    INTRODUCTION In India 65% of total power is generated by the Thermal Power Stations.

    Yamunanagar Thermal Power Project i.e D.C.R.T..P.P(Deen Bandhu ChotuRam

    Thermal Power Plant) is a project of hariyana.

    Harduaganj Thermal Power Stationis located at Kasimpur Power HouseColonywhich is 1KM distance from Harduaganj Railway Station at Harduaganj in

    Aligarh districtin the Indian state of Uttar pradesh.

    http://en.wikipedia.org/wiki/Qasimpur_Power_House_Colonyhttp://en.wikipedia.org/wiki/Qasimpur_Power_House_Colonyhttp://en.wikipedia.org/wiki/Aligarh_districthttp://en.wikipedia.org/wiki/Uttar_pradeshhttp://en.wikipedia.org/wiki/Uttar_pradeshhttp://en.wikipedia.org/wiki/Aligarh_districthttp://en.wikipedia.org/wiki/Qasimpur_Power_House_Colonyhttp://en.wikipedia.org/wiki/Qasimpur_Power_House_Colony
  • 8/13/2019 HARDUAGANJ THERMAL POWER STATION

    3/21

    CAPACITY

    Harduaganj Thermal Power Station has a installed capacity of 665 MW.

    1 Unit of 60 MW capacity (it is unit number fifth).

    1 Unit of 250 MW capacity (it is unit number eighth).

    1 Unit of 250 MW capacity (it is unit number ninth)..

    Its last unit (ninth unit) of 250 MW became operational in June 2012.

  • 8/13/2019 HARDUAGANJ THERMAL POWER STATION

    4/21

  • 8/13/2019 HARDUAGANJ THERMAL POWER STATION

    5/21

    WHAT IS THERMAL POWER STATION

    A thermal power station is a power plant in which the main requirement for

    making electricity is steam.

    Thermal power station are the stations in which energy of coal is converted

    into electrical energy. It is use to produce heat in the boiler and water is

    converted into steam. This steam is used to drive the steam turbine which is

    connected to the generator and generation of electricity starts. In which coal isused as a fuel and steam turbine is used to start generator.

    Thermal power plant converts the heat energy of coal into electrical energy.

    Coal is burnt in a boiler which converts the water into steam. The expansion of

    steam in turbine produces mechanical power which drives the alternator.

  • 8/13/2019 HARDUAGANJ THERMAL POWER STATION

    6/21

    Main and Auxiliary Equipments:

    Coal handling plantPulverizing plant

    Drafts fans

    Boiler

    Ash handling plant

    Turbine

    Condenser

    Cooling towers and ponds

    Feed water and heater

    Economizer

    Super heater

    Air pre-heater

  • 8/13/2019 HARDUAGANJ THERMAL POWER STATION

    7/21

    Coal Handling Plant:

    A coal preparation plant(CPP) is a facility that washes coalof soiland rock,

    preparing it for transportto market.

    A CPP may also be called a coal handling and preparation plant(CHPP), prepplant, tipple, or wash plant.

    Pulverizing Plant:

    A pulverizeror grinderis a mechanical device for the grinding of many different

    types of materials. For example, they are used to pulverize coalfor combustionin the

    steam-generating furnacesof fossil fuel power plants.

    The pulverizing plant is a ball-mill type.

    Ball Mill:

    A ball millis a type of grinderused to grind materials into extremely fine powder

    for use in mineral dressing processes, paints, pyrotechnics, and ceramics. Ball millsrotate around a horizontal axis.

    http://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Soilhttp://en.wikipedia.org/wiki/Rock_(geology)http://en.wikipedia.org/wiki/Transporthttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Combustionhttp://en.wikipedia.org/wiki/Furnaceshttp://en.wikipedia.org/wiki/Fossil_fuel_power_planthttp://en.wikipedia.org/wiki/Grinder_(milling)http://en.wikipedia.org/wiki/Grinder_(milling)http://en.wikipedia.org/wiki/Fossil_fuel_power_planthttp://en.wikipedia.org/wiki/Fossil_fuel_power_planthttp://en.wikipedia.org/wiki/Fossil_fuel_power_planthttp://en.wikipedia.org/wiki/Fossil_fuel_power_planthttp://en.wikipedia.org/wiki/Fossil_fuel_power_planthttp://en.wikipedia.org/wiki/Fossil_fuel_power_planthttp://en.wikipedia.org/wiki/Fossil_fuel_power_planthttp://en.wikipedia.org/wiki/Furnaceshttp://en.wikipedia.org/wiki/Combustionhttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Transporthttp://en.wikipedia.org/wiki/Rock_(geology)http://en.wikipedia.org/wiki/Soilhttp://en.wikipedia.org/wiki/Coal
  • 8/13/2019 HARDUAGANJ THERMAL POWER STATION

    8/21

    Draft System:

    The combustion in boiler requires supply of sufficient quantity of air and removal of

    exhaust gases. The circulation of air is caused by a difference in pressure, known as draft.

    The drafts used are both Natural draft & Mechanical draft.

    Ash Handling Plant: The percentage of coal varies from 5% to 40%.

    In this ash 25% is furnace bottom ash and 75% is pulverized fuel ash.

    Super Heater: Wet steam from the boiler is passed through super heater where it is dried and

    superheated by the flue gases on their way to chimney to increase overall efficiency

    of plant.

    The ash handling plants are steam jet system as well as electrostatic precipitator.

  • 8/13/2019 HARDUAGANJ THERMAL POWER STATION

    9/21

    Water cycle is completed in three cycles:-

    Condensate water cycle

    Feed water cycle

    Steam cycle

    Condensate Water Cycle:-

    Condensate water cycle starts from condenser and end at section of BFP (boiler feed

    pump).

    Feed Water Cycle:-

    Feed water cycle starts from boiler feed pump (BFP) and at the boiler drum.Steam Cycle:-

    It starts from boiler drum upto condenser.

  • 8/13/2019 HARDUAGANJ THERMAL POWER STATION

    10/21

    Boiler Feed Pump

  • 8/13/2019 HARDUAGANJ THERMAL POWER STATION

    11/21

    Boiler

  • 8/13/2019 HARDUAGANJ THERMAL POWER STATION

    12/21

    A boiler is a closed vessel in which water is converted into steam.

    The boiler used in this plant is water tube boiler in which water flows inside

    the tubes and hot gases flows outside the tubes.

    The circulation of water in the boiler may be natural (due to different in

    density of cold and hot water) or forced through the action of pumps.

  • 8/13/2019 HARDUAGANJ THERMAL POWER STATION

    13/21

    TURBINE

    Turbine is a high speed rotating machine that converts the kinetic energy andpressure energy of the steam in to useful work.

    A turbine generally has three stages namely as high pressure, intermediate pressure

    and low pressure.

    The main steam enters in to H.P. turbine and after expansion in the turbine the

    pressure and temperature fall down. The main steam is returned to the boiler for the

    reheating in the Re-heater.

  • 8/13/2019 HARDUAGANJ THERMAL POWER STATION

    14/21

  • 8/13/2019 HARDUAGANJ THERMAL POWER STATION

    15/21

    TURBINE:-

    It is the device which converts the heat energy of steam into mechanical energy

    (potential rotational kinetic energy).

    HP TURBINE:-

    It is a 12 stage turbine (High Pressure Turbine). The super heated steam without any

    moisture content falls at the blades of HP turbine and pass out from it. It starts

    rotating.

    IP TURBINE:- The steam of 5350c temp and 22kg/cm2IP turbine blades and tries to move it.

  • 8/13/2019 HARDUAGANJ THERMAL POWER STATION

    16/21

    S HEATER

    R H

    I P L P

    condenser

    H P

    STEAM FLOW

  • 8/13/2019 HARDUAGANJ THERMAL POWER STATION

    17/21

    Generator

    A generator is an electro-mechanical device that converts mechanical energy to ac

    current electrical energy. Turbine is coupled with the turbo generator that normally

    spins at 3000 rpm in countries with 50 Hz supply frequency. It is an electro -

    mechanical device that converts mechanical energy in to electrical energy.

  • 8/13/2019 HARDUAGANJ THERMAL POWER STATION

    18/21

    Conclusion

    Suchplants are located at a place where supply of water and coal is available and

    transportation facilities are adequate.

    Cost of fuel transportation maximum because huge amount of coal is transported to

    the plant site.

    Initial cost is lower and running cost is high.

    Overall efficiency is less.

    Requires a lot of time for starting.

    Maintenance cost quite high.

    Stand by losses maximum as the boiler remains in operation even when the turbine

    is not working.

  • 8/13/2019 HARDUAGANJ THERMAL POWER STATION

    19/21

    Reference

    Main and Auxiliary equipments, principal of power system by V.K.Mehta.

    www.wekipedia .com

    www.indianpowersection.com

    www.thermalpowerplant.india.com

    http://www.indianpowersection.com/http://www.thermalpowerplant.india.com/http://www.thermalpowerplant.india.com/http://www.thermalpowerplant.india.com/http://www.indianpowersection.com/http://www.indianpowersection.com/
  • 8/13/2019 HARDUAGANJ THERMAL POWER STATION

    20/21

  • 8/13/2019 HARDUAGANJ THERMAL POWER STATION

    21/21

    ANY QUERY???