Transcript of Hartmann - Model Basedworking
-
8/12/2019 Hartmann - Model Basedworking
1/22
www.hartmann-technologies.net
Model-based working
-
8/12/2019 Hartmann - Model Basedworking
2/22
2
hartmann technologies GmbH
hartmann technologies GmbH page
Number of colleagues: 22salaried staff
10 software engineers
7content developers
3 customer support/schooling
2 managing directors
For test runs /quality assurance or with
unique developmental tasks colleagues from
theIngenieurgesellschaftHartmannmbHwillbe asked to help(60employees).
Established in2009
History of the modelbased work:
1998bis2005collaboration with NemetschekAG
20052012collaboration with RIBAG
since 2010collaboration with Autodesk
-
8/12/2019 Hartmann - Model Basedworking
3/22
3hartmann technologies GmbH page
Scopeofservices:
Participationinthedevelopmentofthesoftwareforthemodelbasedwork(RIB)
Developmentofcontentproductsforthemodelbasedwork
Development
of
software
for
the
handling
with
BIM
models
DevelopmentofsoftwareforthequantitytakeoffaccordingtogermanVOB/englishSMM7/etc.
Trainingandimplementationofthemodelbasedworkingmethodforthespecificfieldsof
tendering,technicalpreparationofthebuildingsites,implementationplanningand
executionofconstructionwork
Products:
ContentfortheworkwithRIBiTWO
iceBIMconstruction
iceBIMbuildingsite
iceBIMplausibility
iceBIMarchitecture
Managingdirectors:
Mr.Dipl.Ing.Dipl.Kaufm.RolfHartmann
Mr.Dipl.Ing.MarkHeinisch
-
8/12/2019 Hartmann - Model Basedworking
4/22
4
Requirements to the model-based working
Automated quantity takeoff according to SMM7
for all
the items of structure and finishings
based onaintelligent3Dmodel
If necessary:detailed working depth for the quantity takeoff,for example bill of quantitys inclusive metalwork,
roofing,facade,doors and windows
Effective work
flow through the achievement of greater working
speed
compared with the classical hand
measurement or halfautomated methods
Integrated,continuous dataflow from the preliminary planning to the practice onthe building site and finally to
the completion of the building
Prefabricated intelligentcontent leads to the easyusage of the technology through guided assistants and
graphical user interfaces
hartmann technologies GmbH page
-
8/12/2019 Hartmann - Model Basedworking
5/22
5model-based working page
DefinitionBIM: To work with abuilding model with contained data.
Modelbased working BIM
-
8/12/2019 Hartmann - Model Basedworking
6/22
6model-based working page
-
8/12/2019 Hartmann - Model Basedworking
7/22
7model-based working page
-
8/12/2019 Hartmann - Model Basedworking
8/22
8model-based working page
-
8/12/2019 Hartmann - Model Basedworking
9/22
9
Workflow ice BIM architecture
model-based working page
-
8/12/2019 Hartmann - Model Basedworking
10/22
10
ice BIM architecture.
Claimmanagement for all
crafts of structure and
finishings
Ability to filter and the base for the
plausibility check
Bidirectional connection
between BOQand model
Visualisation e.g.for
meetings,subcontractors etc.
Creation of craft plans for
structure and finishings
Creation of craft plans for structure and
finishings
Accounting /progress report
for allcrafts of structure and
finishings
Cost control for allcrafts of
structure and finishings
respective data
ice BIM architecture page
Complete BOQwith accessibility to
other calculationsoftware
Calculation of quantities for allstructural
and finishings crafts,technical building
equipment, facade and structural
engineering
Bidirectional connection
between structural and
finishing crafts and model
adaptive,intelligentand
menuguided content
-
8/12/2019 Hartmann - Model Basedworking
11/22
11
Bidirectional connection
between BOQand modelClaimmanagement
for single crafts
Filters
Visualisation e.g.for
meetings,
subcontractors etc.
Accounting /progress report
for single crafts
Cost control for single
crafts respective data
Creation of craft plans for
structure and finishings
Generalproject
information
ice BIM buildingsite.
ice BIM buildingsite page
-
8/12/2019 Hartmann - Model Basedworking
12/22
12
Detection of wrong3Dmodels
Assured quantity takeoff
Automated calculation ofcharacteristics,like cubic footage,
gross floor area,net floor ratio etc.
Integratedviewer to show
determined errors
ice BIM plausibility.
Ice BIM plausibility page
-
8/12/2019 Hartmann - Model Basedworking
13/22
13model-based working page
-
8/12/2019 Hartmann - Model Basedworking
14/22
14
building project: central station Erfurt
3-D models page
-
8/12/2019 Hartmann - Model Basedworking
15/22
15
building project: central station Erfurt
3-D models page
-
8/12/2019 Hartmann - Model Basedworking
16/22
16
building project : office building Rttenscheider Tor Essen
3-D models page
-
8/12/2019 Hartmann - Model Basedworking
17/22
17
building project : hotel- and commercial house
3-D models page
-
8/12/2019 Hartmann - Model Basedworking
18/22
18
building project : Le flair construction site 6
3-D models page
-
8/12/2019 Hartmann - Model Basedworking
19/22
19
building project : Le Flair construction site 7
3-D models page
-
8/12/2019 Hartmann - Model Basedworking
20/22
20
building project : Marie-Elisabeth-Lders-house
3-D models page
-
8/12/2019 Hartmann - Model Basedworking
21/22
21
building project : Baltic Sea hotel (in development)
3-D models page
-
8/12/2019 Hartmann - Model Basedworking
22/22
22
building project : Residential complex Roggenstein
3-D models page