IET600 Training Rev 02

download IET600 Training Rev 02

of 24

Transcript of IET600 Training Rev 02

  • 8/13/2019 IET600 Training Rev 02

    1/24

    IET600 Exercise 1

    IET600 5.1.14 ABB Substation Automation Products

    DocNo/Rev. 2 Page 1 / 24

    IET600 Exercise 1

  • 8/13/2019 IET600 Training Rev 02

    2/24

    IET600 Exercise 1

    IET600 5.1.14 ABB Substation Automation Products

    DocNo/Rev. 2 Page 2 / 24

    Contents

    1 EXERCISE 1 .......................................................... ................................. ................. 3

    1.1 Purpose ....................................................... ................................. ....................... 3

    1.2 System Configuration ............................................. ................................. ............ 3

    1.3 Checking PCM configuration and creating an IET600 new project .............. ....... 4

    1.4 Creating Datasets ......................................................... ................................ ....... 8

    1.5 Creating GOOSE Control Blocks (GCB) ................................ ........................... 12

    1.6 Creating Datasets and GOOSE Control Blocks on the RED670 relay .............. 15

    1.7 Subscribing IEDs .................................................... ................................. .......... 16

  • 8/13/2019 IET600 Training Rev 02

    3/24

    IET600 Exercise 1

    IET600 5.1.14 ABB Substation Automation Products

    DocNo/Rev. 2 Page 3 / 24

    1 Exercise 1

    1.1 Purpose

    This exercise will show you how to configure GOOSE messages on two different

    REX670 relays.

    1.2 System Configuration

    In this exercise a 4 breakers system with two IEDs will be the starting point for the

    GOOSE configuration. The figure above shows the system configuration. Breaker 1

    and 2 will be controlled by a RED670 relay and breakers 3 and 4 by a RET670 relay.

    The following GOOSE messages will be required:

    RET670

    o 87T trip signal

    o Breaker failure initiate signal of Breaker 4

    o Breaker 3 and 4 position

    RED670

    o Breaker failure initiate signal of Breaker 2

    o Breaker 1 and 2 position

  • 8/13/2019 IET600 Training Rev 02

    4/24

    IET600 Exercise 1

    IET600 5.1.14 ABB Substation Automation Products

    DocNo/Rev. 2 Page 4 / 24

    1.3 Checking PCM configuration and creating an IET600 new project

    1. Double check that GOOSEBINRCV and GOOSEINTLKRCV are included on thePCM configuration of the RET670 and RED670 relays. If they are not available on

    the configuration, you will need to add both of them in order to receive the GOOSE

    messages.

  • 8/13/2019 IET600 Training Rev 02

    5/24

    IET600 Exercise 1

    IET600 5.1.14 ABB Substation Automation Products

    DocNo/Rev. 2 Page 5 / 24

    2. Export the SCD file from PCM. Right click over the Substation section and selectExport .

  • 8/13/2019 IET600 Training Rev 02

    6/24

    IET600 Exercise 1

    IET600 5.1.14 ABB Substation Automation Products

    DocNo/Rev. 2 Page 6 / 24

    Because this exercise only uses ABB relays, you can leave the default settings when

    you are exporting the SCD file. If you were using relays from different vendors on PCM,

    then you will need to uncheck Export Private Sections and Export it.

    3. Open IET600.

    4. Click on the IET icon on the top-left side on the IET window and select Manage

    Projects .

  • 8/13/2019 IET600 Training Rev 02

    7/24

    IET600 Exercise 1

    IET600 5.1.14 ABB Substation Automation Products

    DocNo/Rev. 2 Page 7 / 24

    5. Create a new project and give it a name.

    6. Import the SCD file that you previously created from PCM.

    7. After importing the SCD file, you will see the IED on IET.

  • 8/13/2019 IET600 Training Rev 02

    8/24

    IET600 Exercise 1

    IET600 5.1.14 ABB Substation Automation Products

    DocNo/Rev. 2 Page 8 / 24

    8. You can identify the IED if you select the IED tab and then select one of the IEDs.

    You will see the given name on PCM on the properties section.

    1.4 Creating Datasets

    The next step is to create datasets on the RET670. The first dataset will have the 87T trip signal. On this

    exercise, this signal will be simulated from the tripping logic block (SMPPTRC).

  • 8/13/2019 IET600 Training Rev 02

    9/24

    IET600 Exercise 1

    IET600 5.1.14 ABB Substation Automation Products

    DocNo/Rev. 2 Page 9 / 24

    1. Click on Datasets and then right click anywhere on the area showed on the figure

    above. Select Insert new row .

    2. Write a name to the first dataset and click OK . Notice that the dataset is under the

    LLN0 node.

  • 8/13/2019 IET600 Training Rev 02

    10/24

    IET600 Exercise 1

    IET600 5.1.14 ABB Substation Automation Products

    DocNo/Rev. 2 Page 10 / 24

    3. Select the created dataset and look for the SMPPTRC function block.

    Every protection function will be in the LD0 node. You will need to add the quality

    and then the general trip output to this dataset. To add quality [ST] and general

    [ST] use the Append button. In the right side column you can see what has been

    added to the dataset.

  • 8/13/2019 IET600 Training Rev 02

    11/24

    IET600 Exercise 1

    IET600 5.1.14 ABB Substation Automation Products

    DocNo/Rev. 2 Page 11 / 24

    You can create the second dataset that will have the breaker failure initiate of breaker 4

    and follow the steps described above. This signal is gotten from the CCRBRF function

    block.

    The third and last dataset on the RET670 is the breaker position indication of breakers

    3 and 4. These signals come from SCSWI function blocks.

  • 8/13/2019 IET600 Training Rev 02

    12/24

    IET600 Exercise 1

    IET600 5.1.14 ABB Substation Automation Products

    DocNo/Rev. 2 Page 12 / 24

    1.5 Creating GOOSE Control Blocks (GCB)

    1. Select the GCB Data tab. Right click anywhere on the area showed on the figure

    above. Click on Insert new row .

  • 8/13/2019 IET600 Training Rev 02

    13/24

    IET600 Exercise 1

    IET600 5.1.14 ABB Substation Automation Products

    DocNo/Rev. 2 Page 13 / 24

    2. Write a name for the first GCB Data.

  • 8/13/2019 IET600 Training Rev 02

    14/24

    IET600 Exercise 1

    IET600 5.1.14 ABB Substation Automation Products

    DocNo/Rev. 2 Page 14 / 24

    3. Add the dataset that has the 87T trip signal to this GCB Data.

    4. Create a second GCB Data. Follow the steps above and add the dataset that has

    the breaker failure initiate signal of breaker 4.

    5. Create a third and last GCB Data. It will send breaker 3 and 4 positions.

    If you are using a particular Virtual Local Area Network (VLAN), you can set this up on

    the option showed above on the same GCB Data window. Same applies to the

    GOOSE priority. You can choose a high priority (7) is the message is of high

    importance.

    NOTE: In this exercise we will use the default settings.

  • 8/13/2019 IET600 Training Rev 02

    15/24

  • 8/13/2019 IET600 Training Rev 02

    16/24

    IET600 Exercise 1

    IET600 5.1.14 ABB Substation Automation Products

    DocNo/Rev. 2 Page 16 / 24

    Now we will need to create the GCB Data on the RED670. After creating them, you will have

    something like in the figure above.

    1.7 Subscribing IEDs

    One of the final steps before exporting the configured file is to subscribe the IEDs to the GOOSE

    message that is of interest of to each relay.

    In this exercise, the RED670 will subscribe to all the messages created on the RET670. The same

    applies to the RET670. It will subscribe to all the messages sent by the RED670.

    1. Select the RED670 on the IED section and then double click on the boxes that

    have the GOOSE messages sent by the RET670. You will see an x when theselection is done.

  • 8/13/2019 IET600 Training Rev 02

    17/24

    IET600 Exercise 1

    IET600 5.1.14 ABB Substation Automation Products

    DocNo/Rev. 2 Page 17 / 24

    2. Subscribe the RET670 to the GOOSE messages sent by the RED670.

  • 8/13/2019 IET600 Training Rev 02

    18/24

    IET600 Exercise 1

    IET600 5.1.14 ABB Substation Automation Products

    DocNo/Rev. 2 Page 18 / 24

    3. Export the SCD with the GOOSE configuration.

    4. Right click over substation section and click on Import . You will need to import the

    SCD file already created on IET600.

    Note: It is important that you make a backup of your PCM project before

    importing the configured SCD file .

  • 8/13/2019 IET600 Training Rev 02

    19/24

    IET600 Exercise 1

    IET600 5.1.14 ABB Substation Automation Products

    DocNo/Rev. 2 Page 19 / 24

    5. Leave the default options for this exercise when the importing window pops up. If

    you were communicating with relays from different manufacturers and you included

    them on your IET600 configuration, you will need to choose Replace unknown IED

    types with generic IEC 61850 object type .

    After importing the configured SCD file onto PCM, you will have to enable some

    parameters settings.

    6. Open Parameter Settings Tool. Look for IEC61850-8-1:1 in the IED Configuration. In

    the Operation setting choose Enabled . It will enable GOOSE messages. In GOOSE

    setting, verify that the GOOSE messages are sent by OEM311_AB Ethernet rear

    card.

    Note: It is possible to send GOOSE messages by the front Ethernet port, but it does

    not have a high priority on the relays logic when sending GOOSE messagesthrough it.

  • 8/13/2019 IET600 Training Rev 02

    20/24

    IET600 Exercise 1

    IET600 5.1.14 ABB Substation Automation Products

    DocNo/Rev. 2 Page 20 / 24

    7. Under the Application Configuration section, look for GOOSEBINRCV:1 . Enable it.

    This setting enables the GOOSEBINRCV block to receive GOOSE messages.

    Note: The name of the tab, GOOSE, could be different if you chose a different

    name for it when you added the GOOSEBINRCV block on PCM.

    8. Repeat the step above for the GOOSEINTLKRCV .

    9. Open the Signal Matrix Tool. Select the Goose Receive tab. Map the GOOSE

    messages to the GOOSEBINRCV and GOOSEINTLKRCV .

  • 8/13/2019 IET600 Training Rev 02

    21/24

    IET600 Exercise 1

    IET600 5.1.14 ABB Substation Automation Products

    DocNo/Rev. 2 Page 21 / 24

    10. Repeat the steps above for the RED670.

  • 8/13/2019 IET600 Training Rev 02

    22/24

    IET600 Exercise 1

    IET600 5.1.14 ABB Substation Automation Products

    DocNo/Rev. 2 Page 22 / 24

    11. Save everything and write it onto the RET670 and RED670 relays.

  • 8/13/2019 IET600 Training Rev 02

    23/24

    IET600 Exercise 1

    IET600 5.1.14 ABB Substation Automation Products

    DocNo/Rev. 2 Page 23 / 24

  • 8/13/2019 IET600 Training Rev 02

    24/24

    IET600 Exercise 1

    IET600 5.1.14 ABB Substation Automation Products

    Revision History

    Revision 1

    Figures of step 1 on section 1.3 changed.

    Revision 2

    Bolted letters on Note of section 1.7 steps 4.