Module

    3/41

    DNL - Vision

    Deepak Nitrite began with a vision to support the countrys drive towards selfsufficiency and import substitution in 1970.

    What began as a fully indigenous sodium nitrite and sodium nitrate plant inNandesari, Gujarat, has now grown into a globally proactive company with apresence in over 20 countries , including USA, European Union & EastEuropean nations, Japan, ASEAN countries, South Korea and South America.

    This has led to a paradigm shift from low value bulk chemicals andintermediates to high value fine and specialty chemicals based on our coreexpertise as well as lateral and vertical integration of our existing products,exploring downstream derivatives.

    With a strong focus on customer satisfaction, the company has set up CustomManufacturing services to meet specific needs of end users.

    Our capabilities extend to the manufacture of high-value, specialty productseither based on our own end products or developed especially for our users.

    DNL has been ranked amongst the top 500 Body corporate by Dun andBradstreet for the last three years.

  • 8/4/2019 Induction Trg Module

    4/41

    Induction training Mission statement

    Mission StatementThe purpose of all human activity is to make life better. DNL believes in improvinglife through innovative science. Through innovations, we constantly endeavor tobring better products and processes that bring greater value to society

    Core Purpose

    "Improve Life Through Innovative Science"

    VisionWe are a role model enterprise, respected globally for excellence in quality andinnovationWe enhance stakeholder value while adhering to the code of responsible care and

    ethical valuesWe are an employer of choice and preferred business partner worldwide

  • 8/4/2019 Induction Trg Module

    5/41

    Induction training - Values

    Corporate Values

    DNL believes in honoring its commitment. integrity and transparency are anintegral part of our relationship with customers, employees, society.

    Respect for Life: the company believes that life in all its forms must berespected. We respect and value our people. Our employees are our value

    creators whose efforts, creativity and bond we cherish.

    Our customers, who reward us for our value creation and our stakeholders, whoare committed to us in our endeavour to improve life. We also recognize andrespect our environment and take every effort to preserve it.

  • 8/4/2019 Induction Trg Module

    6/41

    Induction training Value statement

    ValueStatement

    Integrity We are open, ethical , transparent & uncomprising in ourwork.

    DecisivenessSet a goal, analyze the facts and work on alternatives andconclude them in fixed time frame.

    Team SpiritWe encourage group interaction and working together.United and collective drive achieves the desired goal.

    CommitmentWe keep all promises made within and outside thecompany.

    CaringWe are concerned for our environment, society andemployees and work for their betterment.

    Excellence We are a role model and benchmark company for ourproducts, services and business processes.

    InnovationWe nurture creativity and encourage application ofknowledge and ideas in all facets of our business.

    Customer OrientationCustomer is uppermost in our mind.We work to exceed his expectations

  • 8/4/2019 Induction Trg Module

    7/41

    Induction training - Quality

    At DNL quality is the keyword in every activity and a constant endeavour toachieve standards of the highest levels has been an ongoing commitment fromthe time of its inception as well as recognition and acknowledgement of thisdevotion. This achievement has been set as a benchmark to go forward inexcellence.For DNL it is an ongoing process to continuously explore new product

    applications, competitive technologies and potential markets. DNL has scaledthis success with its trademark of commitment and quality.The commitment towards this is apparent from the fact that DNL has a totalmanpower of 85 persons supporting the Quality and Technical functions at itsvarious manufacturing facilities.All its products are manufactured in accordance with the current acceptable

    world standards. All its manufacturing facilities have been upgraded conformingto the current ISO:9001:2000 standard, from the earlier ISO:9002:1994 standard,and are now certified by Intertek for ISO:9001:2000 standard.

  • 8/4/2019 Induction Trg Module

    8/41

    Induction training - Environment

    Environment

    Our respect for the environment is reflected in our efforts at ensuring bestpractices followed at all levels. We not only adhere to the statutory norms but havea holistic approach towards environmental protection.

    We are a signatory to the worldwide Responsible Care initiative.The major environmental issues addressed are:

    Ongoing manufacturing processes are studied in detail with a view to minimizegeneration of liquid/gaseous waste streams as a part of continuous improvement.

    A specially constituted Pollution Control Cell at our R&D centre is actively engagedin developing technologies for environment protection at our manufacturing plants.Our Pollution Cell in fact also helps out smaller industrial units that do not have

    capabilities and infrastructure for such jobs. The efforts of our team are not aimedat just pollution minimization but also to conserve energy, improve process yieldsand product quality.

  • 8/4/2019 Induction Trg Module

    9/41

    Induction training - Environment

    At our manufacturing sites we ensure a clean environment by:

    Continuously operating Effluent Treatment Plants Burning of waste gases Controlling NOX emission

    Monitoring of ambient air quality Monitoring of effluents and emission quality Safely disposing solid waste

    The above practices help in achieving strict compliance with statutory standardslaid down by the regional Pollution Control Authorities for plant effluent andemission quality.

  • 8/4/2019 Induction Trg Module

    10/41

    Induction training

  • 8/4/2019 Induction Trg Module

    11/41

    Induction training

  • 8/4/2019 Induction Trg Module

    12/41

    Induction training

  • 8/4/2019 Induction Trg Module

    13/41

    Induction training

  • 8/4/2019 Induction Trg Module

    14/41

    Induction training

    Responsible Care System(include Environment & Occupational health safety mgmt system)

  • 8/4/2019 Induction Trg Module

    15/41

    Induction training Emergency response

    Emergency response plan

    Probable emergency scenarios

    siren system

    assembly point

    Emergency control Centre : Telephone No. 300,216,264

    Occupational Health Centre : Telephone No. 235

  • 8/4/2019 Induction Trg Module

    16/41

    HR MODULES

  • 8/4/2019 Induction Trg Module

    17/41

    PracticesAn aggressive PMS based system.Learning and organization development learning opportunityat every level to actively prepare you for the next.An organization and management review process at the

    management committee level that reviews the status andprogress of talented manpower.Accelerated increment to unionized staff.RecruitmentEmployees referral system / direct / throughconsultancy.Induction.Training & Development.

  • 8/4/2019 Induction Trg Module

    18/41

    ADMINISTRATION:3.1 Attendance system:

    The Company has a Biometric attending recording system Anemployee while coming in the relevant shift has to register hisattendance while entering and leaving the premises.Entry & Exit:

    No workman shall enter or leave the premises of the establishment

    except by the gate or gates fixed for the purpose.The establishment will not be responsible in any way for any damage /

    loss caused to any personal property brought inside theestablishment by a workman with or without the permission of themanager.

    No workman shall leave the premises of the establishment ordepartment concerned during working hours without obtaining agate pass from his department head or the person so authorized byhim.

    3.3Work timings: 9.00 AM TO 5.00 PM[General ) -

    WORKING DAYS - 6 days -WEEKLY OFF- Sunday 6.00 AM TO 2.00 PM 1st shift

    Induction training

  • 8/4/2019 Induction Trg Module

    19/41

    Leave rules:

    The leave account year for all employees is the period Jan to Dec.Privilege leave:

    A permanent employee on completion of one years continuous service will be

    eligible for privilege leave in the succeeding year on the pro-rata basis

    Privilege leave may be accumulated up to 180 days in case of Managementcadre. However, there is no limitation in case of unionized category.Employee who is on probation is entitled to privilege leave completion of theperiod probation. But, this eligible leave will be credited to his account on 1stday of next calendar year.Privilege leave is in the nature of annual and therefore, will not be permitted to

    be availed on more than four occasions in a leave accounting year.In case of PL, any paid holidays/weekly off falling in between will be countedwith respect to the Management cadre. However, it will not be counted in caseof unionized category and the management staff working in the plant.

    Induction training

  • 8/4/2019 Induction Trg Module

    20/41

    Casual leave:

    A permanent employee may be granted 10 days Casual leave with pay duringthe account year.An employee will be allowed to utilized minimum day and maximum 3 daysof Casual leave at a time during a leave accounting year.An employee, who is on probation, will be allowed to utilize casual leave onpro-rata basis.

    Casual leave cannot be prefixed or suffixed with the intervening weekly day ofrest of compensatory off or any other holidays, privilege leave to be availableat a time.This leave is non-cumulative in character and therefore, under nocircumstances be carried forward to the following year. Unavailed casual

    leave will be allowed to be encased at the end of leave accounting year. If anemployee leaves by any nature, he will be allowed to encash the balancecausal leave as per the rules of the company.

    Induction training

  • 8/4/2019 Induction Trg Module

    21/41

    Sick leave:

    A permanent employee in management cadre (M1 to M8) may be alloweda total 12 days sick leave with pay either at one time or at different timesduring the leave account year. Whereas, employee in unionized categoryis eligible fro 15 days sick leave in a year.Sick leave is accumulated up to 60 days for Management cadre. But, thereis no limit for unionized category and it cannot be encashed. However, in

    excess of 60 days accumulation, it will be converted as Privilege leave andwill be allowed to encash the same, as per the rules of the company.When an employees desires to avail sick leave more than 2 days, hisapplication for sick leave must be supported by a certificate fromcompanys medical officer or a registered medical practitioner.

    Induction training

  • 8/4/2019 Induction Trg Module

    22/41

    Induction training

    General:Every application for any kind of leave under the above rules must be made

    in the prescribed form for obtaining the prior permission of the sanctioningauthority. Normally, prior permission for leave must be obtained from thesanctioning authority

    If an employee while on leave desires an extension thereof, he must makean application to that effect in writing to the sanctioning authority sufficientlyin advance to enable him to consider such application and pass necessaryorders to be communicated to the applicant before the expiry of the leaveoriginally sanctioned.Where exigencies of service so require, discretion to refuse, curtain orrevoke leave of any description is reserved to the sanctioning authority and

    the employee already on leave may therefore, be recalled to resume duty bythat authority.Trainees / probationers are entitled for casual leave as per the existing rules.Any absence beyond the permissible period is considered as unauthorizedabsence /leave.All employees can avail 2 short leave (3 hours) in a month.

    Trainees are eligible fro 20 days PL on pro-rata basis.

  • 8/4/2019 Induction Trg Module

    23/41

    Induction training

    Public holidaysBefore end of every calendar year, a list of holidays for the next calendar yearwill be declared. It varies from location to location

    5. EMPLOYEE WELFARE & POLICYWelfare facility applicable to Nandesari Unit.

    Two pair uniform being given to all permanent and trainee employees once in a

    year. Rs. 300/- will be paid to them towards stitching charges.One pair Leather shoe being provided to all permanent and trainee employees

    once in year.

    One rain coat being provided to all permanent employees once in a threeyears.

    A sum of Rs. 350/- being paid to all permanent employees towards the cost ofWoolen jersey once in a three years.

    One Kg. Sweets worth Rs. 150/- being given to all permanent and traineesemployees at the time of Diwali

    Medical reimbursement between Rs. 300 to 450and- being given to theemployees who are out of ESIC scheme.

  • 8/4/2019 Induction Trg Module

    24/41

    Induction training

    Salary advance will be given only in case of emergency.

    A sum of Rs. 1500/- being paid as Festival advance , whichwill be recoverable in five installment.Subsidized canteen facility is extended to all permanent andtrainees employees.Children education reimbursement:Rs. 20/- per child up to to 5th STD.

    Rs.30/- per child up to 10th std.Maximium 3 children.Child education cash award of Rs. 150/- being paid to thechildren who have scored more than 70% marksLoan through Co-operative credit society being paid to itsmembers.A sum equivalent to one day salary of each members beingdeducted from the salary and will be paid to survivingmembers of the to Family of Deceased Members.A sum of Rs. 2500/- being paid to surviving members of theemployees, who died while in services, for completing his lastrites without any problem

  • 8/4/2019 Induction Trg Module

    25/41

    Induction training

    Occupational Health Centre with Paramedical staff and one part-time

    doctor is available in the campus specifically to ensure that anyoccupational disease contracted by the employee is treated promptly andadequately. Further, the post-employment medical check ups are alsoundertaken twice in a year to diagnose the employees thoroughly and toensure that he does not contract any vulnerable disease.Reward & Recognition

    Appreciation letter and a token payment being distributed to respectiveemployees who shows courage while helping to mitigate the accidents.

  • 8/4/2019 Induction Trg Module

    26/41

    Induction training

    Medical benefits:Health Insurance SchemeThe company has group accident / medi-claim policy which

    provided for better social security and medical benefits.These benefits /features are subject to change from time totime depending on the changes made in the policy clauses

    by the insurance company and in any case will not bebinding on the company if not included in the policy at thatpoint of time.

    Hospitalization / Health Insurance Scheme for self and family,50% of the premium will be borne by the Company and 50%premium will be deducted from your salary.

  • 8/4/2019 Induction Trg Module

    27/41

    Induction training

    Gratuity

    When an employee completed five years of continuous services, he becomeseligible for gratuity. The amount due is payable to the employee at the time ofretirement or cessation of services with the company as per the Gratuity Rules.Superannuation:When an employee joins in the Management cadre, he will be eligible forSuperannuation, which is being managed by LIC of India. This amount will be

    paid on his cessation of employment either on resignation, retirement or death.

    Provident fundProvident fund provisions apply to every employee from the date of joining the

    company. The contribution shall be made as per provision of Provident fundrules. This fund is management of Regional Provident fund commissioner andall rules and regulation will be applicable as per Govt. PF Rules.

  • 8/4/2019 Induction Trg Module

    28/41

    Induction training

    PROCESS

    Talent acquisitionThe recruitment for the senior management employee being handled by CorporateHR, as per Recruitment Policy / Employees referral system.InductionAfter joining a candidate, he will be received by Reception and then send him to HRdepartment where he has to complete all joining formalities. HR will arrange one

    day orientation programme. He will also be handed over joinees kit.After completion of orientation programme, he will be sent to concern HOD.

  • 8/4/2019 Induction Trg Module

    29/41

    Induction training

    Confirmation

    After completion of probation period, he will be asked to fill upperformance appraisal form and his HOD will discuss the same withhim . If he found to be eligible for confirmation, he will be given aletter of confirmation. Otherwise, he may be asked to concentratemore on the areas to be improved and accordingly a letter givingextension of his probation period will be issued.

    Learning & Development:HR department will prepare Training calendar for the year involvinginternal and external faculties.

    Performance Management System:

    All management cadre employees shall evaluated through KRAs.Increments are effective from Apr 1 of the respective year to theManagement cadre. In case of unionized category, it will be effectivefrom October 1, of the respective year.

  • 8/4/2019 Induction Trg Module

    30/41

  • 8/4/2019 Induction Trg Module

    31/41

    Induction training

    Farewell & Exit InterviewRetiring employees will be given a memento in appreciation of hislong servicesAn employee who leaves the services will be interviewed by theHead-HR and Unit Head where he can freely express his view

    about the company give his suggestions.

  • 8/4/2019 Induction Trg Module

    32/41

    Induction training

    House magazineA quarterly magazine named Ujala being released by the Corporateoffice incorporating all the important activities

  • 8/4/2019 Induction Trg Module

    33/41

  • 8/4/2019 Induction Trg Module

    34/41

    Induction training

  • 8/4/2019 Induction Trg Module

    35/41

    Induction training

  • 8/4/2019 Induction Trg Module

    36/41

    Induction training

  • 8/4/2019 Induction Trg Module

    37/41

    Induction training

  • 8/4/2019 Induction Trg Module

    38/41

    Induction training

  • 8/4/2019 Induction Trg Module

    39/41

  • 8/4/2019 Induction Trg Module

    40/41

  • 8/4/2019 Induction Trg Module

    41/41