Présentation Nuvia Travaux SpéciauxSILER - Training course on seismic protection of lead-cooled reactors – Verona (Italy) – May 21-25, 2012
HOW TO ISOLATE A NPP ?S. DIAZ – NUVIA Travaux Spéciaux
Le Groupe NuviaSeismic isolation 1Présentation de SalvaremState of the art 2ActivitésIssues to be addressed 3Gamme de produitsDesign & safety 4Exemples de projetsIndustrialization 5
SILER - Training course on seismic protection of lead-cooled reactors – Verona (Italy) – May 21-25, 2012
Exemples de projetsInstallation on-site 6
Le Groupe NuviaSeismic isolation 1Présentation de SalvaremState of the art 2ActivitésIssues to be addressed 3Gamme de produitsDesign & safety 4Exemples de projetsIndustrialization 5
SILER - Training course on seismic protection of lead-cooled reactors – Verona (Italy) – May 21-25, 2012
Exemples de projetsInstallation on-site 6
SILER - Training course on seismic protection of lead-cooled reactors – Verona (Italy) – May 21-25, 2012
1. Seismic isolationBehavior of base-isolated structure
1
Horizontal isolationResistance to vertical loading (without creep)
Resistance to horizontal displacement
Control of the horizontal displacement (flexibility and damping)
SILER - Training course on seismic protection of lead-cooled reactors – Verona (Italy) – May 21-25, 2012
Springs with horizontal stiffness K
KM2T
Building mass M Principle of seismic isolationIsolate the motion of the superstructure from that of the ground by using flexible horizontal isolators (ASB).
ConsequencesLengthen and shift away the natural period from the high frequency range of the earthquakes (reducing the amount of energy transferred to the structure).
Reduce significantly the acceleration and thus the shear forces induced by the earthquakes in the structure (F = M x A).
BenefitsBuilding costs reduction
Reduce damages in structural and non structural components
12. Principles and benefits
K C
Le Groupe NuviaSeismic isolation 1Présentation de SalvaremState of the art 2ActivitésIssues to be addressed 3Gamme de produitsDesign & safety 4Exemples de projetsIndustrialization 5
SILER - Training course on seismic protection of lead-cooled reactors – Verona (Italy) – May 21-25, 2012
Exemples de projetsInstallation on-site 6
SILER - Training course on seismic protection of lead-cooled reactors – Verona (Italy) – May 21-25, 2012
Elastomeric bearings (state of the art in the NPP)Choice of Chloroprene rubber (CR) for robustness
Main advantages: Re-centering of the structure Lesson learnt from other application (bridges, industry,
buildings) No maintenance All inclusive (damping + stiffness)
Major components Rubber layers : provide lateral flexibility Steel shims : provide vertical stiffness to support building
weight while limiting lateral bulging of rubber
Behavior law
21. Isolators
SILER - Training course on seismic protection of lead-cooled reactors – Verona (Italy) – May 21-25, 2012
Sandwich metal – elastomeric rubber
Metal: metallic steel plates S235 prepared
Elastomeric rubber: raw elastomeric matrix made of :Elastomeric polychloroprene (CR)
Charges
Plasticizers
Activators
Protection agent
Vulcanizer agent
Accelerators
Vulcanization = temperature + pressure
CH2 C
Cl
CH CH2
polychloroprene
CH2 C
Cl
CH CH2=
chloroprene
==
1. Isolators composition 2
SILER - Training course on seismic protection of lead-cooled reactors – Verona (Italy) – May 21-25, 2012
Elastomeric bearings main featuresBehavior Each elementary layer, subject to stresses and movements, deflects as shown in the three diagrams below :
Elastomeric bearings are assimilated to spring and damper associated in parallel.
22. Principles and benefits
SILER - Training course on seismic protection of lead-cooled reactors – Verona (Italy) – May 21-25, 2012
3. References on nuclear facilities Koeberg NPP
Main data
- Eigen frequency of isolated structures : 0,75 Hz
- Dynamic Shear modulus Gd = 1,40 MPa
- PGA : 0,3g
- 1800 elastomeric bearings (2 power plants)
- Bearings dimensions : 700 x 700 x 130 mm
- Bearings coupled with friction flat sliders
- Lowering of acceleration : 2,7 to 7 times
Sliding surface
2
SILER - Training course on seismic protection of lead-cooled reactors – Verona (Italy) – May 21-25, 2012
3. References on nuclear facilities Cruas NPP
Main data
- Eigen frequency of isolated structures : 1 Hz
- Dynamic Shear modulus Gd = 1,10 MPa (at construction time)
- PGA : 0,3g
- 3600 elastomeric bearings (4 power plants)
- Bearings dimensions : 500 x 500 x 66,5 mm
2
SILER - Training course on seismic protection of lead-cooled reactors – Verona (Italy) – May 21-25, 2012
Jules Horowitz Reactor (JHR)
Main data
- Eigen frequency of rigid structures : 9 Hz
- Eigen frequency of isolated structures : 0,60 Hz
- PGA : 0,35g (hard soil conditions)
- 195 elastomeric bearings
- Bearings dimensions : 900 x 900 x 181 mm
- Damping ratio : 5%
- Dynamic shear modulus : Gd = 1,10 MPa
23. References on nuclear facilities
SILER - Training course on seismic protection of lead-cooled reactors – Verona (Italy) – May 21-25, 2012
3. References on nuclear facilities International Thermonuclear Experimental Reactor (ITER)
Main data
- Eigen frequency of isolated str. : 0,60 Hz
- PGA : 0,35g (hard soil conditions)
- 493 elastomeric bearings
- Bearings dimensions : 900 x 900 x 181 mm
- Damping ratio : 5%
- Dynamic shear modulus : Gd = 1,10 MPa
2
Le Groupe NuviaSeismic isolation 1Présentation de SalvaremState of the art 2ActivitésIssues to be addressed 3Gamme de produitsDesign & safety 4Exemples de projetsIndustrialization 5
SILER - Training course on seismic protection of lead-cooled reactors – Verona (Italy) – May 21-25, 2012
Exemples de projetsInstallation on-site 6
SILER - Training course on seismic protection of lead-cooled reactors – Verona (Italy) – May 21-25, 2012
3Key issues to be addressedThe isolation supports the nuclear island and the isolators are classified as safety important components. Even if the technology (construction method and isolators themselves) are well known, the following issue need to be addressed :
Design What are the code and standard applicable and what are the nuclear requirements ? How to deal with a long design life – durability demonstration and maintenance requirement - ?
Industrialization How to increase the quality control of the fabrication of standard product ?
On-site installation How to deal with the interfaces with the other construction lot ? What are the installation requirement ?
Le Groupe NuviaSeismic isolation 1Présentation de SalvaremState of the art 2ActivitésIssues to be addressed 3Gamme de produitsDesign & safety 4Exemples de projetsIndustrialization 5
SILER - Training course on seismic protection of lead-cooled reactors – Verona (Italy) – May 21-25, 2012
Exemples de projetsInstallation on-site 6
SILER - Training course on seismic protection of lead-cooled reactors – Verona (Italy) – May 21-25, 2012
1. ASB – Normative contextTwo effective European norms for isolators
Prescriptive standards (« CE » labeled products)
No standard or guidelines for NPP but state of the art
Additional requirements for nuclear facilities are often added from designer
EN 1337Structural bearings
Static calculation criteria
Type tests and routine tests
Production tolerances
EN 15129Paraseismic bearings
Dynamic calculation criteria
Type tests
Production tests
Materials properties
Make distinction between: LDBR – damping <6% HDBR – damping >6% LRB with lead plug
4
SILER - Training course on seismic protection of lead-cooled reactors – Verona (Italy) – May 21-25, 2012
2. Design criteria 4Common practice from previous references
Limitation of the total cumulative deformation and distortion to :
Limitation of the compression loading around 7 to 8 MPa
Mechanical data for the isolators properties to implement the FEM model:
Coming from actual tests on full scale ASB
Higher bound and lower bound properties including the aging effect and the deviations due to production
EN15129
SILER - Training course on seismic protection of lead-cooled reactors – Verona (Italy) – May 21-25, 2012
3. Materials durabilityDurability of elastomeric bearings is a concern because :
Nuclear facilities’ life duration is great (70 years)
Mechanical properties of elastomers change over time
Tests are performed in laboratory to predict these evolutionsPrinciples are based on Arrhenius law
Treatment method in norm ISO 11346
Temperature speeds up physical and chemical changes (aging phenomena)
Impact on the project schedule need to be anticipated
90°C4,75 months
80°C9,5 months
70°C19 months
60°C38 months
50°C6,25 years
40°C12,5 years
30°C25 years
20°C50 years
T°CAging
Van’t Hoff law:Aging divided by 2 when T°C increases by 10°C
4
SILER - Training course on seismic protection of lead-cooled reactors – Verona (Italy) – May 21-25, 2012
Principle of the testsAging phenomena affects chemical and mechanical properties of the rubber.
Key parameter of the experimentation : the shear modulus G i.e the tracer
Knowing the evolution of G, we can deduct the evolution the ASB behavior
Tests performed on both samples and full scale ASB
Description of aging tests (Arrhenius model)Regular measurements of shear modulus G
on pieces of elastomer exposed to various T°C
For a variation of X% in the shear modulus value,
we note the corresponding time for each isotherm.
43. Materials durability
∆G/G0
G = Shear Modulus
Time in hours
SILER - Training course on seismic protection of lead-cooled reactors – Verona (Italy) – May 21-25, 2012
Description of aging tests (Arrhenius model)Combinations (t / T°C) are plotted on a graph log (t) = f(1/T).
If the accelerated aging follows Arrhenius model, all points should line up.
The slope of the Arrhenius line is proportional to the activation energy of the physicochemical reaction E (J/mol).
43. Materials durability
SILER - Training course on seismic protection of lead-cooled reactors – Verona (Italy) – May 21-25, 2012
4Maintenance limited to standards requirements :
The preventive maintenance: based on visual regular inspections Normal inspection Principal inspection (more detailed including some measurements)
Additional requirements coming from regulators:Assessment of the actual mechanical properties of the isolators versus time: Full-scale and samples are kept in the same atmosphere as the real isolators
(samples remain also under compression) Using a zero point performed during the construction and before the loading,
testing are performed to validate the aging curve assumed for the calculation
Isolator replacement
4. Maintenance
SILER - Training course on seismic protection of lead-cooled reactors – Verona (Italy) – May 21-25, 2012
45. ReplacementThe demonstration of the feasability of a replacement was part of the safety issues:
CRUAS lesson learnt: Bearing has been extracted from Cruas NPP in 1990 Civil works which need to destroy the top pedestal concrete
RJH/ITER concept Possibility to remove / change one isolator Method statement Load transfer Removal of the non-shrinkage mortar underneath the isolator Inflate and inject the flat jack
Before: fused mortar After: flat jack injected
Le Groupe NuviaSeismic isolation 1Présentation de SalvaremState of the art 2ActivitésIssues to be addressed 3Gamme de produitsDesign & safety 4Exemples de projetsIndustrialization 5
SILER - Training course on seismic protection of lead-cooled reactors – Verona (Italy) – May 21-25, 2012
Exemples de projetsInstallation on-site 6
SILER - Training course on seismic protection of lead-cooled reactors – Verona (Italy) – May 21-25, 2012
EN standards require I.T.T (Initial Type Tests) i.e qualification of the isolators regarding different issues.
For JHR/ITER Project, test plan with parametric studies (> 1000 tests) during 2006-2008 in collaboration with French Safety authorities and CEA (French Nuclear Agency)
Mechanical properties variation studies (stiffness, damping) versus:
Solicitation parameters: frequency, distortion, creeping
Size of the sample: full scale test and samples (even sample location)
ageing: accelerated ageing (18 months equivalent to 70 years)
51. Qualification
SILER - Training course on seismic protection of lead-cooled reactors – Verona (Italy) – May 21-25, 2012
Elastomeric Vulcanizing agent
Plasticizer Adds
Mixing
Raw materials mixed
Confection
Vulcanizing
Plates preparation
Plates Bonding agent
Plates prepared
Finishing Works
Calendaring
Protection
52. Manufacturing
SILER - Training course on seismic protection of lead-cooled reactors – Verona (Italy) – May 21-25, 2012
The manufacturing process need to be control and assess according to nuclear safety issues which need the definition of quality related activities
Important process points are identified and checked at each steps and are part of the QA process :Follow-up documents filledTests performed (rheology on mixture, mechanical properties of mixture samples…)Measurements (thickness, mass, pressure and temperature of the press…)Monitoring (thermal gage inside each bearing)
3. QA & QC on factory 5
SILER - Training course on seismic protection of lead-cooled reactors – Verona (Italy) – May 21-25, 2012
Tests are realized to control the fabrication deviation.
The key issue is related to the control frequency i.e test numbers and distribution that have huge impact on the project schedule.
For JHR/ITER, number of tests are sometimes higher than the EN standard but sometimes lower
The following tests are done :Compression tests (static & dynamic)
Shear tests (static & dynamic)
Shear adhesion tests
54. Production Tests
Le Groupe NuviaSeismic isolation 1Présentation de SalvaremState of the art 2ActivitésIssues to be addressed 3Gamme de produitsDesign & safety 4Exemples de projetsIndustrialization 5
SILER - Training course on seismic protection of lead-cooled reactors – Verona (Italy) – May 21-25, 2012
Exemples de projetsInstallation on-site 6
SILER - Training course on seismic protection of lead-cooled reactors – Verona (Italy) – May 21-25, 2012
Jules Horowitz Reactor (JHR) / ITERContext
Installation requirements (mechanical tolerances vs civil works !)Flatness tolerances : < 0,1% (i.e. < 1mm/m) due to strong ratio vertical stiffness / horizontal stiffness
Void ratio criteria under steel plate : < 5%
+ =Grouted bearingConcrete pier C40/50
13001300
Elastomeric bearing + plates S355(1,5 T)
1100 1100
51. On-site installation requirements
SILER - Training course on seismic protection of lead-cooled reactors – Verona (Italy) – May 21-25, 2012
Jules Horowitz Reactor (JHR) / ITER
On work-shop (constant height and parallelism):Monolithic sandwich assembly (same height)
Injection of a mortar (removable layer for replacement operations)
Tests on mortar (rheology, compression)
Follow-up documents filled
2. Pre-assembly on workshop 3
SILER - Training course on seismic protection of lead-cooled reactors – Verona (Italy) – May 21-25, 2012
STEP 1 : Bearing installation
Flatness setting by the mean of 3 adjustable supports
Shuttering top of the pier
STEP 2 : 1st stage grouting (studs sealing)
Pouring of self-compacting concrete on 20cm (Foreva Premix C500®)
Flatness control before concrete hardening
STEP 3 : 2nd stage grouting
Pouring of non shrink mortar on 3cm (« Gravity Wave »)
Removing of forms and concrete finishing
5Jules Horowitz Reactor (RJH) / ITER
Innovated solution : 2 stages grouting (decoupling flatness and void requirements)
3. Installation on site
SILER - Training course on seismic protection of lead-cooled reactors – Verona (Italy) – May 21-25, 2012
System installation Filling of the pocket with mortar
Non shrink mortarPEHD Pocket
Hot string
Foreva Premix C500 N
Homogeneous mortar
Bursting of the pocket by PEHD melting
5Jules Horowitz Reactor (RJH)
Focus on the « gravity wave » solution : gravity and laminar mortar flow
3. Installation on site
SILER - Training course on seismic protection of lead-cooled reactors – Verona (Italy) – May 21-25, 2012
54. Full-scale mock-up
SILER - Training course on seismic protection of lead-cooled reactors – Verona (Italy) – May 21-25, 2012
55. QA & QC on site
SILER - Training course on seismic protection of lead-cooled reactors – Verona (Italy) – May 21-25, 2012
56. Interface with othersInterface with Main Contractor in charge of the civil structure:
Casting method for lower raft and upper raft could interfere with the installation on the isolators (method statement sequence)
Interruption of the erection for installation of the isolators for the Main Contractor
Connection interface (reinforcement layout / studs)
Services interface: Handling system for installation Storage of goods (pre fabrication and anticipation of the production)
SILER - Training course on seismic protection of lead-cooled reactors – Verona (Italy) – May 21-25, 2012
5Jules Horowitz Reactor (RJH)
7. JHR pictures
SILER - Training course on seismic protection of lead-cooled reactors – Verona (Italy) – May 21-25, 2012
5International Thermonuclear Experimental Reactor (ITER)
8. ITER pictures
Présentation Nuvia Travaux SpéciauxSILER - Training course on seismic protection of lead-cooled reactors – Verona (Italy) – May 21-25, 2012
New Build & Decommissioning DepartmentSébastien DIAZ92 cours Vitton69006 Lyon