MSIT Office 365 Migration
Phase I - Extranet
1
Seattle Dublin
Singapore
23.38 TB121,907 Sites
269,862 Sub-
sites
5.38 TB36,716 Sites
66,670 Sub-
sites
7.65 TB41,064 Sites
96,184 Sub-sites36.41 TB( 36,140,018 MB )
199,687 Sites
432,716 Sub-
sites
64%21%
15%
SharePoint
UtilityCustom Portals &
Applications
Cost Savings
• Less infrastructure to maintain
• No more SharePoint upgrades
• HA and DR built into the service
• Lower cost per user
User Benefits
• Social collaboration
• SkyDrive Pro
• Access to corporate SharePoint resources
regardless of location or device
• Enabler of MSIT’s Consumerization of IT strategy
Why the Cloud?
"Each Microsoft product group is moving to the cloud as a fundamental business platform.”
-Microsoft Build, 2011
“This is the bet for the company. For the cloud, we’re all in”
-University of Washington, 2010
MSIT should have the goal of "making the cloud the center of our IT development and planning process."
-Memo 2011
BackupsBackupsSourceDB
BackupUpgradeDB
Backup BackupsUpload Target
MSIT Data Center
40 GB/hour
v14 v15 v15DBs
Incremental Sync
Read/Write
Database Backup & Restore
• Two concepts
• Fly all databases to SPO datacenter and restore
• Longer read only window, done in one fell swoop
• Break into batches
• Sites stay in Read/Write while db’s flown over
• Sites locked when incremental updates flown over following weekend
• Limits Read Only window to 72 hours; weekend maintenance windows
Attach,
Fix Links, Scrub
Perms,
Delete Deferred
DB
Restore
Scrub
Customizations
BackupsBackupsSourceSite
BackupUpgradeMirror BackupsUpload BackupsBackupsBackups Target
Site
Restore
MSIT Data Center
Site Collection Backup/Restore :
• Granularity to keep the read/only window ~ 24 hours, enabled weekday execution
• Site Restore triggers the link fix-up we need to move the host name
• ~ 200 GB or ~1000 sites per day (whichever comes first)
• Requires two staging environments, very manual
40 GB/hour
v14 v15 v15
Read Only
Scrub
IdentityScrub
Customizations
MSIT Site
CollectionFull Migration Office365
MSITOffice 365
(Datacenter)
Migration
ToolRead/Write
Third-party tool migration process:
• Perform full migration using migration tool.
• Once full migration complete, reminder to site owner of pending
site collection move
• Start incremental migrations to run continuously until move cut-
over window =<48 hours
• Sites set to Read Only, final incremental completed
• On-premise sites locked, redirected to SharePoint Online
• Completion mail sent to site owner
Read Only
Incremental Migration
Site Lock
Scenario Recommendation
http://technet.microsoft.com/en-us/library/jj838715.aspx