HSSE MANAGEMENT PLAN OF ISBLeia.onep.go.th/images/monitor/1564558546.pdfHSSE MANAGEMENT PLAN OF ISBL...
Transcript of HSSE MANAGEMENT PLAN OF ISBLeia.onep.go.th/images/monitor/1564558546.pdfHSSE MANAGEMENT PLAN OF ISBL...
HSSE MANAGEMENT PLAN OF
ISBL
PTTGC Doc. No.:
ORP-MNL-411
Rev. A Page 1 / 32
SETT Doc. No. : SC6002-SL0P- SAF-80000-009
PTT Global Chemical Public Company Limited
Olefins Reconfiguration Project
Project No. CP-1031-16001
HSSE MANAGEMENT PLAN OF ISBL
A 12-Feb-2018 IFA(For Approval) Y. Y. PARK J. H .KIM K.Y. LEE
REV. DATE
(DD-MMM-YYYY) ISSUE STATUS
WRITTEN BY (name & signature)
CHECKED BY (name & signature)
APPROVED BY (name & signature)
This document has been prepared on behalf of and for the exclusive use of PTT Global Chemical Public Company Limited (PTTGC), and is subject to and issued in accordance with the agreement between PTTGC and the consortium of the consortium of Samsung Engineering ( Thailand )Company Limited (“SET”), and Samsung Engineering Company Limited ( “SECL”) or SETT. PTTGC/SETT accepts no liability or responsibility whatsoever for it in respect of any use of or reliance upon this document by any third party. Copying this document to 3rd parties without the permission of PTTGC and SETT is not permitted.
HSSE MANAGEMENT PLAN OF
PTTGC ORP
PTTGC Doc. No.:
ORP-MNL-411
Rev. A Page 2 / 32
SETT Doc. No. : SC6002-SL0P- SAF-80000-009
REVISION SUMMARY
REV. REVISED DATE (DD-MMM-YYYY)
REVISED SECTION
REVISED DESCRIPTION
A 12-Feb-2018 N/A First Issue
HSSE MANAGEMENT PLAN OF
PTTGC ORP
PTTGC Doc. No.:
ORP-MNL-411
Rev. A Page 3 / 32
SETT Doc. No. : SC6002-SL0P- SAF-80000-009
TABLE OF CONTENTS
Chapter Title Page
1 Project Introduction ...................................................................................... 5
2 Project Goal & Objective ............................................................................. 7
3 Organization ................................................................................................ 7
4 Safety Work Plan ........................................................................................ 9
5 S-CAR (Safety-Corrective Action Request) ................................................ 11
6 Inspection & Audit ..................................................................................... 11
7 Communication (Meeting) .......................................................................... 12
8 Leading Indicator ....................................................................................... 12
9 Incentive & Zero Tolerance Program ......................................................... 13
10 Critical Items ............................................................................................. 14
11 Emergency Response ............................................................................... 15
12 Environment .............................................................................................. 16
13 Incident Reporting & Investigation ............................................................. 16
14 HSSE Training .......................................................................................... 18
15 Personal Protective Equipment (PPE) ....................................................... 18
APPENDIX 1 List of HSSE Procedure .................................................................... 20
HSSE MANAGEMENT PLAN OF
PTTGC ORP
PTTGC Doc. No.:
ORP-MNL-411
Rev. A Page 4 / 32
SETT Doc. No. : SC6002-SL0P- SAF-80000-009
APPENDIX 1 List of HSSE Procedure
APPENDIX 2 S-PCM Format
APPENDIX 3 Start Work Form APPENDIX 4 S-CAR Format
APPENDIX 5 Emergency Drill Report Form
APPENDIX 6 Safety Gloves Specification
APPENDIX 7 Incident Classification
APPENDIX 8 Risk Assessment Standard
APPENDIX 9 Site PPE Color Code
APPENDIX 10 Category and Goal of Leading Indicator
APPENDIX 11 Communication Plan
APPENDIX 12 Training Matrix
HSSE MANAGEMENT PLAN OF
PTTGC ORP
PTTGC Doc. No.:
ORP-MNL-411
Rev. A Page 5 / 32
SETT Doc. No. : SC6002-SL0P- SAF-80000-009
1 Project Introduction
1.1
Summary
1.2 Overall Location
Hemaraj Eastern Industrial Estate, Map Ta Phut, Rayong, Thailand. 150km distance from
Capital city Bangkok
Contract
Period
Project Name
Client
Contracted price
Capacity
Consortium
PTTGC Olefins Reconfiguration (ORP) Project
PTT Global Chemical Public Company Limited
880mil. USD (SECL: 610mil, TTCL: 270mil.USD) / Lump-sum Price
Ethylene 500kTA / Propylene 25.6 kTA / Butadiene 66.5kTA
SECL + SET (Leader) + TTCL (Consortium), LUMMUS
(Subcontractor/Licensor)
Effective Date : 01 June, 2017
Mechanical Completion : 30 April, 2020
Performance Acceptance Certificate : Nov , 2020 (42M)
HSSE MANAGEMENT PLAN OF
PTTGC ORP
PTTGC Doc. No.:
ORP-MNL-411
Rev. A Page 6 / 32
SETT Doc. No. : SC6002-SL0P- SAF-80000-009
1.3 Site Location
1.4 Plant Layout
HSSE MANAGEMENT PLAN OF
PTTGC ORP
PTTGC Doc. No.:
ORP-MNL-411
Rev. A Page 7 / 32
SETT Doc. No. : SC6002-SL0P- SAF-80000-009
2 Project Goal & Objective 2.1 Project Goal
- 15Million Safety Man-hour with Zero Incident
- Zero Environment impact on the local community
- 100% Project security compliance and services
Slogan: I AM SAFETY.
2.2 Objectives:
PLAN • All works shall be planned safely. • Risky works are required to conduct S-PCM in advance.
DO • Follow and conduct SWF (Start Work Form) • Regular Training, Drill, Campaign for Construction team • & workers to promote HSSE-Culture owner ship.
CHECK
• Conduct Audit & inspection regularly • Analysis of Incidents, S-CAR, Violation trend.
FEEDBACK
• Share leading indicator thru meeting communication • Incentive & Zero Tolerance System
3 Organization 3.1 SET Organization
HSSE MANAGEMENT PLAN OF
PTTGC ORP
PTTGC Doc. No.:
ORP-MNL-411
Rev. A Page 8 / 32
SETT Doc. No. : SC6002-SL0P- SAF-80000-009
3.2 SET HSSE Organization
- Safety Ratio :
Safety coverage is provided with a ratio of at least 1:50 (One (1) Safety Officer for every 50 employees) for regular works at site. if manpower is less than 50, at least 1 safety officer to be mobilized. For night work or critical activity, work on live facilities the ratio will be more stringent.
No. of Manpower
1 ~ 49
50 ~ 99
100 ~ 149
150 ~
No. of Safety officer
1
2
3
Follow 1:50 ratio
- Mature Ratio (Buddy system) :
Working group shall consist of mature and non-mature workers ratio at least 7:3 (Seven (7) mature workers and Three (3) non-mature workers). Mature workers shall train and take care non-mature workers on how to work safely for the first 5 weeks after that the non-mature workers will get evaluation about their work skill. During first 5 weeks, non-mature workers to be identified by newbie stickers on safety helmet. Inexperienced newbie’s have restrictions in their work execution and are restricted to perform high risk works.
HSSE MANAGEMENT PLAN OF
PTTGC ORP
PTTGC Doc. No.:
ORP-MNL-411
Rev. A Page 9 / 32
SETT Doc. No. : SC6002-SL0P- SAF-80000-009
3.3 Investigation Team Organizational Chart
4 Safety Work Plan
4.1 S-PCM (Small Pre-Construction Meeting)
A meeting held to discuss measures to eliminate or mitigate risks to an
acceptable level for risks from work classified as grade 4(refer appendix 8 for
risk level) or above, and work of new disciplines and new work crew by set up
detailed sequence of work and improvements. Construction SI, SV, Foreman,
HSSE Manager, HSSE SV are required to participate in the S-PCM (refer
appendix 2 for S-PCM form)
4.2 SWF (Start Work Form)
For efficient work, “Do it right the 1st time”.
During TBM (Toolbox Meeting) SWF shall be discussed to workforce for their
awareness on prior to execute their activities.
All activities which are conducted at site shall follow SWF process using SWF
form (appendix 3 for SWF form) daily. Imaging consequences & motivates
behaviour.
- Risk identified in Planning
- Risk identified in Preparation
- Risk controlled in execution
- Safe completion
HSSE MANAGEMENT PLAN OF
PTTGC ORP
PTTGC Doc. No.:
ORP-MNL-411
Rev. A Page 10 / 32
SETT Doc. No. : SC6002-SL0P- SAF-80000-009
* SWF daily process
* UAUC : Unsafe Action & Unsafe Condition
4.3 Permit To Work
The purpose of the work permit system is to set out clear procedures and
safety requirements for the many diverse categories of work to be performed at
the job site in order to ensure that such works are carefully planned and safely
executed to prevent property damages, injurious accidents and any
detrimental consequences. Permits to work procedures are necessary for
performing work safety in high hazard areas. Refer Permit to Work Procedure
for specific contents and the activities which are required to submit PTW are:
- Cold Work - Hot Work - Confined Space Work - Radiation Work
HSSE MANAGEMENT PLAN OF
PTTGC ORP
PTTGC Doc. No.:
ORP-MNL-411
Rev. A Page 11 / 32
SETT Doc. No. : SC6002-SL0P- SAF-80000-009
- Excavation Work - Lifting Work - Road closure Work - Scaffolding erection and dismantling Work - Electrical Work
4.4 TBM (Tool Box Meeting) at working location
SET and Subcontractor's CM, SI, SV, Forman shall conduct daily TBM with
workers and shall maintain proper record of the meeting. HSSE SV shall Attend
daily TBM and give advise if required. TBM will be monitored and assessed by
HSSE team or H.Q HSSE Team. The topics for the TBM shall include, but not
limited to:
- Highlight specific job hazardous activities for today’s work.
- Countermeasures for prevention of incident and recurrence.
- Health and safety reminders to constantly remind workers on HSSE rules
and regulations.
- Check work’s health condition and if any persons who are ill and drunk
are found, they shall not be allowed to work.
- Any forth coming HSSE events/instruction/orders and etc.
- Discuss any ‘near miss incidents’.
5 S-CAR (Safety-Corrective Action Request)
A tool that shall be used by all persons to identify unsafe acts / conditions before
they become a ‘near miss’, First aid case, LTI (Lost Time Incident), disabling
injury or even a fatality. All unsafe Conditions and Actions shall be reported, and
the report shall be on a format. S-CAR is used to report, prevent and take
corrective actions for all UNSAFE ACTS / UNSAFE CONDITIONS. It is to be
used by all SECL managers, staffs and subcontractor management, supervisors
and workers. Participation rate will be monitored.(refer appendix 4 S-CAR form)
6 Inspection & Audit
6.1 The purpose of Inspection & Audit
Scheduled HSSE inspection & Audit are essential to the hazard identification
and accident prevention programs. The purpose of the inspection & Audit is
to identify and correct unsafe equipment, situations, conditions, and practices
to prevent accidents. And also identify and encourage good HSE techniques.
6.2 Scope of Inspection & Audit
The HSSE inspection and audit activity is to conduct organized SITE inspection
so as to keep under control and correct all circumstances, which affect the
safety and health of the employees, and environment. The inspectors and
HSSE MANAGEMENT PLAN OF
PTTGC ORP
PTTGC Doc. No.:
ORP-MNL-411
Rev. A Page 12 / 32
SETT Doc. No. : SC6002-SL0P- SAF-80000-009
auditors shall check for general housekeeping, safety violations committed by
workers, any discrepancies that violate legal regulations or requirements.
6.3 Type of Inspection & Audit
Subcontractors are not allowed to conduct any meeting before 09:00AM. Focus
on site and conduct TBM, SWF and walk through.
Description Frequency Action by
HSSE Walk Through & SWF
Daily Subcontractor CM, HSSEM,
SET CM, SI, HSSEM
HSSE Management Patrol (Do small groups, 2 or
3 at max) Weekly
Subcontractor CM, HSSEM SET CM, HSSEM
Owner, CM, HSSEM
Color Coding Inspection (Equipment, Tools and etc.)
Monthly SET inspectors
Supervisor and HSSE SV before use
Planned Observations for designated
activities
Monthly or more often as
required As required
Audit Every 2~4
month based on result of Audit
HSSE Audit part (H.Q)
7 Communication (Meeting)
7.1 The objectives of the HSSE meetings
- To formulate and execute the accident prevention programs.
- To cultivate and promote safe working habits and attitudes
- To create and maintain a safe and healthy working environment.
- To cultivate and promote care and attention to HSSE issues.
7.2 Refer Appendix 11 Communication Plan
8 Leading Indicator
Focuses on future health and safety performance with the intent of continuous improvement. It is signal and monitor of what is being done on an ongoing basis to prevent worker illness and injury.
8.1 Purpose
HSSE management programs are in place to ensure workers go home healthy and safe at the end of the day, every day. But it’s not enough to introduce health and safety processes into the workplace and hope they do the trick.
HSSE MANAGEMENT PLAN OF
PTTGC ORP
PTTGC Doc. No.:
ORP-MNL-411
Rev. A Page 13 / 32
SETT Doc. No. : SC6002-SL0P- SAF-80000-009
What’s needed is to measure their effectiveness on an ongoing basis, include them in HSSE performance discussions, and make adjustments as appropriate.
Leading indicators can be a useful tool to help organizations track, measure and adjust their HSSE related activities so they can effectively direct their health and safety performance and avoid incidents/harm.
8.2 6 Elements of Leading Indicator
- Leadership Engagement - - S-CAR - - Inspection - - Preventive Activity (e.g. SWF, SWM etc.) - - Assessment (S-CAR, SWF, SWM) - - Regular Audit
* Refer Appendix 10 for Leading indicator specific category
9 Incentive & Zero Tolerance Program
9.1 Incentive Program
The purpose of the HSSE incentive program is to influence all employees to participate in the HSSE Program and to believe that HSSE is a value and not just a priority and to influence the behaviour of individuals and groups and develop a Safety culture.
Type of Incentive Frequency Awardees
Personal Incentive
Best performance (based on Leading Indicator)
Every Week Recommended
worker by management
Best S-PCM Best S-CAR BEST TBM
Every Month
Best performance Construction CM, SI, SV, Foreman in S-PCM, S-CAR, TBM
Subcontractor Incentive
Best Subcontractor (based on Leading Indicator)
Every month Best performance
Subcontractor
9.2 Zero Tolerance Program
HSSE MANAGEMENT PLAN OF
PTTGC ORP
PTTGC Doc. No.:
ORP-MNL-411
Rev. A Page 14 / 32
SETT Doc. No. : SC6002-SL0P- SAF-80000-009
ZERO Tolerance is being applied for the 7 critical Saving Life Rules (Working at
height, Excavation, Lifting, Confined Space work, Electrical work, Energy
Isolation, Mechanical work). For not following any of these critical rules there is
Zero Tolerance. This means immediate and permanent removal from site.
For all other Safety Violations, there will be disciplinary program which is
focused on learning and improvement of processes as well as personal discipline
for any reckless or intentional behaviour.
9.3 Accountability Program
- Refresh training for HSSE violators.
- Warning letter to serious violators(Incident, repeated violation, poor
HSSE performance and etc.) and 3rd warning will be result in termination
from the project.
- PM, CM shall take and present disciplinary action and mitigation plan in
case of serious case(e.g. high risk near-miss).
10 Critical Items
Following items are considered as Critical items in order to prevent high risk incidents.
10.1 Lifting Works
- All Equipment and lifting gears shall be inspected and certified.
- The people involved in lifting activities such as Rigger, Operator, Banks man and etc. shall be trained and qualified to perform the lifting works.
- Lifting plan and Permit shall be available.
10.2 Transportation
- Transportation materials (Size, Load and etc.) and route(width, height, high
voltage power cable and etc.) shall be inspected and planned in advance
to prevent any incidents such as collapse, crash to existing structure and
others.
- Transportation equipment shall be inspected and certified.
- The people involved in transportation such as Operator, Flagman and etc.
shall be trained and qualified.
- Supervisor shall check the condition of material securing.
10.3 Fabrication Shop
- Fabrication work shop could be blind spot and cause incidents unless
HSSE MANAGEMENT PLAN OF
PTTGC ORP
PTTGC Doc. No.:
ORP-MNL-411
Rev. A Page 15 / 32
SETT Doc. No. : SC6002-SL0P- SAF-80000-009
proper supervision is not provided.
- Each shop shall be equipped with fire fighting system.
- All facilities (e.g. distribution panel, gas cylinder storage, power cable)
shall be inspected regularly.
- Shop marshal shall be available for monitoring and maintenance.
10.4 Monsoon Season (Heavy rain)
- Appropriate capacity of drainage system shall be provided to prevent flood.
- Electrical power facilities shall be protected from water.
- After rain, supervisor shall check hazardous point such as cable connection,
slippery floor, soil loose and etc.
10.5 Tie-In Activities
- There will be Tie-in works for existing pipes, Electric power cable,
instrument cable and etc. For Tie-in works, communication, isolation and
LOTO are important.
- Where tie-ins are to be made to equipment / systems within construction
/ area battery limits, all works and preparation shall be coordinated with
the appropriate Area Manager or Area Field Supervisor and lockout /
tag-out authority for the specific work to be performed.
11 Emergency Response
11.1 The purpose of Emergency Response
- The objective of Emergency Response is to provide the organization,
guidelines and directions to ensure fast and effective response in any
emergency situation in order to safe life, property and the environment.
- Everyone shall be familiar with the emergency plan while working at work site.
- In the event of emergency one must remain calm and act positively and
quickly for preserving life and property.
11.2 Emergency Response Drill
Emergency drill is to provide practical training on specific emergency equipment,
means of evacuation and escape and procedures personnel should follow in
an emergency. Subcontractors are required to conduct at least 1 time drill in a
month cooperated with SECL. Planned drill schedule to be notified at least 1 day
before.
HSSE MANAGEMENT PLAN OF
PTTGC ORP
PTTGC Doc. No.:
ORP-MNL-411
Rev. A Page 16 / 32
SETT Doc. No. : SC6002-SL0P- SAF-80000-009
12 Environment
The project has the following environmental targets and objectives
• To reduce energy usage 2% year on year • To reduce greenhouse gas emissions by 5% over the course of the program • Zero hazardous waste to landfill • Office based water consumption maximized at 100 litres per person per day • 10% increase in water efficiency and 10 % decrease in water usage over the
course of the program.
During the project engineering, procurement, construction and
commissioning, the environmental aspects shall be identified and effects
evaluated for all significant activities, products and services.
- Develop the Waste Management Plan for the project. This plan provides guideline and minimum requirements for handle, collection and separation of waste, offsite disposal method and management;
- Reduce wastes and emissions to achieve reduction goals and manage a product’s life cycle from inception to final disposal.
- Prevent Soil and Groundwater contamination. - Control noise levels which are nuisance to project personnel and communities. - Keep construction machine and vehicle in good condition to reduce the
pollutant emission - Manage for the draining of sanitary and chemical waste water, water used for the
spraying or rinsing of equipment
- Clean up the access roads or public roads if construction materials drop or spill during transportation.
- Refer to Project Environment Management Plan for detail.
13 Incident Reporting & Investigation
Because all accidents can be prevented, our safety efforts concentrate on
accident prevention. Although accidents may still happen even with our best
efforts to prevent them, it becomes unacceptable when an accident recurs due
to our failure to correctly analyse and effectively learn from them. Therefore, the
importance of timely and accurate reporting and investigation of accidents
cannot be over-emphasized. All incidents to be reported, every unplanned and
undesired incident
HSSE MANAGEMENT PLAN OF
PTTGC ORP
PTTGC Doc. No.:
ORP-MNL-411
Rev. A Page 17 / 32
SETT Doc. No. : SC6002-SL0P- SAF-80000-009
13.1 Incident Investigation
- All the incidents and near-misses must be reported including first aid cases a s determined by the SECL in its leading indicators and project KPI by all the parties at the project including subcontractors.
- SECL shall provide in house incident management training to all its
subcontractors. - Subcontractors to ensure that all incidents are reported immediately to SECL
HSSE representative and are then monitored and analysed as per expectations.
- Incident Investigation team shall be organized; the size and composition
of the investigation team shall be determined depending on the severity of incident or damage.
- The investigation shall be conducted as soon as possible after an accident,
because the quality of the evidence can deteriorate rapidly. Video or photographs
- shall be taken as soon as possible after the accident.
HSSE MANAGEMENT PLAN OF
PTTGC ORP
PTTGC Doc. No.:
ORP-MNL-411
Rev. A Page 18 / 32
SETT Doc. No. : SC6002-SL0P- SAF-80000-009
14 HSSE Training
- HSSE training is essential for executing work safely during the entire
construction, pre-commissioning and commissioning of the project. The
Construction Manager and the HSSE Manager shall establish an On-site
Safety Training Program before commencing the work.
- All training (except tool box talks) will be carried out in a specifically
designed and suitably equipped training room.
- Training attendance shall be recorded for all internal and external training and awareness sessions.
- On site HSSE training categories are :
Induction Training for All New Personnel
Training for manager(including Subcontractor PM, SM) & supervisor
Training for Specific Hazardous Job(e.g. 7 critical Saving Life Rules)
Emergency and Evacuation Training
Training for Refresher course
Training for visitor
- Refer HSSE Training procedure for types and Requirements of training.
15 Personal Protective Equipment (PPE)
- All people and visitors shall wear the specific PPE at all times when they are
on the work SITE, like below :
Head protection
: Safety Helmet with Chin strap (BS-5240, ANSI Z89.1)
Foot protection
HSSE MANAGEMENT PLAN OF
PTTGC ORP
PTTGC Doc. No.:
ORP-MNL-411
Rev. A Page 19 / 32
SETT Doc. No. : SC6002-SL0P- SAF-80000-009
: Safety Shoes (EN345, BS-1870, ANSI Z41)
Fall protection
: Safety Harness (BS-361) with double Lanyard(BS-354, 355)
Eye and face protection
: Safety Glasses (BS-2092, ANSI Z87.1, EN166), Face shield (BS-2092, ANSI Z87.1)
Hand and skin protection
: Hand Gloves (refer to Appendix 6) and Protective Cloth from Dust, Heat, chemical and etc.
Hearing protection\
: Ear Plug, Ear Muff (BS-6344, ANSI S3.19)
Respiratory protection : Dust/Mists Mask (3M Cartridges for additional protection against dusts and mists paint spray), Filter, Oxygen Mask, SCBA (Comply with OEM guide and OSHA respiratory Protection Standard for task purpose)
- PPE shall be used according to respective job assignments and items
identified in risk assessments.
- Subcontractor shall train regularly and require their employees to wear appropriate PPE that is maintained in good condition. a failure in compliance shall result in disciplinary action against the offender employee and where appropriate, their line supervision.
- For general works, 100% cotton cloth is required but for special works(e.g.
Tie-in, brown field hot work and etc.), the PPE’s specification shall be met with PTTGC Standard, International Standard or equivalent.
- Refer PPE procedure for detail information
HSSE MANAGEMENT PLAN OF
PTTGC ORP
PTTGC Doc. No.:
ORP-MNL-411
Rev. A Page 20 / 32
SETT Doc. No. : SC6002-SL0P- SAF-80000-009
APPENDIX 1 List of HSSE Procedure
- Security and Safety Plan
- Environmental Management Plan
- Waste Management Plan
- Emergency Response Plan
- Traffic Management Plan
- Inspection and Color Coding Procedure
- HSSE Incentive Program
- Incident Reporting and Investigation
- Excavation Safety Procedure
- Working at Height (Sub plan – Scaffoldings and Ladders)
- Fire Prevention Plan
- Confined Space Safety Procedure
- Electrical Safety & LOTO(Lock Out Tag out)
- SIMOPS(Simultaneous Operations)
- Permit To Work Procedure
- Safety Training and Education
- Construction Waste Disposal Program
- PPE Assessment & Management
- Hazardous chemical & Substance
HSSE MANAGEMENT PLAN OF
PTTGC ORP
PTTGC Doc. No.:
ORP-MNL-411
Rev. A Page 21 / 32
SETT Doc. No. : SC6002-SL0P- SAF-80000-009
APPENDIX 2 S-PCM Form
HSSE MANAGEMENT PLAN OF
PTTGC ORP
PTTGC Doc. No.:
ORP-MNL-411
Rev. A Page 22 / 32
SETT Doc. No. : SC6002-SL0P- SAF-80000-009
APPENDIX 3 Start Work Form
HSSE MANAGEMENT PLAN OF
PTTGC ORP
PTTGC Doc. No.:
ORP-MNL-411
Rev. A Page 23 / 32
SETT Doc. No. : SC6002-SL0P- SAF-80000-009
APPENDIX 4 S-CAR
HSSE MANAGEMENT PLAN OF
PTTGC ORP
PTTGC Doc. No.:
ORP-MNL-411
Rev. A Page 24 / 32
SETT Doc. No. : SC6002-SL0P- SAF-80000-009
APPENDIX 5 Emergency Drill Report Form
HSSE MANAGEMENT PLAN OF
PTTGC ORP
PTTGC Doc. No.:
ORP-MNL-411
Rev. A Page 25 / 32
SETT Doc. No. : SC6002-SL0P- SAF-80000-009
APPENDIX 6 Safety Gloves Specification
* Safety Gloves Code
* Gloves minimum requirement
HSSE MANAGEMENT PLAN OF
PTTGC ORP
PTTGC Doc. No.:
ORP-MNL-411
Rev. A Page 26 / 32
SETT Doc. No. : SC6002-SL0P- SAF-80000-009
APPENDIX 7 Incident Classification
HSSE MANAGEMENT PLAN OF
PTTGC ORP
PTTGC Doc. No.:
ORP-MNL-411
Rev. A Page 27 / 32
SETT Doc. No. : SC6002-SL0P- SAF-80000-009
APPENDIX 8 Risk Assessment Standard
Likelihood
Impact
Low(1)
Medium(2)
High(3)
Low(1)
1
2
3
Medium(2)
2
4
6
High(3)
3
6
9
* Risk Level
Level Likelihood
Low (1)
safety preventive devices/facilities and compliance with safety work
procedure
Medium (2)
safety preventive devices/facilities and no compliance with safety work
procedure
No safety preventive devices/facilities and compliance with safety work procedure
High (3) No safety preventive devices/facilities and no compliance with
safety work procedure
* Likelihood Level
Level Impact(Injuries or occupational diseases)
Low(1)
Medical Treatment period: shorter than 4 weeks
Medium(2)
Medical Treatment period: : 4 weeks ~ 12 weeks
High(3)
Medical Treatment period: longer than 12 weeks
* Impact Level
HSSE MANAGEMENT PLAN OF
PTTGC ORP
PTTGC Doc. No.:
ORP-MNL-411
Rev. A Page 28 / 32
SETT Doc. No. : SC6002-SL0P- SAF-80000-009
APPENDIX 9 Site PPE Color Code (Not yet decided)
Department Safety Helmet Vest Remark
Civil, Building, Str/Stu Yellow
Piping Blue
Elec, Inst Orange
Pre-com, Commissioning Gray
Safety Green
Watcher, Flag man Red Red
HSSE MANAGEMENT PLAN OF
PTTGC ORP
PTTGC Doc. No.:
ORP-MNL-411
Rev. A Page 29 / 32
SETT Doc. No. : SC6002-SL0P- SAF-80000-009
APPENDIX 10 Category and Goal of Leading Indicator
HSSE MANAGEMENT PLAN OF
ISBL
PTTGC Doc. No.:
ORP-MNL-411
Rev. A Page 1 / 32
SETT Doc. No. : SC6002-SL0P- SAF-80000-009
APPENDIX 11 Communication Plan
HSSE MANAGEMENT PLAN OF
PTTGC ORP
PTTGC Doc. No.:
ORP-MNL-411
Rev. A Page 2 / 32
SETT Doc. No. : SC6002-SL0P- SAF-80000-009
HSSE MANAGEMENT PLAN OF
PTTGC ORP
PTTGC Doc. No.:
ORP-MNL-411
Rev. A Page 3 / 32
SETT Doc. No. : SC6002-SL0P- SAF-80000-009
APPENDIX 12 Training Matrix SAMSUNG TRAINING
MATRIX.xlsx