History PSI-WS7 has its origins 20 years ago in the Western Canadian Sedimentary Basin. This...
-
Upload
miles-wilkins -
Category
Documents
-
view
226 -
download
12
Transcript of History PSI-WS7 has its origins 20 years ago in the Western Canadian Sedimentary Basin. This...
History
PSI-WS7 has its origins 20 years ago in the Western Canadian
Sedimentary Basin. This development was a new approach to
dealing with the heavy paraffin waxes and asphaltenes present
in those limestone, shale and sandstone formations. The product
has now been refined and has built on those early successes
with current activity in the Middle East, backed up with
independent third party verification.
Services with PSI-WS7
Equipment cleaning Crude tank cleaning
Demulsifying Pit Cleaning
Services with PSI-WS7
Well stimulation Hot oil services
Services with PSI-WS7
Chemical injection
Services with PSI-WS7
• Paraffin and asphaltene wax formation • Pipeline plugging or restrictions• Corrosion of pipeline, tanks and equipment • Wax build up in pipeline or plant facilities• Scaling and emulsions
• Difficulties in removing H2S
• Excessive pressure, reduced volumes• Low productivity• High maintenance costs
Common problems
•PSI-WS7 is a charge soap or an anionic surfactant
•It has an affinity for any positively charged carbon or stainless steel surface, where it is drawn to the steel it forms a protective barrier film
•Typically, results can vary depending on
project but can be as short as 24 hours
What is PSI-WS7?
Features of PSI-WS7
• Single product – multi purpose surfactant• Corrosion control and prevention• Paraffin/asphaltene control and prevention (incl. crystalline wax)• Drag reducer• Cleans pipe lines, pumps, valves and equipment• Cleans tanks and facilities• Chemical injection services• Well stimulation and work over• Emulsion control and breaking• Reduces maintenance down time
• Single product corrosion and wax inhibitor
• Solution drops out into the water and is water soluble
• Environmentally friendly and safe to administer
• Effective for onshore/offshore operations• Cost effective and in most cases can reduce overall
costs of chemical program
Benefits of using PSI-WS7
•Pipeline dimensions•Product being transported•Flow rates•Gas and oil analysis•Facility size•Availability of injection points, pumps•Services available: power, water, workforce camp•Brief history of identified problems•Specifications of equipment related to problem
Application considerations for PSI-WS7
Application benefits of PSI-WS7• No limiting or restricting flow during injection
process
• PSI-WS7 works quickly giving improved performance of valves, instrumentation and plant efficiency
• Results often seen in just 24 hours:• sales tanks cleaned• flare tanks cleaned• process vessels and lines cleaned• clean and clear separation of water
12” in-field pipe line (Bukha) pig returns
Field performance of PSI-WS7
after 9 months with market leader’s inhibitor 6 months later with PSI-WS7
16” export pipe line (Bukha) pig returns
after 9 months with market leader’s inhibitor 6 months later with PSI-WS7
Field performance of PSI-WS7
Pigging with confidence! One year earlier, this pipeline was 100% plugged with wax and suffering from corrosion. They now have a 0% BSW and visible results.
Field performance of PSI-WS7
Thermal image of a 300,000 BBL tank BEFORE cleaning
Field performance of PSI-WS7
Thermal image of a 300,000 BBL tank AFTER cleaning
There was zero entry into the tank and all but the in-organics were recovered, shipped and sold with zero downtime, while dropping the emulsions to zero and shipping 30,000 recovered barrels of oil!
Field performance of PSI-WS7
Field performance of PSI-WS7Increased production Farha South field (Oman)
Pre treatment
Post treatment with PSI-WS7 BPD increase
% improvement
Well FS-31 296 461 165 156%
Well FS-42 33 227.7 194.7 690%
Well FS-56 77 336.1 259.1 436%
Total 406 1025 619 252%
An increase of 619 BPD, which at $100 per barrel = more than $22,000,000 pa increased revenue
Payback was 48 hours in this application
Laboratory tests by Intertek CAPCIS - Wax InhibitionCoaxial Shear Test Method
PSI WS-7 @ 220ppm 85% Inhibition
Leading Competitor @ 500ppm 44% Inhibition
Cold Finger Test
PSI WS-7 @ 220ppm 80% Inhibition
Performance verification of PSI-WS7
Laboratory tests by Intertek CAPCIS - Corrosion InhibitionRotary Cage Autoclave
Welded and Parent metal coupon average weight loss calculated to corrosion rate over one year
Performance verification of PSI-WS7
Target reasonable rate (ref:NORSOK M-001) <0.10 mm/yr
Leading market competitor @ 220ppm >10.00 mm/yr
PSI-WS7@ 220ppm 0.07 mm/yr
Performance verification of PSI-WS7
Performance verification of PSI-WS7
Performance verification of PSI-WS7
Performance verification of PSI-WS7
Figure 1 – Results of emulsion separation at 38 °C with no PSI‐WS7. Separation time is the time after turning off the mixing, i.e. 5 minutes means it has been five minutes since mixing was stopped.
Performance verification of PSI-WS7
Figure 1 – Results of emulsion separation at 38 °C with 300 ppm PSI‐WS7. Separation time is the time after turning off the mixing, i.e. 5 minutes means it has been five minutes since mixing was stopped.
Performance verification of PSI-WS7
Thank you
For information please contactBrenitech Oil Services
Sales and Service
Phone : (+968) 9803 0007 / 9803 0006
Email: [email protected]