Transcript of Implimantation of NH Projects in Assam2
-
Implimentation of NH projects under Assam, PWD
Review meeting on.
Progress PaymentName of project Remarks
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 161
2
3
4
5
Sl. No.
Name of contractor contract amount
Date of notice to proceed with the
work
intended comletion
date
Value of work
done till date
progress in precentag
e (7/4 x 100)
Stipulated
progress till date in
%
short fall (9-8)
Payment made till
date
percentage of
payment (11/4x10
0)
Short fall % (8-12)
Steps required to make up
short fall in progress
Steps required to make up
short fall in Payment
IRQP from km. 105/0 to 115/0 (T= 10.00 Km) and providing paved shoulders in KM 110, 111, 115 and from KM 134/0 to 144/0. (Guwahati)improvement of mirza town by providing footpath cum drain paved shoulder including railing in bazar area from KM 124/400 to 127/400 along with widening of cul. No. 125/1 & 126/1 under parmanent bridge fee fund. (Guwahati)
Improvement by providing paved shoulder from km 72/600 to km 73/675, km 114/950 to km 123/012, km 123/21 to km 124/400 & from km 127/400 to km 134/000 (T=17.125 km) along with footpath cum drain and slab culverts of NH-37 under AP for the year 2007-08. (Not alloted)
PR from km 134/0 to 145/750 (Guwahati/New)SR to Bridges (Reparing of damaged railling wearing coat, expension joints and approaches slabs including painting of railling and kerbs and greasing of bearings) (GLP, Boko, GHY)
-
Sl.No. CUMULATIVE PHYSICAL PROGRESS % CUMULATIVE EXPENDITURE (Rs. In Crore) DATE OF
Mar. 07 Nov. 07 Apr. 07 Mar. 07 Nov. 07 Apr. 07
Target Actual Target Actual Target Actual Target Actual Target Actual Target Actual1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
1
NH-37
2
NH-37
CATOGORY OF ROAD
NAME OF WORK
JOB NO. & DATE OF
SANCTION ORIGINAL/ REVISED
SANCTIONED COST ORIGINAL/
REVISED
LENGTH KM
Jan.08 (T)
Jan.08 (T)
Award of
Contract
Completion as per
contract
IRQP from km. 105/0 to 115/0 (T= 10.00 Km) and providing paved shoulders in KM 110, 111, 115 and from KM 134/0 to 144/0. (Guwahati)
037-AS-2005-06-954 (dt. 20th Octobor 2005)
improvement of mirza town by providing footpath cum drain paved shoulder including railing in bazar area from KM 124/400 to 127/400 along with widening of cul. No. 125/1 & 126/1 under parmanent bridge fee fund. (Guwahati)
037-AS-2006-07-029 (DT.
-
2NH-37
3
NH-37
4
NH-37
5
NH-37
Total
improvement of mirza town by providing footpath cum drain paved shoulder including railing in bazar area from KM 124/400 to 127/400 along with widening of cul. No. 125/1 & 126/1 under parmanent bridge fee fund. (Guwahati)
037-AS-2006-07-029 (DT.
Improvement by providing paved shoulder from km 72/600 to km 73/675, km 114/950 to km 123/012, km 123/21 to km 124/400 & from km 127/400 to km 134/000 (T=17.125 km) along with footpath cum drain and slab culverts of NH-37 under AP for the year 2007-08. (Not alloted)
PR from km 134/0 to 145/750 (Guwahati/New)
SR to Bridges (Reparing of damaged railling wearing coat, expension joints and approaches slabs including painting of railling and kerbs and greasing of bearings) (GLP, Boko, GHY)
-
NOTE T: Target
-
23
REMARKS EASONS
FOR SLIPPAGE ACTION TAKEN
-