Connected Buildings
Case Study
HILTON STRASBOURG RETROFITSignificant energy and cost reductions - all paid for within one year
Client’s expectations• Reinforce Hilton’s commitment to the
environment by reducing energy usage.
• Generate financial savings to reinvest in
additional system improvements and to
contribute to the bottom line.
• Fast return on investment to facilitate the
speedy implementation of further energy
projects.
• Create operational efficiencies by reducing
the workload of major system assets.
• No negative impact on the comfort of guests,
visitors and staff.
Project overview:
Honeywell identified potential savings that could be obtained through greater control of the fresh air provision in the hotel, without any negative impact on the hotel occupants. Fresh air was being constantly heated or cooled and then delivered to all the accommodation, the restaurant and the lobby, even if those areas were not being used.
The proposed retrofit would deliver fresh air only when required to each area and, by doing so, would significantly reduce the energy and the cost associated with that element of the building management system.
The Honeywell offer• IModify the software for the fresh air AHU
controller to add controls for energy savings,
and create a new schedule for week days,
weekends and ‘exception’ days to reduce the
annual workload for the air handling units.
• Install a CO2 sensor, plus inverters on the
supply and exhaust fans, to ensure the
provision of fresh air is linked directly to the
actual occupancy of rooms and areas in the
hotel.
• Reset temperature parameters from
fixed to variable, based on the outdoor air
temperature.
• Provide support to the Hilton when seeking
to obtain Government funding for the project.
The Hilton Strasbourg is an upmarket hotel, located close to the city centre and the European Parliament. Built in 1981, the eight-storey building boasts 245 guest rooms, executive rooms and suites, 14 function rooms, a bar, restaurant, fitness room and 24-hour business centre.
Honeywell Building Solutions installed the hotel’s HVAC equipment and its building management system at the time of its construction, and has been responsible for the maintenance and development of the system since then.
© Honeywell Building Solutions 2017 | Hilton Hotel, Strasbourg, France © Honeywell Building Solutions 2017 | Hilton Hotel, Strasbourg, France
Environmental• Hilton has significantly reduced the amount
of energy needed to heat, cool and distribute
fresh air throughout the hotel by around
904,000 kWh per year, with the equivalent
reduction of greenhouse gases, and
without any negative impact on the hotel’s
operations, staff or guests.
• This substantial saving is a significant
illustration of Hilton’s commitment to
ongoing environmental improvements.
Financial• The reduction in electricity and gas use
following the retrofit is saving over
€39,000 each year. These savings paid for
the project within the first year of operation.
In future years, the savings will effectively
increase, as the cost of energy goes up.
• The excellent ROI has also funded
improvements to the existing building
management system, including fully funding
the replacement of a server and updating
the EBI supervisor software.
• The project was part-financed by
Governmental aid (2%) following a proposal
and support by Honeywell. (document CEE
Bat TH12)
Operational• The retrofit has reduced the workload of the
air handling unit and associated equipment,
which will positively impact on the durability
of these assets and the associated
maintenance programme.
• The EBI supervisor upgrade has enhanced
the system’s operation and is helping Hilton
to identify other energy and cost-saving
opportunities for the hotel.
CLIENTBENEFITS
For more information www.buildingsolutions.honeywell.com
CS | 01 | 02/17 | TM© 2017 Honeywell International Inc.
“Here at Hilton Strasbourg, we pride ourselves on delivering a high quality service to our customers. In Honeywell, we have a long-term provider who shares the same philosophy - in this instance, by proposing and implementing a thoughtful and practical improvement to our building management system. This has provided us with significant immediate benefits, as well as longer-term opportunities for greater savings and to further emphasise our commitment to the environment.”Philippe Dupré, Chief Engineer
Honeywell Building Solutions1985 Douglas Drive North
Golden Valley MN 55422-4386
USA
Honeywell HouseArlington Business Park
Bracknell
United Kingdom RG12 1EB
Phone: +44 (0)3333 455499
www.honeywell.com
Honeywell FranceHoneywell S.A.
Le Gershwin - 1 rue Arnold
Schoenberg
78280 Guyancourt
Honeywell FranceParc Technoland - ZI Champ
Dolin
2 allée du Lazio - Bâtiment 2
69800 Saint Priest
Phone: +33(4)7 87 89 600
Fax: +33(4)7 87 89 629
Honeywell France Strasbourg
Phone: 03 88 65 16 80
Honeywell BelgiqueHoneywell NV
Hermes Plaza
Hermeslaan 1H
B-1831 Diegem
Honeywell LuxembourgHoneywell SA
20 rue de l’Industrie
ZA Wandhaff
L-8399 Windhof
Honeywell SwitzerlandHoneywell AG
Z.A. La Pièce 16
CH-1180 Rolle
Phone: 0041 21 695 3000