HERRIMAN CITY PAVEMENT MAINTENANCE PROGRAM

33
HERRIMAN CITY PAVEMENT MAINTENANCE PROGRAM Herriman City Engineering Department

description

Herriman City Engineering Department. HERRIMAN CITY PAVEMENT MAINTENANCE PROGRAM. Introduction. Herriman City has experienced tremendous growth over the last several years Many new subdivisions and associated roads have been constructed in the City. Deterioration. - PowerPoint PPT Presentation

Transcript of HERRIMAN CITY PAVEMENT MAINTENANCE PROGRAM

Page 1: HERRIMAN CITY PAVEMENT MAINTENANCE PROGRAM

HERRIMAN CITYPAVEMENT MAINTENANCE PROGRAM Herriman City

Engineering Department

Page 2: HERRIMAN CITY PAVEMENT MAINTENANCE PROGRAM

Introduction

Herriman City has experienced tremendous growth over the last several years

Many new subdivisions and associated roads have been constructed in the City

Page 3: HERRIMAN CITY PAVEMENT MAINTENANCE PROGRAM

Deterioration

The rapid growth and construction activity has exposed our roads to traffic and heavy loads, which in some cases accelerated the deterioration of our roads

Page 4: HERRIMAN CITY PAVEMENT MAINTENANCE PROGRAM

InventoryCurrently Herriman City has as

an inventory of 17,821,898 SF of asphalt road.

A well implemented preventive Road Maintenance plan is needed to take care of our roads and keep them operative and functional.

Page 5: HERRIMAN CITY PAVEMENT MAINTENANCE PROGRAM

Preventive Maintenance

Preventive Maintenance not reactive maintenance

Deterioration = Life

Very Cost Effective Applicable for all pavements Right treatment, right pavement, right time Importance of life-cycle cost analysis

Page 6: HERRIMAN CITY PAVEMENT MAINTENANCE PROGRAM

Preventive Maintenance

Page 7: HERRIMAN CITY PAVEMENT MAINTENANCE PROGRAM
Page 8: HERRIMAN CITY PAVEMENT MAINTENANCE PROGRAM

Pavement Life Curve

Page 9: HERRIMAN CITY PAVEMENT MAINTENANCE PROGRAM

Starting Early Saves Money

“Every $1 spent in keeping a good road good precludes spending $6-$14 to rebuild one that has deteriorated.”

NowLater

Page 10: HERRIMAN CITY PAVEMENT MAINTENANCE PROGRAM

Asphalt Preservation Treatments

Crack seal Patching Fog seal Chip seal Slurry surfacing Overlay Full Depth reclamation

Page 11: HERRIMAN CITY PAVEMENT MAINTENANCE PROGRAM

HERRIMAN CITY

Primary Road Maintenance Treatments: Crack seal/ Patching/Slurry seal Mill and Overlay Full depth reclamation (FDR)

Dirt Road pavement

Page 12: HERRIMAN CITY PAVEMENT MAINTENANCE PROGRAM

HERRIMAN CITYRoad Maintenance Plan

Page 13: HERRIMAN CITY PAVEMENT MAINTENANCE PROGRAM

Recommended 6 Year Slurry Seal

Maintenance Plan

Click icon to add picture

Page 14: HERRIMAN CITY PAVEMENT MAINTENANCE PROGRAM

Road Maintenance Plan SummarySlurry Seal Projects

Page 15: HERRIMAN CITY PAVEMENT MAINTENANCE PROGRAM

Recommended 6 Year Overlay Maintenance

PlanClick icon to add picture

Page 16: HERRIMAN CITY PAVEMENT MAINTENANCE PROGRAM

Road Maintenance Plan SummaryOverlay Projects

Page 17: HERRIMAN CITY PAVEMENT MAINTENANCE PROGRAM

Recommended 6 Year Full

Depth Reclamation

Click icon to add picture

Page 18: HERRIMAN CITY PAVEMENT MAINTENANCE PROGRAM

Road Maintenance Plan SummaryFull Depth Reclamation

Page 19: HERRIMAN CITY PAVEMENT MAINTENANCE PROGRAM

Recommended 6 Year Dirt

Road Paving Plan

Click icon to add picture

Page 20: HERRIMAN CITY PAVEMENT MAINTENANCE PROGRAM

Road Maintenance Plan SummaryDirt Road Paving Plan

Page 21: HERRIMAN CITY PAVEMENT MAINTENANCE PROGRAM

Road Maintenance

PlanClick icon to add picture

Page 22: HERRIMAN CITY PAVEMENT MAINTENANCE PROGRAM

Road Maintenance - Copper Creek

Areas in red are to be sawcut and repaired

Page 23: HERRIMAN CITY PAVEMENT MAINTENANCE PROGRAM

Emma Mine Road in Copper Creek

Note size of cracks

Cracks sealed 2009 New cracks formed 2010

Page 24: HERRIMAN CITY PAVEMENT MAINTENANCE PROGRAM

Emma Mine and Powder Cove

Cracks sealed 2009 New cracks formed 2010

Page 25: HERRIMAN CITY PAVEMENT MAINTENANCE PROGRAM

Emma Mine Road in Copper Creek

Cracks sealed 2009 New cracks formed 2010

Page 26: HERRIMAN CITY PAVEMENT MAINTENANCE PROGRAM

Copper Creek Road Repair

Cost of repairs this year in Copper Creek

Cost of repairs in 2007: $25,000 Cost of repairs in same area 2010: $230,000 New roads need a timely schedule of regular

maintenance 5-7 years after Initial Construction

Page 27: HERRIMAN CITY PAVEMENT MAINTENANCE PROGRAM

Midas Gold and Claim Staker roads most critical areas

Page 28: HERRIMAN CITY PAVEMENT MAINTENANCE PROGRAM

Midas Gold and Claim Staker Way

Cracks sealed 2009 New cracks formed 2010

Page 29: HERRIMAN CITY PAVEMENT MAINTENANCE PROGRAM

Midas Gold and Claim Staker Way

Cracks sealed last year

New cracks formed this year

Page 30: HERRIMAN CITY PAVEMENT MAINTENANCE PROGRAM

Claim Staker Way and Midas Gold Road

Cost of repairs in 2007: $15,000 Cost of repairs in same area 2010: $175,300 New roads need a timely schedule of regular maintenance

5-7 years after initial Construction

Copper Creek Road Repair

Page 31: HERRIMAN CITY PAVEMENT MAINTENANCE PROGRAM
Page 32: HERRIMAN CITY PAVEMENT MAINTENANCE PROGRAM

2011 2013 2015 2017 2027 2029 20312019 2021 2023 2025

Fog Seal$37,000

Slurry Seal$100,500 Slurry Seal

$135,000

Slurry Seal$84,000

Pavement Management Option

Slurry Seal$120,000

Future Value: $ 458,000Present Value: $ 255,000

Every Dollar Spent on

Pavement Management

Saves Ten Dollars for Future Repairs!

Budget: ~$23,000 Annually

Budget: ~$235,000 Annually

2011 Pavement Scenario

(Herriman Towne Center & 5600 W)

20312019 2021 2023 2025 2027 20292011 2013 2015 2017

Full DepthReclaimation$3.3. Million

Overlay$1.4 Million

No Pavement Management Option

Future Value: $ 4.7 MillionPresent Value: $ 2.9 Million

5 yrs

5 yr

s

10

yrs

15 yrs

20

yrs

15 yrs

20

yrs

10 yrs

Page 33: HERRIMAN CITY PAVEMENT MAINTENANCE PROGRAM

Budget Requirements

Annual Budget Requirements for Current Roadways (18.3 Million Square feet):

Pavement Management Option▪ $853,000

No Pavement Management Option

▪$9.4 Million