    Safety Movement

    South Korea(4thDec. TOTAL SITE)

    While a contractor worker was working to eliminate the rust on 1 inch

    piping with a power brush before painting. The worker was wearing a

    neck muff to keep warm from cold weather. The neck muff rolled in to thepower wire brush and the victim was suffocated by being strangled his

    respiratory tract by the muff around the neck, immediately CPR (Cardio

    Pulmonary Resuscitation) and AED(Automated External Defibrillator)

    was done at the location and later was taken to hospital where he was

    declared dead.

    WATER PIPELINE AND GATHERING SYSTEM INSTALLATION

  • 5/26/2018 HSE Presentation of Project to BP.ppt

    3/12

    GPS HSE Management System

    GPS HSE Management System is developed in line with the

    PDOs/OPALs requirements

    HSE MS Manual was developed by a team of experts and is reviewed

    periodically with improvements effected as required to align with changes in

    national/International HSE standards. A Dedicated team of HSE

    professionals are supervising / monitoring the implementation on a day-to-

    day basis

    GPS is now a ISO 14001 and OHSAS 18001 certified companyElements covered by the GPS HSE Management System are :

    Element 1 Leadership & Commitment

    Element 2 Policy & Strategic Objectives

    Element 3 Organization & Responsibilities, Resources, Standards &

    DocumentsElement 4 Hazard & Effects Management Process (HEMP)

    Element 5 Planning & Procedures

    Element 6 Implementation, Monitoring & Corrective Actions

    Element 7 Audit & Inspections

    Element 8 Management Review

  • 5/26/2018 HSE Presentation of Project to BP.ppt

    4/12

    GPS HSE Management System

    Following BP- Golden Rules will be in compliancePermit to work

    Energy Isolation

    Ground disturbance

    Confined Space Entry

    Working at Height

    Lifting Operations

    Driving SafetyManagement of Change

  • 5/26/2018 HSE Presentation of Project to BP.ppt

    5/12

    GPS HSE Management System

    All Site Visitors are required to adhere to the BP HSE & PPE requirements when

    visiting sites. (Such as access permit where required, Site orientation by Site HSE

    Advisor, Compliance to PPE requirements , intimation to work site supervisor

    before entering his site etc.)

    HSE Induction will be given to all employees before mobilization

    PTW system will be complied where applicable.

    All vehicles and plant deployed for this project will be meeting BPs requirements

    Road Worthiness Standards (RAS) inspections for all vehicles will be ensured ,

    IVMS will be fitted on vehicles and monitored.

    Safe Journey Management System will be ensured, Road Safety Officers will be

    deployed to ensure road safety.

    Night Driving and Night works are not allowed in GPS operation except in

    emergencies with the permission from BP authorities.

  • 5/26/2018 HSE Presentation of Project to BP.ppt

    6/12

    GPS HSE Management System

    Regular Management visits / HSE Audits and inspections are conducted to ensurethe proper implementation of HSE management system on projects

    Apart from HSE Induction other HSE Training as per BP requirements will be

    ensured before mobilization/Soon after the mobilization to site.

    GPS has the Monthly HSE Incentive Scheme on this project (Best Driver/Operator,Best Safety Man, Best Suggestion and Best Stop Card/Observation originator are

    awarded)

    STOP/Safety Observation /reporting programme will be followed on this project

    GSMs or Thuraya phones will be provided to staff to maintain communications atall time

  • 5/26/2018 HSE Presentation of Project to BP.ppt

    7/12

    GPS HSE Management System

    The Key Focus areas /challenges to sustain HSE MS on GPS

    Projects shall be the following :

    a) Achieve Goal Zero: By demonstrating visible, caring, and firm leadership at all

    levels

    By focusing on Road Safety Standards/Safe Driving practices

    and IVMS monitoring

    By focusing on competency assessment & training of HSE

    Critical positions.

    By focusing on strict compliance to Life Saving Rules and

    Golden rules

    (Comply, Respect & Intervene).

    By increasing the awareness of employees through cascading

    in TBT, HSE meetings & Drivers forums. By continuous monitoring at sites for effective

    implementation.

    By teamwork (effective involvement of senior & other line

    management)

    By displaying HSE messages through Posters/

    Bulletins/Alerts.

  • 5/26/2018 HSE Presentation of Project to BP.ppt

    8/12

    GPS HSE Management System

    b) Improve hazard identification skills; enhance HSE competence

    & awareness of all staff:

    By organizing hazard awareness training program/workshops.

    By conducting regular site Audits/inspection by line

    management

    By conducting periodic Hazards Hunt by the staff on the sites to

    improve hazards identification skills.

    By organizing dedicated TBT sessions for all supervisors on

    conducting effective TBT

    By conducting behavior based safety programme

    STOP/Observation tours. By assessment of Drivers/ HSE Critical positions.

    By analyzing IVMS reports and taking corrective /preventive

    actions where required.

    By ensuring the Road Safety requirements as per OPAL

    Upstream Operators Road Safety Standard (OPAL-STD-HSE-01).

  • 5/26/2018 HSE Presentation of Project to BP.ppt

    9/12

    GPS HSE Management System

    c) Focus on peoples behavior and motivate them to build positive

    attitude/approach towards HSE:

    By frequent site visits and interaction with site team by the

    senior management.

    By involvement of line management in HSEmeetings/forums/investigations/risk control measures etc.

    By motivation to site team through suitable rewards (milestone

    achievements/monthly incentives).

    By conducting competence assessment of HSE critical

    positions & Drivers. By empowering all employees to stop unsafe act/conditions.

    By effective disciplinary action against HSE defaulters and LSR

    violators.

  • 5/26/2018 HSE Presentation of Project to BP.ppt

    10/12

    GPS HSE Management System

    d) Ensure employee wellness and well being:

    By providing well equipped clinic in the camps. By ensuring fit to work medical exams for all employees.

    By employees involvements in sports (Indoor/Out door) and

    other cultural/social activities.

    By monitoring health and hygiene conditions in the camps.

    By organizing food safety training for kitchen staff.

    By PPT presentation on Health related topics (Heat

    stress/Noise/Dust etc.)

    By organizing Mass Housekeeping in camps/work sites

    By displaying environmental/health posters By ensuring proper disposal of all types of waste

    By periodic water sampling/analyzing for drinking purpose.

  • 5/26/2018 HSE Presentation of Project to BP.ppt

    11/12

    Proper Journey Management (JM) during mobilization phase is

    key to safe and timely completion.

    Journey Management procedures will be put in place

    immediately giving route details/rest areas/speed limits

    /emergency response etc.

    Any Movement of resources from Coast to Site will be through

    proper JM controlled by Coastal Journey Managers. Site based Journey Manager will be established immediately

    with first mobilisation.

    Manpower movement after establishment from Coast to

    QarnAlam will be in Public transport.

    Daily Bus shuttle will be provided from QarnAlam to Block 61Contractor camp.

    Thuraya Phone will be provided to the Bus driver to maintain

    communication at all times.

    Journey Management & Communication

  • 5/26/2018 HSE Presentation of Project to BP.ppt

    12/12

    S.No.Performance

    Indicator2009 2010 2011 2012

    2013 up to

    Nov

    1. Total Man Hours Worked 15209150 18159944 19302288 16794684 16579077

    2. Total KMs Driven 14590133 17744863 19699786 15630389 15675776

    3 No. of LTIs One 1 Zero 1 Zero

    4. LTI Frequency 0.13 0.05 0.05 0.05 Zero

    5. No. of Fatalities One Zero 1 Zero Zero

    6. No. of Road Traffic Accidents 6 2 3 1 4

    7.Road Traffic Accident

    Frequency0.41 0.11 0.15 0.06 0.26

    8. Journey Management Index 0.96 0.97 1.02 0.93 0.95

    9. Total Recordable Cases 2 1 3 1 1

    10.Total Recordable CaseFrequency

    0.13 0.01 0.15 0.05 0.06

    11. TROI 0 0 0 Zero Zero

    12. NAD 0 0 2 2 2

    HSE Performance Indicators/Targets - 2008-2013 (Year to Date)