Transcript of 1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy...
1
Entergy Gulf States, Inc. (Louisiana)
Proposed Transmission Reliability Projects
Entergy Transmission Planning Summit
New Orleans, LA
July 8, 2004
3
Coly-Loblolly-Hammond Line Construction
Loblolly FairgroundsColy Hammond
69 kV
230 kV
To Lockhart 69 kV
To Polyform 69 kV69 kV
230 kV
Phase II: Install 230\69 kV auto from Harelson
Phase I: Build at 230 kV and operate at 69 kV
To Vignes 230 kV
To Jaguar 230 kV
To Moler 230 kV
To French Settlement 230 kV
To Ponchatoula 230 kV
To Independence 115 kV
Phase II: Build Loblolly-Hammond 230 kV
Phase I: $3.62 MM with ISD 2004
Phase II: $11.4 MM with ISD 2007See ELI-South Presentation for Phase II details
2003-04
4
2005-06 EGSI-LA Transmission Reliability ProjectsMcManus 69 kV:
Capacitor Bank Addition
ASI Improvement Plan:Conway-Panama (2005 ISD) CarryoverColy-Vignes (2006 ISD)SEE ELI Presentation
Loblolly-Hammond:Build 230kV line2007 ISD Est. Cost: $3 MM (R.O.W.)SEE ELI Presentation
Jefferson Davis Parish 69 kV System Improvement Plan
69 kV Jackson- MarydaleLine Upgrade
69 kV Lafayette-Holiday Line Upgrade
69 kV Coly-Denham Springs: Upgrade Line
138 kV Port Hudson-Crown Zellerbach Line upgrade: Phase 2
138 kV Moril-Hopkins: Construct new line
138 kV Nelson-Mossville: Upgrade line
5
138 kV Line 368 Port Hudson-Crown Zellerbach:
Upgrade Line
2004-05
Scenario• The 138 kV substations Star Hill, Crown Zellerbach, and Repapco in East Baton Rouge
and East Feliciana Parishes are served by 2-230/138 kV autotransformers located at Port Hudson substation. This industrial loop serves approximately 207 MVA with the Repapco cogeneration out-of-service.
• Under peak loading conditions, loss of the Repapco-Port Hudson line can potentially overload Line 368 (Port Hudson-Crown Zellerbach) by as much as 25% in 2004, that portion of line composed of 795 AA and rated at 174 MVA
Recommended Solution• Complete 2nd phase of reconductoring 7.5 miles of Line 368 with a conductor capable of
at least 301 MVA or 1,260 A.
• Estimated Cost: $5.5 MM
7
69kV Jackson-Marydale:Upgrade Line
Scenario
• The 69 kV system serving loads north of Baton Rouge in East and West Feliciana Parishes is supported by two 69 kV lines out of Port Hudson substation. This is a rural service area with long distances between substations on two divergent radial circuits. This 69 kV system will serve approximately 70 MW in summer 2004 and 71 MW in 2005.
• Loss of Port Hudson to Sandy Creek to Jackson or Francis to Grant to Port Hudson will overload Jackson-Marydale by 17%.
Recommended Solution
• Replace 5.89 miles of existing 1/0 ACSR conductor with 336 ACSR. Replace all structures and conductor as needed. The reconductor will increase line capacity from 33 MVA to 69 MVA.
• Estimated Cost: $1.43 MM
2006
9
McManus 69kV Substation: Replace Cap Bank & Correct Load Power Factor
Scenario:
• McManus 69 kV Substation is located north of Baton Rouge in East Feliciana Parish near the end of a 12 mile radial 69 kV line. There will be approximately 70 MW of load in the area in 2005.
• Loss of Port Hudson to Jackson 69 kV will cause voltages less than 90% at multiple substations in East Feliciana Parish.
Recommended Solution:
• Install a 6 MVAr capacitor bank at McManus substation for contingencies only. The existing 18 MVAR bank at McManus should be on-line during summer peak.
• Estimated Cost: $550 K
2006
11
69 kV Coly-Denham Springs:Upgrade Line
Scenario
• There is approximately 67 MW of load on the affected 69 kV transmission line.
• For the loss of Gloria-Harelson 69 kV line, the Coly-Polyform-Denham Springs line overloads by 12% in summer 2005.
Recommended Solution:
• Replace 4.37 miles of a mix of 500 Cu, 1033 AA, and 1024 ACAR with twin bundle 666 ACSR or conductor rated at least 180 MVA (1,500 amps).
• Estimated cost: $2.1 MM
2005-06
13
Jefferson Davis Parish69 kV System Improvement Plan
Scenario:• The 69 kV transmission system between Jennings and Chlomal substations will serve
approximately 85 MW of load including the radial from Lawtag substation in 2005. The main "trunk" of these systems are the contiguous segments comprising of Line 13 (Jennings-Compton-Elton), Line 16 (Elton-Tupper-Serpent-Carter), and Line 11 (Carter-Lacassine-Chlomal).
• As an indication of load growth in this area, a new 25 MVA transformer was added in 2004 at Lacassine Substation.
• Splices have been used to make repairs and they are beginning to fail. The current loading can potentially cause the 69kV lines to sag into the distribution underbuild that is located along most of these lines. Upgrading these lines is needed to address safety and reliability concerns.
2006-08
14
Existing Configuration of Lines 11, 12, 13, 14
Station with Breaker
Non-Breaker Station
LEGEND
Station with Proposed Breakers
Radial to Winn/Potter/Thornwell/ TexLake
Chlomal Iowa Derouen
Lacassine
Carter
Serpent Tupper
Elton
Compton
Roanoke
Lawtag
Robbie
Jennings
Welsh
Normally-OpenedL11 L13
L16
L13A
L12L14
15
Contingency Overload/Undervoltage
Loss of Jennings-Lawtag Chlomal-Iowa 20%
Loss of Elton-Jennings Chlomal-Lacassine 28%
LC Bulk-Chlomal 6%
Loss of Chlomal-Carter Compton-Jennings 5%
Loss of Lawtag-Jennings Robbie, Winn, Texlake
Potter < 0.915 p.u.
Loss of Richard-Nelson 500 Lawtag-Jennings 22%
• Recommended Solution:Phase I: Upgrade 3.07 miles of 795 AA from Lake Charles Bulk to Chlomal. Upgrade 4.78
miles 4/0 CU from Jennings-Lawtag with a conductor rated at least 101 MVA of capacity. Install breaker at Lacassine.
Phase II Upgrade 12.36 miles 1/0 ACSR of Chlomal-Lacassine to a conductor with at least 101 MVA of capacity. Install a 9MVAR capacitor at Winn Substation.
• Estimated cost: Phase I $3.7 MM
Phase II $6.3 MM
Jefferson Davis Parish69 kV System Improvement Plan
16
Phase II Install cap bank at Winn Substation
Phase I Upgrade Line
Phase II Upgrade Line
Phase I Upgrade Line
Jefferson Davis Parish69 kV System Improvement Plan
17
69 kV Lafayette-Holiday: Upgrade LineScenario:
• There is approximately 141 MW of load in the area. Lafayette-Holiday-Billeaud line is currently rated at 39 MVA. In fall 2002, a breaker was installed at Billeaud, a normally-opened point, allowing it to be normally-closed. In summer 2007, Lafayette-Holiday is expected to load to 101% under normal operations.
• Loss of Moril 138/69 kV auto causes a 19% overload and loss of Moril-New Iberia 69 kV line causes an overload of 14% on Lafayette-Holiday in Summer 2005.
Recommended Solution:
• Replace 4.89 miles of 1- 4/0 Cu with 1-336 ACSR or conductor that achieves at least 68 MVA (or 569 amps) capacity.
• Estimated Cost: $2.23 MM
2005-06
19
138 kV Moril-Hopkins (Cleco):Construct Parallel Line
Scenario
• The Iberia and Vermillion Parish area’s 69 kV transmission system is served from Scott Bulk (via Richard 138 kV lines) and the two 138 kV tie-lines (Moril-Hopkins and Ivanhoe-Bayou Warehouse) with CLECO. The area load is approximately 168 MW.
• For the loss of Moril-Hopkins, Duboin-Bayou Warehouse overloads by 13%.
Recommended Solution
• Build new parallel line from Moril to Hopkins 2.56 miles with a conductor that achieves at least 290 MVA (1,205 amps) capacity.
• Estimated cost: $2.5 MM
Note: Requires joint planning with CLECO
21
138 kV Nelson-Mossville:Upgrade Line
Scenario:
• The 138 kV transmission system in the Lake Charles area serves large industrial loads and commercial & residential loads. The affected area load is approximately 200 MW.
– For the loss of Carlyss-Citicon West, Nelson-Mossville overloads by 3% in 2005 and 6% in summer 2006.
Recommended Solution:
• Reconductor 3.28 miles of 1-1033 AA with conductor with at least 333 MVA capacity or 1,590 ACSR.
• Estimated cost: $1.7 MM
23
2007-08 EGSI-LA Transmission Expansion Projects
Gloria-Harelson Line Upgrade
Alchem-Monochem Line Upgrade: 2008 ISD
Scott-Carencro Line Upgrade: 2007 ISD
Scott-Judice-Meaux Line Upgrade: 2008 ISD
Richard-Colonial Academy Line Upgrade: 2007 ISD
Loblolly-Hammond:Build 230kV line:
2007 ISD