Handling Hazmat During Construction WisDOT NCR Construction Conference March 7, 2013 Shar TeBeest,...

25
Handling Hazmat During Construction WisDOT NCR Construction Conference March 7, 2013 Shar TeBeest, DTSD Bureau of Technical Services 608-266-1476 or [email protected]

Transcript of Handling Hazmat During Construction WisDOT NCR Construction Conference March 7, 2013 Shar TeBeest,...

Page 1: Handling Hazmat During Construction WisDOT NCR Construction Conference March 7, 2013 Shar TeBeest, DTSD Bureau of Technical Services 608-266-1476 or sharlene.tebeest@dot.wi.gov.

Handling Hazmat During Construction

WisDOT NCR Construction ConferenceMarch 7, 2013

Shar TeBeest, DTSD Bureau of Technical Services608-266-1476 or [email protected]

Page 2: Handling Hazmat During Construction WisDOT NCR Construction Conference March 7, 2013 Shar TeBeest, DTSD Bureau of Technical Services 608-266-1476 or sharlene.tebeest@dot.wi.gov.

Planned EncountersUsually identified in Hazmat special provisions– Identified contaminated areas within or outside

the zone of construction– Hazmat consultant oversight areas– Dewatering plans– Bridge paint waste handling and disposal– Asbestos abatement– Well locations to be protected – Well locations to be abandoned

Page 3: Handling Hazmat During Construction WisDOT NCR Construction Conference March 7, 2013 Shar TeBeest, DTSD Bureau of Technical Services 608-266-1476 or sharlene.tebeest@dot.wi.gov.

Planned EncountersWhat else should be in your special provisions…– EPA IDs for the bridges to be repainted– Waste handling plans– Predefined notification periods for contacting the

environmental consultant– Identified acceptable disposal locations for

contaminated soil to be excavated by the construction contractor

– Notification requirements for asbestos abatement or demolition

– Well locations

Page 4: Handling Hazmat During Construction WisDOT NCR Construction Conference March 7, 2013 Shar TeBeest, DTSD Bureau of Technical Services 608-266-1476 or sharlene.tebeest@dot.wi.gov.

Planned Asbestos Abatement

Page 5: Handling Hazmat During Construction WisDOT NCR Construction Conference March 7, 2013 Shar TeBeest, DTSD Bureau of Technical Services 608-266-1476 or sharlene.tebeest@dot.wi.gov.

Planned Asbestos Abatement

Page 6: Handling Hazmat During Construction WisDOT NCR Construction Conference March 7, 2013 Shar TeBeest, DTSD Bureau of Technical Services 608-266-1476 or sharlene.tebeest@dot.wi.gov.

Unplanned Encounters

“Construction Emergencies” – Tanks– Contaminated soil or groundwater– Asbestos – Fill – Monitoring wells – Coal storage bins

Page 7: Handling Hazmat During Construction WisDOT NCR Construction Conference March 7, 2013 Shar TeBeest, DTSD Bureau of Technical Services 608-266-1476 or sharlene.tebeest@dot.wi.gov.

Tanks – bad enough without added complications!

Directionally drilled utility line.

Page 8: Handling Hazmat During Construction WisDOT NCR Construction Conference March 7, 2013 Shar TeBeest, DTSD Bureau of Technical Services 608-266-1476 or sharlene.tebeest@dot.wi.gov.

Asbestos in Fill

Page 9: Handling Hazmat During Construction WisDOT NCR Construction Conference March 7, 2013 Shar TeBeest, DTSD Bureau of Technical Services 608-266-1476 or sharlene.tebeest@dot.wi.gov.

Asbestos Pipe Insulation

Page 10: Handling Hazmat During Construction WisDOT NCR Construction Conference March 7, 2013 Shar TeBeest, DTSD Bureau of Technical Services 608-266-1476 or sharlene.tebeest@dot.wi.gov.

Landfills

Page 11: Handling Hazmat During Construction WisDOT NCR Construction Conference March 7, 2013 Shar TeBeest, DTSD Bureau of Technical Services 608-266-1476 or sharlene.tebeest@dot.wi.gov.

Unplanned Encounters

What do you do? Follow the procedures in the Construction and

Materials Manual Chapter 1-30

Page 12: Handling Hazmat During Construction WisDOT NCR Construction Conference March 7, 2013 Shar TeBeest, DTSD Bureau of Technical Services 608-266-1476 or sharlene.tebeest@dot.wi.gov.

CMM 1-30

Page 13: Handling Hazmat During Construction WisDOT NCR Construction Conference March 7, 2013 Shar TeBeest, DTSD Bureau of Technical Services 608-266-1476 or sharlene.tebeest@dot.wi.gov.

What do you do?1. Stop Work

2. Notify the regional environmental coordinator and the Project Manager

3. Notify Environmental Services

Communication and Coordination are critical!

Page 14: Handling Hazmat During Construction WisDOT NCR Construction Conference March 7, 2013 Shar TeBeest, DTSD Bureau of Technical Services 608-266-1476 or sharlene.tebeest@dot.wi.gov.

14

Planned or Unplanned?Some projects have both…

Page 15: Handling Hazmat During Construction WisDOT NCR Construction Conference March 7, 2013 Shar TeBeest, DTSD Bureau of Technical Services 608-266-1476 or sharlene.tebeest@dot.wi.gov.

From the Field - Communications• Lead-contaminated soil identified in Special

Provisions (just east of roundabout, STA 114-95, 30’ – 60’ left of reference line). This soil has been excavated and was stockpiled immediately east of the sewer trench. Once the soil is removed and taken to the landfill, the excavation and management of contaminated soil identified in the Special Provisions will be completed.

Page 16: Handling Hazmat During Construction WisDOT NCR Construction Conference March 7, 2013 Shar TeBeest, DTSD Bureau of Technical Services 608-266-1476 or sharlene.tebeest@dot.wi.gov.

Contaminated groundwater seepage

Page 17: Handling Hazmat During Construction WisDOT NCR Construction Conference March 7, 2013 Shar TeBeest, DTSD Bureau of Technical Services 608-266-1476 or sharlene.tebeest@dot.wi.gov.

From the Field - Communications• Sewers are being installed at ~14’ bgs. Highly

contaminated water is entering the excavation – strong petroleum odor and significant sheen is on the water. Project has stopped working here and is awaiting our direction. Please call my cell phone as soon as you can.

• The project has decided that it can work elsewhere for a day or two. I was on-site today and brought the sample to the lab courier a minute ago; the lab is expediting the protocol B, GRO and DRO on the soil, and is expediting the analytical requested by Veolia for the water sample (GRO, DRO, VOCs, PCBs, metals and flashpoint)

Page 18: Handling Hazmat During Construction WisDOT NCR Construction Conference March 7, 2013 Shar TeBeest, DTSD Bureau of Technical Services 608-266-1476 or sharlene.tebeest@dot.wi.gov.

Transite pipe

All the

Crushed

Stuff

hand to

be

removed

by hand!

Page 19: Handling Hazmat During Construction WisDOT NCR Construction Conference March 7, 2013 Shar TeBeest, DTSD Bureau of Technical Services 608-266-1476 or sharlene.tebeest@dot.wi.gov.

From the Field - Communications• Material is transite electrical conduit pipe used by

the city for the electrical supply for city lighting.

• Material that went to the Crushing site is segregated and they are roping/barreling off the area to ensure that the material remains segregated and is not covered by other loads. Approx. 5-6 loads of material containing the pipe were hauled here. Material is in large pieces. This material will need to be removed and hauled to a landfill licensed to accept asbestos. Determine which licensed landfill is closest to project and coordinate the paperwork for acceptance.

Page 20: Handling Hazmat During Construction WisDOT NCR Construction Conference March 7, 2013 Shar TeBeest, DTSD Bureau of Technical Services 608-266-1476 or sharlene.tebeest@dot.wi.gov.

From the Field - Communications

• There are approximately 1 ½ Miles of piping to be removed between the sidewalk and curb and gutter. The contractor can remove the sidewalk without disturbing the piping, we will need to coordinate the removal and disposal of the piping. Determine if contractor and hauler can perform removal and disposal, or if we need to bring in a sub.

• Notify DNR

Page 21: Handling Hazmat During Construction WisDOT NCR Construction Conference March 7, 2013 Shar TeBeest, DTSD Bureau of Technical Services 608-266-1476 or sharlene.tebeest@dot.wi.gov.
Page 22: Handling Hazmat During Construction WisDOT NCR Construction Conference March 7, 2013 Shar TeBeest, DTSD Bureau of Technical Services 608-266-1476 or sharlene.tebeest@dot.wi.gov.

From the Field - Communications• Asbestos (Transite conduit) is present within 6th

Street west of College and is in close proximity to the 14-foot+ deep sewer work starting tomorrow. The sewer work is a critical path at this time. The transite has been sampled and is confirmed to be asbestos (lab report attached). The conduit, which contains a back-up emergency communications line for the City ,and which is live, will eventually be replaced but needs to stay protected for now. It was agreed to uncover the conduit and wrap the conduit in tape to hold it together, and gently hold the conduit out of the way to facilitate the storm sewer work

Page 23: Handling Hazmat During Construction WisDOT NCR Construction Conference March 7, 2013 Shar TeBeest, DTSD Bureau of Technical Services 608-266-1476 or sharlene.tebeest@dot.wi.gov.

From the Field - Communications• The transite that contains the live

communications cable to the police station (wrapped in plastic and taped) can remain in place.

• We will document the location, horizontally and vertically, of the transite that is to remain in place.

• The new communications line will be installed elsewhere on the project

Page 24: Handling Hazmat During Construction WisDOT NCR Construction Conference March 7, 2013 Shar TeBeest, DTSD Bureau of Technical Services 608-266-1476 or sharlene.tebeest@dot.wi.gov.

From the Field - Communications• Railroad ties within 6th Street immediately

north of City Hall (6th Street STA 9 to 10) –surveyed today and found the top of the RR ties to be 2/10” in conflict with the project. RR ties would remain in place unless the City requested they be removed

Page 25: Handling Hazmat During Construction WisDOT NCR Construction Conference March 7, 2013 Shar TeBeest, DTSD Bureau of Technical Services 608-266-1476 or sharlene.tebeest@dot.wi.gov.

What have you encountered?

Questions?