ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2010 Sheraton New Orleans, Louisiana
  • date post

    21-Dec-2015
  • Category

    Documents

  • view

    215
  • download

    2

Transcript of ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August...

Page 1: ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2010 Sheraton New Orleans, Louisiana.

ICT 2011 Reliability Assessment and Construction Plan Evaluation

Entergy Transmission SummitAugust 11, 2010SheratonNew Orleans, Louisiana

Page 2: ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2010 Sheraton New Orleans, Louisiana.

SPP.org 2

Overview

• Background

• Scope

• Draft Construction Plan

• Results

Page 3: ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2010 Sheraton New Orleans, Louisiana.

SPP.org 3

Background

• Reliability Assessment is performed pursuant to Entergy’s Open Access Transmission Tariff (OATT) Attachment K.

• Objectives:

• Assess of the ability of the Entergy transmission system to perform according to the Planning Criteria.

• Evaluate the Construction Plan’s ability to mitigate any performance deficiencies found.

• Provide basis for development of the Base Plan.

Page 4: ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2010 Sheraton New Orleans, Louisiana.

SPP.org 4

Background

Page 5: ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2010 Sheraton New Orleans, Louisiana.

SPP.org 5

Background

• Draft report was made available for stakeholder review and comment

• Posted on Entergy’s OASIS July 1, 2010

• Presentation made at LTTIWG July 21, 2010

• Final report is posted on Entergy’s OASIS.

• Detailed spreadsheets not included in report are posted on Entergy’s oasis

• Background models, data, and other information is posted on Entergy’s oasis

Page 6: ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2010 Sheraton New Orleans, Louisiana.

SPP.org 6

Entergy Planning Criteria

• Planning Criteria

• NERC Planning Standards

• SERC Supplements

• Entergy’s Local Planning Criteria

• Entergy’s Business Practices (Planning Guidelines)

• Posted on Entergy’s OASIS

• NERC Planning Standards being revised

Page 7: ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2010 Sheraton New Orleans, Louisiana.

SPP.org 7

Reliability Assessment Scope

• Models (2009 Series Update 1)

• Near-Term Period: Summer & Winter 2012 & 2016

• Longer-Term Period: Summer 2019

• Construction Plan Projects

1. Initial Scan: Approved Projects from 2010-12 Construction Plan (CP)

2. CP Evaluation: Approved and Proposed Projects from 2011-13 CP

• System Intact Review – Category A

• Contingency Scan – Category B

• Breaker-to-Breaker analysis

• ICT’s 100MW rule (Bus-to-Bus analysis)

Page 8: ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2010 Sheraton New Orleans, Louisiana.

SPP.org 8

Reliability Assessment Scope (cont)

• Sensitivities

• Specific Load Pocket Criteria

• Low Hydro Sensitivity

Page 9: ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2010 Sheraton New Orleans, Louisiana.

SPP.org 9

Entergy’s Draft Construction Plan 2011-2013

• May 7, 2010: Original Draft Posted

• July 28, 2010: Update 1 Posted

• 2 New Projects (1 replaced)

• 2 Delayed Projects

• 5 projects changed from Proposed to Approved

• 2010 BP and 2010-12 CP Differences Report

• No differences

Page 10: ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2010 Sheraton New Orleans, Louisiana.

SPP.org 10

Map Legend

Year Color Key

Overloads and Low VoltagesPlanned Upgrade from

Entergy’s Draft Construction Plan

Other Notes

Solution being investigated

Annotations

Contingency Scan Results with Entergy’s Draft Construction Plan Projects Included

Key to Map Highlights

Page 11: ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2010 Sheraton New Orleans, Louisiana.

SPP.org

Arkansas CPE Results

11

Brandon Hentschel

Page 12: ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2010 Sheraton New Orleans, Louisiana.

SPP.org 12

(2015)Calico Rock-Melbourne - Upgrade 161kV Line

(2016) Norfork-Calico Rock : Upgrade 161 kV Line

Holland Bottoms Project

Page 13: ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2010 Sheraton New Orleans, Louisiana.

SPP.org 13

(2019)Truman-Truman West- Upgrade 161 kV Line

Page 14: ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2010 Sheraton New Orleans, Louisiana.

SPP.org 14

Clarksdale op-guide

Helena Op-guide

(2016)AECC L&D 2 to Gillett: Construct new 115 kV Line

Page 15: ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2010 Sheraton New Orleans, Louisiana.

SPP.org 15

(2016)AECC L&D 2 to Gillett: Construct new 115 kV Line

Page 16: ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2010 Sheraton New Orleans, Louisiana.

SPP.org 16

(2016)Hot Springs Hamilton (Albright) - Bismarck: Construct new 115 kV Line and convert Bismarck and Mountain Pine South to ring bus stations. Add capacitor bank at Milton

Page 17: ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2010 Sheraton New Orleans, Louisiana.

SPP.org 17

(2019)Mayflower - Morgan 115 kV Line: Upgrade

(2016) NLR Westgate - NLR Levy: Reconductor 115 kV Line

(2016) NLR Levy - NLR Dixie: Reconductor 115 kV line

Page 18: ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2010 Sheraton New Orleans, Louisiana.

SPP.org 18

Page 19: ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2010 Sheraton New Orleans, Louisiana.

SPP.org 19

(2016) Monticello East to Reed construct new 115 kV line

Page 20: ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2010 Sheraton New Orleans, Louisiana.

SPP.org 20

(2016)Ebony SS 161 kV (Phase 2): Install, 24 MVAR capacitor bank

(2016)Getwell Area Improvements

Page 21: ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2010 Sheraton New Orleans, Louisiana.

SPP.org 21

Low Hydro

• Simulate reduced availability of SPA hydro units during summer peak (2012, 2016, and 2019)

• Conway (Arkansas) Area

• Little Rock

• Truman

Page 22: ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2010 Sheraton New Orleans, Louisiana.

SPP.org 22

Low Hydro (cont)

Page 23: ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2010 Sheraton New Orleans, Louisiana.

SPP.org 23

Low Hydro (cont)

Page 24: ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2010 Sheraton New Orleans, Louisiana.

SPP.org 24

Load Pocket Criteria

• 2016 Summer

• Application of Specific Load Pocket Criteria

• Western

• Amite South

• Downstream of Gypsy (DSG)

• G-1, N-1

• No new problems identified.

Page 25: ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2010 Sheraton New Orleans, Louisiana.

SPP.org

Mississippi CPE Results

25

Eric Burkey

Page 26: ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2010 Sheraton New Orleans, Louisiana.

SPP.org 26

(2016)Getwell Area Improvements:•Construct new 230 kV line from Getwell to new Senatobia Industrial 230-115 kV substation.•Add new 230-115 kV autotransformer at new Senatobia Industrial substation.•Cut in Senatobia to Sardis 115 kV line into new substation.

Page 27: ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2010 Sheraton New Orleans, Louisiana.

SPP.org 27

(2013)Ray Braswell - Wyndale 115kV Line

Page 28: ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2010 Sheraton New Orleans, Louisiana.

SPP.org 28

(2013)Ray Braswell - Wyndale 115kV Line

(2017)Braswell to Forest Hill 115 kV

Line Upgrade

(2014)Rankin Industrial – Airport 115 kV Line Upgrade

(Target)Upgrade South Jackson - East Jackson 115kV line

Page 29: ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2010 Sheraton New Orleans, Louisiana.

SPP.org 29

(2016)Lake Village Bagby to Reed 115

kV Line Upgrade

Page 30: ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2010 Sheraton New Orleans, Louisiana.

SPP.org

Louisiana CPE Results

30

James Lyle

Page 31: ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2010 Sheraton New Orleans, Louisiana.

SPP.org 31

Vatican-Scott 138kV

(2015)Vatican 138 kV Substation: Cut in Scott to Acadia 138 kV line to Vatican 138 kV, and add breakers at Vatican.

Page 32: ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2010 Sheraton New Orleans, Louisiana.

SPP.org 32

(2019) Champagne – Add 138kV Capacitor Bank

Page 33: ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2010 Sheraton New Orleans, Louisiana.

SPP.org 33

(2015) Port Hudson – Zachary REA 69kV Upgrade Line

(2014) Jackson – Tejac 69kV Line

(2014) McManus to Brady Heights – Upgrade 69kV Line

(2015) Port Hudson – 69kV Area Improvement

Page 34: ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2010 Sheraton New Orleans, Louisiana.

SPP.org 34

(2015) Coly Area Improvement – Upgrade 230/69kV Autotransformers

(2015) Port Hudson – Zachary REA 69kV Upgrade Line

(2014) McManus to Brady Heights – Upgrade 69kV Line

(2014) Jackson – Tejac 69kV Line

Page 35: ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2010 Sheraton New Orleans, Louisiana.

SPP.org 35

(2015) St. James – Add 230kV Capacitor Bank

(2016) Sorrento Upgrade 138/115kV Auto & upgrade Gonzales-Sorrento 138kV Line

Page 36: ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2010 Sheraton New Orleans, Louisiana.

SPP.org 36

Valcherie – Waterford 230kV

(2018) Raceland – Cut Waterford to Valentine 230kV line in/out of Raceland

Page 37: ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2010 Sheraton New Orleans, Louisiana.

SPP.org 37

Cleco Project: Var support

Page 38: ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2010 Sheraton New Orleans, Louisiana.

SPP.org 38

(2016) Mt. Olive to Arcadia – Construct new 230kV line (Operate at 115kV)

Page 39: ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2010 Sheraton New Orleans, Louisiana.

SPP.org 39

(2016) Mt. Olive to Arcadia – Construct new 230kV line (Operate at 115kV)

(2019) Arcadia to Sailes – Construct new 230kV line (Operate at 115kV)

Page 40: ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2010 Sheraton New Orleans, Louisiana.

SPP.org 40

Lake Charles Bulk Transformers

(2017) LC Bulk: Construct 230kV facilities & add 230/69kV Autotransformer

Page 41: ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2010 Sheraton New Orleans, Louisiana.

SPP.org 41

Chlomal - Lacassine

Canal-LA - Mossville

Page 42: ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2010 Sheraton New Orleans, Louisiana.

SPP.org

Texas CPE Results

42

Eddie Filat

Page 43: ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2010 Sheraton New Orleans, Louisiana.

SPP.org 43

Create normally open point at Batson

Page 44: ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2010 Sheraton New Orleans, Louisiana.

SPP.org 44

Create normally open point at Batson

Page 45: ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2010 Sheraton New Orleans, Louisiana.

SPP.org 45

Transfer of load from Atlantic Bulk 69 kV to the 230 kV system at Gulfway.

Page 46: ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2010 Sheraton New Orleans, Louisiana.

SPP.org 46

(2016) China – Stowell 138 kV Line

South Beaumont to Lovells Lake

Page 47: ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2010 Sheraton New Orleans, Louisiana.

SPP.org 47

(2016) Conroe Area Switching Station

Page 48: ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2010 Sheraton New Orleans, Louisiana.

SPP.org 48

(2015) Upgrade Jacinto-Splendora 138 kV Line

Page 49: ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2010 Sheraton New Orleans, Louisiana.

SPP.org 49

(2012) New Caney capacitor bank expansion

(2018) Expand cap bank at Dayton Bulk

Page 50: ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2010 Sheraton New Orleans, Louisiana.

SPP.org 50

Questions?

• Brandon HentschelEngineer II, ICT [email protected]