Incorporating Safety into the Transportation Planning Process

29
Incorporating Safety into the Transportation Planning Process 62 nd Illinois Traffic Engineering and Safety Conference October 23, 2013

description

Incorporating Safety into the Transportation Planning Process. 62 nd Illinois Traffic Engineering and Safety Conference October 23, 2013. Traffic Safety. - PowerPoint PPT Presentation

Transcript of Incorporating Safety into the Transportation Planning Process

Page 1: Incorporating Safety into the Transportation Planning Process

Incorporating Safety into the Transportation

Planning Process

62nd Illinois Traffic Engineering and Safety Conference

October 23, 2013

Page 2: Incorporating Safety into the Transportation Planning Process

• Traffic safety is one of the most important characteristics of transportation system performance. Therefore, one would expect that safety is well integrated into all aspects of an agency’s planning and decision-making processes. However, in many instances, such is not the case.

• A comprehensive and effective consideration of safety in transportation-planning would result in traffic safety improvements for the region.

Traffic Safety

Page 3: Incorporating Safety into the Transportation Planning Process

CUUATS Integration of Safety into the Planning

Process• The purpose of this presentation is to

provide overall direction on how safety is integrated into the CUUATS transportation-planning process.

Page 4: Incorporating Safety into the Transportation Planning Process

CUUATS’ Safety Approach• Integrate safety into all aspects of the

transportation planning process. • Identify safety as a major LRTP goal and be

committed to safety. • Define specific objectives & performance

measures & strategies to achieve safety goals.

• As an MPO, assist local member agencies addressing their highway safety problems & needs.

Page 5: Incorporating Safety into the Transportation Planning Process

CUUATS’ Safety Approach• Use current technologies (e.g., GIS) to

provide timely & accurate information, especially in the areas of data collection and analysis.

• Develop community-based traffic safety programs.

• Create a safety committee. This committee helps to ensure the timeliness, accuracy, and linkage of data and help to avoid duplication of efforts.

• Develop a comprehensive safety program that includes a range of strategies & actions & involves different agencies & groups.

Page 6: Incorporating Safety into the Transportation Planning Process

CUUATS Transportation Planning Process (Safety)

LRTP Mission LRTP Goals LRTP

ObjectivesPerformance

Measures Data Analysis

Crash Analysis, Network

Screening, etc.

Geometric Features

IDOT Crash Records

Traffic Counts

Proposed Strategies

TIP

Preferred Scenario

Long Term Safety

Recommendations

Engineering

Education

Enforcement

EMS

Evaluation

HSIP

Implementation

Planning

Operations

Page 7: Incorporating Safety into the Transportation Planning Process

Long Range Transportation Plan 2035:

Mission Statement• LRTP 2035 Mission:

– To provide a safe, efficient, and economical transportation system that makes the best use of existing infrastructure, optimizes mobility, promotes environmental sensitivity, sustainability, accessibility, economic development, and enhances quality of life for all users.

Page 8: Incorporating Safety into the Transportation Planning Process

Long Range Transportation Plan 2035:Goals

• SAFETEA-LU/MAP-21 Planning Factor #2– Increase the safety of the transportation

system for motorized and non-motorized users

• Goal 3: – Transportation modes and facilities in

the urbanized area will be safe for all users

Page 9: Incorporating Safety into the Transportation Planning Process

Long Range Transportation Plan 2035:

Objectives & Performance Measures• Objective:

– Reduce the total number of crashes in Champaign-Urbana by 5% by 2014

• Performance Measure: – Total Crashes per 100M VMT

• Objective: – Reduce the total number of fatalities and severe

injuries in Champaign-Urbana by 25% between 2009 and 2014

• Performance Measures: – Total Fatalities per 100M VMT– Total Severe Injuries per 100M VMT

Page 10: Incorporating Safety into the Transportation Planning Process

Long Range Transportation Plan 2035:

Objectives & Performance Measures• Objective:

– Reduce the total number of crashes involving bicyclists and pedestrians in Champaign-Urbana by 15% by 2014

• Performance Measures:– Total Pedestrian Crashes– Total Bicycle Crashes

Page 11: Incorporating Safety into the Transportation Planning Process

Suggestions for deciding about performance

measures• Review safety-related performance measures used by similar agencies in the U.S.

• Prepare a list of typical safety-related performance measures that reflect the goals & objectives defined in your planning effort.

• Discuss the proposed performance measures with those in the agency responsible for collecting the data to ensure feasibility of collection and data accuracy.

Page 12: Incorporating Safety into the Transportation Planning Process

Data Analysis• Effective data analysis relies on the

availability and use of accurate/reliable data.

• Data analysis is also important for identifying “hot spots” for traffic safety.

Page 13: Incorporating Safety into the Transportation Planning Process

CUUATS Crash Data Analysis Process

Page 14: Incorporating Safety into the Transportation Planning Process

Tools for Data Analysis • Inventory the types of safety analysis tools

that exist in the state or metropolitan area’s safety-related agencies.

• Develop a long term and coordinated data-collection and safety analysis strategy for the metropolitan area.

• Use crash reduction factors and their associated reductions in crashes & fatalities for different types of safety improvements.

Page 15: Incorporating Safety into the Transportation Planning Process

Total Crashes per 100 MVMT

YearDaily VMT (Thousand

s)

Yearly VMT (100

Millions)

Crashes per 100M VMT

Champaign-Urbana Illinois

2007 2,335 852.3 358.3 393.62008 2,368 864.3 333.4 386.52009 2,426 885.9 255.7 276.52010 2,425 885.49 246.4 273.62011 2,372 866.14 234.5 272.6

LTRP 2035 Objective: Reduce the total number of crashes in Champaign- Urbana by 5% by 2014. Performance Measure: Total crashes per 100 M VMT Data Analysis: The total number of crashes decreased 10.3% from 2,264 in 2009 to 2,030 in 2011 and crash rates declined 8.3% in the same period. The VMT in the region decreased 2.2% between 2009 and 2011. Performance Measure Results: Positive rating due to the 8.3 % reduction in total crashes per 100 M VMT since 2009. This is 3.3% higher than the target of 5% decrease in crashes in the urbanized area by 2014.  

VMT and Total Crash Rates in Champaign-Urbana

Total Crashes per 100 Million VMT

Page 16: Incorporating Safety into the Transportation Planning Process

Fatalities per 100 Million VMT

LRTP 2035 Objective: Reduce the number of fatalities in Champaign-Urbana by 25% between 2009 and 2014. Performance Measure: Total fatalities per 100 M VMT. Data Analysis: Number of fatalities in the urbanized area dropped from 8 in 2008 to 4 in 2009 but increase back to 6 in 2011.Performance Measure Results: Negative rating for year 2011 because the fatalities per 100 M VMT increased from 0.45 in 2009 to 0.69 in 2011.

Traffic Fatalities in Champaign-Urbana Traffic Fatalities per 100 Million VMT

Page 17: Incorporating Safety into the Transportation Planning Process

Fatal Crash Locations in Champaign-Urbana

Page 18: Incorporating Safety into the Transportation Planning Process

Corridor Analysis

Roadway Crashes

Fatalities

Total Injuries

A-Injury Crashe

s

B-Injury Crashe

s

C-Injury Crashe

sEast-West Corridor Bradley Ave 673 2 241 46 61 60 University Ave 1,110 3 355 67 112 78 Springfield Ave 938 2 280 49 82 79 Kirby Ave/Florida Ave 707 2 227 42 68 56 Windsor Rd 355 1 150 21 47 37North-South Corridor Mattis Ave 833 1 296 47 84 58 Prospect Ave 1,094 1 307 42 79 102 Neil St 944 0 291 39 99 60 Lincoln Ave 676 0 185 32 72 47 Cunningham Ave/Vine St 592 1 188 31 78 38 High Cross Road/IL 130 86 1 39 10 12 5

Total 8,008 14 2,559 426 794 620

Crashes along Major Corridors in Champaign-Urbana

Page 19: Incorporating Safety into the Transportation Planning Process

University Avenue Crash Statistics

Page 20: Incorporating Safety into the Transportation Planning Process

Fatal and Severe Crashes along Major Corridors

Page 21: Incorporating Safety into the Transportation Planning Process

Tools for Data Analysis• For non-infrastructure or non-traffic

operations strategies, such as safety education, marketing campaigns, & emergency management services, work closely with safety partner organizations to determine a methodology for assessing the effectiveness of such strategies. This might include targeted before and after studies on selected programs.

Page 22: Incorporating Safety into the Transportation Planning Process

Evaluation• Most safety-related evaluation efforts

use one of three methods: 1. Listing the evaluation criteria and

show how the alternatives compare2. Assigning weights or scores to the

evaluation factors3. Conducting cost-benefit analysis

Page 23: Incorporating Safety into the Transportation Planning Process

HSIP ApplicationCounty Road 1

SAFETY ISSUE PROPOSED MITIGATIONThe absence of paved shoulders and rumble strips on roadways may increase the risk of run-off the road crashes.

Purchase right-of-way in order to provide wider shoulders along roadway. Install shoulder rumble strips throughout corridor.

The presence of steep ditches close to the edge of the pavement may increase the risk of vehicle overturns.

Provide and widen shoulder along roadway with gentle slopes and increase separation of ditches from the edge of the roadway.

High speeds on the roadway may increase the risk of side swipe and animal crashes.

Improve roadway signing and enhanced pavement markings, including raised reflective markings and centerline rumble strips.

Vehicles traveling at high speeds on County Road 1 may not be expecting upcoming intersections, and sharp horizontal curves increasing the risk of angle crashes.

Reduce approach speeds at intersections by effectively reducing the lane width (narrowing intersections).Improve warning signs along corridor. Provide chevrons along the curves.

Proposed Mitigation Measures

1. Listing the evaluation criteria and show how the alternatives compare

Page 24: Incorporating Safety into the Transportation Planning Process

CUUATS Project Assessment Guidelines for TIP

Safety Improvements (*) Definition and Goals

SAFETEA-LU and the LRTP both place emphasis on ensuring the safety of all transportation system users. Because CUUATS believes that safety is one of the greatest concerns to be considered when planning the region’s transportation system, it is included as a project evaluation criterion.

Criteria and Requirements This criterion is consistent with the procedure used to select crash intersection locations (SCIL) in the urbanized area. Therefore, all the variables considered to determine the priority rating for those locations will be used to assign points under this criterion. (See Appendix 1 for SCIL methodology). Highest score if project has significant immediate public safety benefit as identified in the Safety Analysis. The performance measure is the "Priority Level” according to SCIL methodology. A project can match only one category and can earn a maximum score of 10. Project Score Category

10 Project site has a very high average crash frequency, very high average crash rate and high average crash severity. The project has safety improvement as its prime objective

8 Project site has a high average crash frequency, very high average crash rate and high average crash severity. The project has safety improvement as its prime objective

6 Project site has a high average crash frequency, high average crash rate and moderate average crash severity. The project has safety improvement as its prime objective

4 Project site has an above mean average crash frequency and above mean average crash rate. The project has safety improvement as a prime objective

2 Provides some improvement to road user safety. Safety improvement is stated in the objectives

2. Assigning weights or scores to the evaluation factors

Page 25: Incorporating Safety into the Transportation Planning Process

HSIP ApplicationCounty Road 1

Project: Prepared by: Rita Morocoima-Black

District: 5 County: Champaign City: Date 2/28/2013 The combined effect of multiple countermeasures is limited to 0.60 or the smallest CMF.

Key Route: Marked Route: MilePost: Current AADT: 3850 2.1.9.S1.1 - Pavement Treatments - Rumble Strips (Centerline) AADT is not within HSM limits

Location Description: 2.1.9.S1.1 - Pavement Treatments - Rumble Strips (Centerline) AADT is not within HSM limits

10.75

Crash data: 5 Years 1.0%

From 2007 to 2011 4.0%

Peer Group: Peer Group 1 - Rural Two-Lane Highway

Cras

h Ty

pe

All

Cra

shes

Ang

le

Ani

mal

Fixe

d O

bjec

t

Hea

d O

n

Left

Turn

Oth

er N

onco

llisi

on

Oth

er O

bjec

t

Ove

rturn

ed

Ped

estri

an

Ped

alcy

clis

t

Par

ked

Veh

icle

Rea

r End

Rig

ht T

urn

Sid

esw

ipe

Sam

e D

irect

ion

Sid

esw

ipe

Opp

osite

Dire

ctio

n

Turn

ing

Trai

n

Nig

ht T

ime

Wet

Pav

emen

t

Tota

l

Crash Severity ALL AG AN FO HO LT OtherNC OtherO OVT PD PDC PKV RE RT SSD SOD T TR NGT WP TOTFatal Crashes 1 1A-Injury Crashes 1 1 2 4B-Injury Crashes 4 7 4 1 2 1 19C-Injury Crashes 1 1 1 3PDO Crashes 2 5 14 4 7 5 2 1 1 41

CMF * Unit Cost Quantity Units Total Cost Service Life Present worth EUAC **

0.67 $15,000 10 Miles $150,000 12 $150,000 $13,491

0.78 $7,000 21.5 Miles $150,500 8 $260,469 $23,427

0.97 $40,000 10.75 Miles $430,000 15 $430,000 $38,675

0.80 $20,000 4 Unit Qnty $80,000 3 $320,520 $28,828

$838,995 $104,421

8.00 ANNUAL NUMBER OF FATALITIES POTENTIALLY PREVENTED 0.08

* CMF = Crash Modification Factor

** EUAC = Estimated Uniform Annual Cost

PROJECT DESCRIPTION - PROJECT DATA INPUT (SEGMENTS)

County Road 1 between Champaign city limits and US136

SEGMENTS BENEFIT COST ANALYSISCOUNTERMEASURE COST CALCULATIONS

SEGMENTS CRASH SEVERITY DISTRIBUTION BY CRASH TYPE FOR ANALYSIS PERIOD

Traffic Growth factor

Interest rate

Length (miles):

BENEFIT CALCULATIONS

County Road 1 Messages

TOTAL COSTTOTAL BENEFIT

COUNTERMEASURE Crash Type affected by this improvement

BENEFIT/ COST

All

All

FO, OVT

ROR, FO, HO, OVT, SOD, SSD

B/C 8.00

3. Conducting cost-benefit analysis

Page 26: Incorporating Safety into the Transportation Planning Process

Plan and Program Development

Strategies included in the LRTP and UTWP • Produce the Selected Crash Intersection

Locations (SCIL) report every two years• Evaluate intersections that have

problematic or crash-inducing patterns and identify solutions

• Improve visibility for all roadway users through improved lighting, striping, signage, visibility triangles, and access control

Page 27: Incorporating Safety into the Transportation Planning Process

Plan and Program Development

• Continue educational programs for CUUATS member agencies as well as law enforcement officers about safety issues

• Continue educational programs for grades K-12 including driver’s education and safety programs such as Operation Cool

• Continue educational safety programs for the community including drivers, bicyclists & pedestrians

Page 28: Incorporating Safety into the Transportation Planning Process

System Monitoring• LRTP 2035 Report Card• Monticello Road HSIP Project: Before

and AfterCollision Type

Before

After Change

Angle 1 5 3 Animal 0 1 1 Fixed Object 8 1 -7 Overturned 5 1 -4 Rear End 5 5 0 Turning 3 4 1 Sideswipe Opposite 1 2 1 Other 1 2 1 Total 24 19 -5

Crash Severity Before After Fatal Crashes 1 -

A- Injuries Crashes 1 3

B - Injuries Crashes 5 5

C - Injuries Crashes 2 1 PDO Crashes 15 10

Crash Severity: Before and After

Collision Type Distribution: Before and After

Page 29: Incorporating Safety into the Transportation Planning Process

Thanks!

Questions?