IDC Nutanix - Hyperconvergence and the Pulling Forces in the Datacenter
-
Upload
nexttour -
Category
Technology
-
view
2.302 -
download
0
Transcript of IDC Nutanix - Hyperconvergence and the Pulling Forces in the Datacenter
![Page 1: IDC Nutanix - Hyperconvergence and the Pulling Forces in the Datacenter](https://reader034.fdocuments.in/reader034/viewer/2022051318/58701aae1a28ab7f428b66c1/html5/thumbnails/1.jpg)
Hyperconvergence and the Pulling Forces in the Datacenter
Giorgio Nebuloni, IDC EMEANutanix .NEXT On Tour 2015
![Page 2: IDC Nutanix - Hyperconvergence and the Pulling Forces in the Datacenter](https://reader034.fdocuments.in/reader034/viewer/2022051318/58701aae1a28ab7f428b66c1/html5/thumbnails/2.jpg)
© IDC Visit us at IDC.com and follow us on Twitter: @IDC 2
Agenda State of the Datacenter Union What’s Forcing Change The New Wave of Convergence Customer Learnings Market Data Essential Guidance
![Page 3: IDC Nutanix - Hyperconvergence and the Pulling Forces in the Datacenter](https://reader034.fdocuments.in/reader034/viewer/2022051318/58701aae1a28ab7f428b66c1/html5/thumbnails/3.jpg)
3
State of the Datacenter Union
![Page 4: IDC Nutanix - Hyperconvergence and the Pulling Forces in the Datacenter](https://reader034.fdocuments.in/reader034/viewer/2022051318/58701aae1a28ab7f428b66c1/html5/thumbnails/4.jpg)
© IDC Visit us at IDC.com and follow us on Twitter: @IDC 4
Goal of Operating a Datacenter
Datacenter
Staff
Software(Business App, OS, BSM, System Mgmt)
External Contracts(outsourcers, clouds, suppliers)
Facility(energy, building, etc.)
Hardware(servers, storage, networking) Delivering
IT servicesto users
![Page 5: IDC Nutanix - Hyperconvergence and the Pulling Forces in the Datacenter](https://reader034.fdocuments.in/reader034/viewer/2022051318/58701aae1a28ab7f428b66c1/html5/thumbnails/5.jpg)
© IDC Visit us at IDC.com and follow us on Twitter: @IDC 5
A Well Known Reality
2009Q
1
2009
Q3
2010Q
1
2010
Q3
2011Q
1
2011
Q3
2012Q
1
2012
Q3
2013
Q1
2013
Q3
2014
Q1
2014
Q3
2015
Q10
500,000
1,000,000
1,500,000
2,000,000
2,500,000
3,000,000
3,500,000
4,000,000
4,500,000
5,000,000
Compute Cores shippedMoving average (Compute Cores shipped)Servers shippedMoving average (Servers shipped)
2009
Q1
2009Q
3
2010
Q1
2010
Q3
2011
Q1
2011
Q3
2012
Q1
2012Q
3
2013
Q1
2013
Q3
2014
Q1
2014
Q3
2015
Q10
500,000
1,000,000
1,500,000
2,000,000
2,500,000
3,000,000
3,500,000
4,000,000
4,500,000
5,000,000
Total Terabytes shipped
All data Western Europe; Sources: IDC EMEA Quarterly ESS and Server Trackers, 2Q15 (September 2015)
![Page 6: IDC Nutanix - Hyperconvergence and the Pulling Forces in the Datacenter](https://reader034.fdocuments.in/reader034/viewer/2022051318/58701aae1a28ab7f428b66c1/html5/thumbnails/6.jpg)
The Virtualization “Given”
6Source: IDC WW Server Virtualization Tracker; IDC Estimates; all data Western Europe
36% of all new servers are virtualized in 2014
~70% excluding bare metal environments
>8 million VMs deployed in 2014
29% in 2012
~50% in 2012
~1.6 million physical servers deployed in 2014
![Page 7: IDC Nutanix - Hyperconvergence and the Pulling Forces in the Datacenter](https://reader034.fdocuments.in/reader034/viewer/2022051318/58701aae1a28ab7f428b66c1/html5/thumbnails/7.jpg)
7
What’s Forcing Change
![Page 8: IDC Nutanix - Hyperconvergence and the Pulling Forces in the Datacenter](https://reader034.fdocuments.in/reader034/viewer/2022051318/58701aae1a28ab7f428b66c1/html5/thumbnails/8.jpg)
© IDC Visit us at IDC.com and follow us on Twitter: @IDC 8
The Alphabet of Change
![Page 9: IDC Nutanix - Hyperconvergence and the Pulling Forces in the Datacenter](https://reader034.fdocuments.in/reader034/viewer/2022051318/58701aae1a28ab7f428b66c1/html5/thumbnails/9.jpg)
© IDC Visit us at IDC.com and follow us on Twitter: @IDC 9
Give me a… D
Mobile Users
•50% Growth•3.8 Billion•50% Penetration
Data Center Cores
•2x Growth•77 Billion•10/Person
Data Growth
•4x Growth•24ZBs •760 TBs/Second
2018
Massive Size Driven by
Consumers
+ ∞
Combinations of Technology
![Page 10: IDC Nutanix - Hyperconvergence and the Pulling Forces in the Datacenter](https://reader034.fdocuments.in/reader034/viewer/2022051318/58701aae1a28ab7f428b66c1/html5/thumbnails/10.jpg)
© IDC Visit us at IDC.com and follow us on Twitter: @IDC 10
Visions, but not Only Visions
Idea Bank / iTaxi Pilot ATM-on-Demand in Warsaw
Programmatic Marketing Company
![Page 11: IDC Nutanix - Hyperconvergence and the Pulling Forces in the Datacenter](https://reader034.fdocuments.in/reader034/viewer/2022051318/58701aae1a28ab7f428b66c1/html5/thumbnails/11.jpg)
Impact on IT Operations
Copyright 2014 IDC
Operation Efficiencies
Deeper Customer Relationships
Net-New Revenue Streams
Geo-Dispersed & Always Available
Extract Value from Corporate Data
Faster Time to Deployment
Business Benefits Data Center Impact
![Page 12: IDC Nutanix - Hyperconvergence and the Pulling Forces in the Datacenter](https://reader034.fdocuments.in/reader034/viewer/2022051318/58701aae1a28ab7f428b66c1/html5/thumbnails/12.jpg)
Give me an… S
12Source: European Integrated System Survey, total =400 (103, 137, 160)
Q. On average how long (in days) does it take to develop and deploy a new application?
10 to 99 empl. 100 to 499 500+36
38
40
42
44
46
48
50
Average days to de-velop/deploy an applica-tion
![Page 13: IDC Nutanix - Hyperconvergence and the Pulling Forces in the Datacenter](https://reader034.fdocuments.in/reader034/viewer/2022051318/58701aae1a28ab7f428b66c1/html5/thumbnails/13.jpg)
Winning Back Time
13Source: European Integrated System Survey, total =400
Q. Considering the following mix of tasks, over a given week, what percentage of total IT admin and operations staff time (across server, networking and storage infrastructure) is spent on the following?
16.9%
18.6%
14.1%
39.2%
11.2%
Provisioning, patching, con-fig management
New service request and approval mgmt
Vendor and internal meet-ings
Monitoring, troubleshooting, remediation
Innovation and new projects
![Page 14: IDC Nutanix - Hyperconvergence and the Pulling Forces in the Datacenter](https://reader034.fdocuments.in/reader034/viewer/2022051318/58701aae1a28ab7f428b66c1/html5/thumbnails/14.jpg)
Power & CoolingMgmt & AdministrationNew Server Spending
Give me an… O
14
1995 2000 20052010
2015
OPEX/CAPEX Ratio
0.48 0.771.51
2.83
3.91
$94B$123B
$138B
$206B
$272B
WW Server, P&C and Administration Spending
3x
8x
![Page 15: IDC Nutanix - Hyperconvergence and the Pulling Forces in the Datacenter](https://reader034.fdocuments.in/reader034/viewer/2022051318/58701aae1a28ab7f428b66c1/html5/thumbnails/15.jpg)
15
Vs.
![Page 16: IDC Nutanix - Hyperconvergence and the Pulling Forces in the Datacenter](https://reader034.fdocuments.in/reader034/viewer/2022051318/58701aae1a28ab7f428b66c1/html5/thumbnails/16.jpg)
16
The New Wave of Convergence
![Page 17: IDC Nutanix - Hyperconvergence and the Pulling Forces in the Datacenter](https://reader034.fdocuments.in/reader034/viewer/2022051318/58701aae1a28ab7f428b66c1/html5/thumbnails/17.jpg)
Q. What do you see as the top two major benefits of Integrated Systems? Please select top two
Integrated Systems, convergence 1.0Converged Systems Integrated Systems
Compute Nodes
Storage
Internal Fabric
Operating System
Virtualization SW
Systems Management
Middleware
Apps
Middleware-centric Database-centric
Compute Nodes
Storage
Internal Fabric
Operating System
Virtualization SW
Systems Management
Compute Nodes
Storage
Internal Fabric
Operating System
Systems Management
Database
Integrated Systems
17Source: European Storage Survey, 2015; N = 498
Improved agility / faster resource availability
Lower Total Cost of Ownership
Improved Utilization IT resources
Fewer management Tools
Improved IT staff Efficiency
Lower Maintenance Costs
Improved Disaster Recovery
Lower Power/Cooling Costs
0% 5% 10% 15% 20% 25% 30%
![Page 18: IDC Nutanix - Hyperconvergence and the Pulling Forces in the Datacenter](https://reader034.fdocuments.in/reader034/viewer/2022051318/58701aae1a28ab7f428b66c1/html5/thumbnails/18.jpg)
18
Time of Choice for the IT DepartmentChallenges to integrated systems
Lack of visibility into traffic patterns
Cost and doubt of ROI
Single point of failure
Hard to segregate and protect data across multiple users
Resistance from IT domains
IT org not structured to implement change
Concerns about app performance requirements
Concerns about technical maturity
0% 20% 40%
27%
27%
30%
34%
35%
36%
37%
37%
What do you see as the top two challenges in moving to converged or integrated systems? N = 498 ; European Storage Survey, 2015
In the process of evaluating converged or integrated systems, what other alternatives, if any, did you consider to meet your compute, storage and network requirements? : IDC WW Converged and Integrated Systems End-User Survey (N + 308)
Did not consider alternative
Integrated Systems from a differenet vendor
Do nothing - rely on existing resources
Outsourcing
SaaS, PaaS, IaaS
"Traditional" hardware IT purchase
0% 20% 40% 60%
5%
12%
20%
20%
33%
44%
Alternatives Evaluated
![Page 19: IDC Nutanix - Hyperconvergence and the Pulling Forces in the Datacenter](https://reader034.fdocuments.in/reader034/viewer/2022051318/58701aae1a28ab7f428b66c1/html5/thumbnails/19.jpg)
Integrated Systems vs. Hyper-ConvergedConverged Systems Integrated Systems
Compute Nodes
Storage
Internal Fabric
Operating System
Virtualization SW
Systems Management
Middleware
Apps
Middleware-centric Database-centric
Compute Nodes
Storage
Internal Fabric
Operating System
Virtualization SW
Systems Management
Compute Nodes
Storage
Internal Fabric
Operating System
Systems Management
Database
Hyperconvergence
Converged Systems Integrated Systems
Compute Nodes
Storage
Internal Fabric
Operating System
Virtualization SW
Systems Management
Middleware
Apps
Middleware-centric Database-centric
Compute Nodes
Storage
Internal Fabric
Operating System
Virtualization SW
Systems Management
Compute Nodes
Storage
Internal Fabric
Operating System
Systems Management
Database
Storage Volumes Virt. Storage Function
Virt.Networking Virt.
With mixed Flash/HDD storage
19
Integrated Systems Core storage and compute
functionality in a single, highly virtualized, solution
All compute and storage functions delivered through the same server-based resources
Typically in clusters and scale-out
![Page 20: IDC Nutanix - Hyperconvergence and the Pulling Forces in the Datacenter](https://reader034.fdocuments.in/reader034/viewer/2022051318/58701aae1a28ab7f428b66c1/html5/thumbnails/20.jpg)
20
Customer Learnings
![Page 21: IDC Nutanix - Hyperconvergence and the Pulling Forces in the Datacenter](https://reader034.fdocuments.in/reader034/viewer/2022051318/58701aae1a28ab7f428b66c1/html5/thumbnails/21.jpg)
Why Hyperconvergence ?
Q. What were the key motivators to deploy Hyper-converged systems?
Source: IDC European Storage Survey 2015, Europe (410 responses). 1Q15 (only companies using Hyperconverged) 21
Elimination of SAN
Reduction in Technical support staff
Different type of backup
Easier to secure budget
Easier disaster recovery
Ease of set up
Speed of deployment
Scalability
0% 5% 10% 15% 20% 25% 30% 35% 40%
20%
23%
26%
28%
30%
30%
33%
35%35%
33%
30%
![Page 22: IDC Nutanix - Hyperconvergence and the Pulling Forces in the Datacenter](https://reader034.fdocuments.in/reader034/viewer/2022051318/58701aae1a28ab7f428b66c1/html5/thumbnails/22.jpg)
22
Hyperconvergence: Improving CAPEX
Network
Storage - SSD
Storage - HDD
Servers
Power
Datacenter Facility
0% 20% 40% 60% 80%
14%
25%
27%
30%
Sources: IDC, Quantifying the Business Value of Nutanix Solutions (2015)
67%
51%
« The complexity of doing disaster recovery in a traditional model is harder and it takes more time. But the savings is more about cost, because we're buying expensive SAN solutions. We'd probably have to buy another SAN at the second site. . . We'd be at a million dollars total of additional SAN costs » IT Manager, US company, Services
![Page 23: IDC Nutanix - Hyperconvergence and the Pulling Forces in the Datacenter](https://reader034.fdocuments.in/reader034/viewer/2022051318/58701aae1a28ab7f428b66c1/html5/thumbnails/23.jpg)
23 23
IT Staff Savings from Management of Hyperconvergence
Sources: IDC, Quantifying the Business Value of Nutanix Solutions (2015)
Application development
Deployment - staff time
Management
Support
0% 25% 50% 75% 100%
16%
50%
71%
82%
IT Staff Productivity Gains
«We needed two days with Nutanix to deploy. The old way, it would take 1-2 months for a new storage system — we'd have to buy storage separately, then buy the compute separately, and then buy networking gear, and only then could we plug it all together” IT Manager, Government (USA)
![Page 24: IDC Nutanix - Hyperconvergence and the Pulling Forces in the Datacenter](https://reader034.fdocuments.in/reader034/viewer/2022051318/58701aae1a28ab7f428b66c1/html5/thumbnails/24.jpg)
© IDC Visit us at IDC.com and follow us on Twitter: @IDC 24
Market Data
![Page 25: IDC Nutanix - Hyperconvergence and the Pulling Forces in the Datacenter](https://reader034.fdocuments.in/reader034/viewer/2022051318/58701aae1a28ab7f428b66c1/html5/thumbnails/25.jpg)
25
1% - 10% 11% - 25% 26% - 50% 51% - 75% 76% - 100%0%
5%
10%
15%
20%
25%
30%
35%
40%
45%
30%
25%
18%
8%
2%
H-C Systems in 18 months
Hyper-converged and Storage Usage
Q. What percentage of your company's total storage is used for Hyper-converged systems now and in 12/18 month?
1% - 10% 11% - 25% 26% - 50% 51% - 75% 76% - 100%0%
5%
10%
15%
20%
25%
30%
35%
40%
45%40%
21%
8%4%
1%
H-C Systems Now
Source: IDC European Storage Survey 2015, Europe 556 responses. 1Q15
12% 20%
![Page 26: IDC Nutanix - Hyperconvergence and the Pulling Forces in the Datacenter](https://reader034.fdocuments.in/reader034/viewer/2022051318/58701aae1a28ab7f428b66c1/html5/thumbnails/26.jpg)
26
Hyperconverged Infrastructure
All Flash Arrays
Integrated Infrastructure & Platforms
ODM Direct Storage Systems
Hybrid Flash Arrays
Enterprise Networking Market
External Storage Market
Server Market
Total Infrastructure Market
-20% 0% 20% 40% 60% 80% 100% 120%
New Industries & Technologies Drive Market Growth
2015 Forecasted Growth in WW Spending
Heavily Influenced by New Brands
![Page 27: IDC Nutanix - Hyperconvergence and the Pulling Forces in the Datacenter](https://reader034.fdocuments.in/reader034/viewer/2022051318/58701aae1a28ab7f428b66c1/html5/thumbnails/27.jpg)
© IDC Visit us at IDC.com and follow us on Twitter: @IDC 27
WW Hyperconverged Infrastructure Market
2013 2014 2015 2016$0.0B
$0.5B
$1.0B
$1.5B
$2.0B
+162%
+116%
+94%
Sources: Worldwide Hyperconverged Systems 2015–2019 Forecast (April 2015)
![Page 28: IDC Nutanix - Hyperconvergence and the Pulling Forces in the Datacenter](https://reader034.fdocuments.in/reader034/viewer/2022051318/58701aae1a28ab7f428b66c1/html5/thumbnails/28.jpg)
28
Do the Buyer Homework
Measure Goals vs.
Parameters
Key Recommendations for IT Buyers
1 3Contrast and compare with
cloud
2
![Page 29: IDC Nutanix - Hyperconvergence and the Pulling Forces in the Datacenter](https://reader034.fdocuments.in/reader034/viewer/2022051318/58701aae1a28ab7f428b66c1/html5/thumbnails/29.jpg)
Any questions?
For questions or feedback,please e-mail or call us
Giorgio Nebuloni
[email protected] +49 (0) 69 90502 112
@gnebuloni