    Hydraulics

    for

    OLB

    Prepared by : Asep M. I. Shiddiq

  • 7/30/2019 Hidrolika OLB

    2/48

    Name : Asep M. I. ShiddiqAddress : Komp. Riung Bandung Blok

    IVB No. 168 Bandung.

    HP` : 08156272401

    Institution : Pusdiklat Migas

    Education : Magister of Petroleum

    Engineering ITB

    E-mail : [email protected]

    : [email protected]

  • 7/30/2019 Hidrolika OLB

    3/48

    Objectives :

    a. Detemination of laminar or turbulent flow

    b. Rheological model (newtonian & non-newtonian)

    c. Determination pressure loss in pipe and annulusd. Determination pressure drop across the Bit

    e. Determination HHP, PHP, BHHP, IHP and BHP

  • 7/30/2019 Hidrolika OLB

    4/48

    Mud Flow Rate & Velocity

    Mud Flow rate :t

    VolQ

    Mud velocity :t

    Lv

    Mud Volume : ALVol x

    Substitute Eq. (3) to (1) :

    (1)

    (2)

    (3)

    AxvAxtL

    tALQ )(. (4)

    Average Velocity of

    mud: AQ

    v (5)

  • 7/30/2019 Hidrolika OLB

    5/48

    Velocity inside DP

    Equation in field unit :

    min/52.24

    144

    48.7

    )())(4/(

    )gal/min(2

    2

    2

    3

    22 ftID

    Q

    in

    ft

    gal

    ft

    xinID

    Qv

    dp

    dp

    sec/4085.0sec/60

    152.2422

    ftID

    QxftxID

    Qxvdp

  • 7/30/2019 Hidrolika OLB

    6/48

    Velocity in DP

    Equation in field unit :

    22 )(4085.0

    )(448.2 dpdpdp

    ID

    Qx

    IDx

    Qv

    Where :

    inchDPdiameterInsideIDgpmrateFlowQ

    fpsftDPinvelocityv

    dp

    dp

    ,)(

    sec),/(

  • 7/30/2019 Hidrolika OLB

    7/48

    Velocity in DC

    Equation in field unit :

    22 )(4085.0

    )(448.2 dcdcdc

    ID

    Qx

    IDx

    Qv

    Where :

    inchDCdiameterInsideIDgpmrateFlowQ

    fpsftDCinvelocityv

    dc

    dc

    ,)(

    sec),/(

  • 7/30/2019 Hidrolika OLB

    8/48

    Velocity in Annulus DP&Casing

    Equation in field unit :

    )(4085.0

    )(448.22222/

    dpcdpc

    cdpODID

    Qx

    ODIDx

    Qv

    Where :

    inchDP,diameterOutsideOD

    inchCasing,diameterInsideID(gpm)rateFlowQ

    fps(ft/sec),DCinvelocityv

    dp

    c

    dp/c

  • 7/30/2019 Hidrolika OLB

    9/48

    Velocity in Other Section

    Equation in DP & Open Hole :

    )(4085.0

    )(448.22222/

    dphdph

    hdpODD

    Qx

    ODDx

    Qv

    Equation in DC & Open Hole :

    )(4085.0

    )(448.22222/

    dchdch

    hdcODD

    Qx

    ODDx

    Qv

  • 7/30/2019 Hidrolika OLB

    10/48

    Velocity in Bit Nozzles

    Equation in field unit :

    )(4085.0

    )(448.22

    3

    2

    2

    2

    1

    2

    3

    2

    2

    2

    1 ddd

    Qx

    dddx

    Qvn

    Where :

    inchDiameterd

    inchDiameterd

    inchDiameterdgpmratePumpQ

    fpsftnozzleinvelocityvn

    ,3nozzle

    ,2nozzle

    ,1nozzle)(

    sec),/(

    3

    2

    1

  • 7/30/2019 Hidrolika OLB

    11/48

    Problem

    Data :Pump rate : 250 gpm

    DP : 5 OD, 4.276 ID

    DC : 7 OD, 2,5 ID

    Casing : 9-5/8 OD, 9.083IDHole diameter : 8.5

    Nozzle size : 10x10x11

    Calculate mud velocity:

    a. In the annulus between drill pipe-casing ?b. In the annulus between drill pipe-hole ?

    c. In the annulus between drill collar-hole ?

    d. Nozzle velocity?

  • 7/30/2019 Hidrolika OLB

    12/48

    Continuity Formula

    Equation:

    )()(22

    /

    22

    /

    22

    dphhdpdpccdpdcdcdpdp ODDxvODIDxvIDxvIDxv

    )()(2

    3

    2

    2

    2

    1

    22

    /

    2dddxvODDxvIDxv ndchhdcdpdp

  • 7/30/2019 Hidrolika OLB

    13/48

    Problem

    Data :The velocity in DP is 6 fps

    DP : 5 OD, 4.276 ID

    DC : 7 OD, 2,5 ID

    Casing : 9-5/8 OD, 9.083ID

    Hole diameter : 8.5Nozzle size : 10x10x11

    Calculate mud velocity:

    a. In drill collar?

    b. In the annulus between drill pipe-casing ?

    c. In the annulus between drill pipe-hole ?

    d. In the annulus between drill collar-hole ?

    e. Nozzle velocity?

    f. Mud flow rate?

  • 7/30/2019 Hidrolika OLB

    14/48

    Type of Mud flow

    Laminar flow

    Mud flows parallel or in line with the pipe, regularly and slow. The

    mud velocity in the center of pipe is the highest and near the wall of

    the pipe is slower

  • 7/30/2019 Hidrolika OLB

    15/48

    Type of Mud flow

    Turbulent flow

    the mud flows irregularly and fast. The mud flow in the annulus

    between drill string and open hole must not turbulent. It should

    be laminar flow.

  • 7/30/2019 Hidrolika OLB

    16/48

    Flow Type

  • 7/30/2019 Hidrolika OLB

    17/48

    Type of Mud flow

    In oil well drilling, turbulent flow is to be avoided as far as possible,

    since turbulence can cause :

    Severe hole erosion

    Pressure loss increase with degree of turbulence

    In cementing, turbulence is deliberately initiated to :

    Displace the mud cake from the wall of hole

    Allow the cement to contact the fresh surface of theformation

    This will then result a better cementing job.

  • 7/30/2019 Hidrolika OLB

    18/48

    Determining of mud flow

    To determine the type of mud flow is based on :

    The critical mud velocity.

    If the mud velocity is higher than the its critical mud velocity, the mud flow

    is turbulent. When the mud velocity is slower or equal, the mud flow is

    laminar.

    Vm > Vc Turbulent

    Vm < Vc Laminar

    The Reynold Number.

    Nre < 2100 : Laminer

    Nre > 2100 : Turbulen

  • 7/30/2019 Hidrolika OLB

    19/48

    Critical Mud Velocity

    Critical mud velocity in DP:

    )).((

    ))).(.()(34.12()(078.1))(078.1( 22

    MWID

    YPMWIDPVPV

    dpc dp

    dp

    v

    Where :

    inchDPdiameterinsideID

    ppgweightmudMWftlbyieldmudYP

    cPplasticmudPV

    fpsvelocitymudcriticalv

    dp

    dpc

    ,

    ,100/viscosity,

    viscosity,

    ,

    2

  • 7/30/2019 Hidrolika OLB

    20/48

    Critical Mud Velocity

    Critical mud velocity in DC:

    )).((

    )).(.()(34.12)(078.1)(078.1 22

    MWID

    YPMWIDPVPV

    dcc dc

    dcv

    Where :

    inchDCdiameterinsideID

    ppgweightmudMWftlbyieldmudYP

    cPplasticmudPV

    fpsvelocitymudcriticalv

    dc

    dcc

    ,

    ,

    100/viscosity,

    viscosity,

    ,

    2

  • 7/30/2019 Hidrolika OLB

    21/48

    Critical Mud Velocity

    Critical mud velocity Between DP & casing :

    )).((

    )).(.()(256.9)(078.1)(078.1

    /

    22

    MWODID

    YPMWODIDPVPV

    cdpc dpc

    dpc

    v

    Where :

    inchDPdiameterinsideID

    ppgweightmudMWftlbyieldmudYP

    cPplasticmudPV

    fpsvelocitymudcriticalv

    dp

    cdpc

    ,

    ,100/viscosity,

    viscosity,

    ,

    2

    /

  • 7/30/2019 Hidrolika OLB

    22/48

    Critical Mud Velocity

    Critical mud velocity Between DP & open hole :

    )).((

    )).(.()(256.9)(078.1)(078.1

    /

    22

    MWODD

    YPMWODDPVPV

    hdpc dph

    dph

    v

    Where :

    inchsumurdiameterID

    ppgweightmudMWftlbyieldmudYP

    cPplasticmudPV

    fpsvelocitymudcriticalv

    h

    hdpc

    ,

    ,100/viscosity,

    viscosity,

    ,

    2

    /

  • 7/30/2019 Hidrolika OLB

    23/48

    Critical Mud Velocity

    Critical mud velocity Between DC & open hole :

    )).((

    )).(.()(256.9)(078.1)(078.1

    /

    22

    MWODD

    YPMWODDPVPV

    hdcc dch

    dchv

    Where :

    inchsumurdiameterID

    ppgweightmudMWftlbyieldmudYP

    cPplasticmudPV

    fpsvelocitymudcriticalv

    h

    hdcc

    ,

    ,100/viscosity,

    viscosity,

    ,

    2

    /

  • 7/30/2019 Hidrolika OLB

    24/48

    Variable Reynold Number :

    Pipe diameter

    Density of fluid

    Viscosity of fluid Average flow velocity of fluid

  • 7/30/2019 Hidrolika OLB

    25/48

    Reynold Number

    Note :Nre < 2100 : Laminer

    Nre > 2100 : Turbulen

  • 7/30/2019 Hidrolika OLB

    26/48

    Pressure Loss

    Pressure loss through DP

    Pressure loss through DC

    Pressure loss through annulus between DP open hole

    Pressure loss through annulus between DC open hole

    Pressure loss through annulus between DP casing

    Pressure loss through the bit

    Pressure loss through surface equipment

  • 7/30/2019 Hidrolika OLB

    27/48

    Pressure Loss

  • 7/30/2019 Hidrolika OLB

    28/48

    Pressure loss DP

    Laminar Flow :

    ).(225

    ).(

    ).(1500

    .).(2

    dp

    dp

    dp

    dpdp

    dpID

    LYP

    ID

    VLPVP

    Turbulent Flow :

    )(8.25

    ).(.. 2

    dp

    dpdp

    dpID

    VLMWf

    P

  • 7/30/2019 Hidrolika OLB

    29/48

    Pressure loss DP

    factorfrictionf

    cPityvisplasticPV

    inchDPdiameterInsideID

    fpsvelocitymudv

    ftDPofLengthL

    psiDPlosspressureP

    where

    dp

    dp

    dp

    ,cos

    ,

    ,

    ,

    ,

    :

  • 7/30/2019 Hidrolika OLB

    30/48

    Pressure loss DC

    Laminar Flow :

    ).(225

    ).(

    ).(1500

    .).(2

    dc

    dc

    dc

    dcdcdc

    ID

    LYP

    ID

    VLPVP

    Turbulent Flow :

    )(8.25

    ).(.. 2

    dc

    dcdcdcID

    VLMWfP

  • 7/30/2019 Hidrolika OLB

    31/48

    Pressure loss DC-OH

    Laminar Flow :

    ).(200

    ).(

    ).(1000

    .).(2

    //

    dch

    dc

    dch

    hdcdchdc

    ODD

    LYP

    ODD

    VLPVP

    Turbulent Flow :

    )(8.25

    ).(.. 2

    /

    dch

    dcdchdc

    ODD

    VLMWfP

  • 7/30/2019 Hidrolika OLB

    32/48

    Pressure loss DP-OH

    Laminar Flow :

    ).(200

    ).(

    ).(1000

    .).(2

    /

    /

    dph

    dp

    dph

    hdpdp

    hdp

    ODD

    LYP

    ODD

    VLPVP

    Turbulent Flow :

    )(8.25

    ).(.. 2

    /

    dph

    dpdp

    hdpODD

    VLMWf

    P

  • 7/30/2019 Hidrolika OLB

    33/48

    Pressure loss DP-Casing

    Laminar Flow :

    ).(200

    ).(

    ).(1000

    .).( /2

    //

    /

    dpc

    cdp

    dpc

    cdpcdp

    cdp

    ODD

    LYP

    ODD

    VLPVP

    Turbulent Flow :

    )(8.25

    ).(.. 2///

    dpc

    cdpcdp

    cdpODID

    VLMWf

    P

  • 7/30/2019 Hidrolika OLB

    34/48

    Pressure Loss Across the Bit

    Pressure Loss :

    22

    2

    ).(.12032

    ).(

    CdAn

    QMWPb

    edischoftcoefficienCd

    ppgweightmudMW

    inchnozzlebitareationcrossAn

    gpmrateflowQ

    psibittheacrosslosspressureP

    where

    b

    arg

    ,

    ,sec

    ,

    ,

    :

    2

    % Pressure loss at bit : 50% - 65%

    Flowrate : 30 70 gpm/inc of diamater bit

  • 7/30/2019 Hidrolika OLB

    35/48

    T.F.A Comparison Chart

  • 7/30/2019 Hidrolika OLB

    36/48

    Pressure Loss Through

    Surface Equipment

    Surface equipment :

    Stand pipe

    Rotary Hose

    Swivel

    Kelly

  • 7/30/2019 Hidrolika OLB

    37/48

  • 7/30/2019 Hidrolika OLB

    38/48

    Equivalent Length

    ComponentComb. 1 Comb. 2 Comb. 3 Comb. 4

    ID,in L, ft ID,in L, ft ID,in L, ft ID,in L, ft

    Standpipe 2 40 3.5 40 4 45 4 45

    Rot. Hose 2 45 2.5 55 3 55 3 55

    Swivel 2 4 2.5 5 2.5 5 3 5

    Kelly 2.25 40 3.25 40 3.25 40 4 40

    OD DP, in Equivalent Length, ft

    3.5 437 161

    4.25 761 479 340

    5.0 816 579

  • 7/30/2019 Hidrolika OLB

    39/48

    Equivalent Length

  • 7/30/2019 Hidrolika OLB

    40/48

    Total Pressure Loss

    Total pressure loss :

    bsccdphdphdcdcdp PPPPPPPP ///

    Paracitic pressure loss :

    Pressure loss in the mud circulating equipment without bit

    nozzle pressure loss.

    sccdphdphdcdcdpp PPPPPPP ///

  • 7/30/2019 Hidrolika OLB

    41/48

    Problem

    The data given during circulation with 350 GPM are as follows :

    Pressure loss on the surface line : 25 Psi

    Pressure loss through DP : 300 Psi

    Pressure loss through DC : 100 PsiPressure loss through Bit : 800 Psi

    Pressure loss through DP and DC annulus : 100 Psi

    Hydrostatic prsssure on bottom hole : 3500 Psi

    Calculate :

    The pump pressure ?

  • 7/30/2019 Hidrolika OLB

    42/48

    Hydraulic Optimization

  • 7/30/2019 Hidrolika OLB

    43/48

    Rules of Thumb

  • 7/30/2019 Hidrolika OLB

    44/48

    Thank U...

  • 7/30/2019 Hidrolika OLB

    45/48

  • 7/30/2019 Hidrolika OLB

    46/48

    QUIZ

    Drill pipe 5 OD, 4.275ID 7550 ft. Open hole 8.5. Casing 9-5/8

    OD, 9.1 ID, Velocity through annulus between DP and hole is 3 fps,

    mud viscosity is 30 cP, YP = 8 lb/100ft2 and MW = 11 ppg.

    (friction factor = 0.005)

    Calculate :

    a. Mud velocity in DP ?

    b. Critical velocity in DP?c. Predict the type of flowing in DP?

    d. How much is the pressure loss in the DP?

  • 7/30/2019 Hidrolika OLB

    47/48

    QUIZ

    Drill pipe 5 OD, 4.275ID. Open hole 12.25. Velocity through

    annulus between DP and hole is 3 fps, mud viscosity is 30 cP, YP =

    8 lb/100ft2 and MW = 11 ppg.

    Calculate :

    a. Mud velocity in DP ?

    b. Critical velocity in DP?

    c. Predict the type of flowing in DP?

  • 7/30/2019 Hidrolika OLB

    48/48

    The mud flow rate is 500 gpm. The nozzle size is 11 x 10 x 10, MW

    = 10 ppg, coefficient of discharge = 0.95

    Calculate :

    How much is the pressure losses across the bit nozzle ?

    Note :

    An = total area of three nozzle= 3 x (/4) x (d/32)2 inch2