ICI Development Proposal

16
Introduction Our commercial building is based on shopping mall called The Brand new ,named by me and my Brother,Su Bang Xiang.Our commercial building is about 4 storey,including Ground floor of basement parking.Our shopping centre have retail shop,hypermarket,cinema,hawker and etc.Even restaurant also include in this shopping mall.You can spend your time with your family,relax,gathering and etc which can help you to reduce stress.You can find anything you want in this shopping mall,Vegetable,Clothes,Fruits,Branded shop and etc.This is the best place to let the buyer shop because you can buy all those thing in 1 shopping mall. We choose this site because of it’s huge.The site located on the centre of industry area and resident area.Therefore the worker and family can go there more easier.

Transcript of ICI Development Proposal

Introduction

Our commercial building is based on shopping mall called The Brand new ,named by me and my Brother,Su Bang Xiang.Our commercial building is about 4 storey,including Ground floor of basement parking.Our shopping centre have retail shop,hypermarket,cinema,hawker and etc.Even restaurant also include in this shopping mall.You can spend your time with your family,relax,gathering and etc which can help you to reduce stress.You can find anything you want in this shopping mall,Vegetable,Clothes,Fruits,Branded shop and etc.This is the best place to let the buyer shop because you can buy all those thing in 1 shopping mall.

We choose this site because of it’s huge.The site located on the centre of industry area and resident area.Therefore the worker and family can go there more easier.

Benefit-Can buy anything you want in 1 shopping mall.-easy accessibility to the shopping mall.-5 min away from the industry area-People who live at housing area need to use about 8-10 min by using car-Weekday,10am-5pm.Weekend and holiday,8am-11pm which can let the tourisms and family have more time accompany with their family.

Impact-Traffic jam at working time-Lack of packing area because we are provide g floor basement parking area only.-Air pollution,the shopping mall build on the centre of industry area.

Waterpark-The waterpark build on the rooftop. Therefore, it will attract more tourism come to the waterpark.Beside it also build a small waterpark for 4-8 years old children.Thus,they can enjoy with their family

Massage.-If tourism want to take a rest. Don't worry! We provide the massage room which locate beside the waterpark.Thus,tourism and family can go to massage after play at the waterpark.

Rationale basement,ground floor,1st floor,2rd floor and 3rd floorGround floor is basement car park.It allow the car park at there.We will not decorate the basement car park because ugly basement car park will not effect the tourism mood.We plan for build on the Ground floor is because it can save more lane.So that,we can build more building beside the commercial building.

1st floor have main entrance,information centre,retail shop and etc.A lot of branded shop open at there too such as Channel,converse,Nike and etc.Therefore you can buy any branded goods you want as long as you have money.2rd floor will build the food street which can let them eat different type of foods.

3rd floor is build on the rooftop and it will have a waterpark and massage at there.The massage room will provide a well known service which can let the tourism recover their stamina faster and release stress.

Conceptual Plan

Master Plan

Material used1st floor tiles,Shopping area.

2rd tiles,food court

Double Loading tiles use at massage centre floor

Type to enter text

Marble stone tiles

Build on the rooftop to prevent suicide action and child care.

The 3rd floor waterpark will use non slippery tiles to prevent slip down.

Wall.

Using brick and cement

Facilities

CONCLUSION

In the nutshell,i learn how to do my work as a team and I try my best to design the interior building and draw a plan which can help me to improve the knowledge.

1st floor>Shopping centre

Retail shop Hypermarket

2rd floor>hawker stall

3rd floor>Rooftop Waterpark

Basement Car Park

Scope of work of each professional Civil engineer-design, construct, supervise, operate, and maintain large construction projects and systems, including roads, buildings, airports, tunnels, dams, bridges, and systems for water supply and sewage treatment.

Quantity Surveyor-preparing tender and contract documents, including bills of quantities with the architect and/or the client,undertaking cost analysis for repair and maintenance project work,assisting in establishing a client's requirements and undertaking feasibility studies; performing risk, value management and cost control,advising on procurement strategy,identifying, analysing and developing responses to commercial risks,preparing and analysing costings for tenders,allocating work to subcontractors,providing advice on contractual claims,analysing outcomes and writing detailed progress reports,valuing completed work and arranging payments,maintaining awareness of the different building contracts in current use,understanding the implications of health and safety regulations.

Electrical engineer-identifying customer requirements,designing systems and products,reading design specifications and technical drawings,researching suitable solutions and estimating costs and timescales,making models and prototypes of products using three-dimensional design software,working to British (BS), European (EN) and other standards,liaising with others in the design team,liaising with clients and contractors,attending meetings on site,designing and conducting tests,recording, analysing and interpreting test data,proposing modifications and retesting products,qualifying the final product or system,servicing and maintaining equipment,preparing product documentation, writing reports and giving presentations,monitoring a product in use to improve on future design.

Architect-attend site meeting or analysis and other problem which may be critical,Work with other professional such as engineer and QS,Need to know the full detail of the project and follow the required and some request by clients,The Architect has the authority to order inspection or testing of the Work by contractor,state the clients’ financial limit and request to the Professional,writing the term of condition of the appointment and request confirmation,Inform clients other professional required.

ICI PROJECT PROPOSAL

BY SU BANG ZHENG