BILL OF ENGINEERING MEASUREMENT& EVALUATION PROJECT TITLE:-RELOCATION OF 2N0.LOW TENSION CONCRETE POLES S/NO DESCRIPTIONS QTY UNIT RATE TOTAL A POLES/FITTINGS& ACCESSORIES 1 8.3M LOW TENSION REIN-FORCED CONCRETE POLE 1 NO 20000.00 20000.00 2 D IRON COMPLETE WITH SPINDLE[ORIGINAL] 4 NO 350.00 1400.00 3 3 NO 3500.00 10500.00 4 35 MTR. 2800.00 98000.00 5 4 NO. 1500.00 6000.00 6 16.0MM PVC COPPER CABLE [KABEL METAL] 50 MTR. 500.00 25000.00 7 8 MTR. 200.00 1600.00 8 SUNDRY ITEMS SHALL INCLUDE BOLT AND NUTS ETC LOT SUM 10000.00 10000.00 9 225X 150MM PLASTIC ADAPTABLE BOX 1 NO. 1500.00 1500.00 SUB TOTAL[1-9] _ _ _ 174000.00 LABOUR/HIRING OF HIAB _ _ _ 115000.00 GRAND TOTAL _ _ _ 289000.00 COMPLETE STAY SHALL INCLUDE STAY WIRE ,STAY BLOCK ,STAY INSULATORS ETC 4X16.0MM PVC /SWA/PVC ARMOURED CABLE IN 50MM DIAM.UPVC PIPE[NIGERCHIN] 50MM DIAM.BI-METAL LINE TAP COMPLETE WITH ALL INSTALLATION ACCESSORIES 50X50MM PVC TRUNKING PIPES WITH ALL THE NECESSARY FIXING ACCESSORIES

description

doc

Transcript of Hos

Page 1: Hos

BILL OF ENGINEERING MEASUREMENT& EVALUATION

PROJECT TITLE:-RELOCATION OF 2N0.LOW TENSION CONCRETE POLES

S/NO DESCRIPTIONS QTY UNIT RATE TOTAL

A POLES/FITTINGS& ACCESSORIES

1 1 NO 20000.00 20000.00

2 D IRON COMPLETE WITH SPINDLE[ORIGINAL] 4 NO 350.00 1400.00

3 3 NO 3500.00 10500.00

4 35 MTR. 2800.00 98000.00

5 4 NO. 1500.00 6000.00

6 16.0MM PVC COPPER CABLE [KABEL METAL] 50 MTR. 500.00 25000.00

7 8 MTR. 200.00 1600.00

8 LOT SUM 10000.00 10000.00

9 225X 150MM PLASTIC ADAPTABLE BOX 1 NO. 1500.00 1500.00

SUB TOTAL[1-9] _ _ _ 174000.00

LABOUR/HIRING OF HIAB _ _ _ 115000.00

GRAND TOTAL _ _ _ 289000.00

8.3M LOW TENSION REIN-FORCED CONCRETE POLE

COMPLETE STAY SHALL INCLUDE STAY WIRE ,STAY BLOCK ,STAY INSULATORS ETC

4X16.0MM PVC /SWA/PVC ARMOURED CABLE IN 50MM DIAM.UPVC PIPE[NIGERCHIN]

50MM DIAM.BI-METAL LINE TAP COMPLETE WITH ALL INSTALLATION ACCESSORIES

50X50MM PVC TRUNKING PIPES WITH ALL THE NECESSARY FIXING ACCESSORIES

SUNDRY ITEMS SHALL INCLUDE BOLT AND NUTS ETC