Incheon Airport

28
INCHEON INTERNATIOAL AIRPORT HAMAD AHMED ALI RISHWAN MOHAMED MASOOD SURYA PRASATH SHEKHAR THAKURI

description

PPT about Incheon Airport

Transcript of Incheon Airport

INCHEON INTERNATIOAL AIRPORT

INCHEON INTERNATIOAL AIRPORTHAMAD AHMEDALI RISHWANMOHAMED MASOODSURYA PRASATHSHEKHAR THAKURI Rated as the best airport for 7 consecutive years (2005-2012)

Overwhelming facilities

Best departure and arrival process in the whole industry

Net profits for 8 consecutive years

Current worth USD 70 billion WHY WE CHOSE INCHEON AIRPORT

16 mins 4 departure, arrival 12 mins, far more efficient than industry average 60m 45m respectively

2Increased traffic after the 1988 Seoul Olympics, needed a way to cope

Construction of the Incheon airport began in November 1992

Constructed on reclaimed land between Yeongjong Island and Youngyu Island

Eight years to construct, with an additional six months to test

Officially opened in March 2001BRIEF HISTORY OF INCHEON AIRPORTPhase 1Pax capacity : 30 million per annumCargo capacity: 1.7 million metric tons per annumConstruction of:Passenger terminal with a floor space of 496,000 square meters Two parallel runwaysControl towerAdministrative buildingTransportation centre Three cargo terminalsInternational business centreGovernment office buildingNovember 1992: Phase I construction and site preparation initiatedMarch 2001 : Phase I competedPHASES PLANNED FOR THE AIRPORTPhase 2Pax capacity: 44 million per annumCargo capacity: 4.5 million metric tons per annumConstruction of:A third parallel 4,000 meters (13,000ft) long runway13-hectare cargo terminal area16.5 hectare concourse connected to the main passenger building via two parallel 870 meters (2,850ft) long underground passageways Shuttle trainshuttling passengers between the concourse and the main terminalFebruary 2002: Phase II construction startsJune 2008: Phase II construction is completed

PHASES PLANNED FOR THE AIRPORTPhase 3Pax capacity: 62 million per annumCargo capacity: 5.8 million metric tons per annumPlanned construction of:Second passenger terminal in the northern field of the airportExpand existing cargo terminal and other infrastructureConnection with each other by the underground "Starline" train2011: Phase III construction starts2017: Phase III construction is expected to be completedEstimated expenditure: 4trillion (USD3.7 billion)PHASES PLANNED FOR THE AIRPORT6Phase 4Pax capacity: 100 million per annumCargo capacity: 7 million metric tons per annumUpon completion, the airport will have:2 passenger terminals4 satellite concourses5 parallel runways (1 dedicated for cargo flights)Estimated to be completed by 2020

PHASES PLANNED FOR THE AIRPORT7OPERATION FACILITIES AND INFRASTRUCTURE22 story, 100.4 meters tallA Parabolic antenna is located on the highest floor, which is used by he Airport Surface Detection EquipmentDetects all airplanes and obstacles within 5kmTotal area of Control Tower is 179sqm, the 3rd largest in the worldCONTROL TOWER

93 parallel asphalt runways, 15R/33L, 15L33R and 16/43Both 15R/33L and 15L/33R are each 3750 meters long, while runway 16/34 is 4000 meters longAll runways are equipped withILSCAT IIIb at both sides to allow for operation in visibility conditions as low as 50 metersAir Traffic Controllers can provide progressive taxiing to an aircraft by setting the computer to manipulate the taxi and runway lights so that it will lead them to their designated gate or parking standRUNWAYS

There are three parallel paved asphalt runways in operation, 15R/33L, 15L/33R and 16/34. Runway 15R/33L and 15L/33R are each 3,750 metres (12,300ft) long, 60 metres (200ft) wide, and 1.05 metres (3ft 5in) thick. Runway 16/34 is 4,000 metres (13,000ft) long. Runway 15R/33L is used mostly for departures, while runway 15L/33R is used mostly for arrivals. This is evident from the amount of rubber present on each runway; runway 15L/33R has more rubber on it due to the higher number of landings. A third parallel runway (16/34), 4,000 meters long, began operation in June 2008. Landing and takeoffs of most passenger flights are done on the new runway and the existing runway 15R/33L, while runway 15L/33R is mostly used for cargo flights for its proximity with the cargo terminals. Although the runways are labelled 33 and 34, all three runways have the same heading. Once Phase 4 construction is complete, the airport will have 4 parallel runways, two of which will be 3,750 meters long, and the other two 4,000 meters long. All runways are equipped withILSCAT IIIb at both sides to allow for operation in visibility conditions as low as 50 meters. As of the date of upgrade, Incheon International Airport was the only airport in Asia to have full ILS CAT IIIb capability. The runway lights at Incheon International Airport (as well as the taxi lights) are tied into special computers at the control tower. Air Traffic Controllers can provide progressive taxiing to an aircraft by setting the computer to manipulate the taxi and runway lights so that it will lead them to their designated gate or parking stand.10The main passenger terminal measures 594,000 sqmWas designed byCurtis W. Fentress ofFentress ArchitectsConstruction cost was 1.3816trillion (USD 1.2 billion)The terminal has:44 boarding ports (all of which can accommodate the new Airbus A380)50 customs inspection ports2 biological quarantine counters6 stationary and 14 portable passenger quarantine counters120 arrival passport inspection counters8 arrival security ports28 departure security ports252 check in counters120 departure passport inspection counters

MAIN TERMINAL

The main passenger terminal (measuring 594,000 square metres) is the largestairport terminalin area in South Korea. The passenger terminal was designed byCurtis W. Fentress, FAIA, RIBA ofFentress Architects. It is 1,060 metres (3,480ft) long, 149 metres (489ft) wide, and 33 metres (108ft) high. Its construction cost was 1.3816trillion South Korean Won.[citation needed]The terminal has 44 boarding ports (all of which can accommodate the new Airbus A380), 50 customs inspection ports, 2 biological quarantine counters, 6 stationary and 14 portable passenger quarantine counters, 120 arrival passport inspection counters, 8 arrival security ports, 28 departure security ports, 252 check in counters, and 120 departure passport inspection counters.11Completed at the end of May 2008All foreign airlines use this terminal as of 10th June 2008Connected to the Main Terminal by two parallel 870-metre long underground passageways equipped with IATs (Intra Airport Transit).Has 30 gates and 6 loungesCONCOURSE

The passenger concourse was completed at the end of May 2008, and all foreign airlines use this terminal as of 10 June 2008. It is connected to the Main Terminal by two parallel 870-metre (2,850ft) long underground passageways equipped with IATs (Intra Airport Transit). It has 30 gates and six lounges (Asiana Airlines/Star Alliance, Singapore Airlines/Star Alliance, Cathay Pacific/Oneworld, Japan Airlines/Oneworld, Korean Air/SkyTeam, and China Eastern Airlines/SkyTeam).12The Cargo Terminal Area (CTA) comprises:

6 cargo terminals

5 separated warehouses

All E/F class 36 parking stands for freighters

Administration officesCARGO TERMINAL

OPERATIONAL EFFICIENCY IN INCHEON AIRPORTOPERATIONS FLOW CHART

SERVICES AVAILABLE IN THE MAIN TERMINALProvides passengers with amenities, such as:Food Court BankConvenience storeRecord shopBookstoreDrug storeSauna (open 24 hours a day, can be a good resting place for passengers who have to stay one night at the airport). WHATS ON THE B1 FLOOR?

The first floor of the Passenger Terminal has a baggage-claim area and a customs area for arriving passengersThe F1 features many convenient facilities and information counters for greeters and passengers shops include fast food stores, coffee shops, flower shops, photo shops and foreign exchange boothsInformation counters help people to easily get information on the airport, buses, hotels, car rentals, and delivery services.WHATS ON THE FIRST FLOOR? (ARRIVAL)

The immigration and quarantine areas for arriving passengers are located on the second floor. Also on the second floor are offices of fixed based operators in the airport, such as airline companies. A coffee shop which is more quiet and relaxing atmosphere than those on the first, third and fourth floors. Passengers can easily access the Internet at the Internet Center next to the coffee shopWHATS ON THE SECOND FLOOR?

The center part of the third floor has ticket counters of each airline Specialty retail stores for clothes, souvenirs, sportswear and stationery are locatedStores for luggage wrapping, courier services, foods and beverages, and convenience stores are also hereSecurity inspection, departure immigration, waiting room, and lounge for departing passengersRestaurants, coffee shops, duty free shops and foreign exchange booths are also located on the outer portionForeign and domestic airlines check-in counters for over-sized baggageWHATS ON THE THIRD FLOOR?

The fourth floor houses only shops and amenities for passengers. Food and beverage shops provide a various selection of menus including Korean, Japanese, Chinese and Western foods. There are also restaurants operated by Koreas top-class hotel and buffet restaurants.Airlines VIP lounges and transfer/transit lounges.For transit and transfer passengers staying at the airport for long hours, facilities such as massage/shower room, prayer room, and transit hotel are provided at the east and west end of the fourth floor.WHATS ON THE FOURTH FLOOR?

BusBus stops are located on the arrival floorBus tickets and information are available here

GROUND TRANSPORTTaxiTaxi stops are located on the arrival floorJumbo taxis, branded taxis and regular taxis are available hereKTX (Korea Express Train)Information counter for KTX is located at the east and west end of the Passenger Terminal First floor

Passenger volumeChange over previous yearAircraft operationsCargo tonnage200114,542,29086,8071,186,015200220,924,17143.9%126,0941,705,928200319,789,8745.4%130,1851,843,055200424,084,07221.7%149,7762,133,444200526,051,4668.2%160,8432,150,139200628,191,1168.2%182,0072,336,571200731,227,89710.8%211,4042,555,580200829,973,5224.0%211,1022,423,717200928,549,7704.8%198,9182,313,002201033,478,92517.3%214,8352,684,499201135,062,3664.7%229,5802,539,222201238,970,86411.1%254,0372,456,724Source: IIAC Airport StatisticsTRAFFIC AND STATISTICSACCOLADES 2013Best Airport In The WorldAward Presentation :GT Tested AwardsOrganization :Global TravelerCirculation :World

International Airport of the Year 2013Award Presentation :CAPA Aviation Awards for ExcellenceOrganization :CAPACirculation :World

The World Routes Awards 2013Award Presentation :The World Routes Awards 2013Organization :UBM LiveCirculation :World

ACCOLADES 2013Airport with the Best Duty FreeAward Presentation :Airport with the Best Duty FreeOrganization :Business Traveler MagazineCirculation :World

Best Airport in Asia-PacificAward Presentation :Airport Service Quality Awards for 2012Organization :ACI (Airport Council International)Circulation :World

Best Airport less than 25-40 million passengersAward Presentation :Airport Service Quality Awards for 2012Organization :ACI (Airport Council International)Circulation :World

ACCOLADES 2013Airport of the Year 2013Award Presentation :World Air Cargo Awards 2013Organization :Air Cargo WeekCirculation :World

Best Green Service AirportAward Presentation :The Asian Freight & Supply Chain AwardOrganization :Cargonews AsiaCirculation :Asia

Best Cargo Airport in AsiaAward Presentation :Air Cargo Excellence AwardsOrganization :Air Cargo WorldCirculation :World