THIS IS CERTAINLY OUR FUTURE if we do not ACT NOW
![Page 2: Icw presentation for rallly forum2014dec20](https://reader036.fdocuments.in/reader036/viewer/2022081520/58f9b111760da3da068bbd23/html5/thumbnails/2.jpg)
DIGDIG FAULTRUNNING THROUGH
WESTERN IFUGAO PROVINCE
![Page 3: Icw presentation for rallly forum2014dec20](https://reader036.fdocuments.in/reader036/viewer/2022081520/58f9b111760da3da068bbd23/html5/thumbnails/3.jpg)
IFUGAO
![Page 4: Icw presentation for rallly forum2014dec20](https://reader036.fdocuments.in/reader036/viewer/2022081520/58f9b111760da3da068bbd23/html5/thumbnails/4.jpg)
IFUGAO
![Page 5: Icw presentation for rallly forum2014dec20](https://reader036.fdocuments.in/reader036/viewer/2022081520/58f9b111760da3da068bbd23/html5/thumbnails/5.jpg)
CATEGORY 3 & 4TYPHOONSStructural failure of some buildings. Complete roof failures on many buildings.
![Page 6: Icw presentation for rallly forum2014dec20](https://reader036.fdocuments.in/reader036/viewer/2022081520/58f9b111760da3da068bbd23/html5/thumbnails/6.jpg)
During earthquakes
• Well-built buildings suffer slight damage
• Poorly built structures suffer severe damage
• Hillsides might crack if the ground is wet
![Page 7: Icw presentation for rallly forum2014dec20](https://reader036.fdocuments.in/reader036/viewer/2022081520/58f9b111760da3da068bbd23/html5/thumbnails/7.jpg)
DIGDIG FAULT
NEW IGH LOCATION
![Page 8: Icw presentation for rallly forum2014dec20](https://reader036.fdocuments.in/reader036/viewer/2022081520/58f9b111760da3da068bbd23/html5/thumbnails/8.jpg)
WHAT DOES THESE MEAN?
![Page 9: Icw presentation for rallly forum2014dec20](https://reader036.fdocuments.in/reader036/viewer/2022081520/58f9b111760da3da068bbd23/html5/thumbnails/9.jpg)
THESE ARE NOT ACCEPTABLE!
MISSING SUPPORT
EMBEDDED PAPER
IGH
IGH IGH
![Page 10: Icw presentation for rallly forum2014dec20](https://reader036.fdocuments.in/reader036/viewer/2022081520/58f9b111760da3da068bbd23/html5/thumbnails/10.jpg)
INSUFFICIENT CONCRETE COVER ON “BARIKIS” THAT ARE NOT TIED WITH 135 DEGREES HOOKS…
MAY END UP LIKE THIS!
IGH
![Page 11: Icw presentation for rallly forum2014dec20](https://reader036.fdocuments.in/reader036/viewer/2022081520/58f9b111760da3da068bbd23/html5/thumbnails/11.jpg)
NOT THIS WAY!THIS WAY!
IGH
![Page 12: Icw presentation for rallly forum2014dec20](https://reader036.fdocuments.in/reader036/viewer/2022081520/58f9b111760da3da068bbd23/html5/thumbnails/12.jpg)
CONSTRUCTION JOINTSAT THIS POINT OF HIGH STRESS…
CAN RESULT TO THIS DURING AN EARTHQUAKE
IGH
![Page 13: Icw presentation for rallly forum2014dec20](https://reader036.fdocuments.in/reader036/viewer/2022081520/58f9b111760da3da068bbd23/html5/thumbnails/13.jpg)
THESE NON-MONOLITHICALLY POURED CONCRETE CORBELS CAN NOT HOLD THE RAFTERS!
Chipped, Drilled, welded… IGH
IGH
IGH
IGH
IGH. . . & superimposed
![Page 14: Icw presentation for rallly forum2014dec20](https://reader036.fdocuments.in/reader036/viewer/2022081520/58f9b111760da3da068bbd23/html5/thumbnails/14.jpg)
AN EARTHQUAKE CAN LEAD TO THIS!
![Page 15: Icw presentation for rallly forum2014dec20](https://reader036.fdocuments.in/reader036/viewer/2022081520/58f9b111760da3da068bbd23/html5/thumbnails/15.jpg)
WATERY MIX = LOW STRENGTH CONCRETE
GOOD ENOUGH FOR THIS STRUCTURE
IGH
![Page 16: Icw presentation for rallly forum2014dec20](https://reader036.fdocuments.in/reader036/viewer/2022081520/58f9b111760da3da068bbd23/html5/thumbnails/16.jpg)
IGH
USING RIVETS INSTEAD OF THE SPECIFIED FASTENERS MEANS BLOWN AWAY ROOFS DURING A CATEGORY 3 & 4 TYPHOON
![Page 17: Icw presentation for rallly forum2014dec20](https://reader036.fdocuments.in/reader036/viewer/2022081520/58f9b111760da3da068bbd23/html5/thumbnails/17.jpg)
TESTED STRUCTURAL MEMBERSUPPER GROUND FLOOR (PHASE 1)
BEAMS FAILED (1450 psi, 1950 psi)
SLAB 1 (2051 psi)
SLAB 2 (2574 psi)
REFERENCE: .85(3,000 psi) = 2550
![Page 18: Icw presentation for rallly forum2014dec20](https://reader036.fdocuments.in/reader036/viewer/2022081520/58f9b111760da3da068bbd23/html5/thumbnails/18.jpg)
TESTED STRUCTURAL MEMBERS II.
SLAB 3 (2571 psi)
SECOND FLOOR (PHASE 1)
REFERENCE: .85(3,000 psi) = 2550
![Page 19: Icw presentation for rallly forum2014dec20](https://reader036.fdocuments.in/reader036/viewer/2022081520/58f9b111760da3da068bbd23/html5/thumbnails/19.jpg)
TESTED STRUCTURAL MEMBERS III.ROOF FRAME (PHASE 2)
BEAM (1450 psi)
BEAM (1350 psi)
BEAM (1800 psi)
REFERENCE: .85(3,000 psi) = 2550
![Page 20: Icw presentation for rallly forum2014dec20](https://reader036.fdocuments.in/reader036/viewer/2022081520/58f9b111760da3da068bbd23/html5/thumbnails/20.jpg)
PHASE 2 STRUCTURAL WORK COVERAGE:
All
CONCRETE GUTTER
SUPERIMPOSEDCORBEL
SUPERIMPOSEDCORBEL
![Page 21: Icw presentation for rallly forum2014dec20](https://reader036.fdocuments.in/reader036/viewer/2022081520/58f9b111760da3da068bbd23/html5/thumbnails/21.jpg)
PHASE 2 STRUCTURAL DESIGN INFRACTIONS:
SUBSTANDARD STRENGTH OF STRUCTURAL MEMBERS (COLUMNS, BEAMS, STIFFENERS)IMPROPER CONSTRUCTION
JOINTS ON BEAMS/STIFFENERS
![Page 22: Icw presentation for rallly forum2014dec20](https://reader036.fdocuments.in/reader036/viewer/2022081520/58f9b111760da3da068bbd23/html5/thumbnails/22.jpg)
CHANGE OF DESIGN OF CONCRETE GUTTER
SUPERIMPOSEDCORBEL
PHASE 2 STRUCTURAL DESIGN INFRACTIONS:
![Page 23: Icw presentation for rallly forum2014dec20](https://reader036.fdocuments.in/reader036/viewer/2022081520/58f9b111760da3da068bbd23/html5/thumbnails/23.jpg)
CHANGE OF ROOF DESIGN
PHASE 2 CONTRACT DESIGN INFRACTIONS:
![Page 24: Icw presentation for rallly forum2014dec20](https://reader036.fdocuments.in/reader036/viewer/2022081520/58f9b111760da3da068bbd23/html5/thumbnails/24.jpg)
BADLY TIED “BARIKIS” ON COLUMNS+ EMBEDDED PAPER & WOOD + WRONG CONSTRUCTION JOINTS + NON-MONOLITHIC “BUHOS” + WEAK CONCRETE STRENGTH+ POORLY FASTENED ROOFING+ VIOLATION OF BUILDING CODES
Disaster=
![Page 25: Icw presentation for rallly forum2014dec20](https://reader036.fdocuments.in/reader036/viewer/2022081520/58f9b111760da3da068bbd23/html5/thumbnails/25.jpg)
A HOSPITAL IS A BUILDING THAT IS ESSENTIAL TO POST-EARTHQUAKE OR DISASTER RESPONSE AND THEREFORE MUST HAVE:
• Very low risk of earthquake induced- collapse
• Low risk that the building or structure will be damaged sufficiently to impair use in post-earthquake response and recovery efforts
![Page 26: Icw presentation for rallly forum2014dec20](https://reader036.fdocuments.in/reader036/viewer/2022081520/58f9b111760da3da068bbd23/html5/thumbnails/26.jpg)
WHAT NEEDS TO BE DONE NOW?
1. A THOROUGH ASSESSMENT OF THE STRUCTURE
2. IMMEDIATE AND PROPER REMEDIES (DEMOLISH WHAT CAN NOT BE SAVED, RETROFIT WHAT CAN BE FIXED, REDESIGN WHAT NEEDS TO BE IMPROVED)
3. STRICT COMPLIANCE TO CODES AND DESIGN SPECIFICATIONS
4. FUND SUPPORT
5. PUBLIC PARTICIPATION IN MONITORING THE IMPLEMENTATION
![Page 27: Icw presentation for rallly forum2014dec20](https://reader036.fdocuments.in/reader036/viewer/2022081520/58f9b111760da3da068bbd23/html5/thumbnails/27.jpg)
WHO ALLOTS FUNDS FOR THE IGH?
- THE DEPARTMENT OF HEALTH THROUGH THE HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP) WHICH WILL END IN 2015
WHO INFORMS THE DOH ON THE NEEDS OF THE IGH?- THE GOVERNOR, FROM THE PLGU’S PLANS, PROGRAM OF WORKS AND REPORTS
SOME QUESTIONS AND ANSWERS:
![Page 28: Icw presentation for rallly forum2014dec20](https://reader036.fdocuments.in/reader036/viewer/2022081520/58f9b111760da3da068bbd23/html5/thumbnails/28.jpg)
WHO NEGOTIATES WITH DOH ON FUNDING?- THE CONGRESSMAN AIDED BY GROUND INFORMATION FROM THE GOVERNOR/PLGU
WHO WILL HANDLE FUTURE WORKS OF THE PROJECT? - THE DPWH (DBM CIRCULAR 551 JANUARY 2, 2014)
WHO SHALL SUPERVISE THE NEXT PHASES?- THE DPWH, BEING THE IMPLEMENTOR,
SHALL SUPERVISE
![Page 29: Icw presentation for rallly forum2014dec20](https://reader036.fdocuments.in/reader036/viewer/2022081520/58f9b111760da3da068bbd23/html5/thumbnails/29.jpg)
CAN THE PUBLIC MONITOR THE PROJECT?
- YES, ACCREDITED CIVIL SOCIETY ORGANIZATIONS CAN NOW MONITOR AND PARTICIPATE IN:• PROJECT IDENTIFICATION• BUDGETING PROCESS• PRE-CONSTRUCTION ACTIVITIES• CONSTRUCTION, AND • POST EVALUATION OF PROJECTS
![Page 30: Icw presentation for rallly forum2014dec20](https://reader036.fdocuments.in/reader036/viewer/2022081520/58f9b111760da3da068bbd23/html5/thumbnails/30.jpg)
OTHER RECOMMENDATIONS
![Page 31: Icw presentation for rallly forum2014dec20](https://reader036.fdocuments.in/reader036/viewer/2022081520/58f9b111760da3da068bbd23/html5/thumbnails/31.jpg)
1. RECOMMENDATION From ICW and Ifugao Professionals:
“…re-analyze the entire structure with a finite element program using the concrete test results and identify failing structural components. If too many components are failing, normally at beam-column connections, I would introduce bracing. Bracing can compromise functionality and aesthetics but “Safety is Number One”. Columns in a braced system would be spared most of the bending stresses from earthquake and wind. They participate as axial members with stresses more uniformly dispersed in their cross section thus greatly reducing stress concentrations. Where flexural members (beams and slabs) are still overstressed with bracings in place, there are a number of solutions including what I described above. With the lowered ultimate strengths used in the analysis, it may become possible to use CRFP to reduce stresses below those strengths if close enough though I would limit its possible use to beams because of the stringent quality controls required that may be difficult to maintain over wide slab areas…” – Arthur Butic, Structural Engineer, USA
![Page 32: Icw presentation for rallly forum2014dec20](https://reader036.fdocuments.in/reader036/viewer/2022081520/58f9b111760da3da068bbd23/html5/thumbnails/32.jpg)
From ICW and Ifugao Professionals:
“…use thick steel plates all sides welded full height of the columns gunite* with high strength cement to fill up the gap between plates & column….(this) will straighten out the column perpendicularly on center though the column will be bigger in size. YOU CANNOT RETROFIT A VERY WEAK CONCRETE STRUCTURE WITH CFRP. ” – Manny Dulnuan, Engineer USA
*GUNITE - a cement-sand mortar that is sprayed onto formwork, walls, or rock by a compressed air ejector giving a very dense strong concrete layer: used to repair reinforced concrete
![Page 33: Icw presentation for rallly forum2014dec20](https://reader036.fdocuments.in/reader036/viewer/2022081520/58f9b111760da3da068bbd23/html5/thumbnails/33.jpg)
IGH MAIN BUILDING AT “SAFE DISTANCE”
NATURAL STORM WATER DRAINAGE “GOHANG, KULU”
2. RECOMMENDATION: ON LOCATION
![Page 34: Icw presentation for rallly forum2014dec20](https://reader036.fdocuments.in/reader036/viewer/2022081520/58f9b111760da3da068bbd23/html5/thumbnails/34.jpg)
RECOMMENDATION: BUILD PROPER STORM DRAIN CHANNELS TO PREVENT SCOURING OF SURROUNDINGS
Note to neighbors & LGU: no settlement must be built along this natural drain
![Page 35: Icw presentation for rallly forum2014dec20](https://reader036.fdocuments.in/reader036/viewer/2022081520/58f9b111760da3da068bbd23/html5/thumbnails/35.jpg)
35
3. FURTHER RECOMMENDATIONS
-DPWH as implementor of next phases to consult the Designers
-MOA provisions to include civil society groups to monitor the project
-Ammend R.A. 9184 or update IRR to include specific guidelines on Phased Projects