INDIANA - IN.gov km/h2 Area square inch square foot square yard acre square mile in2 ft2 yd2 ac mi2...

1184
INDIANA DEPARTMENT OF TRANSPORTATION ____________ STANDARD SPECIFICATIONS 2016

Transcript of INDIANA - IN.gov km/h2 Area square inch square foot square yard acre square mile in2 ft2 yd2 ac mi2...

  • INDIANA

    DEPARTMENT OF

    TRANSPORTATION ____________

    STANDARD

    SPECIFICATIONS

    2016

  • MICHAEL R. PENCE GOVERNOR

    INDIANA DEPARTMENT OF TRANSPORTATION

    Karl B.Browning

    COMMISSIONER

    STANDARDS COMMITTEE

    CHAIRMAN

    Mark A. Miller, Construction Management Director

    MEMBERS

    David Boruff, Traffic Engineering

    Robert D. Cales, Contract Administration

    Louis Feagans, District Production Management

    David Holtz, Pavement Engineering

    Michael Koch, Fort Wayne District Construction

    Greg Pankow, State Construction Engineer

    Elizabeth Phillips, Bridge Standards and Policy

    Ronald P. Walker, Materials Management

    Peter Yao, Highway Design and Technical Support

    SECRETARY

    Scott T. Trammell, Construction Specifications Engineer

  • iii

    MEASUREMENTS The first two paragraphs of 109.01, Measurement of Quantities reads as follows: (a) General Requirements All measurements of work completed under the contract will be according to the English System unless otherwise specified. The standard measures shown in this publication are primarily in the English System of Units such as feet and inches, pounds, gallons, and acres. Any metric equivalents, shown in parentheses, are intended only for those contracts in which they are specified, or to maintain consistency with industry standards. No guarantee is provided, explicit or implicit, that the units are accurate conversions. The following general notes and table are provided to assist you in becoming familiar with the metric system.

  • iv

    SI UNITS AND CONVERSION FACTORS

    MEASUREMENT ENGLISH UNIT ENGLISH

    UNIT SYMBOL

    MULTIPLIER FOR CONVERSION FROM ENGLISH UNIT TO

    SI UNIT (*) SI UNIT SI SYMBOL

    Acceleration foot per second squared mile per hour squared

    ft/sec2mi/h2

    0.304 8 exactly 1.060 93

    meter per second squared kilometer per hour squared

    m/s2 km/h2

    Area square inch square foot square yard acre square mile

    in2 ft2 yd2 ac mi2

    645.16 exactly 0.092 9 0.836 1 0.404 7

    2.59

    square millimeter square meter square meter hectare square kilometer

    mm2 m2 m2 ha km2

    Density pound per cubic foot lb/ft3 16.018 46 kilogram per cubic meter kg/m3 Energy footpound force

    kilowatt hour ft lbf kW h

    1.355 8 3 600 000. exactly

    joule joule

    J J

    Force/Weight (Gravity of Force)

    pound force kilopound force ton

    lbf kip t

    4.448 2 4.448 2 8.896 4

    newton kilonewton kilonewton

    N kN kN

    Length inch foot yard mile

    in. ft yd mi

    25.4 exactly 0.304 8 exactly 0.914 4 exactly

    1.609 3

    millimeter meter meter kilometer

    mm m m km

    Mass ounce pound mass ton mass

    oz lbm t

    28.349 5 0.453 6 0.907 2

    gram kilogram megagram

    g kg Mg

    Power horsepower (550 ftlbf/s) hp 745.669 9 watt W Pressure/Stress pound per square inch

    pound per square foot kilopound per square inch

    lb/in2 lb/ft2 kip/in2

    6.894 8 0.047 88

    6.894 8

    kilopascal kilopascal megapascal

    kPa kPa MPa

    Speed/Velocity foot per second mile per hour

    ft/s mi/h

    0.304 8 exactly 1.609 3

    meter per second kilometer per hour

    m/s km/h

  • v

    Temperature degree Fahrenheit F (F -32)/1.8(**) exactly degree Celsius C Volume, Fluid cubic inch

    fluid ounce gallon 1000 gallons

    in3 fl oz gal. kGAL.

    16.387 1 29.573 4

    3.785 4 3.785 4

    milliliter milliliter liter kiloliter

    mL mL L kL

    Volume, Solid cubic inch cubic foot bushel cubic yard 1000 feet board measure

    in3 ft3 bu yd3 MFBM

    16.387.06 exactly 0.028 32 0.035 24

    0.764 6 2.359 7

    cubic millimeter cubic meter cubic meter cubic meter cubic meter

    mm3 m3 m3 m3 m3

    (*) Conversion from SI unit to English unit may be made by dividing the SI unit by the conversion factor shown in this column. (**) This is a formula, and not a multiplier. The Fahrenheit temperature is substituted for F in the formula to attain the Celsius temperature. Conversion from Celsius

    temperature to Fahrenheit temperature may be made by substituting the Celsius temperature for C in the formula (1.8 x C) +32. This is an exact conversion. Angles will continue to be measured in degrees, minutes, and seconds instead of radians.

  • vi

    GENERAL NOTES 1. The SI unit of millimeter should be used to convert inches to millimeters. 2. The SI unit of Mass is the Kilogram (Kg) which should be used for smaller

    masses expressed in pounds. The megagram (Mg) should be used for larger masses expressed in tons.

    3. All units peculiar to the various cgs systems (measurement systems constructed

    by using the centimeter, gram and second as base units) are to be avoided. 4. In commercial and everyday use, the term weight nearly always means mass;

    thus, when one speaks of a persons weight, the quantity referred to is mass. In Science and Technology, the term weight of a body has usually meant the force that, if applied to the body, would give it an acceleration equal to the local acceleration of free fall g (acceleration of gravity). When the term is used, it is important to know whether mass or force is intended and to use SI Units properly, by using Kilograms for Mass or Newtons for Force. The use of force of gravity (mass times acceleration of gravity) instead of weight with this meaning is recommended. Because of the dual use of the term weight as a quantity, this term should be avoided in technical practice except under circumstances in which its meaning is completely clear.

    5. The term load means either mass or force, depending on its use. A load that

    produces a vertically downward force because of the influence of gravity acting on a mass may be expressed in mass units. Any other load is expressed in force units.

    6. A quantity stated as limits, such as not more than or maximum, must be

    handled so that the stated limit is not violated. 7. Conversion of quantities should be handled with careful regard to the implied

    correspondence between the accuracy of the data and the given number of digits. In all conversions, the number of significant digits retained should be such that accuracy is neither sacrificed nor exaggerated. For example, a length of 125 ft converts exactly to 38.1 m. If however, the 125 ft length has been obtained by rounding to the nearest 5 ft, the conversion should be given as 38 m. The proper conversion procedure is to multiply a value by a conversion factor that is more accurate than is required, the result is then rounded to the appropriate number of significant digits.

    8. For calculation of results, avoid rounding of intermediate quantities. For

    reporting results, the rule for addition and subtraction is that the answer shall contain no significant digits farther to the right than occur in the least precise number. The rule for multiplication and division is that the product or quotient

  • vii

    shall contain no more significant digits than are contained in the number with the fewest significant digits used in the multiplication.

    9. When a figure is to be rounded to fewer digits than the total number available,

    the standard 5 up procedures should be used as follows: (a) When the first digit discarded is less than 5, the last digit retained

    should not be changed. For example, 3.46325, if rounded to three digits, would be 3.463; if rounded to two digits, would be 3.46.

    (b) When the first digit discarded is 5 or greater, the last digit retained

    should be increased by one unit. For example, 8.37652, if rounded to three digits, would be 8.377; if rounded to two digits would be 8.38.

    10. Refer to ASTM SI 10 American National Standard for Use of the International

    System of Units (SI) for other conversion factors. 11. This specification book uses the word shall to describe the Contractors

    responsibilities. The word will is used to describe the Departments responsibilities. The words shall and will are not required to be followed by the words by the Contractor or by the Department to retain these meanings.

  • TABLE OF CONTENTS

    Section Title Page

    viii

    SECTION 100 GENERAL PROVISIONS

    SECTION 101 DEFINITIONS AND TERMS ....................................................... 1 101.01 Abbreviations ........................................................................................... 1 101.02 Above Normal Inclement Weather Days ................................................. 3 101.03 Blank ........................................................................................................ 4 101.04 Bid Bond .................................................................................................. 4 101.05 Bidder ...................................................................................................... 4 101.06 Bridge ...................................................................................................... 4

    (a) Length ..................................................................................................... 4 (b) Roadway Width ...................................................................................... 4

    101.07 Business Day ........................................................................................... 4 101.08 Calendar Day ........................................................................................... 4 101.09 Change Order ........................................................................................... 4 101.10 Construction Limits ................................................................................. 4 101.11 Contract ................................................................................................... 4 101.12 Contract Information Book ...................................................................... 5 101.13 Contract Item (Pay Item) ......................................................................... 5 101.14 Contract Time .......................................................................................... 5 101.15 Contractor ................................................................................................ 5 101.16 Culvert ..................................................................................................... 5 101.17 Commissioner .......................................................................................... 5 101.18 Department .............................................................................................. 5 101.19 Embankment Foundation ......................................................................... 5 101.20 Engineer ................................................................................................... 6 101.21 Equipment ................................................................................................ 6 101.22 Extra Work .............................................................................................. 6 101.23 Failed Material ......................................................................................... 6 101.24 Force Account Work ................................................................................ 6 101.25 Frequency Manual ................................................................................... 6 101.26 Holidays ................................................................................................... 6 101.27 Invitation for Bids .................................................................................... 7 101.28 Itemized Proposal .................................................................................... 7 101.29 Laboratory ............................................................................................... 7 101.30 Major and Minor Contract Items ............................................................. 7 101.31 Materials .................................................................................................. 7 101.32 Notice to Proceed ..................................................................................... 7 101.33 Open to Unrestricted Traffic .................................................................... 7 101.34 Pavement Structure .................................................................................. 7 101.35 Performance Bond ................................................................................... 8 101.36 Plans ........................................................................................................ 8 101.37 Professional Engineer .............................................................................. 8 101.38 Profile Grade ............................................................................................ 8 101.39 Project ...................................................................................................... 8

  • TABLE OF CONTENTS

    Section Title Page

    ix

    101.40 Proposal ................................................................................................... 8 101.41 Proposal Book .......................................................................................... 8 101.42 Quality Assurances Adjustments ............................................................. 8 101.43 Reasonably Close Conformance .............................................................. 8 101.44 Right-of-Way ........................................................................................... 9 101.45 Road ......................................................................................................... 9 101.46 Roadbed ................................................................................................... 9 101.47 Roadside .................................................................................................. 9 101.48 Roadside Development ............................................................................ 9 101.49 Roadway .................................................................................................. 9 101.50 Schedule of Pay Items ............................................................................. 9 101.51 Shoulder ................................................................................................... 9 101.52 Sidewalk ................................................................................................ 10 101.53 Special Provisions .................................................................................. 10 101.54 Specifications ......................................................................................... 10 101.55 Specified Completion Date .................................................................... 10 101.56 State ....................................................................................................... 10 101.57 Street ...................................................................................................... 10 101.58 Structures ............................................................................................... 10 101.59 Substantial Completion .......................................................................... 10 101.60 Blank ...................................................................................................... 10 101.61 Subcontractor ......................................................................................... 10 101.62 Subgrade ................................................................................................ 11 101.63 Substructure ........................................................................................... 11 101.64 Superintendent ....................................................................................... 11 101.65 Superstructure ........................................................................................ 11 101.66 Supplemental Specifications .................................................................. 11 101.67 Surety ..................................................................................................... 11 101.68 Technician or Inspector ......................................................................... 11 101.69 Titles (Headings) ................................................................................... 11 101.70 Township, Town, City ........................................................................... 11 101.71 Traveled Way ........................................................................................ 11 101.72 Work ...................................................................................................... 12 101.73 Work Day .............................................................................................. 12 101.74 Working Drawings................................................................................. 12

    SECTION 102 BIDDING REQUIREMENTS AND CONDITIONS .................. 12 102.01 Prequalification and Bidding ................................................................. 12 102.02 Certification Regarding Lobbying for Contracts, Grants,

    Loans, and Cooperative Agreements ..................................................... 12

    SECTION 103 AWARD AND EXECUTION OF CONTRACT ......................... 13 103.01 Disadvantaged Business Enterprise Program ........................................ 13

    (a) General Requirements ........................................................................... 13 (b) Definitions ............................................................................................ 13

  • TABLE OF CONTENTS

    Section Title Page

    x

    1. DBE ................................................................................................... 13 2. Small Business Concern .................................................................... 14 3. Socially and Economically Disadvantaged Individuals ..................... 14 4. Certified DBE .................................................................................... 14

    (c) Goal ....................................................................................................... 14 1. DBE Joint Venture Type A ................................................................ 15 2. DBE Joint Venture Type B ................................................................ 15

    (d) Affirmative Actions .............................................................................. 16 (e) Determination of Good Faith Efforts .................................................... 16

    1. Good Faith Efforts Prior to Award .................................................... 16 2. Good Faith Efforts for Extra Work .................................................... 19

    (f) Affirmative Action Certification ........................................................... 20 (g) Subcontracts .......................................................................................... 21 (h) Leases and Rentals ................................................................................ 21 (i) Records and Reports .............................................................................. 22

    103.02 Specific Equal Employment Opportunity Responsibilities .................... 23 103.02.1 Record Keeping .................................................................................. 23 103.03 Blank ...................................................................................................... 23 103.04 Insurance ................................................................................................ 24

    (a) Workers Compensation and Employers Liability ............................... 24 (b) Commercial General Liability .............................................................. 24 (c) Business Automobile Liability .............................................................. 25 (d) Railroads Protective Liability .............................................................. 25 (e) Owners and Contractors Protective Liability Insurance

    Coverage for Operations of Designated Contractor .............................. 25 (f) Basis of Payment ................................................................................... 26

    103.05 Waiver of Damages ............................................................................... 26 103.06 Wage and Labor Requirements .............................................................. 26

    (a) Non-discrimination of Employees ........................................................ 26 (b) Affidavits and Payrolls ......................................................................... 27 (c) Wage Stipulations ................................................................................. 27

    1. General Decision Included in Contract Information Book ................ 27 2. General Decision Not Included in Contract Information Book ......... 28

    103.07 Accident Prevention and Safety ............................................................. 28

    SECTION 104 SCOPE OF WORK ...................................................................... 28 104.01 Intent of Contract ................................................................................... 28 104.02 Changed Conditions............................................................................... 29

    (a) Differing Site Conditions ...................................................................... 29 (b) Suspensions of Work Ordered by the Engineer .................................... 30 (c) Significant Changes in the Character of Work ...................................... 30 (d) Pre-established Remedies to Changed Conditions ................................ 31

    1. Acceleration ....................................................................................... 32 2. Inefficiencies ..................................................................................... 33 3. Unrecoverable Costs .......................................................................... 33

  • TABLE OF CONTENTS

    Section Title Page

    xi

    4. Unacceptable Cost Calculation Methods ........................................... 33 104.03 Extra Work ............................................................................................ 33 104.04 Maintenance of Traffic .......................................................................... 34

    (a) Special Detours ..................................................................................... 34 (b) Maintenance Directed by the Engineer ................................................. 35 (c) Blank ..................................................................................................... 35 (d) Traffic Control for Patching on a Two-Lane Roadway ........................ 35

    104.05 Removal and Disposal of Structures and Obstructions .......................... 36 104.06 Removal and Disposal of Regulated Materials ...................................... 36

    (a) For Such Materials which are Identified in the Proposal Book as Being Present on the Project Site ............................................ 37

    (b) For Such Materials which are not Identified in the Proposal Book as Being Present on the Project Site ............................................ 37

    104.07 Rights in and Use of Materials Found in the Project Site ...................... 40 104.08 Final Clean-Up ...................................................................................... 40

    SECTION 105 CONTROL OF WORK ................................................................ 41 105.01 Authority of the Engineer ...................................................................... 41 105.02 Plans and Working Drawings ................................................................ 41 105.03 Conformance with Plans and Specifications .......................................... 42 105.04 Coordination of Plans, Standard Specifications, Supplemental

    Specifications, and Special Provisions .................................................. 43 105.05 Cooperation by Contractor .................................................................... 44 105.06 Cooperation with Utilities ...................................................................... 44 105.07 Cooperation Between Contractors ......................................................... 45 105.08 Construction Stakes, Lines, and Grades ................................................ 45

    (a) Construction Engineering by the State .................................................. 45 (b) Construction Engineering by the Contractor ......................................... 46 (c) Production Staking by the Contractor ................................................... 49

    105.09 Duties of Technician and Inspector ....................................................... 50 105.10 Inspection of Work ................................................................................ 51 105.11 Removal of Unacceptable and Unauthorized Work .............................. 51 105.12 Load Restrictions ................................................................................... 52 105.13 Maintenance During Construction ......................................................... 52 105.14 Failure to Maintain Roadway, Structures, Barricades,

    and Construction Signs .......................................................................... 52 105.15 Acceptance and Final Inspection ........................................................... 53

    (a) Partial Acceptance ................................................................................. 53 (b) Final Acceptance................................................................................... 53

    105.16 Notice of Changed Conditions and Claims ............................................ 54 (a) Contractual Notice of a Changed Condition ......................................... 54 (b) Claims ................................................................................................... 55

    1. Required Documentation ................................................................... 55 2. Auditing of Claims ............................................................................ 56

    (c) Claim Resolution Process ..................................................................... 56

  • TABLE OF CONTENTS

    Section Title Page

    xii

    1. Project Level Review ......................................................................... 56 2. District Office Review ....................................................................... 57 3. Central Office Review ....................................................................... 58

    SECTION 106 CONTROL OF MATERIAL ....................................................... 59 106.01 Source of Supply and Quality Requirements ......................................... 59

    (a) Approved or Prequalified Materials ...................................................... 59 (b) Material Records ................................................................................... 60

    1. Documentation of Material Delivery ................................................. 60 2. Delivery Ticket Information .............................................................. 60 3. Payment Procedures ........................................................................... 60

    (c) Buy America Requirement .................................................................... 61 106.02 Samples, Tests, Cited Specifications ..................................................... 61 106.03 Plant Inspection ..................................................................................... 62 106.04 Blank ...................................................................................................... 62 106.05 Storage of Materials ............................................................................... 63 106.06 Handling of Materials ............................................................................ 63 106.07 Unacceptable Materials ......................................................................... 63 106.08 Hazard Communication Program .......................................................... 63 106.09 Department Furnished Materials ........................................................... 64 106.10 Proportioning Materials ......................................................................... 64 106.11 Sample Asbestos Exclusion Letter ........................................................ 64

    SECTION 107 LEGAL RELATIONS AND RESPONSIBILITY TO PUBLIC .. 64 107.01 Laws to be Observed ............................................................................. 64 107.02 Permits, Licenses, and Taxes ................................................................. 66 107.03 Patented Devices, Materials, and Processes .......................................... 66 107.04 Restoration of Surfaces Opened by Permit ............................................ 67 107.05 Federal Aid Provisions .......................................................................... 67 107.06 Equal Employment Opportunity Trainees ............................................. 67 107.07 Sanitary Conditions Requirements ........................................................ 69 107.08 Public Convenience and Safety ............................................................. 69

    (a) Worker Safety ....................................................................................... 70 (b) Dust and Air Pollution .......................................................................... 70 (c) Protection to Traffic .............................................................................. 70 (d) Notice to Local Public Officials ........................................................... 71 (e) Convenience to Traffic and Property Owners ....................................... 71

    107.09 Railroad-Highway Requirements .......................................................... 71 (a) Protection of Track Ballast .................................................................... 72 (b) Hold Harmless Clause .......................................................................... 72

    107.10 Archaeological Artifacts ........................................................................ 73 107.11 Bridges over Navigable Waters ............................................................. 73 107.12 Traffic Control Devices ......................................................................... 73 107.13 Use of Explosives .................................................................................. 75 107.14 Protection and Restoration of Property and Landscape ......................... 75

  • TABLE OF CONTENTS

    Section Title Page

    xiii

    107.15 Erosion Control Plan and Proof of Publication ...................................... 76 107.16 Forest Protection .................................................................................... 76 107.17 Responsibility for Damage Claims ........................................................ 77 107.18 Opening Sections of Project to Traffic .................................................. 78 107.19 Contractors Responsibility for Work .................................................... 78 107.20 Contractors Responsibility for Utility Property and Services .............. 79 107.21 Furnishing Right-of-Way ....................................................................... 80 107.22 Personal Liability of Public Officials .................................................... 80 107.23 Waiver of Legal Rights .......................................................................... 80 107.24 Governing Law ...................................................................................... 81 107.25 Severability ............................................................................................ 81

    SECTION 108 PROSECUTION AND PROGRESS............................................ 81 108.01 Subletting of Contract ............................................................................ 81 108.02 Release of Retainage to Subcontractors ................................................. 82 108.03 Notice to Proceed ................................................................................... 82 108.04 Prosecution of the Work ........................................................................ 82 108.05 Pre-phase Site Construction Meetings ................................................... 86 108.06 Limitation of Operations ........................................................................ 87 108.07 Character of Workers, Methods, and Equipment ................................... 87 108.08 Determination and Extension of Contract Time .................................... 88

    (a) Excusable, Non-Compensable Delays .................................................. 93 (b) Excusable, Compensable Delays .......................................................... 93 (c) Non-Excusable Delays .......................................................................... 94 (d) Concurrent Delays ................................................................................ 94

    108.09 Failure to Complete on Time ................................................................. 94 108.10 Default and Termination of Contract ..................................................... 95 108.11 Termination of Contractors Responsibility .......................................... 97 108.12 Contract Documentation ........................................................................ 98

    SECTION 109 MEASUREMENT AND PAYMENT .......................................... 98 109.01 Measurement of Quantities .................................................................... 98

    (a) General Requirements ........................................................................... 98 (b) Scales and Measurement by Weight (Mass) ......................................... 99 (c) Measurement by Volume .....................................................................101 (d) Measurement of Asphalt Materials ......................................................101 (e) Measurement of PCC ...........................................................................102 (f) Measurement of Aggregates .................................................................102 (g) Measurement of Timber or Lumber .....................................................103 (h) Rental of Equipment ............................................................................103 (i) Manufactured Materials ........................................................................103

    109.02 Scope of Payment .................................................................................104 109.03 Compensation for Altered Quantities ...................................................104 109.04 Cost Reduction Incentive, CRI .............................................................105

    (a) CRI Initial Requirements .....................................................................105

  • TABLE OF CONTENTS

    Section Title Page

    xiv

    (b) CRI Formal Proposal Requirements ....................................................106 (c) Approval of Formal CRI Proposal .......................................................108 (d) Payment for Design of Formal Proposal, if Rejected...........................109 (e) Other Conditions ..................................................................................110 (f) Time Savings Proposals .......................................................................110 (g) Adjustments to Contract Time .............................................................110 (h) Method of Measurement ......................................................................111 (i) Basis of Payment ..................................................................................111

    109.05 Payment for Extra Work .......................................................................112 (a) Agreed Price .........................................................................................112 (b) Force Account ......................................................................................112

    1. Labor Costs .......................................................................................112 2. Bond and Insurance ..........................................................................113 3. Materials ...........................................................................................113 4. Equipment .........................................................................................113 5. Miscellaneous ...................................................................................114 6. Subcontracting ..................................................................................114 7. Compensation ...................................................................................114 8. Statements .........................................................................................114

    109.05.1 Quality Adjustments ..........................................................................115 (a) HMA ....................................................................................................115 (b) PCCP ...................................................................................................115 (c) Superstructure Concrete, SC ................................................................115 (d) Temporary Traffic Control Devices, TTCD ........................................115 (e) Failed Materials, FM ............................................................................115 (f) Pavement Traffic Markings, PTM ........................................................116 (g) Erosion and Sediment Control, E&SC .................................................116

    109.05.2 Delay Costs ........................................................................................116 (a) Allowable Delay Costs .........................................................................116

    1. Labor .................................................................................................116 2. Insurance ...........................................................................................116 3. Equipment .........................................................................................116 4. Field Office Costs .............................................................................117 5. Escalation Costs ................................................................................117

    a. Labor Escalation ...........................................................................117 b. Materials Escalation or Storage ...................................................117 c. Equipment Escalation ...................................................................117

    (b) Blank ....................................................................................................118 109.06 Eliminated Pay Items ............................................................................118 109.07 Partial Payments ...................................................................................118 109.08 Final Payment .......................................................................................119

    SECTION 110 MOBILIZATION AND DEMOBILIZATION ...........................119 110.01 Description ............................................................................................119 110.02 Limitations ............................................................................................119

  • TABLE OF CONTENTS

    Section Title Page

    xv

    110.03 Method of Measurement .......................................................................120 110.04 Basis of Payment ..................................................................................120

    SECTION 111 STOCKPILED MATERIALS .....................................................120 111.01 Description ............................................................................................120 111.02 General Requirements ..........................................................................120 111.03 Structural Steel and Concrete Structural Members ...............................120

    (a) Delivered to the Job Site ......................................................................121 (b) Acceptably Stored at the Fabricators or Manufacturers Storage

    Facilities ...............................................................................................121 111.04 Dowel Bar Assemblies .........................................................................121 111.05 Granular Base, Subbase Materials, and Aggregates for HMA and

    Concrete Pavements .............................................................................121 111.06 Bridge Expansion Joints .......................................................................122

    (a) Type SS ................................................................................................122 (b) Type M.................................................................................................122

    111.07 Structural Supports for Signals, Signs, and Luminaires .......................122 111.08 Precast Concrete Median Barrier ..........................................................122 111.09 Concrete Face Panels and Ground Reinforcement for MSE Walls ......122 111.10 Additional Requirements ......................................................................123 111.11 Method of Measurement .......................................................................123 111.12 Basis of Payment ..................................................................................123

    SECTION 112 BLANK .......................................................................................124

    SECTION 113 PARTNERING OVERHEAD .....................................................124 113.01 Description ............................................................................................124 113.02 Requirements ........................................................................................124

    (a) Meeting Room .....................................................................................124 (b) Meeting Length ....................................................................................124 (c) Facilitator .............................................................................................124

    113.03 Method of Measurement .......................................................................125 113.04 Basis of Payment ..................................................................................125

    SECTION 200 EARTHWORK

    SECTION 201 CLEARING AND GRUBBING .................................................126201.01 Description ............................................................................................126201.02 General .................................................................................................126201.03 Clearing and Grubbing .........................................................................126201.04 Scalping ................................................................................................127201.05 Hedge Removal ....................................................................................127201.06 Method of Measurement .......................................................................127

    (a) Area Basis ............................................................................................127(b) Lump Sum Basis ..................................................................................127(c) Individual Unit Basis ...........................................................................127

  • TABLE OF CONTENTS

    Section Title Page

    xvi

    201.07 Basis of Payment ..................................................................................128(a) Area Basis ............................................................................................128(b) Lump Sum Basis ..................................................................................128(c) Individual Unit Basis ...........................................................................128(d) Clearing Right-of-Way ........................................................................129(e) Exclusions ............................................................................................129

    SECTION 202 REMOVAL OF STRUCTURES AND OBSTRUCTIONS ........129202.01 Description ............................................................................................129202.02 General Requirements ..........................................................................129

    (a) Type Y Waste ......................................................................................131(b) Type Z Waste .......................................................................................131

    202.03 Removal of Bridges, Culverts, and Other Drainage Structures ............131(a) Complete ..............................................................................................131(b) Portions ................................................................................................132(c) Disposal of Concrete ............................................................................133

    202.04 Removal of Pipe and Tile Drains ..........................................................133202.05 Removal of PCCP, Sidewalks, Curbs, RCBA, and

    Reinforced Concrete Moment Slabs .....................................................133202.06 Removal of Houses and Buildings ........................................................134202.07 Inspection and Removal of Asbestos ....................................................135202.08 Removal of Underground Storage Tanks Containing

    Petroleum Products or Other Hazardous Chemicals .............................135(a) Type A Waste ......................................................................................138(b) Type B Waste ......................................................................................138(c) Type C Waste .......................................................................................138

    202.09 Remediation of Contaminated Soil and Groundwater ..........................138202.10 Remediation of Other Regulated Materials ..........................................139202.11 Transportation and Disposal of Regulated Materials ............................139202.12 Blank .....................................................................................................140202.13 Method of Measurement .......................................................................140202.14 Basis of Payment ..................................................................................140

    SECTION 203 EXCAVATION AND EMBANKMENT ...................................145203.01 Description ............................................................................................145203.02 Common Excavation ............................................................................146203.03 Rock Excavation ...................................................................................146203.04 Unclassified Excavation .......................................................................146203.05 Peat Excavation ....................................................................................146203.06 Waterway Excavation ...........................................................................146203.07 Class Y Excavation ...............................................................................146203.08 Borrow or Disposal ...............................................................................146203.08.1 Linear Grading ...................................................................................150203.09 General Requirements ..........................................................................151

  • TABLE OF CONTENTS

    Section Title Page

    xvii

    203.10 Disposal of Excavated Material Except Waterway and Peat Excavation ..............................................................................153

    203.11 Disposal of Waterway Excavation ........................................................153203.12 Disposal of Peat ....................................................................................154203.13 Slides ....................................................................................................154203.14 Drainage................................................................................................154203.15 Excavating Rock ...................................................................................155203.16 Peat Deposit Treatment .........................................................................158

    (a) Treatment of Existing Fills ...................................................................158(b) Treatment by Removal .........................................................................158(c) Treatment by Displacement .................................................................159

    203.17 Cased Test Holes ..................................................................................160203.18 Embankment Construction ...................................................................160203.19 Embankment Over and Around Structures ...........................................160203.20 Rock and Shale Embankment ...............................................................161

    (a) Rock Embankment ...............................................................................161(b) Shale, Shale and Soft Rock Mixtures, or Soft Rock ............................162(c) Shale and Thinly Layered Limestone ...................................................163

    203.21 Embankment on Hillsides or Slopes .....................................................163203.22 Embankment Over Existing Roadbeds .................................................163203.23 Embankment other than Rock, with Strength or Density Control ........165203.24 Method of Making Strength, Stiffness and Density Tests ....................166

    (a) Laboratory ............................................................................................166(b) Field .....................................................................................................167

    203.25 Embankment Without Density Control ................................................167203.26 Proofrolling ...........................................................................................168203.27 Method of Measurement .......................................................................168

    (a) Contract Quantity .................................................................................168(b) Measured Quantities ............................................................................168(c) Measurement on a Linear Basis ...........................................................169(d) Measurement of Excavation Items on a Weight Basis .........................169(e) Measurement of Embankments ............................................................169(f) Measurement of Borrow .......................................................................170(g) Measurement of Embankment Foundation Soils Treatment ................170(h) Measurement of Water for Shale, Shale and Soft Rock

    Mixtures, or Soft Rock .........................................................................170(i) Lump Sum ............................................................................................171(j) Measurement of Exploratory Cores ......................................................171

    203.28 Basis of Payment ..................................................................................171

    SECTION 204 GEOTECHNICAL INSTRUMENTATION ...............................175204.01 Description ............................................................................................175204.02 Materials ...............................................................................................175204.03 Settlement Plates ...................................................................................175

    (a) Installation Requirements.....................................................................175

  • TABLE OF CONTENTS

    Section Title Page

    xviii

    (b) Instrument Readings and Settlement Period ........................................176204.04 Standpipe Piezometers ..........................................................................176

    (a) Installation Requirements.....................................................................177(b) Readings and Maintenance of Piezometer ...........................................178

    204.05 Method of Measurement .......................................................................179204.06 Basis of Payment ..................................................................................179

    SECTION 205 TEMPORARY EROSION AND SEDIMENT CONTROL .......180205.01 Description ............................................................................................180205.02 Materials ...............................................................................................180205.03 General Requirements ..........................................................................180205.04 Temporary Surface Stabilization ..........................................................181

    (a) Seed ......................................................................................................1811. Spring Mix ........................................................................................1822. Fall Mix ............................................................................................182

    (b) Mulch ...................................................................................................1821. Type A ..............................................................................................1822. Type B ..............................................................................................1833. Type C ..............................................................................................183

    (c) Manufactured Surface Protection Products ..........................................1831. Excelsior Blanket ..............................................................................1832. Straw Blanket ...................................................................................1833. Rolled Erosion Control Products ......................................................1844. Geotextile ..........................................................................................184

    205.05 Concentrated Flow Protection ..............................................................184(a) Check Dam ...........................................................................................184(b) Check Dam, Traversable ......................................................................185(c) Diversion Interceptors ..........................................................................185(d) Sediment Traps ....................................................................................185(e) Sediment Basins ...................................................................................185(f) Slope Drains .........................................................................................185(g) Vegetative Filter Strips ........................................................................185(h) Splashpads ...........................................................................................185(i) Inlet Protection .....................................................................................186(j) Retention Ponds ....................................................................................186

    205.06 Perimeter Protection .............................................................................186(a) Silt Fence .............................................................................................186(b) Filter Berm ...........................................................................................186

    205.07 Maintenance ..........................................................................................186(a) Silt Fence .............................................................................................187(b) Sediment Basin ....................................................................................187(c) Filter Berm ...........................................................................................187(d) Inlet Protection .....................................................................................187(e) Sediment Traps ....................................................................................187(f) Concrete Washout ................................................................................187

  • TABLE OF CONTENTS

    Section Title Page

    xix

    (g) Check Dams .........................................................................................187205.08 Quality Adjustments .............................................................................188205.09 Removal ................................................................................................188205.10 Method of Measurement .......................................................................189205.11 Basis of Payment ..................................................................................189

    SECTION 206 STRUCTURE EXCAVATION ..................................................191206.01 Description ............................................................................................191206.02 Class X Excavation ...............................................................................191

    (a) General Excavation ..............................................................................191(b) Excavation for Foundation of Traffic Support Structures ....................192

    206.03 Wet Excavation .....................................................................................192206.04 Dry Excavation .....................................................................................192206.05 Foundation Excavation, Unclassified ...................................................193206.06 General Requirements ..........................................................................193206.07 Disposal of Excavated Material ............................................................193206.08 Preparation of Foundation Surfaces ......................................................194206.09 Cofferdams and Temporary Construction Dikes ..................................195206.10 Method of Measurement .......................................................................196206.11 Basis of Payment ..................................................................................196

    (a) Culverts ................................................................................................199(b) Bridges .................................................................................................200(c) Traffic Structure Supports ....................................................................201

    SECTION 207 SUBGRADE ...............................................................................202207.01 Description ............................................................................................202207.02 Materials ...............................................................................................202207.03 General Requirements ..........................................................................202207.04 Subgrade Treatments ............................................................................203207.05 Method of Measurement .......................................................................205207.06 Basis of Payment ..................................................................................205

    SECTION 208 FINISHING SHOULDERS, DITCHES, AND SLOPES ............206208.01 Description ............................................................................................206208.02 Finishing Shoulders ..............................................................................206208.03 Finishing Ditches ..................................................................................206208.04 Finishing Slopes ...................................................................................207208.05 Blank .....................................................................................................207208.06 Finishing at Contract Drainage Structures ............................................207208.07 Method of Measurement .......................................................................207208.08 Basis of Payment ..................................................................................207

    SECTION 209 FINISHING EARTH GRADED ROADS ..................................207209.01 Description ............................................................................................207209.02 Construction Requirements...................................................................207209.03 Method of Measurement .......................................................................208

  • TABLE OF CONTENTS

    Section Title Page

    xx

    209.04 Basis of Payment ..................................................................................208

    SECTION 210 FINAL TRIMMING AND CLEANING ....................................208210.01 Description ............................................................................................208210.02 Construction Requirements...................................................................208210.03 Method of Measurement .......................................................................209210.04 Basis of Payment ..................................................................................209

    SECTION 211 B BORROW AND STRUCTURE BACKFILL .........................209211.01 Description ............................................................................................209211.02 Materials ...............................................................................................209211.03 General Requirements ..........................................................................210211.03.1 Structure Backfill Types ....................................................................211

    (a) Type 1 ..................................................................................................211(b) Type 2 ..................................................................................................211(c) Type 3 ..................................................................................................211(d) Type 4 ..................................................................................................212(e) Type 5 ..................................................................................................212

    211.04 Compaction ...........................................................................................212211.05 Embankment for Bridges ......................................................................213211.06 B Borrow Around Bents .......................................................................213211.07 Blank .....................................................................................................213211.08 Spandrel Filling ....................................................................................213211.09 Method of Measurement .......................................................................213211.10 Basis of Payment ..................................................................................214

    SECTION 212 STOCKPILED SELECTED MATERIALS ................................215212.01 Description ............................................................................................215212.02 Materials ...............................................................................................215212.03 Construction Requirements...................................................................215212.04 Method of Measurement .......................................................................216212.05 Basis of Payment ..................................................................................216

    SECTION 213 FLOWABLE BACKFILL...........................................................216213.01 Description ............................................................................................216213.02 Materials ...............................................................................................216213.03 Flowable Backfill Mix Design ..............................................................217213.04 Flowable Backfill Mix Criteria .............................................................217

    (a) Flow Consistency .................................................................................217(b) Lightweight Dynamic Cone Penetration Blow Count Number ............217(c) Removability Modulus .........................................................................218

    213.05 Flowable Backfill Trial Batch ...............................................................218213.06 Mixing Equipment ................................................................................219213.07 Placement .............................................................................................219213.08 Method of Measurement .......................................................................219213.09 Basis of Payment ..................................................................................220

  • TABLE OF CONTENTS

    Section Title Page

    xxi

    SECTION 214 GEOGRID ...................................................................................220214.01 Description ............................................................................................220214.02 Materials ...............................................................................................220214.03 Foundation Preparation .........................................................................220214.04 Geogrid Placement................................................................................221214.05 Fill Placement .......................................................................................221214.06 Method of Measurement .......................................................................222214.07 Basis of Payment ..................................................................................222

    SECTION 215 CHEMICAL MODIFICATION OF SOILS ................................222215.01 Description ............................................................................................222215.02 Materials ...............................................................................................222215.03 Testing and Mix Design ........................................................................223215.04 Storage and Handling ...........................................................................223215.05 Weather Limitations .............................................................................224215.06 Preparation of Soils...............................................................................223215.07 Spreading of Chemical Modifiers .........................................................224215.08 Mixing ..................................................................................................224215.09 Compaction ...........................................................................................224215.10 Curing ...................................................................................................225215.11 Method of Measurement .......................................................................225215.12 Basis of Payment ..................................................................................225

    SECTION 216 CELLULAR CONCRETE FILL, CCF .......................................226216.01 Description ............................................................................................226216.02 Materials ...............................................................................................226216.03 Mix Design ...........................................................................................227216.04 Properties and Tests ..............................................................................227

    (a) CCF Cast Density .................................................................................227(b) Foam Density .......................................................................................227

    216.05 Storage and Handling ...........................................................................227216.06 Weather Limitations .............................................................................227216.07 Preparation of Subgrade .......................................................................228216.08 Installation ............................................................................................228216.09 Lots .......................................................................................................228216.10 Testing ..................................................................................................228216.11 Method of Measurement .......................................................................228216.12 Basis of Payment ..................................................................................228

    SECTION 217 - SOILS DRYING WITH CHEMICAL MODIFIERS ..................228217.01 Description ............................................................................................229217.02 Materials ...............................................................................................229217.03 Testing and Mix Design ........................................................................229217.04 Storage and Handling ...........................................................................229217.05 Weather Limitations .............................................................................230217.06 Preparation of Soils...............................................................................230

  • TABLE OF CONTENTS

    Section Title Page

    xxii

    217.07 Spreading of Chemical Modifiers .........................................................230217.08 Mixing ..................................................................................................230217.09 Compaction ...........................................................................................230217.10 Method of Measurement .......................................................................231217.11 Basis of Payment ..................................................................................231

    SECTION 300 AGGREGATE PAVEMENT AND BASES

    SECTION 301 AGGREGATE BASE .................................................................232301.01 Description ............................................................................................232301.02 Materials ...............................................................................................232301.03 Preparation of Subgrade .......................................................................232301.04 Temperature Limitations ......................................................................232301.05 Spreading ..............................................................................................232301.06 Compacting ...........................................................................................232301.07 Checking and Correcting Base .............................................................233301.08 Priming .................................................................................................233301.09 Method of Measurement .......................................................................233301.10 Basis of Payment ..................................................................................233

    SECTION 302 SUBBASE ...................................................................................233302.01 Description ............................................................................................233302.02 Materials ...............................................................................................234302.03 Preparation of Subgrade .......................................................................234302.04 Temperature Limitations ......................................................................234302.05 Spreading ..............................................................................................234302.06 Compacting ...........................................................................................234

    (a) Aggregate Separation Layers and Dense Graded Subbase ...................234(b) Aggregate Drainage Layers .................................................................234

    302.07 Checking and Correcting Subbase ........................................................235302.08 Method of Measurement .......................................................................235302.09 Basis of Payment ..................................................................................235

    SECTION 303 AGGREGATE PAVEMENTS OR SHOULDERS .....................235303.01 Description ............................................................................................235303.02 Materials ...............................................................................................235303.03 Preparation of Subgrade .......................................................................236303.04 Temperature Limitations ......................................................................236303.05 Spreading ..............................................................................................236303.06 Compacting ...........................................................................................236303.07 Checking and Correcting Base and Surface ..........................................236303.08 Dust Palliative .......................................................................................236303.09 Method of Measurement .......................................................................237303.10 Basis of Payment ..................................................................................237

  • TABLE OF CONTENTS

    Section Title Page

    xxiii

    SECTION 304 ASPHALT BASES .....................................................................237304.01 Description ............................................................................................237304.02 Materials ...............................................................................................237304.03 Sealing Cracks and Joints .....................................................................237304.04 Patching ................................................................................................237304.05 Widening ..............................................................................................238304.06 Method of Measurement .......................................................................239304.07 Basis of Payment ..................................................................................239

    SECTION 305 CONCRETE BASES ..................................................................239305.01 Description ............................................................................................239305.02 Materials ...............................................................................................239305.03 New PCC Base .....................................................................................240305.04 Existing PCCP ......................................................................................240

    (a) Patching................................................................................................240(b) Surface Milling ....................................................................................240(c) Retrofit Load Transfer .........................................................................240(d) Rubblizing Existing PCCP ...................................................................240

    305.05 Widening With PCC Base ....................................................................242305.06 Method of Measurement .......................................................................242305.07 Basis of Payment ..................................................................................243

    SECTION 306 MILLING ....................................................................................244306.01 Description ............................................................................................244306.02 General .................................................................................................244306.03 Equipment .............................................................................................244

    (a) Roadway Milling Machine ...................................................................244(b) Power Saw ...........................................................................................245(c) Rotary Power Broom ...........................................................................245(d) Straightedge .........................................................................................245

    1. Straightedge 16 ft ...........................................................................2452. Straightedge 10 ft ...........................................................................245

    306.04 Asphalt or PCCP Scarification Milling .................................................245306.05 Asphalt or PCCP Profile Milling to Correct Cross-Slope .....................246306.06 Approach Milling .................................................................................247306.07 Asphalt or PCCP Milling to a Specified Average Depth ......................247306.08 Asphalt Overlay Removal .....................................................................248306.09 Transition Milling .................................................................................249306.10 Method of Measurement .......................................................................249306.11 Basis of Payment ..................................................................................249

    SECTION 400 ASPHALT PAVEMENTS

    SECTION 401 QUALITY CONTROL/QUALITY ASSURANCE, QC/QA, HOT MIX ASPHALT, HMA, PAVEMENT ................251

    401.01 Description ............................................................................................251

  • TABLE OF CONTENTS

    Section Title Page

    xxiv

    401.02 Quality Control .....................................................................................251401.03 Materials ...............................................................................................251401.04 Design Mix Formula .............................................................................251401.05 Volumetric Mix Design ........................................................................252401.06 Recycled Materials ...............................................................................255401.07 Lots and Sublots ...................................................................................257401.08 Job Mix Formula ..................................................................................257401.09 Acceptance of Mixtures ........................................................................257401.10 General .................................................................................................259401.11 Preparation of Surfaces to be Overlaid .................................................260401.12 Process Control .....................................................................................260401.13 Weather Limitations .............................................................................261401.14 Spreading and Finishing .......................................................................261401.15 Joints .....................................................................................................262401.16 Density ..................................................................................................263401.17 Pavement Corrugations .........................................................................264401.18 Pavement Smoothness ..........................................................................264

    (a) Profilograph .........................................................................................265(b) 16 ft Straightedge and 10 ft Straightedge .............................................266(c) Smoothness Correction ........................................................................266

    401.19 Pay Factors ...........................................................................................267(a) Dense Graded Mixture One Lot ........................................................267(b) Dense Graded Mixture < One Lot and Open Graded Mixture .............268(c) Smoothness ..........................................................................................271

    401.20 Appeals .................................................................................................273(a) MSG .....................................................................................................273(b) BSG of the Gyratory Specimen ...........................................................273(c) Binder Content .....................................................................................273(d) BSG of the Density Core .....................................................................273

    401.21 Method of Measurement .......................................................................273401.22 Basis of Payment ..................................................................................274

    SECTION 402 HOT MIX ASPHALT, HMA, PAVEMENT ..............................275402.01 Description ............................................................................................275402.02 Quality Control .....................................................................................275402.03 Materials ...............................................................................................276402.04 Design Mix Formula .............................................................................276402.05 Volumetric Mix Design ........................................................................277402.06 Job Mix Formula ..................................................................................277402.07 Mix Criteria ..........................................................................................277

    (a) Composition Limits for HMA Transverse Rumble Strip Mixtures ......277(b) Composition Limits for HMA Wedge and Leveling Mixtures ............277(c) Composition Limits for Temporary HMA Mixtures ............................277(d) Composition Limits for HMA Curbing Mixes .....................................278

    402.08 Recycled Materials ...............................................................................278

  • TABLE OF CONTENTS

    Section Title Page

    xxv

    402.09 Acceptance of Mixtures ........................................................................279402.10 General .................................................................................................280402.11 Preparation of Surfaces to be Overlaid .................................................280402.12 Weather Limitations .............................................................................281402.13 Spreading and Finishing .......................................................................281402.14 Joints .....................................................................................................282402.15 Compaction ...........................................................................................282402.16 Low Temperature Compaction Requirements ......................................284402.17 Pavement Corrugations .........................................................................285402.18 Pavement Smoothness ..........................................................................285402.19 Method of Measurement .......................................................................285402.20 Basis of Payment ..................................................................................285

    SECTION 403 COLD MIX ASPHALT, CMA, PAVEMENT ............................286403.01 Description ............................................................................................286403.02 Materials ...............................................................................................286403.03 Weather Limitations .............................................................................286403.04 Equipment .............................................................................................287403.05 Preparation of Mixtures ........................................................................287403.06 Preparation of Subgrade or Base ..........................................................287403.07 Spreading Mixture ................................................................................287403.08 Curing ...................................................................................................288403.09 Compaction ...........................................................................................288403.10 Surface Tolerances................................................................................288403.11 Method of Measurement .......................................................................288403.12 Basis of Payment ..................................................................................288

    SECTION 404 SEAL COAT ...............................................................................288404.01 Description ............................................................................................288404.02 Quality Control .....................................................................................289404.03 Asphalt Material ...................................................................................289404.04 Cover Aggregate ...................................................................................289404.05 Weather Limitations .............................................................................289404.06 Equipment .............................................................................................290404.07 Preparation of Surface ..........................................................................290404.08 Applying Asphalt Material ...................................................................290404.09 Application of Cover Aggregate ...........................................................290404.10 Rolling Operation .................................................................................290404.11 Sweeping Operation..............................................................................291404.12 Protection of Surface ....