IEEE Conformity Assessment Program (ICAP) for SIEPON
-
Upload
ieee-standards-association -
Category
Technology
-
view
975 -
download
0
description
Transcript of IEEE Conformity Assessment Program (ICAP) for SIEPON
Ravi Subramaniam – Technical
Director, ICAP
20 April 2012 Prague, Czech Republic
IEEE Conformity Assessment Program (ICAP) for SIEPON
20 April 2012 1
Why Does SIEPON need a Conformity Assessment Program?
• Conformity assessment is the accepted way of demonstrating that a product adheres to a standard
• Opportunity for participants to demonstrate adherence to Testing requirements
• IEEE 1904.1 standards based • New Technology – Instill consumer or end-user
confidence • Supports free flow of SIEPON related products
and services across national boundaries • Increased adoption
3 possible models
Conformity Assessment System
Independent Lab
Vendor
Buyer
• 1st Party – Vendor • 2nd Party – Buyer or
User • 3rd Party –
Independent Entity
20 April 2012 3
2nd Party Testing
• Logo Usage with TMLA
IEEE/SIEPON Certified Product
• ICAP Review Prior to Certification • ICAP to Determine Surveillance
Needs
Buyer or Network
Operator Tested
• 2nd Party Lab tested • Authorized Tools
Product
3rd Party Testing
• Logo Usage with TMLA
SIEPON Certified Product
• Independent lab recommends for Certification
• ICAP Issues Certification • ICAP to Determine Surveillance Needs
3rd Party Declaration
• Authorized Labs • 3rd Party Lab tested • Authorized Tools
Product
Self vs. 3rd Party Certification
• Speed of Implementation • Time to Market • Cost of Test Tools • Vendor Misrepresentation • Regulatory Risks • End-Buyer confidence
Why interoperability is hard in digital communications?
20 April 2012 7
Interoperability
PerformanceConformance“Can you hear me now?”
Are the “1”s and “0”s
right?
Is transmission and reception good enough?
Considerations for a harmonized technical approach
• Harmonized test procedures, use cases and derived test sets may enhance confidence in fielded interoperability
• There may be no clear regulatory or coordinated marketplace demand driver to drive technical harmonization
• Lots of choices and unique system implementation – I am special!
• Testing – “to infinity and beyond” • performance • digital conformance (may be lots of permutations) • interoperability testing (for all equipment models –
software changes)
28 April 2012 8
Performance/Design Requirements
ISO/IEC 17025 + competency requirements
SIEPON Certification Scheme
20 April 2012 9
Products
ISO/IEC Guide 65 Best Practices
Certification Authority (ICAP)
Laboratories
Roles of Entities
IEEE 1904/SIEPON
Certified Products
P1904 WG • IEEE 1904 Standard •Test Specification
ICAP (Certification Authority) •Entry/Exit Point for Certification Process •Policies & Procedures •TMLA •Test Labs Facilitation •Market Certification Program •Certified Product Registry •Committee of Experts
Test Laboratories • Independent •2nd Party •Test bed/tools
implementation
A Scenario to consider
Vendor submits application to ICAP
ICAP – Initiates Certification Agreement &
invoices vendor
Vendors choose lab from list of approved labs
Test Program starts at Test Lab
Test Lab delivers Final Test Report
to ICAP for Review
ICAP delivers certificate and authorizes logo
usage
ICAP publishes on Certified Product
Registry
20 April 2012 11
SIEPON Certification
Role of Committee of Experts
• Entity based participation • Major responsibilities will include
– Determine compliance levels – Act as advisors on test methods and interpretation of
standards – Test Lab Requirements/Audits – Test Tool Validation – Time required for implementation – Validate Test Report template
20 April 2012 12
Current Labs that participate in WG
• CableLabs (3rd Party) • RITT (3rd Party) • Shanghai Institute of China Telecom (2nd Party) • University of New Hampshire –Interoperability
Lab (3rd Party) • Future Lab in Japan
20 April 2012 13
SIEPON Brand Awareness
• Tested products will be awarded a certification mark • The “SIEPON Certified” mark will convey trust in
the device and the certification program. • Drive to ensure that End-Users are committed to
purchase certified products to minimize negative impact on the network
• Certified Product Registry to be maintained
20 April 2012 14
Questions & Discussion
15 20 April 2012