In association with D-Structure Ltd Consulting Civil /Structural Engineers Tel: 01689 875980 Email: [email protected] Site Inspection Report by KTA Project The Rose and Crown, Welwyn Project Number: 19268 Date: 08/10/2019 Present: Charles Davenport - KTA Purpose: KTA were requested to visit the above site to view and inspect the following: 1. The existing rear barn structure for structural stability. 2. The rear garden wall along the church yard boundary for structural stability. Note: This report follows the convention of denoting Left, Right, Front and Back whilst viewing the property from the front / street. Existing structure observations 1. The existing barn structure is located at the rear of the house. 2. The barn is part two-storey and part single storey at the left end, and both are formed in brick masonry with timber framed roofs. 3. The two-storey element is part double height at the right end and part mezzanine/1 st floor to the left half. 4. There are various structural defects which may be observed across both sections of the building. These are largely related to the masonry walls where there are numerous cracks in the brickwork on every elevation. 5. The roof structure to the two storey section is formed in oak and appears to be structurally sound, although there are a number of shakes/splits in the main cross beams. The lower section of the roof tiling appears to have flattened out indicating that the rafters have sagged locally. 6. The lower single storey roof is obscured from below by a lath and plaster ceiling which is in very poor condition. 7. The timber framing to the mezzanine floor appears to be sound although flaking paint has made it difficult to make a full assessment of these. 8. The left most room of the single storey structure was not accessible as the external door was jammed shut. 9. The rear boundary garden wall between the house garden and the church yard is leaning over into the church yard. The wall is unstable and the brickwork has collapsed in one location leaving a hole through the wall. The adjacent area of the church yard is currently cordoned off.

Transcript of In association with D-Structure Ltd Consulting Civil ...

In association with D-Structure Ltd

Consulting Civil /Structural Engineers

Tel: 01689 875980

Email: [email protected]

Site Inspection Report by KTA

Project The Rose and Crown, Welwyn

Project Number: 19268

Date: 08/10/2019

Present: Charles Davenport - KTA

Purpose: KTA were requested to visit the above site to view and inspect the following:

1. The existing rear barn structure for structural stability. 2. The rear garden wall along the church yard boundary for structural stability.

Note: This report follows the convention of denoting Left, Right, Front and Back whilst viewing the property from the front / street.

Existing structure observations

1. The existing barn structure is located at the rear of the house. 2. The barn is part two-storey and part single storey at the left end, and both are

formed in brick masonry with timber framed roofs. 3. The two-storey element is part double height at the right end and part

mezzanine/1st floor to the left half. 4. There are various structural defects which may be observed across both sections of

the building. These are largely related to the masonry walls where there are numerous cracks in the brickwork on every elevation.

5. The roof structure to the two storey section is formed in oak and appears to be structurally sound, although there are a number of shakes/splits in the main cross beams. The lower section of the roof tiling appears to have flattened out indicating that the rafters have sagged locally.

6. The lower single storey roof is obscured from below by a lath and plaster ceiling which is in very poor condition.

7. The timber framing to the mezzanine floor appears to be sound although flaking paint has made it difficult to make a full assessment of these.

8. The left most room of the single storey structure was not accessible as the external door was jammed shut.

9. The rear boundary garden wall between the house garden and the church yard is leaning over into the church yard. The wall is unstable and the brickwork has collapsed in one location leaving a hole through the wall. The adjacent area of the church yard is currently cordoned off.

2

Discussion

1. The walls of the double height barn space appear to be unstable. It is likely that when the building was erected that there may have been a full length first floor which provided lateral restraint to the walls.

2. The cracking at numerous locations will need to be strapped back into the structure using helifix bedjoint reinforcement, or by steel strapping. Alternatively the cracked brickwork at the edges of the door and window openings may be carefully dismantled and re-built fully tied into the remainder of the wall.

3. The lower roof structure will need to be made accessible by removing the deteriorated lath and plaster ceiling.

4. The end room of the single storey structure will need to be made accessible for inspection.

5. A number of the brick lintels which appear to have failed will need to be re-built or strengthened with an internal steel lintel.

6. The roof tiling across the whole building is in poor condition and will require a general overhaul.

7. The rear garden boundary wall is structurally unstable and will need to be strengthened with buttressing or dismantled and re-built. Any buttresses will need to be installed on the church yard side of the wall. Signed,

Charles Davenport CEng MICE

3

Photo 1: The house front elevation Photo 2: The 2-storey barn building to the rear of the main house

Photo 3: The single storey section on the left side of the rear barn

Photo 4: Loose tiles on the front face of the lower roof

Photo 5: missing tiles on the single storey front roof behind the budlia

Photo 6: missing tiles on the single storey front roof

4

Photo 7: The rafters at the eaves appear to have rotten through at the left end of the singe storey structure

Photo 8: The gable end stud wall appears to be rotten and has bowed outwards

Photo 9: The tiber rainscreen cladding is rotten in sections and has come loose in areas on the gable wall of the single storey element

Photo 10: As photo 9.

Photo 11: Cracking on the front left corner of the 2-storey structure

Photo 12: Stepped cracking at the left end of the 2-storey structure

5

Photo 13: Cracking on the front wall at the left side of the central door

Photo 14: Previous repairs to the brick lintel over the central front elevation door

Photo 15: The first floor brick lintel above appears to have failed and is likely supported on the timber door frame

Photo 16: Cracking on the right side of the central door

Photo 17: The upper window lintel also appears to have failed

Photo 18: the right gable end wall with ivy growth

6

Photo 19: Cracking at ground level on the right gable end wall

Photo 20: The rear elevation of the 2-storey structure

Photo 21: The rear elevation of the single storey structure

Photo 22: Loss of mortar on the rear wall

Photo 23: Stepped cracking on the rear left corner of the 2-storey structure

Photo 24: The central rear elevation – the roof slope has flattened to the lower area

7

Photo 25: Rear elevation right end Photo 26: The dropped rafters and flattened out rafters

Photo 27: The double height internal space to the right end of the barn – the timber framing appears to be sound

Photo 28: The rear right wall

Photo 29: The space under the 1st floor mezzanine to the left end of the 2-storey barn section

Photo 30: Cracking to the left side of the door opening on the front wall

8

Photo 31: Cracking on the right side of the front wall ground floor window

Photo 32: As photo 31 – with cracking on the left side of the front wall window

Photo 33: Crcking below the window on the front wall

Photo 34: The wall has failed below the central timber beam on the front wall

Photo 35: Cracking on the left end wall of the 2-storey structure

Photo 36: Cracking on the rear of the left end wall of the 2-stroey structure

9

Photo 37: Cracking in the rear wall of the 2-storey structure

Photo 38: Cracking in the rear wall at the stair support steel beam

Photo 39: Cracking on the internal face of the right gable end wall at ground level

Photo 40: Cracking on the rear right corner

Photo 41: Loss of mortar on the rear wall at the right end

Photo 42: Movement of the wall at mezzanife level on the rear wall

10

Photo 43: As photo 42 Photo 44: A possible mechanics pit in the ground floor at the right end of the building

Photo 45: The roof structure above the mezzanine appears sound

Photo 46: Cracking on the left end wall at mezzanine level

Photo 47: Minor checking in mezzanine rear left corner

Photo 48: The mezzanine timber roof frame appear sound

11

Photo 49: Minor cracking in front left of mezzanine Photo 50: Cracking below window in front wall of mezzanine

Photo 51: As photo 50 Photo 52: Large yew trees in adjacent church yard

Photo 53: The unstable rear boundary wall Photo 54: As photo 53

12

Photo 55: Boundary wall with mortar loss and loose bricks

Photo 56: As photo 55

Photo 57: As photo 55 Photo 58: Hole through wall

Photo 59: Heavy undergrowth obscuring end of wall

Photo 60: As photo 58

13

Photo 61: As photo 58 Photo 62: Churchside of boundary wall

Photo 63: As photo 62 Photo 64: As photo 62

Photo 65: As photo 62 Photo 66: Hole through wall

14

Photo 67: As photo 62 Photo 68: As photo 62

Photo 69: Severe lean to wall Photo 70: As photo 69

DIAGRAMMATIC ROOF PLAN

SCALE 1 : 50

AD

C B

F

E

BOUNDARY WALL

WITH CHURCH

PUB GARDEN

4

5

6

7 +8

9

10

N

19268 - 01

TM 1:50 at A1

Rev

ROOF PLAN

THE ROSE & CROWN

WELWYN

AL6 9LX

STAR PUBS

Rev Description Date By

Drawing No.

OCT 2019DateScaleDrawn

Drawing Title

Job Title

Client

Notes

1. All dimensions to be checked on site and not scaled from this

or any other drawing.

2. Drawing to be read in conjunction with all Architect's drawings

and other related documentation.

3. All works to be notified to the Local Authority and Building

Control Officer's Approvals obtained as appropriate during

the course of the works.

4. Temporary Works: To ensure the stability of the existing

building during construction and is to be the contractor's

responsibility.

5. Steel sections to be mild steel grade S275.

6. Concrete for padstones to be 1 : 1

1

2

: 3 nominal mix by

volume with 10mm aggregate size.

7. Mass concrete to be grade C30 having a minimum crushing

strength of 30 N/mm² at 28 days.

8. Reinforced concrete to be grade C35 having a minimum

crushing strength of 35N/mm² at 28 days.

9. Unless noted otherwise, ground bearing pressure required for

new foundation works to be 100kN/m² andf formation level

agreed with BCO

10. All structural softwood timbers used are to be treated and

have an average moisture content not exceeding 20%.

Timber is to be identified as C16 or 24 dry, or KD as part of

the grading marking.

11. All blockwork to be 3.6 N/mm² in 1 : 6 mortar above and

7N/mm² laid in 1 : 3 mortar below DPC unless otherwise

shown.

12. All lengths of structural steelwork to be confirmed on site prior

to ordering.

NB: Connection details not shown to be to fabricator's design

and detail to cater for end reactions stated on drawings

shown as ??kN (ULT) unless noted.

13. All internal structural steelwork to be painted with two coats

of zinc rich primer prior to erection and touched in after

erection, all external structural steelwork to be galvanised

prior to delivery to site.

14. Welds to be 6mm full profile fillet unless otherwise shown. Hit

and Miss welds to be 100 'Hit' and 75 'Miss' throughout.

15. Cut line above new openings to allow for 25mm minimum

semi-dry 3: 1 sand/cement mortar packing, to be well

consolidated between cut face of existing masonry and top of

new supporting member.

16. Tied Movement Joints (TMJ) to comprise of proprietary wall

tie system that provides for lateral movement with plaster

beads internally and mastic sealant fill externally.

17. Where Resin Anchors are to be fixed into masonry they must

be into masonry and NOT mortar joints.

18. All proprietary products are to be used and installed in

accordance with manufacturer's instructions and/or

recommendations.

19. Where alternative products are used in substitution for those

specified here, then the substitute product must be equivalent

to or superior than the specified product.

Consulting Civil/Structural Engineers

Office 11 Mentmore House

Cray Avenue

Orpington

Kent BR5 3QF

Tel: 01689 875 980 Email: [email protected]

In association with

D-Structure Ltd.

P1

P1 Issued for Information 17/10/19 KD

PHOTO NUMBER GROUND FLOOR

3

21

52

22

23

24 +26

25

20

18 +

19

16 +

17

14 +15

13

1211

41

40

43

42

39

44

27

29

28

38

37

30 +31

32 +33

34

35

36

47

45 +

48

49

46

50

51

+

+

N

N

19268 - 02

TM 1:50 at A1

Rev

GROUND FLOOR AND

MEZZANINE

THE ROSE AND CROWN

WELWYN

AL6 9LX

STAR PUBS

Rev Description Date By

Drawing No.

OCT 2019DateScaleDrawn

Drawing Title

Job Title

Client

Notes

1. All dimensions to be checked on site and not scaled from this

or any other drawing.

2. Drawing to be read in conjunction with all Architect's drawings

and other related documentation.

3. All works to be notified to the Local Authority and Building

Control Officer's Approvals obtained as appropriate during

the course of the works.

4. Temporary Works: To ensure the stability of the existing

building during construction and is to be the contractor's

responsibility.

5. Steel sections to be mild steel grade S275.

6. Concrete for padstones to be 1 : 1

1

2

: 3 nominal mix by

volume with 10mm aggregate size.

7. Mass concrete to be grade C30 having a minimum crushing

strength of 30 N/mm² at 28 days.

8. Reinforced concrete to be grade C35 having a minimum

crushing strength of 35N/mm² at 28 days.

9. Unless noted otherwise, ground bearing pressure required for

new foundation works to be 100kN/m² andf formation level

agreed with BCO

10. All structural softwood timbers used are to be treated and

have an average moisture content not exceeding 20%.

Timber is to be identified as C16 or 24 dry, or KD as part of

the grading marking.

11. All blockwork to be 3.6 N/mm² in 1 : 6 mortar above and

7N/mm² laid in 1 : 3 mortar below DPC unless otherwise

shown.

12. All lengths of structural steelwork to be confirmed on site prior

to ordering.

NB: Connection details not shown to be to fabricator's design

and detail to cater for end reactions stated on drawings

shown as ??kN (ULT) unless noted.

13. All internal structural steelwork to be painted with two coats

of zinc rich primer prior to erection and touched in after

erection, all external structural steelwork to be galvanised

prior to delivery to site.

14. Welds to be 6mm full profile fillet unless otherwise shown. Hit

and Miss welds to be 100 'Hit' and 75 'Miss' throughout.

15. Cut line above new openings to allow for 25mm minimum

semi-dry 3: 1 sand/cement mortar packing, to be well

consolidated between cut face of existing masonry and top of

new supporting member.

16. Tied Movement Joints (TMJ) to comprise of proprietary wall

tie system that provides for lateral movement with plaster

beads internally and mastic sealant fill externally.

17. Where Resin Anchors are to be fixed into masonry they must

be into masonry and NOT mortar joints.

18. All proprietary products are to be used and installed in

accordance with manufacturer's instructions and/or

recommendations.

19. Where alternative products are used in substitution for those

specified here, then the substitute product must be equivalent

to or superior than the specified product.

Consulting Civil/Structural Engineers

Office 11 Mentmore House

Cray Avenue

Orpington

Kent BR5 3QF

Tel: 01689 875 980 Email: [email protected]

In association with

D-Structure Ltd.

P1

P1 Issued for Information 17/10/19 KD

PHOTO NUMBER GROUND FLOOR

PHOTO NUMBER MEZZANINE

AutoCAD SHX Text
UP

64

65

59

60

61

53

58

57

70

65

63

67

69

56

68

62

52

55

N

19268 - 03

TM 1:50 at A1

Rev

REAR BOUNDARY WALL

THE ROSE AND CROWN

WELWYN

AL6 9LX

STAR PUBS

Rev Description Date By

Drawing No.

OCT 2019DateScaleDrawn

Drawing Title

Job Title

Client

Notes

1. All dimensions to be checked on site and not scaled from this

or any other drawing.

2. Drawing to be read in conjunction with all Architect's drawings

and other related documentation.

3. All works to be notified to the Local Authority and Building

Control Officer's Approvals obtained as appropriate during

the course of the works.

4. Temporary Works: To ensure the stability of the existing

building during construction and is to be the contractor's

responsibility.

5. Steel sections to be mild steel grade S275.

6. Concrete for padstones to be 1 : 1

1

2

: 3 nominal mix by

volume with 10mm aggregate size.

7. Mass concrete to be grade C30 having a minimum crushing

strength of 30 N/mm² at 28 days.

8. Reinforced concrete to be grade C35 having a minimum

crushing strength of 35N/mm² at 28 days.

9. Unless noted otherwise, ground bearing pressure required for

new foundation works to be 100kN/m² andf formation level

agreed with BCO

10. All structural softwood timbers used are to be treated and

have an average moisture content not exceeding 20%.

Timber is to be identified as C16 or 24 dry, or KD as part of

the grading marking.

11. All blockwork to be 3.6 N/mm² in 1 : 6 mortar above and

7N/mm² laid in 1 : 3 mortar below DPC unless otherwise

shown.

12. All lengths of structural steelwork to be confirmed on site prior

to ordering.

NB: Connection details not shown to be to fabricator's design

and detail to cater for end reactions stated on drawings

shown as ??kN (ULT) unless noted.

13. All internal structural steelwork to be painted with two coats

of zinc rich primer prior to erection and touched in after

erection, all external structural steelwork to be galvanised

prior to delivery to site.

14. Welds to be 6mm full profile fillet unless otherwise shown. Hit

and Miss welds to be 100 'Hit' and 75 'Miss' throughout.

15. Cut line above new openings to allow for 25mm minimum

semi-dry 3: 1 sand/cement mortar packing, to be well

consolidated between cut face of existing masonry and top of

new supporting member.

16. Tied Movement Joints (TMJ) to comprise of proprietary wall

tie system that provides for lateral movement with plaster

beads internally and mastic sealant fill externally.

17. Where Resin Anchors are to be fixed into masonry they must

be into masonry and NOT mortar joints.

18. All proprietary products are to be used and installed in

accordance with manufacturer's instructions and/or

recommendations.

19. Where alternative products are used in substitution for those

specified here, then the substitute product must be equivalent

to or superior than the specified product.

Consulting Civil/Structural Engineers

Office 11 Mentmore House

Cray Avenue

Orpington

Kent BR5 3QF

Tel: 01689 875 980 Email: [email protected]

In association with

D-Structure Ltd.

P1

P1 Issued for Information 17/10/19 KD330

PHOTO NUMBER GROUND FLOOR