Hts 2134981 Rhm Bolting Proposal Yanbu 11.05.13

download Hts 2134981 Rhm Bolting Proposal Yanbu 11.05.13

of 4

Transcript of Hts 2134981 Rhm Bolting Proposal Yanbu 11.05.13

  • 7/29/2019 Hts 2134981 Rhm Bolting Proposal Yanbu 11.05.13

    1/4

    Providing Safe, Reliable Connections

    EQMS Document No.: 10119 Service Dept. (Middle East)

    Customer : RAJEH H.AL-MARRI & SONS CO.Project : YASREF

    Tel : 055 438 7288

    Fax :

    PROPOSAL FOR THE HIRE OF:

    EQUIPMENT AND MANPOWER FORHYDRAULIC BOLTING SERVICE

    Our Reference : EMEA13-5SAU11217

    Customer Reference : Your mail dated 11th

    May 2013.

    Date : 11th

    May 2013

    Presented To : Mr. George ManuelPresented By : Shaikh Imran

    Tel :+966 (4) 396 2963

    Mobile :+966 503 222 942

    E-mail : [email protected]

    Website: : www.hydratight.com & www.dlricci.com

  • 7/29/2019 Hts 2134981 Rhm Bolting Proposal Yanbu 11.05.13

    2/4

    Page 2 of 4

    Providing Safe, Reliable Connections

    EQMS Document No.: 10119 Service Dept. (Middle East)

    Dear Sir,

    Many thanks for your enquiry and for the opportunity provided us to quote for yourrequirement. With the above mentioned reference, please find below our bestproposal for the Hire of Equipments and Manpower for carrying out the HydraulicBolting Services at Yasref, as per the details provided by you.

    SCOPE OF WORK:

    To provide equipments and manpower for carrying out the Hydraulic Bolting Servicesat Yasref on 2 x 900# flange, as per the details provided by you.

    MANPOWER LIST:

    Crew Level: 01 Crew in Day shift. Each crew consist of 02 Hydratight TrainedTechnicians and will work for a shift of 10 hrs including lunch and refreshmentbreaks.

    HIRE PRICE SCHEDULE:

    Hire price for Manpower & Equipments: SR 3,600/- per crew per shift of 10hrs.

    Mob / Demob charge: SR. 5,500/- per crew per mobilization.

    Overtime charges if worked beyond 10hrs will be on pro-rate basis.

    NOTE:

    NUMBER OF CREWS DEPLOYED TO PERFORM THE JOB WILL BE

    DETERMINED BASED ON SITE REQUIREMENTS AND SCHEDULE PROVIDED

    BY THE CLIENT AND CHARGED FOR.

    Hydratight - Tig Tesco standard service terms and conditions will be applied.

    GENERAL TERMS AND CONDITIONS:

    1. PRICE:

    The above PRICES are based on the assumption that the required kit is available inour Dammam stock at the time of hire (HIRE STOCKS ARE SUBJECT TOAVAILABILITY).

    2. PAYMENT:

    100% Advance along with clear and firm purchase order.

    3. VALIDITY:

    Validity of this proposal is 30 days from the date of submission of proposal.

  • 7/29/2019 Hts 2134981 Rhm Bolting Proposal Yanbu 11.05.13

    3/4

    Page 3 of 4

    Providing Safe, Reliable Connections

    EQMS Document No.: 10119 Service Dept. (Middle East)

    4. EQUIPMENTS AND MANPOWER:

    1. Normally available in Jubail subject to prior allocation on other jobs.2. Part Days worked are charged at full days rate.3. During normal working shift if technician is sent off site, but retained on call,

    full rates apply.4. Security pass, ID, work permit, Insurance ...etc at customers cost and

    responsibility.5. Taxes / Levies if any will be at customers cost and responsibility.

    5. ON-SITE FACILITIES:

    Customer to provide the following:-1. Compressed air at 90 psi and 110 cfm along with air hose line c/w Chicago

    fittings near the place of work.2. Scaffolding and or work platform if deemed necessary.3. Temporary lighting if required.

    4. Assistance with material handling equipment for the off-loading, installation,on-site material movement and re-loading of our equipment on site.

    5. Work Permit and any special safety kit.

    6. LOOSENING OF BOLTS:

    We will break loose the nut, this covers the unloading of the stud to the point wherezero bolt load is achieved. This does not cover the nut removal from the stud or thestud removal from the flange. Additionally no contractual obligation is accepted tobreak loose nuts where the nuts are heavily rusted on to the studs, or abnormallyfixed to the studs in any other way. The equipment supplied to break loose the nutsare considered to be of adequate capacity to achieve a zero bolt load, even where

    the studs are in a dry unlubricated condition. If, however, for whatever reason thebreak loose torque is abnormally high to the extent that the equipment hasinsufficient capacity, no contractual obligation is accepted to supply alternativeequipment or services. Working on joints that are live and operational is subject toour Companys safety regulations and will be handled on case to case basis.

    7. ASSEMBLY:

    All nuts must be free running, tightened up to the flange face and fitted according toHydratight Ltd specification for Torque Wrench / Bolt Tensioners as the case maybe. The assembly of the joint is not our responsibility although advice and assistancemay be given. Working on joints that are live and operational is subject to ourCompanys safety regulations and will be handled on case to case basis.

  • 7/29/2019 Hts 2134981 Rhm Bolting Proposal Yanbu 11.05.13

    4/4

    Page 4 of 4

    Providing Safe, Reliable Connections

    EQMS Document No.: 10119 Service Dept. (Middle East)

    8. INVOICING NORM:

    FOR EQUIPMENT & MANPOWER: Time sheet will be made on daily basis and ithas to be approved on daily basis by an authorised person from Client. Thisauthorised time sheet will form the basis for our Invoicing for hire service.

    Hope the above is in line with your requirement for you to proceed further. For anyfurther clarifications, please feel free to contact us.

    Thanks & best regards,

    Shaikh ImranSales Engineer - Western RegionHydratight Ltd.,