    Year Development

    1910 Electricity Act 1910

    1948 Electricity Supply Act 1910

    1950 SEB formation1951 CEA established as a part-

    time body

    1975 CEA established as a full-time body

    1996 First SERC was formed in

    the state of Orissa

    1998 Electricity RegulatoryCommission Act 1998

  • 7/28/2019 Npp Mnit 22Dec2011

    6/34

    2001 Energy conservationc

    2002 The bureau of EnerEfficiency

    2005 NEP, Appellate

    Tribunal for Electricity

  • 7/28/2019 Npp Mnit 22Dec2011

    7/34

    -POC and PX

  • 7/28/2019 Npp Mnit 22Dec2011

    8/34

    Electricit Act 2003

    It facilitates investment by creating competitive environment and reformingdistribution segment of power industry

    Entry barriers removed/reduced

    No license required for generation

    Freedom to captive generation including group captives

    Recognizing trading as an independent activity

    Open access in transmission already in place Open access to consumers above 1 MW within five years commencing from 27th

    J an 2004 (date of enforcement of amendment of Electricity act)

    Multiple licenses permitted in same distribution areaRegulatory Commissions-to fix tariff and to regulate

  • 7/28/2019 Npp Mnit 22Dec2011

    9/34

    Objective

    Mainly to develop an efficient pricing algorithm fortransmission/distribution use of system charges toencoura e erturbation of new industrial loads andgenerations.

  • 7/28/2019 Npp Mnit 22Dec2011

    10/34

    Vision

    To provide technical inputs and develop models in the area

    Central Electricity Regulatory Commission (CERC)

    State Electricity Regulatory Commission (SERC)

  • 7/28/2019 Npp Mnit 22Dec2011

    11/34

  • 7/28/2019 Npp Mnit 22Dec2011

    12/34

  • 7/28/2019 Npp Mnit 22Dec2011

    13/34

    Network Pricing Issues

    --

    Cost Allocation -- Technical Issue

    Revenue Reconciliation -- Regulatory Issue

  • 7/28/2019 Npp Mnit 22Dec2011

    14/34

    Network Cost Evaluation (Tariff)

    CAPITAL COST OF THE PROJ ECT : Rs 100 CrsLOAN : Rs 70 CrsEQUITY : Rs 30 CrsRATE OF INTEREST ON LOAN : 8% PA

    Tariff P/AIOL (Interest on loan) : 70 x 0.08 = 5.60 CrsROE (Return on e uit ) : 30 x 0.14 = 4.20 CrsDEPRECIATION : 100 x 0.0297 = 2.97 CrsO & M : 276 x 0.227 = 62.65 Lakhs

    (for 276 ckt kms Line): 2 x 28.12 = 56.24 Lakhs ( for 2 bays)TOTAL O&M : 62.65+56.24 = 118.89 LAKHS = 1.19 CrsIOWC(Interest on Working Capital) : 10%WC : 3.42 Crsi) Two months receivables : 2.32 Crs

    ii)ii) One month O&M : 0.10 Crsiii)iii) 1% of capital cost as spares: 1.00 CrsIOWC : 3.42 x .10 = 0.34 CrsAAD(Annual average damage) : 5.83 -2.97= 2.86 CrsRepayment of loan @ 5.83 Crs per annum in 12 yrs

    TOTAL ANNUAL TARIFF : =17.16 Crs

  • 7/28/2019 Npp Mnit 22Dec2011

    15/34

  • 7/28/2019 Npp Mnit 22Dec2011

    16/34

    Entry & Exit Charges

    Entry Charges for Generators, Exit Charges forLoad

    Varies With System Voltage Levels Between Entry& Exit Points

  • 7/28/2019 Npp Mnit 22Dec2011

    17/34

    Common Service Charges

    Asset Related Costs & Services Ensuring Integrityof Network & Benefiting All

  • 7/28/2019 Npp Mnit 22Dec2011

    18/34

    Network Use of System Charges

    Return on Capital Value of Network

  • 7/28/2019 Npp Mnit 22Dec2011

    19/34

    Pricing Methodologies

    PSM (Postage Stamp Method)

    DRM (Distribution Reinforcement Model)

  • 7/28/2019 Npp Mnit 22Dec2011

    20/34

  • 7/28/2019 Npp Mnit 22Dec2011

    21/34

    PpeakTCRt *=

    Rt=transmission price for load t

    Pt= peak power of load t

    Ppeak= system peak power

  • 7/28/2019 Npp Mnit 22Dec2011

    22/34

    DRM (Distribution Reinforcement Model)

  • 7/28/2019 Npp Mnit 22Dec2011

    23/34

  • 7/28/2019 Npp Mnit 22Dec2011

    24/34

    ong un are ncrementa ost

    a new shared and back to future methodology

  • 7/28/2019 Npp Mnit 22Dec2011

    25/34

    From

    Bus

    To

    Bus Xfrmr MW From Mvar From

    MVA

    From Lim MVA

    % of MVA

    Limit (Max) MW Loss Mvar Loss

    1 5 Yes 394.8 114.3 411 600 68.5 2.53 33.79

    4 2 No 303.7 121.5 327.1 1200 27.3 11.84 -17.57

    5 2 No 525.7 263 587.8 1200 49 17.5 122.13

    3 4 Yes 440 297.5 531.1 1000 53.1 1.92 25.59

    5 4 No -133.4 -182.5 226.1 1200 18.8 1.04 -32.18

  • 7/28/2019 Npp Mnit 22Dec2011

    26/34

    Future Scope

  • 7/28/2019 Npp Mnit 22Dec2011

    27/34

    Future Scope

  • 7/28/2019 Npp Mnit 22Dec2011

    28/34

  • 7/28/2019 Npp Mnit 22Dec2011

    29/34

    CAPACITY=1MVA

    GSP

    LOAD

    GSPGSPGSP

    CAPACITY=1MVAREAL POWER=1MW

    LOAD(1+j0)MVA

    CAPACITY=1MVAREAL POWER=0.8MW

    LOAD(0.8+j0.6)MVA

    CAPACITY=1MVAREAL POWER=0.6MW

    LOAD(0.6+j0.8)MVA

  • 7/28/2019 Npp Mnit 22Dec2011

    30/34

    sin

    Q

    cosP

    Q

  • 7/28/2019 Npp Mnit 22Dec2011

    31/34

    Price Elasticity

  • 7/28/2019 Npp Mnit 22Dec2011

    32/34

    ICRP Charging Model

  • 7/28/2019 Npp Mnit 22Dec2011

    33/34

    Framework

  • 7/28/2019 Npp Mnit 22Dec2011