HOW LOCAL UPGRADE APPROVALS & VARIANCES ARE HANDLED UNDER TITLE 5
Claire A. Golden, EEIV, MassDEP
MEHA
On-site Wastewater for Local Environmental Health Officials
March 11, 2015
![Page 2: HOW LOCAL UPGRADE APPROVALS & VARIANCES ARE …€¦ · variances •Specifically eliminates new construction (including increased in flow) from LUA and requires variance (see 310](https://reader037.fdocuments.in/reader037/viewer/2022090607/605c9ff552d71b0cb60b2ee1/html5/thumbnails/2.jpg)
DISCUSSION POINTS
• Regulations
• Process
• Title 5 Compliance
• Maximum Feasible Compliance & Local Upgrade Approvals
• Variances
• Appeals
• Closing Remarks
![Page 3: HOW LOCAL UPGRADE APPROVALS & VARIANCES ARE …€¦ · variances •Specifically eliminates new construction (including increased in flow) from LUA and requires variance (see 310](https://reader037.fdocuments.in/reader037/viewer/2022090607/605c9ff552d71b0cb60b2ee1/html5/thumbnails/3.jpg)
REGULATIONS • Provides the framework for how to review/process LUA and variances
• Specifically eliminates new construction (including increased in flow) from LUA and requires variance (see 310 CRM 15.402(2)
• Maximum feasible compliance
• Contents of LUA
SUBPART E: PROCEDURES FOR SEEKING AND RECEIVING LOCAL UPGRADE APPROVALS AND VARIANCES FROM THE PROVISIONS OF SUBPARTS B AND C OF 310 CMR 15.00
310 CMR 15.401 - 310 CMR 1.5422
![Page 4: HOW LOCAL UPGRADE APPROVALS & VARIANCES ARE …€¦ · variances •Specifically eliminates new construction (including increased in flow) from LUA and requires variance (see 310](https://reader037.fdocuments.in/reader037/viewer/2022090607/605c9ff552d71b0cb60b2ee1/html5/thumbnails/4.jpg)
DESIGN PLANSUBMITTED
T5 COMPLIANCE?
YESNO
NEWCONSTRUCTION?
YES
VARIANCE
DECISION
LUA?
NO
NO
YES
VARIANCEDECISION
DECISION
DECISION
![Page 5: HOW LOCAL UPGRADE APPROVALS & VARIANCES ARE …€¦ · variances •Specifically eliminates new construction (including increased in flow) from LUA and requires variance (see 310](https://reader037.fdocuments.in/reader037/viewer/2022090607/605c9ff552d71b0cb60b2ee1/html5/thumbnails/5.jpg)
DESIGN PLANSUBMITTED
T5 COMPLIANCE?
FULLY COMPLYING SYSTEM
• 100% SAS – exceptions re: I/As
• 4 or 5 feet to gw
• 4 feet NOPM
• Reserve area, if new construction
• Meets nitrogen loading, if applicable
![Page 6: HOW LOCAL UPGRADE APPROVALS & VARIANCES ARE …€¦ · variances •Specifically eliminates new construction (including increased in flow) from LUA and requires variance (see 310](https://reader037.fdocuments.in/reader037/viewer/2022090607/605c9ff552d71b0cb60b2ee1/html5/thumbnails/6.jpg)
DESIGN PLANSUBMITTED
T5 COMPLIANCE?
YES
DECISION
LOCAL BYLAW/REG
DENIAL
APPROVAL
NO
![Page 7: HOW LOCAL UPGRADE APPROVALS & VARIANCES ARE …€¦ · variances •Specifically eliminates new construction (including increased in flow) from LUA and requires variance (see 310](https://reader037.fdocuments.in/reader037/viewer/2022090607/605c9ff552d71b0cb60b2ee1/html5/thumbnails/7.jpg)
LUA?
NONEW
CONSTRUCTION?
![Page 8: HOW LOCAL UPGRADE APPROVALS & VARIANCES ARE …€¦ · variances •Specifically eliminates new construction (including increased in flow) from LUA and requires variance (see 310](https://reader037.fdocuments.in/reader037/viewer/2022090607/605c9ff552d71b0cb60b2ee1/html5/thumbnails/8.jpg)
MFC & LUA
• Goal is full compliance for upgrades• Fully complying system
• I/A
• Shared system
• Connection to municipal sewer
• If SI failure caused by one component, upgrade component
• If full compliance is not possible, LUA
![Page 9: HOW LOCAL UPGRADE APPROVALS & VARIANCES ARE …€¦ · variances •Specifically eliminates new construction (including increased in flow) from LUA and requires variance (see 310](https://reader037.fdocuments.in/reader037/viewer/2022090607/605c9ff552d71b0cb60b2ee1/html5/thumbnails/9.jpg)
LUA
1. Property line setback*
2. Foundation, slab, swimming pool setback
3. 25% SAS area reduction;
4. If in Zone II or 100 feet of private well, relocation of the well
5. BVW setback
6. Various wetland resource areas
7. Water supply setback (line, well and surface WS/tributary)
8. Depth to groundwater**
Compliance must not be feasible [310 CMR 15.404(1)and 15.405(1)].
Best feasible upgrade.
Protection of water resources and treatment of the sewage should be emphasized.
Reductions are in the order they are to be considered.
* Notification to affected abutter(s), if
applicable, is required.
** Pre-conditions must be met.
![Page 10: HOW LOCAL UPGRADE APPROVALS & VARIANCES ARE …€¦ · variances •Specifically eliminates new construction (including increased in flow) from LUA and requires variance (see 310](https://reader037.fdocuments.in/reader037/viewer/2022090607/605c9ff552d71b0cb60b2ee1/html5/thumbnails/10.jpg)
DEPTH TO GW LUA
ALLOWANCES
• For slower than 2 mpi soils, gw separation may be reduced from 4 feet to 5 feet provided….
• For faster than 2 mpi soils, gw separation may be reduced from 5 feet to 4 feet provided….
CONDITIONS
• A SE who is a member or agent of BOH determines ESHWL.
• The allowances are maintained.
• Existing system is failed or non-conforming with design flow < 2,000 gpd.
• No increase in design flow.
• No reduction in SAS area, setbacks to wells, BVS, wetland resource areas, PWS, surface water supplies, etc.
![Page 11: HOW LOCAL UPGRADE APPROVALS & VARIANCES ARE …€¦ · variances •Specifically eliminates new construction (including increased in flow) from LUA and requires variance (see 310](https://reader037.fdocuments.in/reader037/viewer/2022090607/605c9ff552d71b0cb60b2ee1/html5/thumbnails/11.jpg)
LUA?
NONEW
CONSTRUCTION?
YES
DECISION
![Page 12: HOW LOCAL UPGRADE APPROVALS & VARIANCES ARE …€¦ · variances •Specifically eliminates new construction (including increased in flow) from LUA and requires variance (see 310](https://reader037.fdocuments.in/reader037/viewer/2022090607/605c9ff552d71b0cb60b2ee1/html5/thumbnails/12.jpg)
LUA?
NO
YES
DECISION
NO
VARIANCE?
![Page 13: HOW LOCAL UPGRADE APPROVALS & VARIANCES ARE …€¦ · variances •Specifically eliminates new construction (including increased in flow) from LUA and requires variance (see 310](https://reader037.fdocuments.in/reader037/viewer/2022090607/605c9ff552d71b0cb60b2ee1/html5/thumbnails/13.jpg)
DESIGN PLANSUBMITTED
T5 COMPLIANCE?
YESNO
NEWCONSTRUCTION?
YES
VARIANCE
DECISION
LUA?
NO
NO
YES
VARIANCEDECISION
DECISION
DECISION
YES
DECISION
![Page 14: HOW LOCAL UPGRADE APPROVALS & VARIANCES ARE …€¦ · variances •Specifically eliminates new construction (including increased in flow) from LUA and requires variance (see 310](https://reader037.fdocuments.in/reader037/viewer/2022090607/605c9ff552d71b0cb60b2ee1/html5/thumbnails/14.jpg)
VARIANCES
• Standards of Review:
• Upgrades/Repairs
• New Construction
• Schools – still handled by MassDEP
• Process
• Conditioning of Variances
• Variance Prohibition – 4 feet NOPM
• Prohibited for new construction
• Permitted for upgrades/repairs with conditions
![Page 15: HOW LOCAL UPGRADE APPROVALS & VARIANCES ARE …€¦ · variances •Specifically eliminates new construction (including increased in flow) from LUA and requires variance (see 310](https://reader037.fdocuments.in/reader037/viewer/2022090607/605c9ff552d71b0cb60b2ee1/html5/thumbnails/15.jpg)
STANDARDS OF REVIEW
• Upgrades/Repairs [310 CMR 15.410(1)]
• Proponent establishes that enforcement of the provision from which variance is sought would be manifestly unjust;
• Equivalent environmental protection is provided without strict enforcement of the provision from which variance is sought.
• New Construction [310 CMR 15.410(2)]
• Same as for upgrades/repairs PLUS
• Manifest unjust proof must include a demonstration that enforcement of the provision from which variance is sought would deny the proponent of substantially all beneficial use of the property
• Schools – still handled by MassDEP [310 MCR 15.416]
![Page 16: HOW LOCAL UPGRADE APPROVALS & VARIANCES ARE …€¦ · variances •Specifically eliminates new construction (including increased in flow) from LUA and requires variance (see 310](https://reader037.fdocuments.in/reader037/viewer/2022090607/605c9ff552d71b0cb60b2ee1/html5/thumbnails/16.jpg)
PROCESS AND CONDITIONS
• Process
• Notification to abutters
• Public hearing
• Decision
• Approval
• Denial
• Conditions
• Monitoring and reporting
• Deed recording
• Financial assurances
• Anything else necessary to protect public health safety and the environment
![Page 17: HOW LOCAL UPGRADE APPROVALS & VARIANCES ARE …€¦ · variances •Specifically eliminates new construction (including increased in flow) from LUA and requires variance (see 310](https://reader037.fdocuments.in/reader037/viewer/2022090607/605c9ff552d71b0cb60b2ee1/html5/thumbnails/17.jpg)
VARIANCE PROHIBITION
• Variance Prohibition – 4 feet NOPM
• Prohibited for new construction
• Permitted for upgrades/repairs with conditions
![Page 18: HOW LOCAL UPGRADE APPROVALS & VARIANCES ARE …€¦ · variances •Specifically eliminates new construction (including increased in flow) from LUA and requires variance (see 310](https://reader037.fdocuments.in/reader037/viewer/2022090607/605c9ff552d71b0cb60b2ee1/html5/thumbnails/18.jpg)
•
DESIGN PLANSUBMITTED
T5 COMPLIANCE?
YESNO
NEW
CONSTRUCTION?
YES
VARIANCE
DECISION
LUA?
NO
NO
YES
VARIANCEDECISION
DECISION
DECISION
LOCAL BYLAW/REG
DENIAL
![Page 19: HOW LOCAL UPGRADE APPROVALS & VARIANCES ARE …€¦ · variances •Specifically eliminates new construction (including increased in flow) from LUA and requires variance (see 310](https://reader037.fdocuments.in/reader037/viewer/2022090607/605c9ff552d71b0cb60b2ee1/html5/thumbnails/19.jpg)
APPEALSAny person aggrieved by any order, variance, issuance or denial of a Disposal System Construction Permit, Local upgrade approval or Certificate of compliance may appeal to a court of competent jurisdiction as provided for by he laws of the Commonwealth.
310 CMR 15.421
![Page 20: HOW LOCAL UPGRADE APPROVALS & VARIANCES ARE …€¦ · variances •Specifically eliminates new construction (including increased in flow) from LUA and requires variance (see 310](https://reader037.fdocuments.in/reader037/viewer/2022090607/605c9ff552d71b0cb60b2ee1/html5/thumbnails/20.jpg)
![Page 21: HOW LOCAL UPGRADE APPROVALS & VARIANCES ARE …€¦ · variances •Specifically eliminates new construction (including increased in flow) from LUA and requires variance (see 310](https://reader037.fdocuments.in/reader037/viewer/2022090607/605c9ff552d71b0cb60b2ee1/html5/thumbnails/21.jpg)
•
MassDEP Contacts
CERO
David Boyer
508-767-2823
NERO
Claire Golden
978-694-3244
Wastewater Info Line
978-694-3215
SERO
Brian Dudley (Cape Office)
781-946-2814
Brett Rowe (Lakeville Office)
781-946-2754
WERO
Paul Nietupski
413-755-2218
![Page 22: HOW LOCAL UPGRADE APPROVALS & VARIANCES ARE …€¦ · variances •Specifically eliminates new construction (including increased in flow) from LUA and requires variance (see 310](https://reader037.fdocuments.in/reader037/viewer/2022090607/605c9ff552d71b0cb60b2ee1/html5/thumbnails/22.jpg)
THANK YOU