Huy Nguyen, PE • ENGR10 • 20Sep12

Engr 10 Guest LectureHuy Nguyen, PE

September 20, 2012

Page 2: Huy Nguyen, PE ENGR10 20Sep12 Engr 10 Guest Lecture Huy Nguyen, PE September 20, 2012.

Huy Nguyen, PE • ENGR10 • 20Sep12

Agenda

I) BackgroundII) Transfer Experience (from Chabot

College to University of California, Davis.)

III) Work ExperienceIV)Seek Constant

ImprovementV) Group ExerciseVI)Staying Positive

Page 3: Huy Nguyen, PE ENGR10 20Sep12 Engr 10 Guest Lecture Huy Nguyen, PE September 20, 2012.

Huy Nguyen, PE • ENGR10 • 20Sep12

I) Background

• AS from Chabot College (June 2001 – June 2004)

• BS in Civil Engineering from UCD (June 2004 – June 2006)

• EIT on January 2007• PE in Civil Engineering

Page 4: Huy Nguyen, PE ENGR10 20Sep12 Engr 10 Guest Lecture Huy Nguyen, PE September 20, 2012.

Huy Nguyen, PE • ENGR10 • 20Sep12

II) Transfer ExperienceMain differences between Chabot and UCD

Chabot• General Education Classes (e.g.

Chemistry, English, History, Math, etc.).– Taken during Freshmen (1st year) &

Sophomore (2nd year).

UCD• Lower Division (e.g. Intro to Civil

and Environmental Engr, etc.) – Taken during Junior (3rd year).– Larger class size– Fast-paced and challenging

• Upper Division (e.g. major specific such as Matrix Structural Analysis).– Taken during Senior (4th year).– Smaller class size– More practical– Fast-paced and challenging– More laboratory work

Page 5: Huy Nguyen, PE ENGR10 20Sep12 Engr 10 Guest Lecture Huy Nguyen, PE September 20, 2012.

Huy Nguyen, PE • ENGR10 • 20Sep12

II) Transfer ExperienceFast-paced and challenging

University• Quarter system ~ 10 – 12 weeks • Successful theoretical • College lifestyles – school focused.• Increase intelligence – directly from

high school to College.• Advanced world.• Grading curves (e.g. UC Irvine)

Page 6: Huy Nguyen, PE ENGR10 20Sep12 Engr 10 Guest Lecture Huy Nguyen, PE September 20, 2012.

Huy Nguyen, PE • ENGR10 • 20Sep12

II) Transfer ExperienceAdvice on how to do well at Chabot and transfer-University

• Class attendance• Successful Homework• Theory Applicability• Teamwork• Time Management• Prioritize Work• Study, Study, and Study!

Page 7: Huy Nguyen, PE ENGR10 20Sep12 Engr 10 Guest Lecture Huy Nguyen, PE September 20, 2012.

Huy Nguyen, PE • ENGR10 • 20Sep12

II) Transfer ExperienceTraffic Study for ENG 162 Transportation System Design

• Traffic analysis for three major intersections in Davis. – Traffic Count of existing conditions over several

days during morning, afternoon, and evening rush hours.

– 30-year population growth prediction for Davis and three nearby cities.

– Provide recommendations: Better timing systems, alternative routes, etc.

Page 8: Huy Nguyen, PE ENGR10 20Sep12 Engr 10 Guest Lecture Huy Nguyen, PE September 20, 2012.

Huy Nguyen, PE • ENGR10 • 20Sep12

II) Transfer ExperienceTraffic Study project for ENG 162 Transportation System Design

Page 9: Huy Nguyen, PE ENGR10 20Sep12 Engr 10 Guest Lecture Huy Nguyen, PE September 20, 2012.

Huy Nguyen, PE • ENGR10 • 20Sep12

III) Work Experience

• Design Engineer, Earthquake and Structures, Inc., Oakland (June 2006 – April 2008)

• Project Engineer, City of San Jose (April 2008 – July 2010)• Environmental Inspector, City of San Jose (July 2010 – July 2011)• Project Engineer, City of San Jose (July 2011 – Current)

– Narvaez Shadow Creek Sanitary Sewer Realignment project• Project feasibility/Development• Design• Bidding & Contract Award• Construction

Page 10: Huy Nguyen, PE ENGR10 20Sep12 Engr 10 Guest Lecture Huy Nguyen, PE September 20, 2012.

Huy Nguyen, PE • ENGR10 • 20Sep12

Project Feasibility/Development

Option 1

Option 2

Option 3

Sewer overflow

Page 11: Huy Nguyen, PE ENGR10 20Sep12 Engr 10 Guest Lecture Huy Nguyen, PE September 20, 2012.

Huy Nguyen, PE • ENGR10 • 20Sep12

Design

Page 12: Huy Nguyen, PE ENGR10 20Sep12 Engr 10 Guest Lecture Huy Nguyen, PE September 20, 2012.

Huy Nguyen, PE • ENGR10 • 20Sep12

Bidding & Contract Award

Lowest responsible and responsive bidder

Page 13: Huy Nguyen, PE ENGR10 20Sep12 Engr 10 Guest Lecture Huy Nguyen, PE September 20, 2012.

Huy Nguyen, PE • ENGR10 • 20Sep12

Construction

Page 14: Huy Nguyen, PE ENGR10 20Sep12 Engr 10 Guest Lecture Huy Nguyen, PE September 20, 2012.

Huy Nguyen, PE • ENGR10 • 20Sep12

Construction

Page 15: Huy Nguyen, PE ENGR10 20Sep12 Engr 10 Guest Lecture Huy Nguyen, PE September 20, 2012.

Huy Nguyen, PE • ENGR10 • 20Sep12

IV) Seek Constant Improvement

• A better alternative:– More efficiently – Save resources and time– Minimize disturbances to existing conditions

such as environment, lifestyle, traffic, etc.• Lead, manage, and lead-up.

– Team support– Recognition– Inspire

Page 16: Huy Nguyen, PE ENGR10 20Sep12 Engr 10 Guest Lecture Huy Nguyen, PE September 20, 2012.

Huy Nguyen, PE • ENGR10 • 20Sep12

V) Group Exercise

Appreciation

Page 17: Huy Nguyen, PE ENGR10 20Sep12 Engr 10 Guest Lecture Huy Nguyen, PE September 20, 2012.

Huy Nguyen, PE • ENGR10 • 20Sep12

VI) Staying PositiveDon’t

1. Complain

2. Negative focus of failed work

3. Individual

4. I’m Worst

Do

1. Identify Challenges

2. Solution to failed work

3. Teamwork

4. Moving forward by appreciating yourself.