PAVEMENT MAINTENANCE II

43
PAVEMENT MAINTENANCE II Part 1b: Chip Seal Construction Idaho Roads Scholar Program

description

Idaho Roads Scholar Program. PAVEMENT MAINTENANCE II. Part 1b: Chip Seal Construction. Objectives. Review how to set up a good chip seal, Investigate equipment operation, and field checks, Identify common problems and possible solutions. Field Checks. Weather/Surface Condition - PowerPoint PPT Presentation

Transcript of PAVEMENT MAINTENANCE II

Page 1: PAVEMENT MAINTENANCE II

PAVEMENT MAINTENANCE IIPart 1b: Chip Seal Construction

IdahoRoads Scholar Program

Page 2: PAVEMENT MAINTENANCE II

Objectives Review how to set up a good chip

seal, Investigate equipment operation, and

field checks, Identify common problems and

possible solutions.

Page 3: PAVEMENT MAINTENANCE II

Field Checks Weather/Surface Condition Traffic Control Aggregate Asphalt Asphalt and Chip Distributor Rollers Sweeping

Page 4: PAVEMENT MAINTENANCE II

Weather/Surface Condition Dry or Damp Surface

Temperature Rain/Humidity

Wind

Page 5: PAVEMENT MAINTENANCE II

Surface Temperature

Page 6: PAVEMENT MAINTENANCE II

Proper Traffic Control is Essential!

Page 7: PAVEMENT MAINTENANCE II

Aggregate Requirements for Successful Seal Coat

Must be clean. Less then 1% passing #200 sieve.

Cubical chips are better then flat chips.

Must be crushed. At least 2 crushed faces.

More single sized the better.

Page 8: PAVEMENT MAINTENANCE II

Dirty Chips > 1% passing the #200 sieve

Impedes the ability of binder to bond chip to roadway.

Limits amount of binder that can be applied.

Creates dust after sweeping.

Page 9: PAVEMENT MAINTENANCE II

Aggregate Condition

Emulsions => Damp Surface

Asphalt Cement => Dry Surface

Page 10: PAVEMENT MAINTENANCE II

Can only glue down a single layer of chips.

Must have chips at least 60 to 70% embedded to withstand traffic and snow plow damage.

Should see emulsion at top of chips before emulsion breaks.

Chip Considerations

Page 11: PAVEMENT MAINTENANCE II

Which are the better chips?

Page 12: PAVEMENT MAINTENANCE II

Distributors

Page 13: PAVEMENT MAINTENANCE II

Asphalt Distributor Components Nozzles

Spray Bar Height

Application Rate

Product Temperature

Page 14: PAVEMENT MAINTENANCE II

Nozzle Angle

Page 15: PAVEMENT MAINTENANCE II
Page 16: PAVEMENT MAINTENANCE II

Spray Bar Height

Page 17: PAVEMENT MAINTENANCE II
Page 18: PAVEMENT MAINTENANCE II

Triple Coverage

Page 19: PAVEMENT MAINTENANCE II

Test Shot

Apply Asphalt Product for Known Distance & Width

Calculate Amount of Applied Asphalt Product

Calculate Spread Rate

Page 20: PAVEMENT MAINTENANCE II

Product Temperature

Typically 140 to 185oF

Check At Distributor

Page 21: PAVEMENT MAINTENANCE II

Common Emulsion: CRS-2P Develops strength in hours that

normally take days. Sweep same day. Requires clean chips. Must place chips within one minute

of placement of binder. Eliminates bleeding

Higher softening point

Page 22: PAVEMENT MAINTENANCE II

Sample Asphalt Product

Sample Location Truck or Trailer Nozzle

Sample Container 1 Gallon Plastic w/Lined

Screw Cap, Wide Mouth

Page 23: PAVEMENT MAINTENANCE II

Chip Spreaders

Page 24: PAVEMENT MAINTENANCE II

Chip Spreader Issues

Correct Application Rate

Uniform Application Rate

Page 25: PAVEMENT MAINTENANCE II

Test Shot to Insure Correct Application Rate

Apply aggregate for known distance and width

Calculate Amount of Aggregate

Calculate Spread Rate

Page 26: PAVEMENT MAINTENANCE II
Page 27: PAVEMENT MAINTENANCE II
Page 28: PAVEMENT MAINTENANCE II
Page 29: PAVEMENT MAINTENANCE II
Page 30: PAVEMENT MAINTENANCE II

Check Rollers

Type

Weight

Speed

Page 31: PAVEMENT MAINTENANCE II

Rolling

Page 32: PAVEMENT MAINTENANCE II
Page 33: PAVEMENT MAINTENANCE II

Best Pneumatic-Tire Roller

Page 34: PAVEMENT MAINTENANCE II

Buns Up: Check Embedment

Page 35: PAVEMENT MAINTENANCE II

Factors Affecting Breaking and Curing Weather Conditions:

temperature, humidity, wind Water Absorption Aggregate moisture content:

although wet aggregate may facilitate coating, it tends to slow the curing process

Mechanical forces: roller pressure forces water from mix

Surface area: excessive fines or dirty aggregate accelerate breaking

Surface chemistry

Page 36: PAVEMENT MAINTENANCE II

Broom

Page 37: PAVEMENT MAINTENANCE II
Page 38: PAVEMENT MAINTENANCE II

Safety

Approved Vests

Communication

Eye Contact

Page 39: PAVEMENT MAINTENANCE II

Typical Problems Streaked Appearance Bleeding/Flushing Loss of Cover Aggregate Bad Centerline Joint Utilities/New Patches Tight Alignment or Steep Grades Heavy Tree Canopy Fall Weather

Page 40: PAVEMENT MAINTENANCE II

Common Chip Seal Problems

Page 41: PAVEMENT MAINTENANCE II

Rules of Thumb for Seal Coats• Make sure pavement is clean• Use high quality materials• Proper application rate for binder• Proper application rate for aggregates.

Extra aggregates only cause failure.• Keep distance between the distributor

and the chipper to minimum. Aggregate must be placed before emulsion starts to break.

Page 42: PAVEMENT MAINTENANCE II

Rules of Thumb for Seal Coats, cont.

Minimum of three rollers. Keep speed under 5 mph. Compaction must be completed before emulsion is broken.

Final sweeping of roadway as soon as possible. No later then the next morning.

Remember that Details count.

Page 43: PAVEMENT MAINTENANCE II

Questions?

Chip Seals