Associating an ionospheric parameter with major earthquake ...
IBM Power Systems · • Client creates a Power Enterprise Pool (2.0) via the Cloud Management...
Transcript of IBM Power Systems · • Client creates a Power Enterprise Pool (2.0) via the Cloud Management...
1
IBM Power Systems
Capacity on DemandEnterprise PoolsPools 2.0
For IBM & Business Partner Education Use Only – not meant for distribution & use with clients without prior approval and appropriate Non-Disclosure Agreement.
Peter DussmannCognitive Systems / Power Systems [email protected] 664 618 6139
1999
Logical Partitions2001
Dynamic LPARs
2002
Capacity Upgrade on Demand
2007
Utility CoDLive Partition Mobility
Virtual I/O
Proven record of virtualization innovation
2004
Micro-partitioning
2019Power Enterprise Pools 2.0
2012System Pools
2
Power Flex
2010
2013
Power Enterprise Pool
2017
Elastic COD via ESS
“Capacity on Demand”(activation of “dark” resources on a certain S/N)
“mobile resources”(share activations across physical systems)
“base activations & credits”
Capacity on Demandhttps://www-01.ibm.com/support/docview.wss?uid=isg3T1027713
3
ESS / Entitled Systems Supporthttps://www.ibm.com/servers/eserver/ess/OpenServlet.wss
Permanent activation
DAY activation
Proc by MINUTE
30days trial
Trial Capacity on DemandTo be requested by customer !
Capacity on Demand - Activation Codeshttps://www-912.ibm.com/pod/pod
4
EXAMPLE
Enter “Machine Type” (eg:9080)S/N … 12 - 34567
Initial Purchase
Core & Memory Upgrades
Exception Trial (proc/mem)
Codes need to be entered in right sequence !
Master HMC
Power Enterprise Pools&
Elastic Capacity
5
Automation of Mobility with Power Enterprise PoolElastic Capacity from
IBM Marketplace/ESS
Power E850C
POWER950
POWER980
ManagingHMC
Managing HMC
Power E880C
Power E870C
Power Enterprise Pools&
Elastic Capacity
6
Elastic Capacity from IBM Marketplace/ESS
Power E850C
POWER950
POWER980Power E880C
Power E870C
To keep in mind:- Activation of cores / Memory per DAY (24h)- New ECoD is not tied to the S/N be used on different systems ! (see ESS)- Can be used in different locations within the customer within a country.- PrePaid only – purchase via ESS in minutes (customer) or via econfig (BP/IBM)
7
Entitled Systems Supporthttps://www.ibm.com/servers/eserver/ess/ProtectedServlet.wss
ECoD
Steps to purchase ECOD days (Client)
Step 2 Client enters MTM/Serial
number, O/S and total number of ECOD days to
be purchased
Step 3Client enters
purchase order number
Step 4 Client agrees to payment totals
Step 5Client is provided with
receipt and records order number for
future ECOD usage
Step 1 for purchase of ECOD capacity:From the Entitled Systems Support site,
(http://www-304.ibm.com/servers/eserver/ess/index.wss), client logs on with their IBM ID, goes to “My Entitled Hardware” and then to the
Purchase New Elastic Days section
Steps to purchase ECOD days (Seller/Business Partner)
Step 2 Select Power Virtual
Capacity Machine Type Model: MTM 4586-COD
to order against
Step 3Select appropriate billing feature(s) for a server type you would like to
order ECOD and perform final validation
(feature description will show supported server MTM)
Step 4Share plant order number &
customer number as well as the provisioning instruction below with your client and invoice client BAU
(ECOD order will show up on clients ESS account for provisioning within 1-2 days)
Step 1 for purchase of ECOD capacity:From e-config/Partner commerce,
Seller/BP initiates a new or MES path configuration
Steps to generate and use ECOD days (Client)
Step 2 Client enters customer number and Marketplace order number
and selects MTMS from drop down menu provided list of
owned MTMSs
Step 3Client is provided
with current account balance information
Step 4 Client requests amount of ECOD days, accept
terms & conditions and generates activation
code
Step 5Download the new
ECOD activation code
Step 1 for deployment to servers:From the Entitled System Support site
(http://www-304.ibm.com/servers/eserver/ess/index.wss),client logs on with their IBM ID, goes to “My Entitled Hardware” and then to the
Generate new Elastic Codes section
Note: If client request provisioning (generating activation codes) by business partner. Client can authorize partner to use the customer number and partner can then set up ESS account with the order and customer number and following steps above. Also if customer would like to provision with a different customer number they can do so as long as the servers and customer number belong to same enterprise (DUNS) number.
Master HMC
Power Enterprise Pools&
Elastic Capacity
11
Automation of Mobility with Power Enterprise PoolElastic Capacity from
IBM Marketplace/ESS
Power E850C
POWER950
POWER980
ManagingHMC
Managing HMC
Power E880C
Power E870C
Power Enterprise Pools&
Elastic Capacity
12
Master HMC
Automation of Mobility with Power Enterprise Pool
POWER980
ManagingHMCManagin
g HMC
Power E880C
Power E870C
To keep in mind:- Minimum# of static activations (proc/mem) on every S/N needed !- Pools can be P7&P8 or P8&P9 !- Mobile activations (proc/mem) have higher purchase & maint price
because of additional value- Pools can be across countries within the European Union !- Mobile activations can be transferred to next generation (n+1) for free.
(n+2 is 50% off price ; n+3 not allowed !)
Power Enterprise Pools enable you to move processor and memory
activations within a defined pool of systems, at your convenience.Instant
Movement !
Power Enterprise Pool - Example
Sys B96-core E880
Activations:30 static
32 mobile34 “dark”
Sys C 96-core E980
Activations:16 static
35 mobile45 “dark”
Sys D128-core E980
Activations:40 static
53 mobile35 “dark”
Pool Totals
Activations:96 static
160 mobile128 “dark”
Sys A 64-core E870C
Activations:10 static
40 mobile14 “dark”
Move activations
Power Enterprise Pools
2.0
1414
Shared Utility Capacity across a pool of Power E980 systems
• Purchase System and Base capacity
• Variable demand addressed by purchasing Capacity Credits for Metered capacity
• Cloud Management Console with HMC automatically tracks and debits against Capacity Credits based on actual usage
Base and Metered Capacity • Processor activations• Memory activations• AIX and IBM i licenses
Usage tracked by the minute via Cloud Management Console
Base
Metered
All processor & memory resources are fully activated
Power Enterprise Pools 2.0 with Utility Capacity
Utility Capacity consists of :• Base Capacity - purchased on each Power E980 system but aggregated
across the pool for consumption monitoringü Base Processor Activation (1 core - any OS)ü Base Linux Processor Activation (1 core)
ü Base AIX software license entitlement (1 core)
ü Base IBM i software license entitlement (1 core) ü Base 1 GB Memory usage
• Metered Capacity - additional resource above Base Capacity, activated for use when each system is added to a Poolü Metered resource consumption is monitored by the minute at the pool levelü Metered Capacity resource consumption is charged by the minute for specific
resources consumed above a pool’s aggregated Base Capacity
• Clients may manage potential resource consumption via PowerVM & PowerVC configuration & resource management options & policies
15
Power Enterprise Pools 2.0 will offer Utility Capacity across a collection of Power E980 systems to deliver seamless multi-system resource sharing and new flexibility for clients deploying a private cloud infrastructure.
Client purchases Power E980 systems with new Base Processor & Memory Activation resources.
16
Processors Active by System
32 Base128 Installed
64 Base128 Installed
96 Base128 Installed
Pool = 192 BasePool = 384 Installed
192
32
19264
96
Base
Base
BaseBase
System A System B Pool #1System C
Enterprise Pools 2.0 purchase example
All remaining resources are activated when a Pool is started. Resource usage is metered for minutes above the pool’s aggregate Base resources
17
Processors Active by System
32 Base128 Installed
64 Base128 Installed
96 Base128 Installed
Pool = 192 BasePool = 384 Installed
192
32
19264
96
Base
Base
BaseBase
System A System B Pool #1System C
Power Enterprise Pools 2.0 resource activation
18
32 Base128 Installed
64 Base128 Installed
96 Base128 Installed
Pool = 192 BasePool = 384 Installed
Base
Base
BaseBase
Processor Example - Pool has 1 system using more than its Base Processor Activations, but another system is idle, using less than its Base Processor resources at the same time, so 0 Metered resource usage is recorded
0 Metered Minutes
System A System B Pool #1System C
Power Enterprise Pools 2.0 processor usage use case #1
19
32 Base128 Installed
64 Base128 Installed
96 Base128 Installed
Pool = 192 BasePool = 384 Installed
Base
Base
BaseBase
32 Metered Minutes recorded for # minutes where usage > aggregate Base resources
Processor Example - Processor usage > the aggregate of Base Processor Activations across the pool, so Metered Processor Capacity minutes are recorded and Metered Capacity Credits are debited accordingly
System A System B Pool #1System C
Power Enterprise Pools 2.0 processor usage use case #2
Maximum Cores - Pool View of aggregated Base Capacity
Aggregated Peak for Pool Potential to leverage shared resources in Pools 2.0 to reduce Base Capacity
20
Total of purchased Processor Activations for System A + System B
Time
# Ac
tive
Core
s
System A System B Pool 1
Requirements for Power Enterprise Pools 2.0• Client purchases or leases a Power E980 system with some “dark”
resources available for temporary use. – Up to 16 Power E980 systems may be in the same Pool– All Power E980 must be in the same enterprise and country – FW 930 is required– Up to 500 VMs at GA (SOD for 1,000)– Shared Processor Partitions only - no Dedicated LPARs– 25% Base Processor Activations are required– 50% Base Memory Activations are required– Cloud Edition software is required for every Base Processor Activation– Cloud Management Console connection required
• All HMCs managing servers within a Pool require Network Time Protocol (NTP) to be enabled
• Performance and Capacity Monitoring (PCM) must be enabled via HMC for each server in a Pool
– Hardware & Software Maintenance are required
• Client purchases Capacity Credits from Sales (via eConfig order) or directly via Entitled System Support (ESS) (where currently available in US, Europe & MEA) to pay for resource consumption.
21
Process for Utility Capacity consumption
22
• Client purchases Capacity Credits from IBM/BP or directly (where available) via Entitled System Support (ESS) site to pay for Metered resource consumption.
• Client establishes a Pool ID via ESS using S/N of a system and selecting order # with Capacity Credits.
• Client creates a Power Enterprise Pool (2.0) via the Cloud Management Console, selecting available Power E980 systems by serial number and associating each with the same Pool ID
• When the Pool is started, all processor and memory resources are activated and made available on each on all system in the pool, and the CMC begins monitoring the Processor, Memory and License entitlement resource usage of the pool by the minute.
• Metered resource usage above the Pool’s aggregate Base capacity is accrued by the minute and debited against a client’s Capacity Credits on account on a real-time basis…. visible in CMC updated daily in ESS.
Pools 2.0 Hardware Features - Power E980
23
Hardware Features for Pools 2.0 Mach/Mod Feature Price Maint (24x7)
Power Enterprise Pools 2.0 Enablement 9080-M9S #EP20 $0 N/A
1 core Base Processor Activation (Pools 2.0) for EFP1 - Any OS 9080-M9S #EP90 $8,000 $57/mo.
1 core Base Processor Activation (Pools 2.0) for EFP2 - Any OS 9080-M9S #EP91 $8,000 $57/mo.
1 core Base Processor Activation (Pools 2.0) for EFP3 - Any OS 9080-M9S #EP92 $8,000 $57/mo.
1 core Base Processor Activation (Pools 2.0) for EFP4 - Any OS 9080-M9S #EP93 $8,000 $57/mo.
1 core Base Processor Activation (Pools 2.0) for EFP1 – Linux/VIOS only 9080-M9S #EP96 $4,000 $29/mo.
1 core Base Processor Activation (Pools 2.0) for EFP2 – Linux/VIOS only 9080-M9S #EP97 $4,000 $29/mo.
1 core Base Processor Activation (Pools 2.0) for EFP3 – Linux/VIOS only 9080-M9S #EP98 $4,000 $29/mo.
1 core Base Processor Activation (Pools 2.0) for EFP4 – Linux/VIOS only 9080-M9S #EP99 $4,000 $29/mo.
256 GB Base Memory Activation (Pools 2.0) 9080-M9S #EP9S $23,552 N/A
512 GB Base Memory Activation (Pools 2.0) 9080-M9S #EP9U $47,104 N/A
Static Mobile Base Feature Proposal
Processor Activation (1 Core) Hardware Maintenance
(24x7 4hr)
$5,000 $42/mo.
$7,000$50/mo.
$8,000$57/mo.
Memory Activation (1 GB) $82 $89 $92
Base Activation Feature Prices $US
Pools 2.0 Capacity Credit Features
24
Capacity Credit Features Mach/Mod Feature Price
1 Capacity Credit 5819-CRD #EP9B $240
10 Capacity Credits 5819-CRD #EP9C $240
100 Capacity Credits 5819-CRD #EP9D $240
1,000 Capacity Credits 5819-CRD #EP9E $240
10,000 Capacity Credits 5819-CRD #EP9F $240
1 Capacity Credit - Digitals 5819-CRD #EP9J $240
10 Capacity Credit - Digitals 5819-CRD #EP9K $240
100 Capacity Credit - Digitals 5819-CRD #EP9L $240
1,000 Capacity Credit - Digitals 5819-CRD #EP9M $240
10,000 Capacity Credit - Digitals 5819-CRD #EP9N $240
• Direct & BP Sales via eConfig & ePricer
• Price these ESS features (used only on ESS)
Pools 2.0 Consumption Rate Table
25
Resource Type Metered Usage Ratio (Minutes : 1 Credit)
Processor Activation (1 core - any operating system) 20,000
Processor Activation (1 core - Linux/VIOS only) 40,000
AIX software entitlement (1 core) 30,000
IBM i software entitlement (1 core) 1,500
Memory Activation (1 GB) 1,500,000
Resource Minutes : 1 Capacity Credit
System Processor Capacity by Minute
26
Pools 2.0 example - 3 systems being proposed without Pools to handle peak load. Total cores proposed = 220-240 taking growth into consideration
Power Enterprise Pools 2.0 processor example: Peak Loads
ROI may be optimized by balancing total cost of Base activations vs. cost of Metered resource use over time for potential overall savings
27
Processors required without Pools 2.0 to handle peak per system
Pools 2.0 example - 3 systems & opportunity to optimize ROI with Base & Metered options for delivering capacity
Power Enterprise Pools 2.0 processor example: Optimize ROI
In this example there are :• 172 cores,8.5TB installed• 17 Base Processor
Activations (12 AIX, 5 Linux)
• 6 Base AIX license entitlements
Cloud Management Console Inventory - Displaying, Monitoring & Managing a Pool
28
The inventory screen provides drill down capability by system and VM, and dashboard views of resources across systems, with tailorable thresholds.
Advanced Monitoring enables clients to track and analyze usage
• Analyze Total or Metered Usage
• Change the Time Frame for analysis (Minute, Hour, Day, Week, Month)
• Usage by resource type
• Trending Analysis with ability to adjust time scale
29
Select time period to see more detailed usage by VM -currently and during selected time period
Analyze Core Usage by Time Period and Partition
30
• Show Capacity Credits consumed and breakdown by resource
• Display Credit balance, budget status, rate table and purchase history
Metered Usage Statement
31
32
®
Useful Links
33
Power Systems Capacity on Demand(Overview on different options ; Step-by-Step Procedure ; Users Guide ; Trial CoD requests)https://www-01.ibm.com/support/docview.wss?uid=isg3T1027713
ESS / Entitled Systems Support(Manage ECoD resources / Pools)https://www.ibm.com/servers/eserver/ess/OpenServlet.wss
Capacity on Demand - Activation Codes(Look up posted activation codes of every MTM-S/N)https://www-912.ibm.com/pod/pod