GUARANTEED RATE FIELD HVAC / AHU RENOVATION PHASE IX · pipe elbow, turned down pipe elbow, turned...
Transcript of GUARANTEED RATE FIELD HVAC / AHU RENOVATION PHASE IX · pipe elbow, turned down pipe elbow, turned...
KEY PLANKEY PLAN
N
10
9
8
67
111
3
5
4
2
19165
DESCRIPTIONDATEREV.
ISSUE/REVISION:
PROJECT NO:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
SCALE:
SHEET NO.
(708) 236-0330 FAX
Hillside, IL 60162
(708) 236-0300
30 N. Wolf Rd., Second Floor
PROJECT:
DRAWING TITLE:
333 WEST 35TH STREETCHICAGO, IL 60616
GUARANTEED RATE FIELD -HVAC / AHU RENOVATION -PHASE IX
10.07.2019 ISSUED FOR BID
ISSUED FOR BID
NOT FORCONSTRUCTION
10/07/2019
M0.01
MECHANICAL COVER PAGE
AS NOTED
AS
AS
MS
GENERAL
PIPING
NEW PIPING
EXISTING PIPING TO REMAIN
EXISTING PIPING TO BE DEMOLISHED
CHWR CHILLED WATER RETURN PIPING
CHWS CHILLED WATER SUPPLY PIPING
DRAIN PIPING (CONDENSATE)D
BALL VALVE
BUTTERFLY VALVE
CHECK VALVE
CIRCUIT SETTER BALANCING VALVE
DIRECTION OF FLOW
DIRECTION OF PIPE PITCH, DOWN
DRAIN VALVE WITH 3/4" THREADED HOSE ADAPTOR
GATE VALVE
MANUAL AIR VENT
NEW PIPE CONNECTION
PIPE CAP
PIPE DROP/RISE
PIPE ELBOW, TURNED DOWN
PIPE ELBOW, TURNED UP
PIPE SLEEVE
PIPE TEE, BOTTOM CONNECTION, 45° OR 90° ELBOW
PIPE TEE, DOWN
PIPE TEE, HORIZONTAL
PIPE TEE, TOP CONNECTION, 45° OR 90° ELBOW
PIPE UNION
PRESSURE GAUGEPSI
STRAINER
TWO-WAY, MODULATING AUTOMATIC CONTROL VALVE
TWO-WAY, TWO-POSITION AUTOMATIC CONTROL VALVE
DUCTWORK
NEW DUCTWORK
EXISTING DUCTWORK TO REMAIN
EXISTING DUCTWORK TO BE DEMOLISHED
DIRECTION OF AIRFLOW
DDC OR STANDALONE PROGRAMMABLE THERMOSTATT
EQUIPMENT TAGTYPENUMBER
P1
POINT OF CONNECTION OF NEW TO EXISTING WORK
ACCESS DOORAD
RECTANGULAR EXHAUST/RETURN DUCTWORK DOWN
RECTANGULAR EXHAUST/RETURN DUCTWORK UP
RECTANGULAR SUPPLY DUCTWORK DOWN
RECTANGULAR SUPPLY DUCTWORK UP
DUCTWORK BREAK LINE (OR CONTINUATION)
FLEXIBLE DUCTWORK CONNECTION
FC
MANUAL VOLUME (OR BALANCING) DAMPERVD
AUTOMATIC CONTROL (OR MOTOR OPERATED) DAMPER
GRILLE/REGISTER/DIFFUSER TAG
NECK SIZE
SERVICECFM
TYPE
A 6x6 NK100-S
ACD AUTOMATIC CONTROL DAMPERACV AUTOMATIC CONTROL VALVEAD ACCESS DOORAFF ABOVE FINISHED FLOORAHU AIR HANDLING UNITAPD AIR PRESSURE DROPBAS BUILDING AUTOMATION SYSTEMBASC BUILDING AUTOMATION SYSTEM CONTRACTORBFV BUTTERFLY VALVEBHP BRAKE HORSEPOWERBTU BRITISH THERMAL UNITBTUH BRITISH THERMAL UNIT PER HOURBV BALL VALVECBV CIRCUIT BALANCING VALVECC COOLING COILCFM CUBIC FEET PER MINUTECHWR CHILLED WATER RETURNCHWS CHILLED WATER SUPPLYCKV CHECK VALVECO CLEANOUTCOND CONDENSATECO2 CARBON DIOXIDEDR DRAINDAT DISCHARGE AIR TEMPERATUREDB DRY BULBDDC DIRECT DIGITAL CONTROLDN DOWN-E EXHAUSTEA EXHAUST AIR
EAD EXHAUST AIR DAMPEREAT ENTERING AIR TEMPERATUREEC ELECTRICAL CONTRACTORECM ELECTRONICALLY COMMUTATED MOTOREDH ELECTRIC DUCT HEATEREER ENERGY EFFICIENCY RATIOEF EXHAUST FANEG ETHYLENE GLYCOLESP EXTERNAL STATIC PRESSUREETR EXISTING TO REMAINEWT ENTERING WATER TEMPERATUREF FAHRENHEITFC FLEXIBLE CONNECTOR (OR CONNECTION)FLA FULL LOAD AMPSFPM FEET PER MINUTEFV FACE VELOCITYGA GAUGEGPM GALLONS PER MINUTEGV GATE VALVEHC HEATING COILHP HORSEPOWERLAT LEAVING AIR TEMPERATURELH LEFT HANDLWT LEAVING WATER TEMPERATUREMBH THOUSAND BRITISH THERMAL UNITS PER HOURMC MECHANICAL CONTRACTORMCA MINIMUM CIRCUIT AMPACITYMOCP MAXIMUM OVER-CURRENT PROTECTIONMOD MOTOR OPERATED DAMPER
NC NORMALLY CLOSEDNIC NOT IN CONTRACTNK NECKNO NORMALLY OPENNR NOT REQUIREDNTS NOT TO SCALEOA OUTDOOR AIRPD PRESSURE DROPPSI POUNDS PER SQUARE INCH-R RETURNRA RETURN AIRRAD RETURN AIR DAMPERRH RIGHT HANDRPM REVOLUTIONS PER MINUTE-S SUPPLYSA SUPPLY AIRSEER SEASONAL ENERGY EFFICIENCY RATIOSF SUPPLY FANSP STATIC PRESSURESTR STRAINERT THERMOSTAT-T TRANSFERTYP TYPICALTSP TOTAL STATIC PRESSUREVD VOLUME DAMPERVFD VARIABLE FREQUENCY DRIVEWB WET BULBWC WATER COLUMNWG WATER GAUGEWMS WIRE MESH SCREENWPD WATER PRESSURE DROP
MECHANICAL ABBREVIATIONS
MECHANICAL SYMBOLS
NOTE: NOT ALL ABBREVIATIONS LISTED MAY APPEAR IN DRAWINGS.NOTE: NOT ALL SYMBOLS LISTED MAY APPEAR IN DRAWINGS.
A. ALL WORK SHALL BE PERFORMED IN A CLEAN AND WORKMANLIKE MANNER. CARESHALL BE EXERCISED TO MINIMIZE ANY INCONVENIENCE OR DISTURBANCE TOOTHER AREAS OF THE BUILDING WHICH ARE TO REMAIN IN OPERATION.
B. ALL DEMOLITION OF THE HVAC SYSTEM AS CALLED FOR ON THE DEMOLITIONDRAWINGS SHALL BE UNDER THIS CONTRACTOR'S WORK.
C. CONTRACTOR SHALL VISIT THE BUILDING, BEFORE SUBMITTING HIS BID, TO VERIFYALL DIMENSIONS AND EXISTING CONDITIONS WHICH MAY AFFECT HIS WORK.
D. BEFORE STARTING ANY DEMOLITION WORK ON HVAC EQUIPMENT WHICH HAS ANELECTRICAL CONNECTION AND IS INDICATED TO BE REMOVED, THIS CONTRACTORSHALL MEET WITH ELECTRICAL CONTRACTOR TO IDENTIFY ALL SUCH EQUIPMENT.ELECTRICAL CONTRACTOR SHALL DISCONNECT THE POWER TO EACH UNIT ANDREMOVE CONDUIT, WIRING, DISCONNECT SWITCHES, AND STARTERS UNDER THISCONTRACT, UNLESS NOTED OTHERWISE. THIS CONTRACTOR SHALL REMOVE ALLEQUIPMENT, ELECTRICAL TEMPERATURE CONTROL WIRING, AND CONDUIT UNDERTHIS CONTRACT.
E. CONTRACTOR IS RESPONSIBLE FOR SCANNING WALLS, FLOORS, ETC., TO LOCATEOBSTRUCTIONS (SUCH AS EXISTING ELECTRICAL CONDUIT, WIRING, PIPING, SLABRE-INFORCING, ETC.) PRIOR TO MAKING ANY PENETRATIONS IN WALLS, FLOORS,ETC. CONTRACTOR TO LOCATE ALL SLAB REINFORCING PRIOR TO MAKING ANY SLABPENETRATIONS. NO SLAB REINFORCING SHALL BE DAMAGED OR CUT. ANY DAMAGERESULTING FROM CORING OR WALL AND/OR FLOOR PENETRATIONS IS THE SOLERESPONSIBILITY OF THE CONTRACTOR AND SHALL BE REPAIRED AT NO ADDITIONALCOST TO THE OWNER.
F. CONTRACTOR SHALL BE RESPONSIBLE FOR HIS OWN CLEANUP THROUGHOUT THECOURSE OF THE DEMOLITION WORK.
G. NO EQUIPMENT, PIPING, VALVES, ETC. SHALL BE REMOVED, DISCONNECTED ORSHUT DOWN WITHOUT PRIOR REVIEW WITH THE OWNER AND/OR ENGINEER TOCONFIRM THAT AREAS TO REMAIN IN OPERATION WILL NOT BE AFFECTED. IF ANYAREAS NOT WITHIN THE SCOPE OF WORK ARE AFFECTED BY ANY SHUTDOWN, ONE(1) WEEK ADVANCE NOTICE SHALL BE GIVEN TO THE OWNER. SHUTDOWNS SHALLBE A MAXIMUM OF FOUR (4) HOURS UNLESS OTHERWISE INDICATED.
H. ALL EQUIPMENT, MATERIAL, ETC. THAT IS BEING DEMOLISHED WILL BECOME THEPROPERTY OF THE CONTRACTOR UNLESS OTHERWISE NOTED OR SPECIFIEDBELOW. ALL SUCH ITEMS WILL BE REMOVED FROM THE BUILDING SITE BY THECONTRACTOR IN A PROPER AND LEGAL MANNER. NO ITEM WHICH IS BEINGREMOVED UNDER THE DEMOLITION CONTRACT MAY BE REUSED UNDER THE NEWWORK CONTRACT UNLESS NOTED ON THE DRAWINGS. ALL ITEMS TO BE TURNEDOVER TO THE OWNER SHALL BE STORED PER THE OWNER'S INSTRUCTION. REFERTO PLANS FOR SPECIFIC NOTES.
I. ALL SALVAGEABLE MATERIAL AND EQUIPMENT, INCLUDING BUT NOT NECESSARILYLIMITED TO HEATING UNITS, AC UNITS, DIFFUSERS, VALVES, ETC., SHALL BEREMOVED AND MAINTAINED IN AS GOOD CONDITION AS POSSIBLE AND TURNEDOVER TO THE BUILDING OWNER'S REPRESENTATIVE. HOWEVER, IF THE BUILDINGOWNER'S REPRESENTATIVE DECIDES ANY SUCH MATERIALS ARE OF NO VALUE TOTHE BUILDING, THEN THEY SHALL BECOME THE PROPERTY OF THE MECHANICALCONTRACTOR WHO SHALL REMOVE SUCH DISCARDED WORK FROM THE PREMISESAND DISPOSE OF SAME. REFER TO PLANS FOR SPECIFIC NOTES.
J. EXISTING EQUIPMENT OR SYSTEMS WHICH ARE SPECIFIED TO BE REPLACED BY NEWEQUIPMENT OR SYSTEMS SHALL NOT BE REMOVED FROM SERVICE UNTIL THE NEWEQUIPMENT OR SYSTEMS HAVE ACTUALLY ARRIVED AT THE PROJECT SITE.
K. SEQUENCE OF ALL DEMOLITION WORK SHALL BE IN STRICT ACCORDANCE WITH THECONTRACT DOCUMENTS AND/OR AS DIRECTED BY THE ENGINEER. ALL SHUTDOWNSOF EXISTING SYSTEMS SHALL BE SCHEDULED AND APPROVED BY THE OWNER.
L. COORDINATE USE OF THE BUILDING ELEVATORS AND ALL MATERIAL DELIVERIESWITH THE OWNER.
M. IF ANY ISOLATION VALVES SHOULD FAIL DURING DEMOLITION, OTHER THAN THOSECALLED OUT TO BE REPLACED, THIS CONTRACTOR SHALL REPAIR/REPLACE THEVALVE AND SUBMIT A CHANGE ORDER REQUEST FOR APPROVAL.
N. THE CONTRACTOR PERFORMING THE DEMOLITION WORK SHALL REMOVE NO MORETHAN 8" OF BUILDING MATERIAL AROUND EACH DEVICE BEING DEMOLISHED.PROVIDE PATCHING AS REQUIRED FOR FINISHED WORK. THE CONTRACTOR SHALLOBTAIN APPROVAL FROM OWNER OR ENGINEER PRIOR TO PERFORMING REMOVALOF MATERIAL FROM EXISTING BUILDING CONSTRUCTION.
O. CONTRACTOR SHALL PROTECT ALL WINDOWS AND SURFACES DURING DEMOLITION.ANY COSTS INCURRED BY DAMAGE FROM CUTTING TORCHES, SPARKS, HEAT, OROTHER DEMOLITION PROCEDURES WILL NOT BE THE RESPONSIBILITY OF THEOWNER.
P. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL LABOR AND MATERIALREQUIRED TO PATCH ALL OPENINGS IN EXISTING WALLS, FLOORS, AND FIRESEPARATIONS CREATED BY THE REMOVAL OF EACH TRADE'S MATERIAL ANDEQUIPMENT WHERE THESE OPENINGS ARE NOT TO BE REUSED. CONTRACTORSHALL BE RESPONSIBLE FOR REPAIR AT AREAS THAT MECHANICAL EQUIPMENT WASREMOVED BACK TO ITS ORIGINAL CONDITION INCLUDING ALL DRYWALL, PLASTER,PAINTING, ETC. CONTRACTOR SHALL EMPLOY TRADES EXPERIENCED IN GENERALCONSTRUCTION TO PATCH ALL OPENINGS. TOOTH IN MASONRY USING WHOLEUNITS TO MATCH EXISTING MASONRY CONSTRUCTION.
Q. EXISTING PLUMBING, ELECTRICAL, AND FIRE PROTECTION SYSTEMS NOT SHOWNSHALL REMAIN UNLESS INDICATED TO BE DEMOLISHED ON THE MECHANICAL ANDELECTRICAL PLANS. INSTALLATION OF NEW EQUIPMENT MAY NECESSITATE THEREROUTING OF EXISTING SYSTEMS TO REMAIN. COORDINATE WITH ENGINEER ANDOWNER.
R. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.
GENERAL MECHANICAL DEMOLITION NOTESA. THE PRIME CONTRACTOR AND ALL HIS SUB-CONTRACTORS SHALL REVIEW IN
DETAIL AND UNDERSTAND THE DRAWINGS, SPECIFICATIONS, AND BIDDOCUMENTS PRIOR TO PROVIDING A BID. IF ANY CONFLICTS ORCONTRADICTIONS BETWEEN THE DRAWINGS, SPECIFICATIONS, OR BIDDOCUMENTS ARE IDENTIFIED, OR IF THE DRAWINGS, SPECIFICATIONS, OR BIDDOCUMENTS CONFLICT WITH OBSERVED FIELD CONDITIONS, IT IS THE PRIMECONTRACTOR'S RESPONSIBILITY TO IMMEDIATELY SUBMIT A REQUEST FORINFORMATION (RFI) TO THE ENGINEER FOR A RESOLUTION PRIOR TO BID. IF NORFI'S ARE RECEIVED, IT IS THEN UNDERSTOOD THAT NO CONFLICTS ORCONTRADICTIONS UNDER THE ABOVE CONDITIONS EXIST.
B. ALL WORK SHALL BE PERFORMED IN A CLEAN AND WORKMANLIKE MANNER.CARE SHALL BE EXERCISED TO MINIMIZE ANY INCONVENIENCE OR DISTURBANCETO OTHER AREAS OF THE BUILDING WHICH ARE TO REMAIN IN OPERATION.
C. MECHANICAL CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND FIELDCONDITIONS PRIOR TO PROCEEDING WITH ANY WORK. ANY DISCREPANCIESSHALL BE REPORTED TO THE ENGINEER FOR RESOLUTION.
D. EXISTING MATERIALS THAT ARE REMOVED SHALL NOT BE REUSED IN NEWSYSTEMS UNLESS SPECIFIED.
E. MEASURES SHALL BE TAKEN TO ENSURE ALL SURFACES, INCLUDING BUT NOTLIMITED TO FINISHED FLOORS, ELEVATORS, AND INTERIOR WALLS, AREPROTECTED DURING DEMOLITION, EQUIPMENT INGRESS, AND OTHER MATERIALMOVEMENTS. ANY DAMAGE RESULTING FROM ACTIVITIES RELATED TO THISPROJECT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
F. MECHANICAL CONTRACTOR SHALL TAKE CARE TO PROTECT ADJACENT SPACESFROM CONSTRUCTION DUST/DEBRIS.
G. REFER TO MECHANICAL DRAWINGS, PROJECT SCHEDULE, CONSTRUCTIONPHASING, AND SCOPE OF WORK FOR ADDITIONAL INFORMATION. ALL WORKAFFECTING SHUTDOWN OF BUILDING UTILITY SYSTEMS SHALL BE COORDINATEDWITH OWNER.
H. ALL SHUT DOWNS OF EXISTING SYSTEMS SHALL BE SCHEDULED AND APPROVEDBY THE OWNER. SHUTDOWNS OF BUILDING SYSTEMS SHALL BE MINIMIZED TOFOUR (4) HOURS.
I. COORDINATE USE OF THE BUILDING ELEVATORS AND MATERIAL DELIVERIESWITH THE OWNER.
J. ANY PENETRATIONS MADE THROUGH EXTERIOR WALLS ARE TO BE SEALEDWEATHER TIGHT AND REPAIRED TO MATCH EXISTING SURFACES.
K. MAINTAIN ALL MANUFACTURER RECOMMENDED SERVICE CLEARANCES,INCLUDING BOTH NEW AND EXISTING EQUIPMENT.
L. THE CONTRACTOR SHALL PROVIDE MANUFACTURER'S INSTALLATIONINSTRUCTION TO BE AVAILABLE ON THE JOB SITE AT THE TIME OF INSPECTIONFOR EVERY APPLIANCE, APPURTENANCE, OR PIECE OF MECHANICALEQUIPMENT. IF SITE-FABRICATED EQUIPMENT IS TO BE A PART OF ANY SYSTEM,THE INSTALLATION INSTRUCTION SHALL BE AVAILABLE FOR EACH COMPONENT.LISTING AND LABELING FOR EQUIPMENT INSTALLED OUTDOORS SHALL ALSO BEAVAILABLE.
M. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.
GENERAL MECHANICAL NEW WORK NOTES
A. ALL WORK SHALL BE IN ACCORDANCE WITH THE CITY OF CHICAGO BUILDINGCODE REQUIREMENTS.
B. ALL EQUIPMENT FURNISHED AND INSTALLED SHALL BE IN FULL COMPLIANCE WITHTHE CURRENT STANDARDS SET BY THE CITY OF CHICAGO DEPARTMENT OFINSPECTIONAL SERVICES.
C. ALL NEW DUCTWORK INSTALLED SHALL BE OF GALVANIZED METAL. ALL SHEETMETAL INSTALLATION SHALL COMPLY WITH THE LATEST STANDARDS OF SMACNAAND ASHRAE.
D. ALL DUCT JOINTS, SEAMS, AND CONNECTIONS SHALL BE SEALED IN ACCORDANCEWITH THE CHICAGO ENERGY CONSERVATION CODE.
E. ALL NEW EQUIPMENT PROVIDED SHALL BE U.L. LISTED AND SHALL BEAR THE U.L.LABEL.
F. ALL OUTSIDE AIR INTAKES SHALL BE A MINIMUM DISTANCE OF 15'-0" FROM ANYEXHAUST LOUVERS, PLUMBING VENTS, OR ANY OTHER POSSIBLE CONTAMINANTSAND SHALL BE A MINIMUM DISTANCE OF 10'-0" ABOVE GRADE.
G. IF FLEXIBLE DUCTS ARE USED, DO NOT EXCEED 5'-0' IN LENGTH. ALL FLEXIBLEDUCTWORK TO BE CITY OF CHICAGO APPROVED.
H. NOISE FROM ALL MECHANICAL EQUIPMENT INSTALLED SHALL NOT EXCEED 55 DBAT THE PROPERTY LINE.
I. CLEARANCES FOR ALL VENTILATION EQUIPMENT MUST CONFORM TOMANUFACTURER'S REQUIREMENTS.
CITY OF CHICAGO NOTES
GUARANTEED RATE FIELD
HVAC / AHU RENOVATION PHASE IX
333 W. 35TH STREET
CHICAGO, ILLINOIS 60616
SCOPE OF WORK
10/07/2019
062-056281
Address:
Fully comply with the requirements of Chapter 18-13. Energy Conservation of theMunicipal Code of Chicago as effective April 22, 2009
Signed: Date:(Arch. S.E. or P.E.)
Illinois License Number:
I certify that I am a Registered Energy Professional (REP). I also certify that tothe best of my professional knowledge and belief that the plans for
ENERGY CODE COMPLIANCE STATEMENT
I hereby certify that these plans were prepared under my direct supervision andto the best of my professional knowledge they conform to the Chicago BuildingCode.
Signed: Date:(Arch. S.E. or P.E.)
CHICAGO BUILDING CODE COMPLIANCE STATEMENT
I hereby certify that the heating system will heat all rooms regularly occupied byhumans to an inside temperature of 68° when the outside temperature is minus10°F (As required by the Sections 34 (13-196-410) and 4 (5-4-270) of the 2010Chicago Building Code and by Paragraph 1204.1 of Chapter 18-12 (InteriorEnvironment) of the proposed Building Planning and Life Safety portion of theCode).
Signed:(Owner, Contractor, or Owner's Licensed Engineer Representative)
HEATING CERTIFICATION STATEMENT
19165
DESCRIPTIONDATEREV.
ISSUE/REVISION:
PROJECT NO:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
SCALE:
SHEET NO.
(708) 236-0330 FAX
Hillside, IL 60162
(708) 236-0300
30 N. Wolf Rd., Second Floor
PROJECT:
DRAWING TITLE:
333 WEST 35TH STREETCHICAGO, IL 60616
GUARANTEED RATE FIELD -HVAC / AHU RENOVATION -PHASE IX
10.07.2019 ISSUED FOR BID
ISSUED FOR BID
NOT FORCONSTRUCTION
10/07/2019
333 W. 35TH ST, CHICAGO, IL 60616
10/07/2019
REFER TO ENTIRE SET OF DOCUMENTS, PLANS, AND SPECIFICATIONS FORCOMPLETE PROJECT SCOPE. REFER TO BID DOCUMENTS FOR BID PACKAGES.
SERVICE LEVEL AHU MOTOR REPLACEMENTREPLACE AHU MOTORS AS DEFINED ON SHEET M0.02.
SIEMENS SHALL INCLUDE A MINIMUM OF 4 HOURS OF TIME TO MANIPULATE THECONTROLS SEQUENCE OF THE AIR HANDLING UNITS ASSOCIATED WITH THE WHITESOX OFFICES.
SIEMENS CONTACT:
CRAIG CRAWFORD, P.E., LEED APSIEMENS INDUSTRY, INC.INFRASTRUCTURE & CITIES SECTORBUILDING TECHNOLOGIES DIVISION585 SLAWIN COURTMT. PROSPECT, IL 60056CELL:(847) 305-0665FAX: (866)[email protected]
SERVICE LEVEL CHILLER REPLACEMENTREPLACE EXISTING AIR-COOLED CHILLER AS DEFINED ON SHEET M1.01.
SERVICE LEVEL VISITORS LOCKER ROOM COOLING MODIFICATIONSPROVIDE NEW FAN COIL UNIT SERVING BACK AREA OF VISITORS CLUBHOUSE ANDRE-BALANCE KITCHEN DIFFUSERS AS DEFINED ON SHEET M1.02.
SERVICE LEVEL BERTUCCIS GAS REGULATOR REPLACEMENTREPLACE EXISTING NATURAL GAS REGULATOR SERVING BERTUCCIS KITCHEN ASDEFINED ON SHEET M1.02.
SERVICE LEVEL PATIO CONDENSING UNIT REPLACEMENTREPLACE EXISTING CONDENSING UNIT, REFRIGERANT PIPING, AND DX COILSERVING PATIO AHU AS DEFINED ON SHEET M1.03.
200 LEVEL FAN COIL REPLACEMENTREPLACE EXISTING FAN COILS AS DEFINED ON SHEET M1.21.
200 LEVEL CONDENSING UNITS REPLACEMENTREPLACE EXISTING CONDENSING UNITS AS DEFINED ON SHEETS M1.21.
200 LEVEL REFRIGERANT PIPING INSULATIONRE-INSULATE AND JACKET ALL OUTDOOR REFRIGERANT PIPING AS DEFINED SHEETM1.21.
400 LEVEL FAN COIL REPLACEMENTREPLACE EXISTING FAN COILS AS DEFINED ON SHEET M1.41.
VALVE TAGGING STANDARDAS PART OF THIS PROJECT, A VALVE TAGGING STANDARD SHALL BE IMPLEMENTEDFOR ALL WORK MOVING FORWARD. REFER TO DETAILS AND SPECIFICATIONS.
Sheet List TableSheet Number Sheet Title
M0.01 MECHANICAL COVER PAGE
M0.02 SERVICE LEVEL OVERALL MECHANICAL PLAN
M0.03 LEVEL 200 OVERALL MECHANICAL PLAN
M0.04 LEVEL 400 OVERALL MECHANICAL PLAN
M1.01 SERVICE LEVEL MECHANICAL WORK PLAN
M1.02 SERVICE LEVEL MECHANICAL WORK PLAN
M1.03 SERVICE LEVEL MECHANICAL WORK PLAN
M1.21 200 LEVEL MECHANICAL WORK PLAN
M1.41 400 LEVEL MECHANICAL WORK PLAN
M2.01 MECHANICAL DETAILS
M3.01 MECHANICAL SCHEDULES
M4.01 MECHANICAL SPECIFICATIONS
M4.02 MECHANICAL SPECIFICATIONS
SCALE:
LOCATION MAP
1 NO SCALE
LOT #6
S. PRIN
CETON AVE.
GATE 6
SERVICE LEVEL
ON AHU-1F-02, REPLACE EXISTING SUPPLY FAN MOTOR WITH NEW(EMERSON, 10 HP, 480V, 3PH, 1800 RPM) MOTOR. VERIFY MOTOR
SIZE IN FIELD PRIOR TO ORDERING. PROVIDE FULL START UP ANDENSURE PROPER FUNCTIONALITY. ALTERNATE PRICE TO REPLACE
BEARINGS ON EXISTING MOTOR. AHU LOCATED ON CATWALKABOVE CEILING. THIS WORK SHALL OCCUR OVER THE WINTER
HOLIDAY BREAK, COORDINATE WITH OWNER.
IN VISITORS CLUBHOUSE, PROVIDE COOLINGMODIFICATIONS. REFER TO ENLARGED PLANS FORADDITIONAL INFORMATION.
ON AHU-1E-04, REPLACE EXISTING SUPPLY FAN MOTOR WITH NEW(EMERSON, 10 HP, 480V, 3PH, 1800 RPM) MOTOR. VERIFY MOTOR
SIZE IN FIELD PRIOR TO ORDERING. PROVIDE FULL START UP ANDENSURE PROPER FUNCTIONALITY. ALTERNATE PRICE TO
REPLACE BEARINGS ON EXISTING MOTOR. AHU LOCATED ONCATWALK ABOVE CEILING. THIS WORK SHALL OCCUR OVER THE
WINTER HOLIDAY BREAK, COORDINATE WITH OWNER.
REPLACE EXISTING NATURAL GAS REGULATORSERVING BERTUCCI'S KITCHEN WITH NEW. REFER TOENLARGED PLANS FOR ADDITIONAL INFORMATION.
REPLACE EXISTING AIR COOLED CHILLER(CHILLER #2) WITH NEW. REFER TO ENLARGED
PLANS FOR ADDITIONAL INFORMATION.
REPLACE EXISTING AHU DX COIL AND REFRIGERANTPIPING WITH NEW, REFER TO ENLARGED PLANS FOR
ADDITIONAL INFORMATION.
KEY PLANKEY PLAN
N
10
9
8
67
111
3
5
4
2
19165
DESCRIPTIONDATEREV.
ISSUE/REVISION:
PROJECT NO:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
SCALE:
SHEET NO.
(708) 236-0330 FAX
Hillside, IL 60162
(708) 236-0300
30 N. Wolf Rd., Second Floor
PROJECT:
DRAWING TITLE:
333 WEST 35TH STREETCHICAGO, IL 60616
GUARANTEED RATE FIELD -HVAC / AHU RENOVATION -PHASE IX
10.07.2019 ISSUED FOR BID
ISSUED FOR BID
NOT FORCONSTRUCTION
10/07/2019
M0.02
SERVICE LEVEL OVERALLMECHANICAL PLAN
1/32" = 1'-0"
AS
AS
MS
200 LEVEL
REPLACE (2) EXISTING CONDENSING UNITS ON ROOFWITH NEW. REFER TO ENLARGED PLANS FORADDITIONAL INFORMATION.
REPLACE (3) FAN COIL UNITS SERVING GIFT SHOP ANDCORRIDOR WITH NEW. REFER TO ENLARGED PLANSFOR ADDITIONAL INFORMATION.
REPLACE (1) EXISTING CONDENSING UNIT ON ROOFWITH NEW. REFER TO ENLARGED PLANS FORADDITIONAL INFORMATION.
KEY PLANKEY PLAN
N
10
9
8
67
111
3
5
4
2
19165
DESCRIPTIONDATEREV.
ISSUE/REVISION:
PROJECT NO:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
SCALE:
SHEET NO.
(708) 236-0330 FAX
Hillside, IL 60162
(708) 236-0300
30 N. Wolf Rd., Second Floor
PROJECT:
DRAWING TITLE:
333 WEST 35TH STREETCHICAGO, IL 60616
GUARANTEED RATE FIELD -HVAC / AHU RENOVATION -PHASE IX
10.07.2019 ISSUED FOR BID
ISSUED FOR BID
NOT FORCONSTRUCTION
10/07/2019
M0.03
LEVEL 200 OVERALLMECHANICAL PLAN
1/32" = 1'-0"
AS
AS
MS
400 LEVEL
REPLACE ALL FAN COIL UNITS SERVING PRESSBOXWITH NEW. REFER TO ENLARGED PLANS FORADDITIONAL INFORMATION.
REPLACE FAN COIL UNIT SERVING CONFERENCEROOM WITH NEW. REFER TO ENLARGED PLANS FORADDITIONAL INFORMATION.
KEY PLANKEY PLAN
N
10
9
8
67
111
3
5
4
2
19165
DESCRIPTIONDATEREV.
ISSUE/REVISION:
PROJECT NO:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
SCALE:
SHEET NO.
(708) 236-0330 FAX
Hillside, IL 60162
(708) 236-0300
30 N. Wolf Rd., Second Floor
PROJECT:
DRAWING TITLE:
333 WEST 35TH STREETCHICAGO, IL 60616
GUARANTEED RATE FIELD -HVAC / AHU RENOVATION -PHASE IX
10.07.2019 ISSUED FOR BID
ISSUED FOR BID
NOT FORCONSTRUCTION
10/07/2019
M0.04
LEVEL 400 OVERALLMECHANICAL PLAN
1/32" = 1'-0"
AS
AS
MS
GATE 6
CHWR
CHWSCHWS
CHWR
CHWS
CH2
CH-1 (ETR)
24
3
1
1
5
475TON
3
(3)#300 MCM, (1)#1G IN 3"C (2 SETS)(3)#400 MCM, (1) 1/0G IN 3"C (2 SETS)
ELEC. DISCONNECTENCLOSURE FOR CH-2
21
2
4
EXISTING FENCE, PROTECTDURING CONSTRUCTION.
KEY PLANKEY PLAN
N
10
9
8
67
111
3
5
4
2
19165
DESCRIPTIONDATEREV.
ISSUE/REVISION:
PROJECT NO:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
SCALE:
SHEET NO.
(708) 236-0330 FAX
Hillside, IL 60162
(708) 236-0300
30 N. Wolf Rd., Second Floor
PROJECT:
DRAWING TITLE:
333 WEST 35TH STREETCHICAGO, IL 60616
GUARANTEED RATE FIELD -HVAC / AHU RENOVATION -PHASE IX
10.07.2019 ISSUED FOR BID
ISSUED FOR BID
NOT FORCONSTRUCTION
10/07/2019
SCALE:
SERVICE LEVEL (SECTION 10) - PARTIAL MECHANICAL PLAN
1 1/8" = 1'-0"
0 4' 8' 16'8'
SCALE: 1/8" = 1'-0" M1.01
SERVICE LEVELMECHANICAL WORK PLAN
VARIES
AS
AS
MS
KEYED ELECTRICAL NEW WORK NOTES #1. EXISTING 800A AND 600A FUSED SWITCHES TO REMAIN. REPLACE 800A FUSES
(3) WITH 700A FUSES.
2. DISCONNECT AND REMOVE EXISTING CABLES AND CONDUIT WHERE POSSIBLE.CAP ANY UNDERGROUND CONDUIT THAT MUST REMAIN.
3. NEW CONDUIT SHALL BE ROUTED UNDERGROUND FOR NEW POWERCONNECTIONS.
4. RECONNECT EXISTING GROUND RING TO NEW CHILLER.
KEYED MECHANICAL NEW WORK NOTES #1. EXISTING CHILLED WATER PIPING TO REMAIN, PROTECT DURING
CONSTRUCTION.
2. REPLACE EXISTING AIR COOLED CHILLER WITH NEW. INSTALL PERMANUFACTURER'S REQUIREMENTS. REFER TO SCHEDULES FOR ADDITIONALINFORMATION.
PRIOR TO REMOVAL OF THE FAILED CARRIER CHILLER, THE FOLOWING PARTSSHALL BE SALVAGED AND TURNED OVER TO ISFA:
· CONDENSING FANS AND MOTORS· COMPRESSORS· MAIN CONTROL ELECTRONICS· ANY CONDENSER COILS NOT SHOWING SIGNS OF OIL LEAKS.
3. REPLACE ISOLATION VALVE AND STRAINER ON CHWS PIPING. PROVIDE NEWPIPING FROM ISOLATION VALVE UP TO NEW CHILLER. MATCH EXISTING PIPESIZE.
4. REPLACE ISOLATION VALVE AND CONTROL VALVE ON CHWR PIPING. PROVIDENEW PIPING FROM ISOLATION VALVE UP TO NEW CHILLER. MATCH EXISTINGPIPE SIZE.
5. MODIFY EXISTING CONCRETE PAD ON GRADE IF REQUIRED TO ACCOMMODATENEW CHILLER DIMENSIONS.
80-E
250-E
385-S
100-E
330-S
150-R
170-R
390-S
390-S
390-S
390-S
410-E
1050-E
1000-E
1000-E
205-S
205-S
175-E
105-E
AHU-1C-15350-S
(100% OA)
100-S
RF-1C-1320-R
8x8
8"∅
8"∅
14"∅
150-S
120-S
T
8"∅
14"∅
14"∅
10x8
BI
T
38x2030x2
0
30x2
0
18x14
18x1412x12
18x1
4
24x1
4
8"∅
24x1
2
14x10
16x1
2
8x6
12x12
16x6
12"∅
10x8 BI
12x1
0
8"∅
10x1010x10
10x10
12"∅
12"∅
8"∅
18x1
0
32x18
26x8
18x10
12x10
12x1
0
120-E
16x6
32x18
16x1
4
12x1
2
125-S
250-S
250-E
250-S
250-S
250-S
300-S
940-E 1500-E
390-S
8"∅
FCU3
1000CFM
6
125-S
6
6
66
14x12
12x1
2
10x1
2
T
M
ACD1
585 CFMOA
1
22
2
2 390-S
23
3
4
7
5
24X24425-R
A
6
6
6
380-S
CU
AC
EF
1
NG
NG NG
NG
EXISTING GAS REGULATOR TO BE REPLACEDWITH NEW. MATCH EXISTING SIZE.(MODEL 210-G, 10 PSI INLET PRESSURE)
KEY PLANKEY PLAN
N
10
9
8
67
111
3
5
4
2
19165
DESCRIPTIONDATEREV.
ISSUE/REVISION:
PROJECT NO:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
SCALE:
SHEET NO.
(708) 236-0330 FAX
Hillside, IL 60162
(708) 236-0300
30 N. Wolf Rd., Second Floor
PROJECT:
DRAWING TITLE:
333 WEST 35TH STREETCHICAGO, IL 60616
GUARANTEED RATE FIELD -HVAC / AHU RENOVATION -PHASE IX
10.07.2019 ISSUED FOR BID
ISSUED FOR BID
NOT FORCONSTRUCTION
10/07/2019
SCALE:
SERVICE LEVEL (SECTION 5) - PARTIAL MECHANICAL PLAN
2 1/8" = 1'-0"
0 4' 8' 16'8'
SCALE: 1/8" = 1'-0" M1.02
SERVICE LEVELMECHANICAL WORK PLAN
VARIES
AS
AS
MS
SCALE:
SERVICE LEVEL (SECTION 3) - PARTIAL MECHANICAL PLAN
1 1/8" = 1'-0"
0 4' 8' 16'8'
SCALE: 1/8" = 1'-0"
KEYED MECHANICAL NEW WORK NOTES #1. NEW FAN COIL UNIT. VERIFY LOCATION OF NEW UNIT WITH EXISTING OBJECTS
IN CEILING. ROUTE NEW CHILLED WATER PIPING FROM NEAREST MAIN, VERIFYLOCATION IN FIELD. ROUTE NEW CONDENSATE DRAIN TO JANITOR SINK INLAUNDRY ROOM.
2. DEMOLISH EXISTING SUPPLY DUCT AND CAP AT MAIN.
3. ROUTE NEW SUPPLY DUCT FROM FAN COIL UNIT TO EXISTING SUPPLYDIFFUSER.
4. NEW RETURN DUCT WITH FILTER RETURN GRILLE. PROVIDE BALANCINGDAMPER.
5. NEW 12x10 DUCT FROM EXISTING MAIN (100% OA) TO PROVIDE REQUIREDVENTILATION. PROVIDE MOTORIZED DAMPER INTERLOCKED TO BAS.
6. RE-BALANCE EXISTING SUPPLY DIFFUSER TO CFM INDICATED.
7. NEW THERMOSTAT TO MATCH FACILITY STANDARD TYPE.
KEYED ELECTRICAL NEW WORK NOTES #1. PROVIDE 277V POWER FROM NEAREST PANEL. PROVIDE UNIT MOUNTED
TOGGLE SWITCH FOR SERVICE.
3
4
3DC1
CU1
2
1
1
1
3
3
1
KEY PLANKEY PLAN
N
10
9
8
67
111
3
5
4
2
19165
DESCRIPTIONDATEREV.
ISSUE/REVISION:
PROJECT NO:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
SCALE:
SHEET NO.
(708) 236-0330 FAX
Hillside, IL 60162
(708) 236-0300
30 N. Wolf Rd., Second Floor
PROJECT:
DRAWING TITLE:
333 WEST 35TH STREETCHICAGO, IL 60616
GUARANTEED RATE FIELD -HVAC / AHU RENOVATION -PHASE IX
10.07.2019 ISSUED FOR BID
ISSUED FOR BID
NOT FORCONSTRUCTION
10/07/2019
SCALE:SERVICE LEVEL (SECTION 2) - PARTIAL MECHANICAL PLAN
1 1/8" = 1'-0"
0 4' 8' 16'8'
SCALE: 1/8" = 1'-0"
M1.03
SERVICE LEVELMECHANICAL WORK PLAN
VARIES
AS
AS
MS
KEYED MECHANICAL NEW WORK NOTES #1. EXISTING CARRIER 26 TON CONDENSING UNIT (INSTALLED IN 2006) AND
ASSOCIATED REFRIGERANT PIPING TO REMAIN. (SERVING PATIO UNIT)
2. EXISTING CARRIER 26 TON CONDENSING UNIT (INSTALLED IN 2006) TO BEDISCONNECTED AND REPLACED WITH NEW. (SERVING PATIO UNIT). MODIFYEXISTING SUPPORTS AND ROOFING AS REQUIRED.
3. REPLACE ALL REFRIGERANT PIPING WITH NEW, ROUTED TO AIR HANDLER INPATIO DINING AREA. SIZE NEW REFRIGERANT PIPING PER MANUFACTURER'SRECOMMENDATIONS.
4. EXISTING AIR HANDLER TO REMAIN. REPLACE EXISTING DX COIL AS REQUIREDFOR OPERATION WITH NEW CONDENSING UNIT.
KEYED ELECTRICAL NEW WORK NOTES #1. DISCONNECT AND RE-FUSE IF NECESSARY.
SCALE:200 LEVEL (SECTION 2) - PARTIAL MECHANICAL PLAN
2 1/8" = 1'-0"
0 4' 8' 16'8'
SCALE: 1/8" = 1'-0"
1
2
3
4
5
T
T T
T
8x8
FCU1
300CFM
FCU1
300CFM
FCU2
800CFM
14x1
2
10x1
0 8x8
24x1
4
12x12
AHU3D-2
6
6
6
10
66
6
7
7
8 8
8
9
CU2
CU3
11
11
11
24X24600-R
A
2
2
1
11
KEY PLANKEY PLAN
N
10
9
8
67
111
3
5
4
2
19165
DESCRIPTIONDATEREV.
ISSUE/REVISION:
PROJECT NO:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
SCALE:
SHEET NO.
(708) 236-0330 FAX
Hillside, IL 60162
(708) 236-0300
30 N. Wolf Rd., Second Floor
PROJECT:
DRAWING TITLE:
333 WEST 35TH STREETCHICAGO, IL 60616
GUARANTEED RATE FIELD -HVAC / AHU RENOVATION -PHASE IX
10.07.2019 ISSUED FOR BID
ISSUED FOR BID
NOT FORCONSTRUCTION
10/07/2019
SCALE:
200 LEVEL (SECTION 6-7) - PARTIAL MECHANICAL PLAN
1 1/8" = 1'-0"
0 4' 8' 16'8'
SCALE: 1/8" = 1'-0"M1.21
200 LEVEL MECHANICALWORK PLAN
VARIES
AS
AS
MS
KEYED MECHANICAL NEW WORK NOTES #1. EXISTING TRANE 90 TON AIR-COOLED CHILLER TO REMAIN.
2. EXISTING CARRIER 10 TON CONDENSING UNIT (INSTALLED IN 2014) TOREMAIN.
3. EXISTING CARRIER 15 TON CONDENSING UNIT (INSTALLED IN 2010) TO BEDISCONNECTED AND REPLACED WITH NEW. RE-CONNECT EXISTINGREFRIGERANT PIPING. MODIFY EXISTING SUPPORTS AND ROOFING ASREQUIRED.
4. EXISTING CARRIER 15 TON CONDENSING UNIT (INSTALLED IN 2010) TO BEDISCONNECTED AND REPLACED WITH NEW. RE-CONNECT EXISTINGREFRIGERANT PIPING. MODIFY EXISTING SUPPORTS AND ROOFING ASREQUIRED.
5. EXISTING CARRIER AIR-COOLED CHILLER TO REMAIN.
6. EXISTING DUCTWORK TO REMAIN WITHOUT MODIFICATION.
7. REMOVE EXISTING THERMOSTAT. CAP EXISTING TUBING WITHIN WALL IFPNEUMATIC SYSTEM. PROVIDE NEW USER ADJUSTABLE, SIEMENSTHERMOSTAT. REFER TO SPECIFICATIONS FOR ADDITIONAL CONTROLINFORMATION. PRIOR TO REMOVAL, VERIFY THERMOSTAT IS SERVING FANCOIL TO ALSO BE REPLACED.
8. DISCONNECT AND REPLACE EXISTING FAN COIL UNIT. MODIFY ANDTRANSITION DUCTWORK CONNECTION AS REQUIRED TO RE-USE EXISTINGDUCTWORK. REMOVE AND REPLACE ALL ASSOCIATED CHILLED WATERPIPING BACK TO EXISTING ISOLATION VALVE. REFER TO DETAILS,SCHEDULES, AND ENLARGED PLAN FOR ADDITIONAL INFORMATION.
9. NEW FILTER RETURN GRILLE. REFER TO DETAILS AND SCHEDULES FORADDITIONAL INFORMATION.
10. EXISTING EQUIPMENT TO REMAIN WITHOUT MODIFICATION. PROTECTDURING CONSTRUCTION.
11. EXISTING REFRIGERANT PIPING TO REMAIN. REPLACE ALL INSULATIONWITH NEW AND PROVIDE METAL JACKET ON ALL OUTDOOR REFRIGERANTPIPING.
KEYED ELECTRICAL NEW WORK NOTES
1. DISCONNECT AND REMOVE POWER CONNECTION FROM EXISTING FAN COILUNIT. EXISTING WIRES AND CONDUIT SHALL REMAIN. DISCONNECT, REMOVE ,AND RE-INSTALL EXISTING LOCAL DISCONNECT SWITCH TO NEW FAN COILUNIT. EXTEND CONDUIT AND WIRES AS REQUIRED TO RECONNECT EXISTINGBRANCH CIRCUITS TO NEW FAN COIL UNIT.
2. DISCONNECT AND REMOVE POWER CONNECTION FROM EXISTINGCONDENSING UNIT. EXISTING WIRES AND CONDUIT SHALL REMAIN.DISCONNECT, REMOVE , AND RE-INSTALL EXISTING LOCAL DISCONNECTSWITCH TO NEW CONDENSING UNIT. EXTEND CONDUIT AND WIRES ASREQUIRED TO RECONNECT EXISTING BRANCH CIRCUITS TO NEW CONDESNINGUNIT.
#
T
T
LH10x8
M
1
2
3
5
1
T
T
T
T
TT
T
T
LH
LH
LH
LH
TT
T
T
12x1
0
10x8
20x1
0
24x1
0
30x1
2
RH
36x1
2
EF
10x8
M
M
10x8
RH
RH
LH
LH
LH
LH
10x8
M
10x8
M
10x8
M
10x8
M
10x8
M
10x8
M
10x8
M
10x8
M
10x8
M
10x8
10x8
M
31
31
31
31
31
31
31
31
31
31
2
4
1
2
2 5
5
5
5
5
5
5
5
5
5
1
1
1
1
1
1
1
1
1
1
1
31 2
2
2
2
2
FCU5 1600
CFM
FCU5
FCU5
FCU5
FCU5
FCU5
FCU5
FCU5
FCU5
FCU5
FCU5
1600CFM
1600CFM
1600CFM
1600CFM
1600CFM
1600CFM
1600CFM
1600CFM
1600CFM
1600CFM
N.I.C.
FCU4
1200CFM
8x8 12x1
0
24X24425-R
A
24X24600-R
A
5
5
7
6
ACD2
125 CFMOA
CONDCHWSCHWR
20x1
2 1" C
ON
D1-
1/4"
CH
WS
1-1/
4" C
HW
R
ISOLATION VALVES TO BE INLOCATED IN SUITE. (TYP.)
CONTROL VALVE. REFER TO DETAILS FORCOMPLETE PIPING ARRANGEMENT.
TRANSITION NEW SUPPLY DUCTWORK ASREQUIRED TO CONNECT TO EXISTINGDUCTWORK. INSULATE DUCTWORK PERSPECIFICATIONS.
FLEX CONNECTION AT DISCHARGE AND INLETOF FAN COIL UNIT.
EXISTING SUPPLY DUCTWORK AND DIFFUSERSTO REMAIN. ADJUST EXISTING VOLUMEDAMPERS AS NECESSARY FOR EVEN AIRFLOW.
EXISTING ELECTRIC DUCT HEATER TOREMAIN. MAINTAIN ALL HEATER INTERLOCKS.
REPLACE EXISTING RETURN GRILLE WITH NEWTYPE 'A' RETURN AIR FILTER GRILLE. REFER TODETAILS AND SCHEDULES FOR ADDITIONALINFORMATION.
INSULATE ALL NEW PIPING AND VALVES PERSPECIFICATIONS.
DEMOLISH EXISTING PIPING BACK TO MAININ CORRIDOR AND CONNECT NEW PIPING.VERIFY ACTUAL LOCATION IN FIELD (TYP.)
RETURN AIR DUCT, RE-USE OF EXISTING RETURNDUCTWORK PERMITTED IF EQUIVALENT SIZE
REPLACE EXISTING FAN COIL UNIT AT SAMELOCATION, INSTALL PER MANFACTURER'SREQUIREMENTS. VERIFY ALL COIL HANDS INFIELD. REFER TO DETAILS AND SCHEDULESFOR ADDITIONAL INFORMATION.
24x24RETURN
A
O.A
.
EXISTING OUTDOOR AIR SERVING FAN COILUNIT TO BE DISCONNECTED AND CAPPED.CODE REQUIRED OUTSIDE AIR VENTILATIONREQUIREMENTS ACHIEVED THRU NATURALVENTILATION (147"x70" OPERABLE WINDOWS).
REPLACE THERMOSTAT IN SAME LOCATION.THERMOSTAT LOCATION MAY VARY BETWEENSUITES, REFER TO PLANS FOR LOCATIONS.
T
CLEAN ALL EXISTING DIFFUSERS TO REMAIN.
PIPE SIZES MAY DIFFER BETWEEN FAN COILUNITS. NEW PIPE SIZE TO MATCH EXISTING BEINGREPLACED, VERIFY IN FIELD. (TYP.)
SCALE:
400 LEVEL (SECTION 5) - PARTIAL MECHANICAL PLAN
1 1/8" = 1'-0"
0 4' 8' 16'8'
SCALE: 1/8" = 1'-0"
KEY PLANKEY PLAN
N
10
9
8
67
111
3
5
4
2
19165
DESCRIPTIONDATEREV.
ISSUE/REVISION:
PROJECT NO:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
SCALE:
SHEET NO.
(708) 236-0330 FAX
Hillside, IL 60162
(708) 236-0300
30 N. Wolf Rd., Second Floor
PROJECT:
DRAWING TITLE:
333 WEST 35TH STREETCHICAGO, IL 60616
GUARANTEED RATE FIELD -HVAC / AHU RENOVATION -PHASE IX
10.07.2019 ISSUED FOR BID
ISSUED FOR BID
NOT FORCONSTRUCTION
10/07/2019
SCALE:TYPICAL FAN COIL UNIT NEW WORK
2 3/8" = 1'-0"
2'
SCALE: 3/8" = 1'-0"
02' 4' 6'
KEYED MECHANICAL NEW WORK NOTES #1. EXISTING DUCTWORK TO REMAIN WITHOUT MODIFICATION.
2. REMOVE EXISTING THERMOSTAT. CAP EXISTING TUBING WITHIN WALL IFPNEUMATIC SYSTEM. PROVIDE NEW USER ADJUSTABLE, SIEMENSTHERMOSTAT. REFER TO SPECIFICATIONS FOR ADDITIONAL CONTROLINFORMATION.
3. DISCONNECT AND REPLACE EXISTING FAN COIL UNIT. MODIFY AND TRANSITIONDUCTWORK CONNECTION AS REQUIRED TO RE-USE EXISTING DUCTWORK.REMOVE AND REPLACE ALL ASSOCIATED CHILLED WATER PIPING BACK TOEXISTING ISOLATION VALVE. REFER TO DETAILS, SCHEDULES, AND ENLARGEDPLAN FOR ADDITIONAL INFORMATION.
4. EXISTING PRESSURIZATION EXHAUST FAN TO BE LEFT ABANDONED.
5. NEW FILTER RETURN GRILLE. REFER TO DETAILS AND SCHEDULES FORADDITIONAL INFORMATION. (TYPE A)
6. ROUTE NEW OUTDOOR AIR DUCTWORK TO NEW FAN COIL UNIT AS SHOWN.CONNECT TO EXISTING. VERIFY EXACT ROUTING IN FIELD.
7. NEW MOTORIZED OA DAMPER. INTERLOCK TO EXISTING BAS SYSTEM.
KEYED ELECTRICAL NEW WORK NOTES
1. DISCONNECT AND REMOVE POWER CONNECTION FROM EXISTING FAN COILUNIT. EXISTING WIRES AND CONDUIT SHALL REMAIN. DISCONNECT, REMOVE ,AND RE-INSTALL EXISTING LOCAL DISCONNECT SWITCH TO NEW FAN COILUNIT. EXTEND CONDUIT AND WIRES AS REQUIRED TO RECONNECT EXISTINGBRANCH CIRCUITS TO NEW FAN COIL UNIT.
#
M1.41
400 LEVEL MECHANICALWORK PLAN
VARIES
AS
AS
MS
SCALE: NO SCALE
TYPICAL FAN COIL DETAIL
HINGED TO ACCESS FILTER FOREASY REPLACEMENT.
1" FILTER
NEW RETURN AIR FILTERGRILLE. REFER TO SCHEDULEFOR ADDITIONAL INFORMATION.
RETURN AIR DUCTWORK, RE-USE OFRETURN DUCTWORK IS PERMITTED.REFER TO PLANS FOR SIZE.
TWO-WAY TEMPERATURE CONTROL VALVEFURNISHED BY BASC, INSALLED BY MC
STRAINER
ISOLATION BALL VALVE (TYP.)
REDUCER/INCREASER ASNECESSARY (TYP.)
UNION (TYP.)
TRAP CONDENSATEPPING AT DRAIN PAN
DRAIN PAIN
FLEXIBLE CONNECTION TORETURN AIR DUCT.
FABRICATE RETURN AIR PLENUMAROUND SUPPLY FAN SECTION.
STEEL HANGER ROD SUPPORTSAS REQUIRED.
COOLING COIL, DETERMINE PIPINGCONNECTION HAND IN FIELD.
FLEX CONNECTION TO NEW LINEDLOW VELOCITY SUPPLY DUCTWORKOFF OF COIL AND CONNECT TOEXISTING DUCTWORK (NOT SHOWN,REFER TO PLANS).
JUNCTION BOX.
AIR VENT
BALANCING VALVE
3/4" MIN. DRAIN VALVE
CONNECT NEW PIPING TO EXISTINGCHWS/CHWR PIPING AND CONDENSATE
PIPING IN CORRIDOR. INSULATE ALLNEW PIPING PER SPECIFCATIONS (TYP.)
CHWS
CHWR
DR
3/4" INSULATED DRAIN PIPINGPITCHED, PROVIDE CLEANOUT.
SCALE: NO SCALE
LOW POINT MANUAL DRAIN DETAIL
EXISTING OBSTRUCTIONS (TYP.)
WATER FLOW
THREADED HOSE CONNECTIONWITH SCREWED ON CAP.
SCHEDULE 80 BLACK NIPPLE
300 PSI FULL STRENGTH COUPLINGWELDED TO PIPING; 1/4" MINIMUMSIZE
INSTALL DRAIN AT LOWEST POINTOF OBSTRUCTION
3/4" BALL VALVE
INSULATION AND VAPOR BARRIERAS REQUIRED.
SCALE: NO SCALE
TYPICAL PIPE IDENTIFICATION MARKERS DETAIL
LEGEND LEGEND
LEGEN
D
LEGEND
NOTES:
1. STENCIL TYPE MARKERS WILL NOT BE PERMITTED. ONLY FACTORYMANUFACTURED MARKERS AS FOLLOWS WILL BE ACCEPTABLE:· PIPES 3/4" THRU 5-7/8" DIAMETER: USE "SNAP-AROUND" TYPE.· PIPES 6" DIAMETER AND LARGER: USE "STRAP-AROUND" TYPE.
2. IDENTIFICATION MARKERS SHALL BE PLACED ON ALL EXPOSED COVERED ANDUNCOVERED PIPES AT 20'-0" INTERVALS, AT ALL VALVES AND BRANCHES, ANDON BOTH SIDES OF WALLS WHERE PIPES PASS THROUGH. ARROWS OF SAMECOLOR AS IDENTIFICATION MARKERS SHALL ALSO BE PLACED ON PIPESPOINTING AWAY FROM MARKER INDICATING DIRECTION OF FLOW.
OUTSIDEDIAMETER OF PIPE
OF COVERING
3/4" TO 1-1/4"1-1/2" TO 2"2'-1/2" TO 6"
8" TO 10"OVER 10"
8"8"
12"24"32"
SIZE OF LEGEND LETTERSLENGTH OF
COLOR FIELD"A"
1/2"3/4"
1-1/4"2-1/2"3-1/2"
SIZE OFLETTERS
"B"
A B
PLANTAG
CHWRCHWS
COND / DR
CHILLED WATER RETURNCHILLED WATER SUPPLYCONDENSATE (DRAIN)
SERVICE IDENTIFICATION MARKER
WHITE LETTERING ON GREEN BACKGROUNDWHITE LETTERING ON GREEN BACKGROUNDWHITE LETTERING ON GREEN BACKGROUND
PERSON'SLINE OF SIGHT
SCALE: NO SCALE
VALVE TAG AND VALVE CHART SAMPLE DETAIL
1CW
CW-1
VALVETAG #
RM. XXX - ABOVE CEILING
LOCATION (ALSO SEE AS-BUILT DRAWINGS)
ON/OFF - FIXTURES IN RM. XXX & XXX...
FUNCTION (WHAT IT DOES & WHAT/WHERE IT SERVICES)
BV
TYPE
1"
SIZE
BELL AND GOSSETT
MANUFACTURER MODEL NUMBER
XX-XXX-XX
VALVE TAG CHART FOR: XXXXXXX MOD: XXX AREA: XXX WING: XXX FLOOR: XXX
CW-2 CORR. XXX - ABOVE DOOR @ RM. XXX BALANCE - 2ND FLOOR, EAST SIDE, NORTH WING BFV 1-1/2" ALLEN BRADLEY XX-XXX-XX
CW-3 BOILER RM. XXX - NE CORNER ON/OFF - MAIN - BLDGS X, Y, & Z GV 8" BELL AND GOSSETT XX-XXX-XX
CW-4 RM. XXX - BEHIND N. ACCESS PANEL ON/OFF - EXTERIOR FIELD HOUSE - IRRIGATION BV 3" M & M XX-XXX-XX
CW-5 RM. XXX - ABOVE CEILING ON/OFF - MIXING VALVE - EYEWASH BV 1" GTM & S XX-XXX-XX
NOTES:
1. ABBREVIATIONS SHALL BE INDICATED FOR EACH DESIGN SYSTEM AS THEY APPEAR ON THE DESIGN DRAWINGS.2. VALVE TAGS SHALL BE INDICATED IN "VALVE CHARTS" AND ON "PROJECT RECORD" DRAWINGS AND SHALL CORRELATE WITH TAG I.D.'S.3. ALL MAJOR SYSTEMS ON-OFF, CONTROL, AND BALANCING VALVES SHOULD HAVE AN ASTERIK***.4. PROVIDE 8.5" x 11" VALVE TAG SHEETS IN A 3-RING BINDER FOR REPRODUCTION AND/OR FUTURE EDITING.5. REFERENCE ALL "VALVE TAGS" TO "VALVE TAG CHARTS", "AS BUILT DRAWINGS", AND "O & M MANUAL DATA" (INDEX VALVES PER CHART).
EXAMPLE VALVE TAG CHART BELOW:
SECURE TO VALVE WITH BRASS CHAINAND HOOD. DRILL VALVE HANDLE AS
REQUIRED TO ACCEPT TAG CHAIN.
TYPICAL LAMINATE THREE LAYER PLASTIC ORBRASS VALVE TAG PER SPECIFICATIONS. PLASTIC
TAGS SHALL HAVE COLORED BACKGROUNDWHICH COINCIDES WITH SERVICE COLOR
EMBOSSED/PRINTED LETTERING
TAG LEGEND (PLUMBING EXAMPLE)CW = COLD / CITY WATERHW = HOT WATERHWR = HOT WATER RE-CIRCULATINGG = GASFP = FIRE PROTECTION
TAG LEGEND (HYDRONIC EXAMPLE)HWS = HOT WATER SUPPLYHWR = HOT WATER RETURNCHWS = CHILLED WATER SUPPLYCHWR = CHILLED WATER RETURNG = GAS
TAG DIAMETER 1-1/2"(MINIMUM)
SYSTEM TYPE -1/4" TEXT MINIMUM
VALVE NUMBER -1/2" TEXT MINIMUM
SCALE: NO SCALE
PIPING HANGER DETAILS
STEEL BEAM CONCRETE INSERT
STEEL JOIST WOOD JOIST OR BEAM
HEAVY-DUTYBEAM CLAMP
HANGER ROD
STRUCTURALSTEEL BEAM
ADJUSTABLE STEELU-SUPPORT
LOCKING NUT
HANGER ROD
WOOD JOIST ORBEAM
LAG SCREWS
SUPPORT NUTONE ANGLE EACH SIDE OF WEB
MEMBERS. REST ON TOP OFTOP CHORD OF OPEN WEB
STRUCTURAL JOIST BETWEENPANEL POINTS. SIZE FOR LOAD.
HANGER NUT
HANGER ROD
BENT STRAP 1-1/2" x 3/16" OVERVERTICAL LEGS OF ANGLES
TOP CHORD OF OPEN WEBSTRUCTURAL JOIST
HANGER ROD
HEAVY-DUTY CONCRETESTEEL INSERT WITHELONGATED SLOT
INSERT NUT
CONCRETE SLAB
PIPE HANGERS AND SUPPORTS
SUPPORT HORIZONTAL STEEL AND COPPER PIPING AS FOLLOWS:
NOMINAL PIPE SIZE DISTANCE BETWEEN SUPPORTS HANGER ROD DIAMETERS
1/2"3/4" TO 1-1/2"2" TO 2-1/2"
3" TO 4"6" TO 12"
14" TO 18"
6'-0"6'-0"
10'-0"10'-0"14'-0"20'-0"
3/8"1/2"1/2"5/8"7/8"1"
· PLACE HANGER WITHIN 1 FOOT OF EACH HORIZONTAL ELBOW. SUPPORTHORIZONTAL SOIL WASTE AND STORM PIPE NEAR EACH HUB WITH 5 FEETMAXIMUM SPACING BETWEEN HANGERS.
· WHERE SEVERAL PIPES CAN BE INSTALLED IN PARALLEL AND AT SAMEELEVATION, PROVIDE MULTIPLE OR TRAPEZE HANGERS.
VERTICAL PIPING:
1. SUPPORT VERTICAL WATER PIPING AT EVERY FLOOR SUPPORT VERTICAL SOILPIPE AT EACH FLOOR AT HUB.
2. SUPPORT VERTICAL SOIL PIPE AT EACH FLOOR AT HUB.3. WHERE PRACTICAL, SUPPORT RISER PIPING INDEPENDENTLY OF CONNECTED
HORIZONTAL PIPING.
SCALE: NO SCALE
TYPICAL DUCT CONSTRUCTION DETAILS
W1
W2 IF "W1" DOES NOT EQUAL "W2",SPECIAL PROVISIONS MUST BEMADE IN VANE SHAPE OR ANGLEOF ENTRY AND EXIT. THISAPPLIES TO ALL TYPES OF VANES.
RADIUS ELBOW
VERTICAL RETURNDUCT RISER
ACCESS DOOR
AIR FLOW
AIR
FLO
W
45° CLINCH COLLARSPLITTERS ARE NOT USED
AT THIS TYPE OF ENTRY
FLEXIBLE DUCT NOTTO EXCEED 5'-0" (TYP.)
FLAT ON BOTTOM
20° MAX.
SPLITTER MAYBE USED
VOLUMEDAMPER (TYP.)
DUCT THRU WALL
20° MAXIMUM ANGLE ONDIVERGING AIRFLOW
30° MAXIMUM ANGLE ONCONVERGING AIRFLOW
AIR
FLO
WAI
R F
LOW
AIR
FLO
W
W
SHORT RADIUS ELBOW: R = 1/2 WLONG RADIUS ELBOW: R = W
R
STRAIGHT TAP
ROUND TAP
RECTANGULAR TAP
REDUCER / INCREASER
RECTANGULAR ELBOW
TYPICAL SUPPLY DUCT CONNECTIONS
R
RW
LONG RADIUS WHEREPOSSIBLE (R = W)
CLINCH LOCK
DUCT SPLIT
DUCT OFFSET
L
W
45°
L = 1/4 W (4" MIN.)
90° BRANCH TAKE OFF W/45° ENTRY W/ VOLUMEDAMPER IN BRANCH DUCT
VD
SPIN IN BELLMOUTH FITTINGWITH VOLUME DAMPER.TYPICAL FOR TAKE OFF TODIFFUSERS
VD
ROUND DUCTWORK
TYPICAL RETURN DUCT CONNECTIONS
VD
LONG RADIUS WHERE POSSIBLE
CORNER FILLER PIECEOR USE GASKET
1/2W1/2W
W WIDTH NOT TO EXCEED 4"
EQUAL SIZE (90° - Y) ELBOWUN-EQUAL SIZE (90° - Y) ELBOW
VDVD
TURNING VANES
AIR FLOW
AIR FLOWA B
L
ROUND DUCT TRANSITION: L = A - B (4" MIN.)
VD VD
VDVD
VD
VERTICAL SUPPLYDUCT RISER
SET SCREW
AIR FLOW
AIR
FLO
W
MAIN BRANCH
VD
VD
VD
VD
SD
SD
HINGE ON ROD
MAIN BRANCHSUB BRANCH
SUB BRANCHA x D1
W x
D2
R2
R1
R1 = 3/4WR2 = A + 3/4W
SCALE: NO SCALE
SINGLE BLADE VOLUME DAMPER DETAIL
ROUND DAMPER ELEVATION TWO BLADEARRANGEMENT
SIDE ELEVATION
OUTSIDE ENDBEARING
INSIDE ENDBEARING
BEARING OPTION
ARM
WING NUT
ROD (CONTINUOUS ON 2"W.G. CLASS AND ON ALL
DAMPERS OVER 12"∅)
3/8" QUADRANT
UP TO 18"
12" MAX.
19" TO 48"
DUCT
1/8" CLEARANCEALL AROUND
22 GA. BLADE
3/8" PIN
DUCT
1/2" ROD PIN
16 GA. BLADE
1/2" QUADRANT
1/8" CLEARANCEALL AROUND
NOTE: USE MULTIPLE BLADES FORDUCTWORK GREATER THAN 12" HIGH
REQUIRED ON 3" W.G.CLASS DUCT AND OVER,OPTIONAL FOR OTHERS
STIFFEN ASREQUIRED
DUCT DEPTH 'D'
1/2"
SCALE: NO SCALE
HIGH POINT MANUAL VENT DETAIL
INSTALL VENT AT HIGHESTPOINT OF OBSTRUCTION
ROUTE TUBING TO NEAREST SERVICESINK OR APPROVED DRAIN WHEN USED
INSIDE BUILDING; 1/4" MIN. SIZE. (NOTREQUIRED FOR OUTDOORS)
INSULATION AND VAPOR BARRIERAS REQUIRED
EXISTING OBSTRUCTIONS (TYP.)
WATER FLOW
GAUGE COCK WITH LEVER HANDLE
SCHEDULE 80 BLACK NIPPLE
300 PSI FULL STRENGTH COUPLINGWELDED TO PIPING; 1/4" MINIMUMSIZE
6
1 2 3
7
8
5
9
SCALE: NO SCALE
PIPE COVERING PROTECTION SHIELDS AND PIPE SADDLES
PIPE SIZE LENGTH "L" GA. MIN.3/4" TO 2" 12" 18
2-1/2" TO 4" 12" 165" TO 6" 18" 16
8" AND UP 24" 14
LOCKING NUT
SUPPORT NUT
VAPOR BARRIER JACKET
STEEL HANGER ROD (SEE SCHEDULE)SUPPORT FROM STEEL BEAM, JOIST OFCHANNEL IRON BETWEEN JOISTS (TYP.)
CONTRACTOR SHALL PROVIDE CLEVISHANGER OF SIZE TO FIT AROUND PIPE
COVER O.D.
STEEL HANGER ROD (SEE SCHEDULE)SUPPORT FROM STEEL BEAM, JOIST OFCHANNEL IRON BETWEEN JOISTS (TYP.)
CONTRACTOR SHALL PROVIDE CLEVISHANGER OF SIZE TO FIT AROUND PIPECOVER O.D.
WATER PIPE
BLOCKING OF HIGH DENSITYRIGID INSULATION
BLOCKING OF HIGH DENSITYRIGID INSULATION
PIPE INSULATION(SEE SPECIFICATIONS)
SHEET METAL PIPE SHIELDSAT ALL CLEVIS HANGERSAND TRAPEZE SUPPORTS
PIPE INSULATION(SEE SPECIFICATIONS)
STEEL PIPE SADDLE (TYP.)
SADDLES FORPIPES 2" THRU 10"
SADDLES FORPIPES 12" & LARGER
(STEEL PIPE SADDLES AT PIPE ROLLERS)
NOTE: INSTALL 360° INSULATION PROTECTION SHIELDSAT ALL PIPING SECURED WITH U-BOLTS AND U-CLAMPS.PROVIDE HIGH DENSITY INSULATION SUPPORTS AT ALLCLEVIS HANGERS, SUPPORTS, AND TRAPEZE HANGERS.PROVIDE STEEL PIPE INSULATION SADDLES ON ALLPIPES SUPPORTED BY ROLLERS.
120°
STEEL PIPE SADDLES
GALVANIZED STEEL SHEET METAL PIPESHIELD BY INSULATION INSTALLER
8" MIN.
L
2" MIN.
12"
4
TRANSITION RETURN DUCTWORK ASREQUIRED TO MATCH INLET SIZE
NOTE: PIPING ARRANGEMENT SHALLBE IDENTICAL FOR NEW DUCTMOUNTED CHILLED WATER COIL (CC-1)
NOTE: SOME FAN COIL UNITS HAVE OACONNECTION TO PLENUM BOX, REFERTO PLANS.
KEY PLANKEY PLAN
N
10
9
8
67
111
3
5
4
2
19165
DESCRIPTIONDATEREV.
ISSUE/REVISION:
PROJECT NO:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
SCALE:
SHEET NO.
(708) 236-0330 FAX
Hillside, IL 60162
(708) 236-0300
30 N. Wolf Rd., Second Floor
PROJECT:
DRAWING TITLE:
333 WEST 35TH STREETCHICAGO, IL 60616
GUARANTEED RATE FIELD -HVAC / AHU RENOVATION -PHASE IX
10.07.2019 ISSUED FOR BID
ISSUED FOR BID
NOT FORCONSTRUCTION
10/07/2019
M2.01
MECHANICAL DETAILS
AS NOTED
AS
AS
MS
FAN COIL SCHEDULE - (2-PIPE CHILLED WATER) (FCU)
TAG QTY.
GENERAL DATA DIMENSIONAL DATA (INCHES) UNIT DATA COOLING DATA ELECTRICAL DATA
NOTESSERVICE LOCATION MFR MODEL ORIENTATION
APPROX.WEIGHT
(LBS)L W H FAN
SPEED
NOMINALAIRFLOW
(CFM)
WATERFLOW(GPM)
ESP(IN. WG)
WATERPRESSURE
DROP(FT. HD.)
COILROWS
MIN. COILWORKING
PRESSURE(PSIG)
E.A.T.DB(°F)
E.A.T.WB(°F)
L.A.T.DB(°F)
L.A.T.WB(°F)
E.W.T.(°F)
TOTALCAP.
(MBH)
SENS.CAP.
(MBH)FLA VOLTS HZ PHASE
1 LEVEL 200SECTION 7
LEVEL 200SECTION 7 CARRIER 42CAA03BLFY6YYAR HORIZONTAL
DUCTED 39 17.5 25.25 8.75 HIGH 300 1.4 0.4 8.6 4 175.0 75.0 67.0 54.7 54.1 44.0 6.3 3.5 0.35 277 60 1 SEEBELOW
1 LEVEL 200SECTION 7
LEVEL 200SECTION 7 CARRIER 42DAA08LLFY6YYBR HORIZONTAL
DUCTED 79 27.5 28.0 16.4 HIGH 800 3.4 0.5 1.79 7 175.0 75.0 67.0 61.6 60.5 44.0 20.4 19.4 1.35 277 60 1 SEEBELOW
1 VISITORSCLUBHOUSE
VISITORSCLUBHOUSE CARRIER 42DAA10BLFY6YYAR HORIZONTAL
DUCTED 90 27.5 32.0 16.4 HIGH 1000 5.3 0.5 4.23 4 175.0 75.0 67.0 59.4 58.4 44.0 24.4 15.1 1.85 277 60 1 SEEBELOW
1 ISFA CONF.ROOM
ISFA CONF.ROOM CARRIER 42DAA12BLFY6YYAR HORIZONTAL
DUCTED 108 27.5 37.0 16.4 HIGH 1200 7.6 0.5 10.35 4 175.0 75.0 67.0 59.3 58.2 44.0 34.6 21.3 2.7 277 60 1 SEEBELOW
11 PRESSBOX PRESSBOX CARRIER 42DAA16BLFY6YYAR HORIZONTALDUCTED 124 27.5 47.0 16.4 HIGH 1600 10.9 0.5 7.84 4 175.0 75.0 67.0 60.3 59.1 44.0 50.1 31.8 3.7 277 60 1 SEE
BELOW
NOTES:
1. CAPACITIES INDICATED AT HIGH SPEED.
2. COIL CONNECTION HAND TO BE DETERMINED BY MECHANICAL CONTRACTOR.
3. EXISTING ELECTRIC HEATING COILS IN SUITES SHALL REMAIN AND BE RE-USED.(FCU-1 ONLY)
4. COORDINATE CONTROLS WITH BUILDING TEMPERATURE CONTROLS CONTRACTOR FOR THERMOSTATS, CONTROL VALVES, INTERCONNECTION OF FAN COIL AND ELECTRIC HEATING COIL.
5. FABRICATE RETURN AIR REAR PLENUM (FCU-1 AND FCU-2).
6. INCLUDE 1" THROWAWAY FILTERS.
7. ALL UNITS SHALL BE SIZED FOR 30% ETHYLENE GLYCOL CONCENTRATION IN CHILLED WATER.
8. NON-FUSED DISCONNECT FOR FCU-1 AND FCU-2. FUSED DISCONNECT FOR FCU-3 AND FCU-4.
9. VERIFY QUANTITIES PRIOR TO ORDERING.
10. NO ALTERNATE MANUFACTURERS PERMITTED. UNIT TO BE SOLE-SOURCED TO MATCH EXISTING UNITS AND SYSTEM ALREADY IN FACILITY.
FCU1
FCU2
FCU3
FCU4
FCU5
GRILLES, REGISTERS, AND DIFFUSER SCHEDULE
TAG MFR MODEL TYPE SERVICE MODULE SIZE MATERIAL BORDERTYPE MAXIMUM NC NOTES
A PRICE 530FF RETURN AIR FILTERGRILLE RETURN 24x24 STEEL LAY-IN 30 SEE BELOW
NOTES:
1. ALL GRILLES, REGISTERS, AND DIFFUSERS TO BE COLOR #35 WHITE.
2. PROVIDE OPPOSED BLADE DAMPER.
3. PROVIDE (1) ADDITIONAL FILTER FOR OWNERS STOCK FOR EVERY TYPE A FILTER GRILLE.
4. ADDITIONAL ACCEPTABLE MANUFACTURERS INCLUDE TITUS, NAILOR, KRUEGER.
MECHANICAL / ELECTRICAL COORDINATION SCHEDULE
NOTES:
1. DEVICES TO BE FURNISHED BY THE ELECTRICAL CONTRACTOR (MARKED 'EC'), OR THE MECHANICAL CONTRACTOR (MARKED 'MC'), THE BUILDING AUTOMATION SYSTEM CONTRACTOR (MARKED 'BASC'), OR THE MANUFACTURER (MARKED 'MFR')
2. ALL CONDUIT AND WIRING FOR TEMPERATURE CONTROL AND EQUIPMENT INTERLOCK SHALL BE BY MECHANICAL CONTRACTOR. OTHER CONTROLS AND CONTROL CONDUIT/WIRING BY TRADE FURNISHING RESPECTIVE EQUIPMENT.
3. IT IS THE RESPONSIBILITY OF THE ELECTRICAL CONTRACTOR TO COORDINATE AND REVIEW THE ELECTRICAL CHARACTERISTICS, AMPACITY, AND OTHER REQUIREMENTS OF COMPONENTS BEFORE INSTALLATION OF WORK. ALL OTHER CONTRACTORS SHALLADVISE ELECTRICAL CONTRACTOR OF ANY MOTOR/DEVICE CHANGES.
4. ALL LOOSE STARTERS SHALL INCLUDE HOA SWITCH, PILOT LIGHT MOUNTED IN COVER, CONTROL TRANSFORMER, AND ONE N.O. AND ONE N.C. AUXILIARY CONTACTS.
5. SEE SPECIFICATIONS AND DRAWINGS FOR TYPES AND LOCATIONS OF DEVICES SCHEDULED BELOW.
6. VERIFY FINAL LOADS AND REQUIREMENTS OF ALL EQUIPMENT WITH FINAL MECHANICAL AND ELECTRICAL DRAWINGS.
EQUIP.TAG EQUIPMENT DESCRIPTION
UNIT MOUNTED DEVICES REMOTE OR LOOSE DEVICES ELECTRICAL
REMARKSVFD STARTER DISCONNECT OVERCURRENT
PROTECTION
SINGLEPOINT
CONNECTIONVFD STARTER DISCONNECT OVERCURRENT
PROTECTION VOLTS HZ PHASE
FAN COIL UNIT - - - - YES - - EC EC 277 60 3EXISTING DISCONNECT SWITCHMAY BE RE-USED.
CONDENSING UNIT - - - - YES - - EC EC 460 60 3
CHILLER MFG - MFG - NO - - - EC 460 60 3
FCU
CU
CH
AUTOMATIC CONTROL DAMPER SCHEDULE (ACD)
TAG SERVICE LOCATION MANUF. MODELSIZE (WIDTHX HEIGHT) BLADE STYLE DAMPER FAIL
POSITION NOTES
VISITORSCLUBHOUSE
VISITORSCLUBHOUSE RUSKIN CDTI-50 12x10 OPPOSED CLOSED SEE BELOW
ISFACONFERENCE PRESSBOX RUSKIN CDTI-50 VERIFY
EXISTING OPPOSED CLOSED SEE BELOW
NOTES:
1. DAMPER SHALL BE FURNISHED BY MC. ACTUATOR WITH FAIL POSITION INDICATED IN SCHEDULE SHALL BE FURNISHED BY BASC.
ACD1
ACD2
REFRIGERATION SCHEDULE
EQUIP.TAG QTY LOCATION
REFRIGERANT COMPRESSOR(S)
REMOTE SELF-CONTAINED AIRCOOLED
WATERCOOLED NOTES
TYPE CKTCHARGE
(LBS.) TYPE QTY HP TONS
1 LEFT FIELD R134A 2 549 SCREW 2 475 NO YES YES NO SEE BELOW
1 200 LEVEL ROOF R410A 2 SCROLL 2 30 YES NO YES NO SEE BELOW
1 500 LEVEL ROOF R410A 1 SCROLL 2 15 YES NO YES NO SEE BELOW
1 500 LEVEL ROOF R410A 1 SCROLL 2 15 YES NO YES NO SEE BELOW
NOTES:
CH1
CU1
CU2
CU3
1. EXPANSION VALVE, DEVICES, AND ALL CONNECTIONS SHALL BE LOCATED OUT OF AIR STREAM.2. ALL REFRIGERANT PIPING SHALL BE COPPER TYPE 'K' OR 'ACR' WITH WROUGHT COPPER FITTINGS. ALL JOINTS SHALL BE JOINED BY BRAZING.3. SAFETY VALVES SHALL COMPLY WITH CHICAGO BUILDING CODE REQUIREMENTS.4. PROVIDE CITY OF CHICAGO APPROVED REFRIGERANT RELIEF VALVE.
A I R C O O L E D C H I L L E R S C H E D U L E ( C H )
TAG
GENERAL DATA DIMENSIONAL DATA (INCHES) PERFORMANCE DATA COMPRESSOR DATA CONDENSER FAN DATA EVAPORATOR DATA ELECTRICAL DATA
NOTESSERVICE LOCATION MFR MODEL TYPE
SHIPPINGWEIGHT
(LBS)
OPERATINGWEIGHT
(LBS)L W H
NOMINALCAPACITY
(TONS)
ACTUALCAPACITY
(TONS)
FULL LOADEFFICIENCY
(EER)
IPLV(EER)
EER AT100%
CIRCUITQUANTITY
CIRCUIT #1CAPACITY
CIRCUIT #2CAPACITY
REFRIG.TYPE
CAPACITYCONTROL
STEPS
AMBIENTAIR
TEMP.(°F)
QUANTITY TOTALKW CFM/FAN GPM
MAXIMUMPRESSUREDROP (FT.)
E.W.T.(°F)
L.W.T.(°F)
CKT. 1MCA
CKT. 2MCA
CKT. 1MOCP
CKT. 2MOCP VOLTS HZ PHASE
LEFT FIELD NEAR GATE 6 DAIKIN AWV026A AIR COOLEDSCREW COMP. 24893 26813 523.2 87.6 100.1 475.0 475.0 9.715 18.06 9.715 2 200 175 R134A VFD 95.0 26 62.0 1136 23.0 54.0 44.0 570 440 700 600 460 60 3 SEE
BELOW
NOTES:
1. 1ST YEAR PARTS AND LABOR WARRANTY, 2ND-5TH YEAR COMPRESSOR PARTS ONLY WARRANTY.
2. PROVIDE FACTORY START-UP.
3. FACTORY MOUNTED AND WIRED VFD STARTER.
4. CHILLER SHALL BE UL LISTED.
5. EER RATING CERTIFIED IN ACCORDANCE WITH ARI STANDARD 590.
6. FACTORY INSTALLED FLOW SWITCHES.
7. REFRIGERANT SUCTION AND DISCHARGE LINES SHUTOFF VALVES.
8. CHILLER SHALL BE INSTALLED ON MANUFACTURER ELASTOMERIC ISOLATORS.
9. FACTORY MOUNTED AND WIRED MICROTECH II DDC CONTROLS WITH BAS INTERFACE.
10. MULTI-POINT POWER CONNECTION.
11. MANUFACTURER PROVIDED SOUND ATTENUATION PACKAGE.
12. COOLER HEATER.
13. DIGITAL COMPRESSORS.
14. 115V CONVENIENCE OUTLET.
15. FACTORY MOUNTED VFD AND WIRED VFD STARTER.
16. LOW AMBIENT TO -10°F (START) AND -20°F (OPERATING)
17. SINGLE LAYER OF 3/4" INSULATION ON THE EVAPORATOR.
18. 30% PROPOLYENE GLYCOL.
19. MICROCHANNEL CONDENSER COIL.
20. HAIL GUARDS AND BASE FRAME GRILLES.
21. UNIT TO BE SOLE-SOURCED. NO ADDITIONAL ACCEPTABLE MANUFACTURERS.
CH2
C O N D E N S I N G U N I T S C H E D U L E ( C U )
TAG
GENERAL DATA DIMENSIONAL DATA (INCHES) PERFORMANCE DATA ELECTRICAL DATA
NOTESSERVICE LOCATION MFR MODEL
SHIPPINGWEIGHT
(LBS)
OPERATINGWEIGHT
(LBS)L W H # OF
CIRCUITSCOMP.TYPE
TOTALCAPACITY
(MBH)
SENSIBLECAPACITY
(MBH)EER REFRIG.
TYPE
SUCTIONLINE SIZE
(IN)
LIQUIDLINE SIZE
(IN)
HOT GASLINE SIZE
(IN)EAT (°F) FLA MCA MOCP VOLTS HZ PHASE
PATIO AHU 200 LEVELSECTION 2 CARRIER 38APS030 1282 1282 88.4 40.3 78.6 2 SCROLL 373.5 10.8 PURON 95.0 66.3 90 460 60 3 SEE
BELOW
SCORE BOARDCONTROL
200 LEVELSECTION 5 CARRIER 38AUDC16A0A6-0A0A0 731 731 86.4 43.4 50.4 1 SCROLL 185.7 13.4 PURON 95.0 29.9 40 460 60 3 SEE
BELOW
SCORE BOARDCONTROL
200 LEVELSECTION 5 CARRIER 38AUDC16A0A6-0A0A0 731 731 86.4 43.4 50.4 1 SCROLL 185.7 13.4 PURON 95.0 29.9 40 460 60 3 SEE
BELOW
NOTES:
1. ONE YEAR WARRANTY.
2. REFRIGERANT LIQUID AND SUCTION SIZED PER MANUFACTURER'S RECOMMENDATIONS..
3. VERTICAL DISCHARGE.
4. UL LISTED.
5. HAIL GUARDS
6. LOW AMBIENT
7. LOW SOUND FANS AND COMPRESSORS.
8. SINGLE POINT POWER CONNECTION.
9. DIGITAL SCROLL COMPRESSORS.
10. ADDITIONAL ACCEPTABLE MANUFACTURERS INCLUDE CARRIER, YORK, DAIKIN.
CU1
CU2
CU3
D X C O I L S C H E D U L E ( D C )
TAG SERVICE LOCATION MANUF. MODELTOTALAREA(SF)
ROWS FPI HEIGHT WIDTH DEPTHE.A.T.
DB(°F)
E.A.T.WB(°F)
L.A.T.DB(°F)
L.A.T.WB(°F)
CFM APD TOTALCAPACITY
SENSIBLECAPACITY NOTES
CU-1 PATIO COMM.COILS
4DX-8-45 X89.5 X 4 - 9 AL 27.97 4 9 45.0 89.5 6.5 80.0 67.0 59.0 57.0 12,000 0.34" 377,970 277,600 SEE BELOW
NOTES:
DC1
KEY PLANKEY PLAN
N
10
9
8
67
111
3
5
4
2
19165
DESCRIPTIONDATEREV.
ISSUE/REVISION:
PROJECT NO:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
SCALE:
SHEET NO.
(708) 236-0330 FAX
Hillside, IL 60162
(708) 236-0300
30 N. Wolf Rd., Second Floor
PROJECT:
DRAWING TITLE:
333 WEST 35TH STREETCHICAGO, IL 60616
GUARANTEED RATE FIELD -HVAC / AHU RENOVATION -PHASE IX
10.07.2019 ISSUED FOR BID
ISSUED FOR BID
NOT FORCONSTRUCTION
10/07/2019
M3.01
MECHANICAL SCHEDULES
AS NOTED
AS
AS
MS
3. TYPE "L" COPPER PIPE WITH WROUGHT COPPER SOLDERED FITTINGS SHALL BE USED FORCONDENSATE DRAIN LINES.
D. REFRIGERANT PIPING
1. PIPING: COPPER TUBING TO 7/8 INCH OD: ANSI/ASTM 280, TYPE K, ANNEALED
2. FITTINGS: ASME B16.22 WROUGHT COPPER / ASME B16.26 CAST COPPER
3. JOINTS: FLARED
4. JOINTS: BRAZE, AWS A5.8 BCUP SILVER/PHOSPORUS/COPPER ALLOY WITH MELTINGRANGE 1190 TO 1480 °F.
5. UNIONS, FLANGES, AND COUPLING (2 INCHES AND SMALLER)
a. FERROUS PIING: 150 PSIG MALLEABLE IRON, THREADEDb. COPPER PIPE: BRONZE, SOLDERED JOINTS.
6. MOISTURE AND LIQUID INDICATORS: SINGLE PORT TYPE, UL LISTED, WITH COPPER ORBRASS BODY, FLARED OR SOLDER ENDS, SIGHT GLASS, COLOR CODED PAPER MOISTUREINDICATOR WITH REMOVABLE ELEMENT CARTRIDGE AND PLASTIC CAP; FOR MAXIMUMWORKING PRESSURE OF 500 PSIG AND MAXIMUM TEMPERATURE OF 200 DEGREES F.
7. VALVES: UL LISTED, GLOBE OR ANGLE PATTERN, FORGED BRASS BODY AND BONNET,PHSOPHOR BRONZE AND STAINLESS STEEL DIAPHRAGMS, RISING STEM AND HANDWHEEL.STAINLESS STEEL SPRING, NYLON SEAT DISC, SOLDER OR FLARED ENDS, WITH POSITIVEBACKSEATING, FOR MAXIMUM WORKING PRESSURE OF 500 PSIG AND MAXIMUMTEMPERATURE OF 275 DEGREES F.
8. PACKED ANGLE VALVES: FORGED, BRASS, OR NICKEL PLATED FORGED STEEL, FORGEDBRASS SEAL CAPS WITH COPPER GASKET, RISING STEM, AND SEAT WITH BACKSEATING,MOLDED STEM PACKING, SOLDER OR FLARED ENDS, FOR MAXIMUM WORKING PRESSUREOF 500 PSIG AND MAXIMUM TEMPERATURE OF 275 DEGREES F.
9. SERVICE VALVES: FORGED BRASS BODY WITH COPPER STUBS, BRASS CAPS, REMOVABLEVALVE CORE, INTEGRAL BALL CHECK VALVE, FLARED OR SOLDER ENDS, FOR MAXIMUMWORKING PRESSURE OF 500 PSIG.
10. FILTER DRIERS: REPLACEABLE CARTRIDGE ANGLE TYPE, SHELL: ARI 710, UL LISTED,BRASS, REMOVABLE CAP, FOR MAXIMUM WORKING PRESSURE OF 350 PSIG.
11. SOLENOID VALVES: AIR 760, PILOT OPERATED, COPPER OR BRASS BODY AND INTERNALPARTS, SYNTHETIC SEAT, STAINLESS STEEL STEM AND PLUNGER ASSEMBLY, WITHFLARED SOLDER, OR THREADED ENDS, FOR MAXIMUM WORKING PRESSURE OF 500 PSIG.STEM SHALL PERMIT MANUAL OPERATION IN CASE OF COIL FAILURE.
12. COIL ASSEMBLY: UL LISTED, REPLACEABLE WITH MOLDED ELECTROMAGNETIC COIL,MOISTURE AND FUNGUS PROOF, WITH SURGE PROTECTOR AND COLOR CODED LEADWIRES, INTEGRAL JUNCTION BOX.
VERTICAL SUPPORTS: STEEL RISER CLAMP.
E. PIPE INSULATION
1. FURNISH AND INSTALL ALL NEW COOLING HYDRONIC WATER PIPING AND CONDENSATEDRAIN PIPING WITH FIBERGLASS MOLDED PIPE INSULATION APPLIED WITH ANALL-SERVICE VAPOR BARRIER JACKET, STAPLED, AND THE SEAMS, JOINTS, AND STAPLESPAINTED WITH VAPOR PROOF MASTIC. ALL DAMAGED INSULATION (RESULTING FROMIMPLEMENTATION OF THIS PROJECT) ON EXISTING PIPING TO REMAIN SHALL BE REPAIRED.PROVIDE INSULATION ON EXISTING PIPING AS INDICATED IN THE MECHANICALDOCUMENTS.
2. MINIMUM INSULATION REQUIREMENTS SHALL BE IN ACCORDANCE WITH THE FOLLOWINGSCHEDULE AND CITY OF CHICAGO CODE:
a. CHILLED WATER PIPING: 1-1/2" THICK, 7# DENSITY FIBERGLASS PIPE INSULATED WITHVAPOR BARRIER JACKET.
b. CONDENSATE DRAIN PIPING: 1" THICK, 7# DENSITY FIBERGLASS PIPE INSULATED WITHVAPOR BARRIER JACKET.
3. PIPE INSULATION SHALL BE APPLIED WITH ALL ADJOINING SECTIONS FIRMLY BUTTEDTOGETHER AND THE LONGITUDINAL SEAM OF THE VAPOR BARRIER LAP CEMENTED WITHFOSTER NO. 85-75. END JOINTS SHALL BE SEALED WITH MINIMUM 3" WIDE FACTORYFURNISHED VAPOR BARRIER STRIPS APPLIED WITH FOSTER NO. 85-75 LAP CEMENT.
4. ALL FITTINGS, VALVES, STRAINERS, TRAPS, ETC., IN PIPING 2-1/2"AND SMALLER SHALL BEINSULATED WITH INSULATING BAGS. MATCH EXISTING FROM PREVIOUS PHASES.
5. NEW OUTDOOR CHILLED WATER PIPING INSULATION SHALL MATCH EXISTING JACKETING.
F. REFRIGERANT PIPING INSULATION
1. INSULATION SHALL BE A FLEXIBLE, CLOSED-CELL ELASTOMERIC PIPE INSULATION: APARMAFLEX, AC ACCOFLEX. ADHESIVE SHALL BE ARMAFLEX 520, 520 BLACK, OR 520 BLVADHESIVE. THE INSULATION MUST CONFORM TO ASTM C534 GRADE 1 TYPE.
2. INSULATION MATERIALS SHALL HAVE A CLOSED CELL STRUCTURE TO PREVENT MOISTUREFROM WICKING WHICH MAKES IT AN EFFICIENT INSULATION.
3. INSULATION MATERIALS SHALL BE MANUFACTURED WITHOUT THE USE OF CFC'S, HFC'S,OR HCFC'S. IT IS ALSO FORMALDEHYDE FREE, LOW VOCS, FIBER FREE, DUST FREE, ANDRESISTS MOLD AND MILDEW.
4. INSULATION MATERIALS SHALL HAVE A FLAME-SPREAD INDEX OF LESS THAN 25 AND ASMOKE-DEVELOPED INDEX OF LESS THAN 50 AS TESTED IN ACCORDANCE WITH ASTM E 84.IN ADDITION, THE PRODUCTS, WHEN TESTED, SHALL NOT MELT OR DRIP FLAMINGPARTICLES AND THE FLAME SHALL NOT BE PROGRESSIVE.
5. INSULATION MATERIALS SHALL HAVE A MAXIMUM THERMAL CONDUCTIVITY OF 0.27BTU-IN./H-FT²-°F AT A 75 °F MEAN TEMPERATURE AS TESTED IN ACCORDANCE WITH ASTMC 177 OR ASTM C 518.
6. INSULATION MATERIALS SHALL HAVE A MAXIMUM WATER VAPOR TRANSMISSION OF 0.08PERM-INCHES WHEN TESTED IN ACCORDANCE WITH ASTM E 96.
7. SADDLES SHALL BE INSTALLED UNDER ALL INSULATED LINES AT UNI-STRUT CLAMPS,CLEVIS HANGERS, OR LOCATIONS WHERE INSULATION MAY BE COMPRESSED.
8. ALL INSULATION EXPOSED TO SUNLIGHT OR INSTALLED OUTDOORS SHALL BE PROTECTEDWITH TWO COATS OF WB ARMAFLEX FINISH OR WEATHER RESISTANT COATING
G. VALVES
1. VALVES SHALL BE LOCATED FOR CONVENIENT ACCESS FOR OPERATION ANDMAINTENANCE.
2. FOR WATER SERVICE, SHUTOFF AND/OR BY-PASS, 2" AND SMALLER, SHALL BE BALLVALVES AS FOLLOWS:
a. 2-PIECE MILWAUKEE #BA-100 (SHUT-OFF)b. 3-PIECE MILWAUKEE #BA-300 (BY-PASS)
3. BUTTERFLY VALVES FOR WATER SERVICE, SHUTOFF, 2-1/2" AND LARGER, WITH A COLDWORKING PRESSURE RATING OF 150 PSIG, SHALL BE AS FOLLOWS:
a. MILWAUKEE, SERIES ML
4. HIGH-PERFORMANCE BUTTERFLY VALVES FOR WATER SERVICE, SHUTOFF, 2-1/2" ANDLARGER, WITH A MAXIMUM COLD WORK PRESSURE RATING OF 285 PSIG, SHALL BE ASFOLLOWS:
a. DEZURIK WATER CONTROLS, MODEL BHP.
5. CLASS 150, GATE, GLOBE, AND CHECK VALVES 2" AND SMALLER SHALL BE AS FOLLOWS:
a. GATE: MILWAUKEE #1151b. GLOBE: MILWAUKEE #590Tc. CHECK: MILWAUKEE #510T
6. CLASS 125, GATE, GLOBE, AND CHECK VALVES 2-1/2" AND LARGER SHALL BE AS FOLLOWS:
a. GATE: MILWAUKEE #2885Ab. GLOBE: MILWAUKEE #2981Ac. CHECK: MILWAUKEE #2974A
7. FLOW CONTROL VALVES SHALL BE GRISWOLD AUTOMATIC FLOW CONTROL VALVES.
8. CALIBRATED BALANCING VALVES SHALL BE DESIGNED TO PRESET BALANCE POINTS FORPROPORTIONAL SYSTEM BALANCE PRIOR TO SYSTEM START UP. VALVES TO HAVEDIFFERENTIAL PRESSURE READOUT PORTS ACROSS VALVE SEAT AREA. READOUT PORTSTO BE FITTED WITH INTERNAL EPT INSERT AND CHECK VALVE. VALVES TO HAVE MEMORYSTOP FEATURE TO ALLOW VALVE TO BE CLOSED FOR SERVICE AND THEN RE-OPENED TOSET POINT WITHOUT DISTURBING THE BALANCE POSITION.
9. VALVES SHOWN ON THE DRAWINGS AND SPECIFIED AS SPRING LOADED/CHECK TYPESHALL BE EQUAL TO APCO IN ACCORDANCE WITH THE FOLLOWING:
a. 2-1/2" AND SMALLER: SERIES 300b. 3" AND LARGER: SERIES 600
10. CHECK VALVES IN LINES DISCHARGING AGAINST PRESSURES LESS THAN 100 PSIG SHALLHAVE 125-LB SEMI-STEEL BODIES, AND FOR PRESSURE 100 PSIG OR GREATER SHALL HAVE250 PSIG SEMI-STEEL BODIES. ALL SHALL BE COMPLETE WITH BRONZE TRIM ANDSTAINLESS STEEL SPRINGS.
11. IN THE DISCHARGE OF BASE-MOUNTED PUMPS, PROVIDE A SPRING LOADED CHECKVALVE.
12. ALL VALVES SHOWN ON THE DRAWINGS AS CHECK VALVES IN VERTICAL PIPING SHALL BESPRING LOADED TYPE.
H. PIPING SPECIALTIES
1. PROVIDE THE FOLLOWING TYPES OF STRAINERS FOR HVAC APPLICATIONS, UNLESSNOTED OTHERWISE FOR SPECIFIC SYSTEMS:
a. SIZE 2" AND UNDER: SHALL BE SCREWED BRASS OR IRON BODY FOR 175 PSIGWORKING PRESSURE, Y PATTERN WITH 1/32" STAINLESS STEEL PERFORATEDSCREEN.
b. SIZE 2-1/2" THRU 4": SHALL BE FLANGED IRON BODY FOR 175 PSIG WORKINGPRESSURE, Y PATTERN WITH 3/64" STAINLESS STEEL PERFORATED SCREEN.
c. SIZE 5" AND UP: SHALL BE FLANGED IRON BODY FOR 175 PSIG WORKING PRESSURE, YPATTERN WITH 1/8" STAINLESS STEEL PERFORATED SCREEN.
2. THERMOMETERS SHALL BE THE BI-METAL DIAL TYPE WITH 5" DIALS. THERMOMETERSSHALL HAVE BLACK CASE, BE OF STAINLESS STEEL CONSTRUCTION, AND SHALL BESEPARABLE SOCKET WITH BRASS WELLS. THERMOMETERS SHALL BE OF THE ADJUSTABLE(ALL ANGLE) TYPE READABLE FROM THE FLOOR. SIZE STEMS AND WELLS AS REQUIRED BYINSTALLATION.
3. RANGES FOR THERMOMETERS SHALL BE AS FOLLOWS:
a. CHILLED WATER: 0-100 °F
4. GAUGES SHALL BE 4-1/2" DIAL GRADE AA PHOSPHUR BRONZE BOURDON TUBE TYPE WITHSTAINLESS STEEL MOVEMENT OF 1/2 OF 1% SCALE ACCURACY.
5. EACH GAUGE SHALL HAVE A SHUT-OFF COCK.
6. GAUGES IN PUMP SUCTIONS SHALL BE COMPOUND TYPE. GAUGES IN PUMP SUCTION ANDDISCHARGE SHALL HAVE APPROVED DAMPENERS.
7. GAUGES SHALL HAVE SCALE RANGES TO 100% IN EXCESS OF THE OPERATING RANGE OFTHE SYSTEM OF WITH THEY ARE APART.
8. PROVIDE DRAIN PANS UNDER ALL AC UNITS AND CHILLED WATER PUMPS.
9. PROVIDE DIELECTRIC UNIONS AT DISSIMILAR PIPING CONNECTIONS.
10. INSTALL DRAIN VALVES AT LOW POINTS IN MAINS, RISERS, BRANCH LINES, ANDELSEWHERE AS REQUIRED FOR SYSTEM DRAINAGE.
11. INSTALL AIR VENTS AT HIGH POINTS IN MAINS, RISERS, BRANCH LINES, AND ELSEWHEREAS REQUIRED FOR SYSTEM VENTING.
12. PROVIDE CLEANING PORTS WITH VALVES AT CONVENIENT LOCATIONS TO FACILITATECLEANING OF ALL NEW PIPING.
I. PIPE LABELING
1. FURNISH AND INSTALL "SETON" OR SIMILAR IDENTIFICATION LABELS AND LABELINGMATERIALS FOR ALL NEW PIPING AS SHOWN ON THE DRAWINGS. LABELS SHALL IDENTIFYTHE DIRECTION OF FLOW AND THE TYPE OF SERVICE.
2. PROVIDE PIPE LABELS AT LOCATIONS BELOW:
a. EACH SHUTOFF VALVE.b. BOTH SIDES OF EACH FULL HEIGHT WALL PENETRATION.c. EVERY 20'-0" OF RUN MINIMUM.d. CHANGE IN PIPING DIRECTION.
3. CONTRACTOR SHALL SUBMIT FOR APPROVAL, PRIOR TO INSTALLATION, THREE (3)SAMPLES OF EACH PIPE LABEL AND PIPE LABELING MATERIALS.
4. LABELS SHALL BE SUITABLE FOR APPLICATIONS.
5. LABEL WIDTH SHALL NOT BE LESS THAN 2".
J. VALVE IDENTIFICATION
1. FURNISH AND INSTALL TAGS FOR ALL NEW AND EXISTING CONTROL VALVES RELATED TOTHE MECHANICAL SYSTEM SPECIFIED HEREIN AND AS SHOWN ON ACCOMPANYINGDRAWINGS. REFER TO DETAILS SHEET FOR ADDITIONAL INFORMATION AND GRAPHICS.
2. FURNISH AND INSTALL TAGS FOR ALL NEW ISOLATION VALVES 2" AND LARGER.
3. VALVE TAGS SHALL HAVE UNIQUE #'S AND SHALL BE COORDINATED WITH THESEDRAWINGS, THE ENGINEER, AND OWNER.
4. VALVE TAGS SHALL BE BRASS MATERIAL AND SHALL BE FASTENED WITH A STURDY CHAIN.
5. CONTRACTOR SHALL SUBMIT FOR APPROVAL, PRIOR TO INSTALLATION, A LIST OF TAG#'SALONG WITH A SAMPLE OF VALVE TAG.
6. VALVE TAG NUMBERS SHALL BE INDICATED ON THE AS-BUILT DRAWINGS.
VIII. DUCTWORK
A. GENERAL
1. IN GENERAL, THE COMPLETE SHEET METAL DUCTWORK SYSTEMS FURNISHED UNDER THISCONTRACT, SHALL BE CONSTRUCTED AND INSTALLED IN STRICT CONFORMANCE WITHTHE STANDARDS AS SET FORTH IN THE "DUCT MANUAL AND SHEET METAL CONSTRUCTIONFOR VENTILATING AND AIR-CONDITIONING SYSTEMS" AS PUBLISHED BY THE SHEET METALAND AIR CONDITIONING CONTRACTORS NATIONAL ASSOCIATION, INC. (SMACNA). ALLDUCTWORK SHALL BE CONSTRUCTED OF GALVANIZED SHEETS OF MILD STEEL.
2. METAL GAUGES FOR USE IN DUCTWORK SHALL CONFORM TO THE FOLLOWING MAXIMUMDUCT SIZE METAL GAUGE (U.S. STD.):
a. 0" THROUGH 29" 24 GAb. 30" THROUGH 54" 22 GAc. 55" THROUGH 84" 20 GAd. 85" AND OVER 18 GA
3. NEW SUPPLY AIR DUCTWORK SHALL HAVE A PRESSURE CLASS RATING OF 3-INCH W.G.AND A SMACNA LEAKAGE CLASS OF 6. NEW SUPPLY AIR DUCTWORK DOWN STREAM OFTHE FAN COIL SHALL HAVE A PRESSURE CLASS RATING OF 2-INCH W.G. AND A SMACNALEAKAGE CLASS OF 6. NEW RETURN AND EXHAUST AIR DUCTWORK SHALL HAVE APRESSURE CLASS RATING OF 2-INCHES W.G. AND A SMACNA LEAKAGE CLASS OF 6.
4. ACCESS DOORS SHALL BE PROVIDED WHERE INDICATED ON THE DRAWINGS AND DETAILS,OR WHERE REQUIRED BY THE INSTALLATION, TO FACILITATE PROPER ACCESS,MAINTENANCE AND INSPECTION OF THE SYSTEM. ALL DUCT ACCESS DOORS SHALL BEHINGED, GASKETED, AND PROVIDED WITH SASH TYPE LOCKING DEVICES.
5. ALL NEW DUCT TURNS, ELBOWS, ETC., SHALL BE INSTALLED WITH TURNING VANES ORMINIMUM 1-1/2 RADIUS ELBOWS.
6. RADIUS ELBOWS, 18" AND LARGER, SHALL BE PROVIDED WITH TURNING BLADES AND 1/3AND 1/2 THE WIDTH OF THE DUCT FROM THE INSIDE RADIUS. TURNING VANES SHALL BEPROVIDED WITH HEMMED EDGES.
7. SQUARE ELBOWS SHALL BE USED ONLY WHERE INDICATED OR WHERE REQUIRED TO FITCONSTRUCTION AND ONLY ON LOW PRESSURE SYSTEMS. PROVIDE ALL SQUARE ELBOWSWITH TURNING VANES.
8. DUCTWORK SHALL COMPLY WITH ALL FIRE AND SMOKE STOPPING, PROOFING ANDDAMPERING.
9. ALL DUCT SIZES SHOWN ON PLANS SHALL BE INSIDE CLEAR DIMENSIONS.
10. UPON COMPLETION OF THE INSTALLATION OF DUCTWORK, CLEAN ENTIRE SYSTEM OFRUBBISH, PLASTER, DIRT, ETC.
11. PROTECT DUCTWORK FROM THE ELEMENTS AND FOREIGN MATERIAL, AND COMPLY WITHINTERMEDIATE DUCT CLEANLINESS LEVEL IN ACCORDANCE WITH SMACNA'S "DUCTCLEANLINESS FOR NEW CONSTRUCTION GUIDELINES".
B. DUCTWORK SUPPORTS AND CONNECTIONS
1. DUCT SECTION CONNECTIONS AND INTERMEDIATE REINFORCING SHALL CONFORM TOTHE ABOVE-NOTED MANUAL.
2. SEAL DUCTS TO THE FOLLOWING SEAL CLASSES ACCORDING TO THE "HVAC DUCTCONSTRUCTION STANDARDS - METAL AND FLEXIBLE" AS PUBLISHED BY SMACNA.
a. SUPPLY AIR DUCTS: SEAL CLASS Ab. RETURN AIR DUCTS: SEAL CLASS Ac. EXHAUST AIR DUCTS: SEAL CLASS Cd. OUTDOOR AIR DUCTS: SEAL CLASS C
3. TAPES AND MASTICS USED TO SEAL DUCTWORK SHALL BE LISTED AND LABELED INACCORDANCE WITH UL 181A OR UL181B.L DUCT CONNECTIONS TO FLANGES OF AIRDISTRIBUTION SYSTEM EQUIPMENT SHALL BE SEALED AND MECHANICALLY FASTENED.DUCT TAPE IS NOT PERMITTED AS A SEALANT ON ANY METAL DUCTS.
4. THIS CONTRACTOR SHALL INSTALL FLEXIBLE DUCT CONNECTIONS BETWEEN EACH PIECEOF EQUIPMENT HAVING A FAN, AND ITS SUPPLY, RETURN, AND EXHAUST DUCTWORK.CONNECTIONS WHEN COMPLETED SHALL BE AIRTIGHT, AND SHALL BE INSTALLED IN ANAPPROVED MANNER. FLEXIBLE CONNECTIONS SHALL BE NEOPRENE MATERIAL, TO INSUREAGAINST TRANSMISSION OF VIBRATION FROM THE FAN TO THE DUCTWORK.
C. DUCTWORK INSULATION AND LINING
1. DUCT INSULATION AND LINING SHALL MATCH EXISTING.
2. ALL INSULATION AND RELATED MATERIALS SHALL HAVE A FLAME-SPREAD INDEX OF 25 ORLESS, AND A SMOKE DEVELOPED INDEX OF 50 OR LESS, AS DETERMINED BY TESTINGIDENTICAL PRODUCTS PER ASTM E 84, BY A TESTING AND INSPECTING AGENCYACCEPTABLE TO THE AUTHORITIES HAVING JURISDICTION. FACTORY LABEL PRODUCTWITH APPROPRIATE MARKINGS OF APPLICABLE TESTING AND INSPECTING AGENCY.
IX. CHEMICAL TREATMENT & CLEANING
A. ALL GREASE, DIRT, OIL, AND METALLIC OXIDES SHALL BE REMOVED FROM EACH CLOSEDRE-CIRCULATING SYSTEM. EQUIPMENT SHALL BE PROVIDED TO METER THE WATER, MIX ANDINJECT THE CLEANING SOLUTION INTO THE SYSTEM. MECHANICAL CONTRACTOR SHALLINFORM WATER TREATMENT CONTRACTOR OF ALL SYSTEM MATERIALS OF CONSTRUCTION,TO INSURE CHEMICAL CLEANER COMPATIBILITY. A CLEANING AGENT SHALL BE CIRCULATED,WETTING ALL SURFACES AND FLUSHED FROM THE SYSTEM AT COMPLETION.
B. CHEMICAL TREATMENT SHALL CONSIST OF A NON-CHROMATE CORROSION INHIBITOR FOR THEPROTECTION OF BOTH FERROUS AND NON-FERROUS METALS. INHIBITOR SHALL BECOMPATIBLE WITH PROPYLENE AND ETHYLENE GLYCOL TYPES OF ANTIFREEZES, AND SHALLNOT BE DETRIMENTAL TO NON-METALLIC MATERIALS SUCH AS PUMP PACKING AND VALVESEALS.
C. MECHANICAL CONTRACTOR SHALL COORDINATE WITH OWNER'S CHEMICAL TREATMENTCONTRACTOR.
XI. MOTORS AND STARTERS
A. ALL MOTORS FOR EQUIPMENT FURNISHED AND INSTALLED UNDER THIS CONTRACT SHALL BEPROVIDED BY THIS CONTRACTOR, AND SHALL BEBALDOR, MARATHON, GENERAL ELECTRIC,TOSHIBA OR US.EACH MOTOR SHALL HAVE STARTING TORQUE CHARACTERISTIC SUITABLEFOR THE EQUIPMENT SERVED. ALL MOTORS FOR AIR HANDLING UNIT AND VENTILATING FANUNIT SERVICE SHALL BE SELECTED FOR QUIET OPERATION. NOMINAL MOTOR VOLTAGESINCLUDE 120, 208, 230, 277, AND 460 VOLTS, AND EACH MOTOR SUPPLIED UNDER THISCONTRACT SHALL BE CHECKED FOR PROPER ROTATION AFTER ELECTRICAL CONNECTION HASBEEN COMPLETED. ALL MOTORS SHALL BE RATED FOR 1.15 SERVICE FACTOR. OPENDRIP-PROOF OR TEFC AS REQUIRED.
B. ALL MOTORS FOR EQUIPMENT FURNISHED AND INSTALLED UNDER THIS CONTRACT SHALL BEPREMIUM EFFICIENCY AS DETERMINED BY NEMA STANDARD MG1 AND ACCORDING TO TABLES12-12 AND 12-13 ACCORDINGLY.
C. ALL MOTORS FURNISHED FOR USE ON VARIABLE FREQUENCY DRIVES (VFD'S) SHALL BE RATEDFOR A MINIMUM OF 4 TO 1 TURNDOWN WHEN USED IN A VARIABLE TORQUE APPLICATION.COMPLY WITH NEMA MG1 PART 31 REQUIREMENTS FOR THERMALLY PROTECTED MOTORSWITH MINIMUM CLASS F OR H INSULATION RATED AT CLASS B TEMPERATURE RISE.
3. FURNISH AND INSTALL DUCT INSULATION IN ACCORDANCE WITH THE FOLLOWINGSCHEDULE PER MANUFACTURER'S INSTRUCTIONS. PROVIDE PRODUCT SUBMITTAL ON ALLINSULATION INSTALLED AS PART OF THIS PROJECT.
a. MATCH EXISTING DUCT INSULATION AND LINING.
4. DUCT LINING, WHERE INDICATED AND TO MATCH EXISTING, AN/OR AS HEREINAFTERSPECIFIED SHALL BE EQUAL TO JOHNS MANVILLE 1" THICK PERMACOTE LINACOUSTICFIBERGLASS DUCT LINER WITH FACTORY APPLIED EDGE COATING. THE LINER SHALL MEETTHE LIFE SAFETY STANDARDS AS ESTABLISHED BY NFPA 90A AND 90B. THE DUCT LINERSHALL CONFORM TO THE REQUIREMENTS OF ASTM C1071, WITH AN NRC NOT LESS THAN0.70 AS TESTED PER ASTM C423 USING A TYPE "A" MOUNTING AND A THERMALCONDUCTIVITY NO HIGHER THAN 0.25 AT 75°F MEAN TEMPERATURE.
5. ALL PORTIONS OF DUCT DESIGNED TO RECEIVE DUCT LINER SHALL BE COMPLETELYCOVERED WITH DUCT LINER. THE SMOOTH, BLACK COATED MAT SURFACES OF THE DUCTLINER SHALL FACE THE AIR STREAM. ALL DUCT LINER SHALL BE CUT TO ENSURE TIGHT,OVERLAPPED CORNER JOINTS.
6. DUCT LINING SHALL BE ADHERED TO THE SHEET METAL WITH FULL COVERAGE OF ANAPPROVED ADHESIVE, AND ALL EXPOSED LEADING EDGES AND TRANSVERSE JOINTSSHALL BE NEATLY BUTTED WITHOUT GAPS AND BE COATED WITH AN EDGE COATING.
7. THE DUCT LINING SHALL MEET SMACNA GUIDELINES AND BE SECURED PERMANUFACTURER'S RECOMMENDATIONS.
8. ALL DUCT WRAP SHALL BE INSTALLED WITH VAPOR BARRIER JACKET, KRAFT PAPERREINFORCED WITH GLASS FIBER YARN AND BONDED TO ALUMINIZED FILM. SECURE WITHPRESSURE SENSITIVE TAPE.
D. DUCTWORK ACCESSORIES
1. ALL SUPPLY, RETURN AND EXHAUST AIR REGISTERS, DIFFUSERS, TROFFERS, GRILLES,ETC. SHALL BE OF MODELS INDICATED, OR APPROVED EQUIVALENT UNITS.
2. EACH SHEET METAL DUCT TEE AND BRANCH TAKE OFF FITTING SHALL BE EQUIPPED WITHA LOCKING TYPE MANUAL VOLUME DAMPER SUITABLE FOR PROPER BALANCING. EACHSUPPLY, RETURN AND EXHAUST AIR REGISTER, DIFFUSER, TROFFER, GRILLE, ETC. SHALLBE DIRECTLY SERVED BY DUCTWORK WHICH INCLUDES A LOCKING TYPE MANUAL VOLUMEDAMPER SUITABLE FOR PROPER BALANCING. MANUAL VOLUME DAMPER SHALL BE"RUSKIN" OR APPROVED EQUIVALENT WITH MINIMUM 20 GAUGE GALVANIZED STEELBLADES AND FRAME AND SYNTHETIC BEARINGS.
3. FLEXIBLE DUCTWORK SHALL BE INSULATED, MEET THE REQUIREMENTS OF UL 181 ANDNFPA 90A, SHALL BE SUITABLE FOR DUCT STATIC PRESSURES OF A MINIMUM OF +1.0" W.C.LENGTHS SHALL NOT EXCEED 5'-0".
E. ACCESS DOORS
1. PROVIDE ACCESS PANELS IN ALL DUCTS ADJACENT TO AUTOMATIC DAMPERS, AT FIREDAMPERS, AT SMOKE DAMPERS, AND AT REHEAT COILS.
2. ACCESS PANELS IN DUCTWORK SHALL BE OF 22 GAUGE GALVANIZED SHEET METAL WITHNEOPRENE GASKETS. PANELS IN INSULATED DUCTWORK, SHALL HAVE 1" THICKFIBERGLASS INSULATION BETWEEN TWO THICKNESS OF SHEET METAL. THE AIRSIDESHEET METAL ON INSULATED PANELS SHALL BE WELDED OR MECHANICALLY LOCKEDPOSITION. PANELS UP TO 15" SHALL BE PROVIDE WITH TWO CAM LATCHES, ONE ON EACHSIDE. PANEL OVER 15" SHALL BE PROVIDE WITH FOUR CAM LATCHES, TWO ON EACH SIDE.ALL PANELS SHALL BE OF SUFFICIENT SIZE FOR EASY ACCESS TO AND THE SERVICING OFDAMPERS, DAMPER MOTORS, COILS, ETC.
F. FIRE DAMPERS
1. PROVIDE FIRE DAMPERS IN ALL TRANSFER OPENINGS IN WALLS WITH FIRE RATINGS OF (1)HOUR OR GREATER.
2. IN UN-SPRINKLED BUILDINGS, PROVIDE MINIMUM 1-1/2 HOUR DYNAMIC RATED FIREDAMPERS IN ALL DUCTWORK OR TRANSFER OPENINGS PENETRATING ANY FULL HEIGHTDEMISING WALL REGARDLESS OF WALL FIRE RATING.
3. FIRE DAMPERS SHALL BE FUSIBLE LINK CURTAIN TYPE AND SHALL BE UL LABELED ANDINSTALLED IN ACCORDANCE WITH UL STANDARD 555 AND NFPA 90A.
4. PROVIDE TYPE C FRAMES IN ALL SUPPLY DUCTS. PROVIDE TYPE B FRAMES IN ALLEXHAUST DUCTWORK AND IN ALL TRANSFER OR UN-DUCTED OPENINGS.
5. PROVIDE 1-1/2 HOUR DAMPERS IN ALL RATED WALLS GREATER THAN 1 HOUR AND LESSTHAN 3 HOURS. PROVIDE 3 HOUR RATED DAMPERS IN ALL RATED WALLS 3 HOURS ORGREATER.
X. ELECTRICAL WORK
A. ALL POWER WIRING FOR THE MECHANICAL SYSTEM HEREIN SPECIFIED, SHALL BE FURNISHEDAND INSTALLED BY THE ELECTRICAL CONTRACTOR UNDER THE MECHANICAL CONTRACTOR'SCONTRACT.
B. ALL ELECTRICAL WORK UNDER THIS CONTRACT SHALL BE DONE IN STRICT ACCORDANCE WITHREQUIREMENTS OF THE CITY OF CHICAGO, FEDERAL, STATE, OR ANY APPLICABLE ORINSPECTING AUTHORITY. THE WORK UNDER THIS CONTRACT SHALL INCLUDE ANY REQUIREDPERMITS AND INSPECTION FEES.
C. THE ELECTRICAL CONTRACTOR (EC) SHALL VISIT THE SITE AND BE FULLY APPRAISED OF ALLASPECTS OF THE REQUIRED UNDER THIS CONTRACT. THE EC SHALL NOTIFY THE ENGINEER INWRITING OF ANY PORTION OF THE WORK HEREIN THAT CANNOT BE INSTALLED, FURNISHED,OR IN COMPLIANCE WITH THE WORK UNDER THIS CONTRACT.
D. ALL PANEL BOARDS FURNISHED SHALL BE MAIN CIRCUIT BREAKER OR MLO, COPPER BUS WITHBOLT-ON STYLE BREAKERS RATED AT 22KA I/C.
E. ALL INDOOR CONDUIT SHALL BE TYPE "EMT" WITH GLAND (COMPRESSION) TYPE CONNECTORSAND COUPLINGS.
F. ALL OUTDOOR CONDUIT SHALL BE TYPE "IMC" WITH THREADED COUPLINGS.
G. FINAL CONNECTION TO ALL MOTORS AND MACHINERY SHALL BE VIA A MIN. 2'-0"LENGTH OFFLEXIBLE CONDUIT.
H. EACH PIECE OF MECHANICAL EQUIPMENT REQUIRING ELECTRICAL POWER SHALL HAVE ALOCAL DISCONNECT (SQUARE D CLASS 2510, HEAVY DUTY SWITCH, OR SIMILAR MAY BENECESSARY.
I. VERIFY THAT THERE IS A GFI SERVICE RECEPTACLE WITHIN 25'-0" OF EQUIPMENT REQUIRINGSERVICE.
J. RELOCATE OR FURNISH AND INSTALL NEW LIGHT FIXTURES THAT MAY BE REQUIRED TOFACILITATE INSTALLATION AND FUTURE SERVICING OF THE MECHANICAL EQUIPMENT UNDERTHIS CONTRACT.
K. PRIOR TO OPERATING OR FINAL CONNECTION OF ANY WIRED DEVICE, EACH CABLE RUN (NEWOR EXITING) SHALL BE MEGGER TESTED WITH NOT LESS THAN A 1000 VOLT MEGGER. ANYCABLE NOT SHOWN TO BE "CLEAN" SHALL BE REPLACED PRIOR TO ENERGIZING. ALL CABLESHALL BE STRANDED COPPER, 600 VOLT, TYPE "XHHW" (WET) OR "THHN" (DRY).
L. THE EC SHALL VERIFY ROTATION OF EACH MOTOR AND MEASURE THE RUNNING AMPERAGEOF EACH MOTOR, OR EQUIPMENT INSTALLED UNDER THIS CONTRACT AND COMPARE WITH THENAMEPLATE RATING.
M. THE EC SHALL WARRANTY ANY MATERIAL AND LABOR FURNISHED UNDER THIS CONTRACT FORNOT LESS THAN ONE (1) YEAR FROM THE DATE OF ACCEPTANCE BY THE OWNER.
I. GENERAL
A. THIS CONTRACTOR SHALL REVIEW THE ENTIRE SET OF CONTRACT DOCUMENTS, INCLUDING,BUT NOT LIMITED TO, ALL ELECTRICAL AND MECHANICAL DRAWINGS, AS WELL AS ALLSPECIFICATIONS AND INSTRUCTIONS TO BIDDERS. THIS CONTRACTOR SHALL VISIT THE SITEAND MAKE A DETAILED INSPECTION OF THE SPECIFIED WORK TO DEVELOP KNOWLEDGE OFALL CONDITIONS PERTINENT TO THE COMPLETION OF HIS WORK. THIS CONTRACTOR SHALLFULLY COORDINATE HIS WORK WITH THE WORK PERFORMED BY OTHER TRADES AND/ORCONTRACTORS, AND SHALL MAKE SUCH FIELD ADJUSTMENTS AS ARE REQUIRED TOACCOMMODATE FIELD CONDITIONS. ALL OF THE ABOVE SHALL BE INCLUDED IN THE SCOPE OFWORK AT NO ADDITIONAL COST TO OWNER.
B. SHOULD THIS CONTRACTOR FIND DISCREPANCIES IN, OR OMISSIONS FROM, THE DRAWINGS,SPECIFICATIONS OR OTHER DOCUMENTS, OR DISCREPANCIES BETWEEN ACTUAL FIELDCONDITIONS AND THOSE REPRESENTED IN THE DRAWINGS, OR CONFLICTS BETWEEN HISWORK AND THAT OF OTHER TRADES, OR BE IN DOUBT AS TO THE MEANING OF ANY CONTRACTDOCUMENTS, THIS CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER AND THEENGINEER IN WRITING, AND SHALL OBTAIN CLARIFICATION PRIOR TO SUBMITTING ANY BID.LACK OF SUCH NOTIFICATION SHALL BE CONSTRUED AS THIS CONTRACTOR'SREPRESENTATION THAT NO DISCREPANCIES OR CONFLICTS EXIST. ADDITIONALCOMPENSATION WILL NOT BE GRANTED AFTER AWARD OF CONTRACT FOR ANY WORKREQUIRED TO COMPLY WITH THIS REQUIREMENT.
C. THE DRAWINGS INDICATE DIAGRAMMATICALLY THE INTENT, REQUIREMENTS FOR, ANDLOCATION OF, THE WORK INCLUDED UNDER THIS CONTRACT. ALL WORK REQUIRED TO EFFECTTHE INDICATED DESIGN, INCLUDING DETAILS NOT SHOWN BUT WHOSE INCLUSION WOULD BEDEEMED A REQUIREMENT BY A KNOWLEDGEABLE TRADESMAN, ENGINEER OR TECHNICIAN,SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.
D. IT IS THE INTENT OF THESE DOCUMENTS THAT THE CONTRACTOR PROVIDE ALL LABOR,MATERIAL, EQUIPMENT AND TOOLS FOR THE COMPLETE INSTALLATION OF ALL WORK SHOWNON THE PLANS AND/OR DESCRIBED HEREIN, INCLUDING ALL DEVICES, CONTROLS ANDAPPURTENANCES REQUIRED TO SET THE NEW SYSTEMS INTO OPERATION, UNLESSOTHERWISE NOTED.
E. THIS CONTRACTOR SHALL VERIFY ALL MOUNTING, ARRANGEMENTS, HEIGHTS AND LOCATIONSPRIOR TO ROUGH-IN. ANY MENTION OF A SPECIFIC MOUNTING ARRANGEMENT, WEIGHT ORLOCATION SHALL NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY TO VERIFYSPECIFIC REQUIREMENTS AND BASE HIS WORK ON THEM. THE SAME CARE SHALL BE TAKENWITH RESPECT TO INFORMATION FURNISHED BY THIS CONTRACTOR TO HISSUBCONTRACTORS OR TO OTHER CONTRACTORS EMPLOYED BY THE OWNER ON THISPROJECT. THIS CONTRACTOR SHALL BE FINANCIALLY RESPONSIBLE FOR ANY CHANGEORDERS NECESSITATED BY INACCURATE OR INCORRECT INFORMATION FURNISHED TO OTHERCONTRACTORS. NO ADDITIONS TO THE CONTRACT AMOUNT WILL BE PERMITTED FOR ITEMSINSTALLED IN WRONG LOCATIONS OR IN CONFLICT WITH OTHER WORK.
F. THIS CONTRACTOR SHALL PAY ALL PERMIT FEES, PLAN REVIEW FEES, LICENSE FEES ANDINSPECTIONS APPLICABLE TO HIS WORK, AND SUCH COSTS SHALL BE INCLUDED IN HIS BASEBID UNLESS OTHERWISE NOTED.
G. THIS CONTRACTOR SHALL ESTABLISH SAFE WORKING PROCEDURES FOR THE PROTECTION OFTHE WORKMEN IN ALL PHASES OF WORK, AND SHALL COMPLY WITH ALL APPLICABLE LOCAL,STATE AND FEDERAL SAFETY LAWS, INCLUDING THE REQUIREMENTS OF OSHA. HE SHALLALSO PROVIDE ALL NECESSARY SIGNS, LIGHTS AND BARRICADES REQUIRED FOR THE SAFETYOF ALL OTHER PERSONS WHO MIGHT COME IN CONTACT WITH THE CONSTRUCTION BEINGPERFORMED UNDER THIS CONTRACT.
H. ALL PUBLIC AND PRIVATE PROPERTY DAMAGED AS A RESULT OF WORK PERFORMED UNDERTHIS CONTRACT SHALL BE REPAIRED AND REPLACED BY THIS CONTRACTOR, TO THESATISFACTION OF REGULATIONS AND AUTHORITIES HAVING JURISDICTION.
I. UPON COMPLETION OF THE WORK, THE CONTRACTOR SHALL CHECK THE ENTIRE WORK AREA,AND SHALL CLEAN CONSTRUCTION DUST AND DEBRIS OFF ALL SURFACES, EQUIPMENT ANDDEVICES. THIS CONTRACTOR SHALL REMOVE SURPLUS AND DEMOLISHED MATERIALS ANDRUBBISH FROM THE PROPERTY AND LEAVE THE WORK AREA IN A NEAT AND CLEANCONDITION. CONTRACTORS SHALL BE RESPONSIBLE FOR THE REMOVAL OF ANY CARTONS,PACKING MATERIALS DEBRIS, AND SO ON, THAT HAVE BEEN BROUGHT TO THE SITE UNDERTHIS CONTRACT. THIS REQUIREMENT APPLIES BOTH TO DEBRIS FROM EQUIPMENT AND WORKPROVIDED BY THIS CONTRACTOR AND TO DEBRIS ASSOCIATED WITH EQUIPMENT FURNISHEDBY THE OWNER FOR INSTALLATION UNDER THIS CONTRACT.
J. THE MECHANICAL CONTRACTOR SHALL MAKE ALL ARRANGEMENTS WITH THE BUILDINGOWNER'S REPRESENTATIVE REGARDING BUILDING RULES AND REGULATIONS, INCLUDINGWORKING HOURS, REFUSE DISPOSAL, SECURITY, INTERRUPTIONS OF BUILDING UTILITIES ORFUNCTIONS, OWNERSHIP OF SALVAGED MATERIALS, AND ANY OTHER ITEMS DEEMED TO BE OFMUTUAL INTEREST.
K. IT SHALL BE THE MECHANICAL CONTRACTOR'S RESPONSIBILITY TO STORE HIS MATERIALS IN AMANNER THAT WILL MAINTAIN AN ORDERLY CLEAN APPEARANCE. IF STORED ON SITE IN OPENOR UNPROTECTED AREAS, ALL EQUIPMENT AND MATERIAL SHALL BE KEPT OFF THE GROUNDBY MEANS OF PALLETS OR RACKS, AND COVERED WITH TARPAULINS. EQUIPMENT ANDMATERIAL, IF LEFT OUT IN THE OPEN AND DAMAGED, SHALL BE REPAINTED OR OTHERWISEREFURBISHED AT THE DISCRETION OF THE BUILDING OWNER'S REPRESENTATIVE. EQUIPMENTAND MATERIAL IS SUBJECT TO REJECTION AND REPLACEMENT IF, IN THE OPINION OF THEENGINEER OR MANUFACTURER, THE EQUIPMENT HAS DETERIORATED OR BEEN DAMAGED TOTHE EXTENT THAT ITS IMMEDIATE USE IS QUESTIONABLE, OR THAT ITS NORMAL LIFEEXPECTANCY HAS BEEN CURTAILED.
L. PROVIDE ALL HOLES, SLEEVES, CUTTING, PATCHING, AND CAULKING FOR INSTALLATION OFTHIS WORK. CAULKING SHALL CONFORM TO THE FIRE RATING OF THE WALLS. SEAL ALLPENETRATIONS THROUGH BLOCK WALLS.
M. EXISTING SYSTEMS TO BE SHUT DOWN A MINIMUM AMOUNT OF TIME. SHUTDOWN TO BECOORDINATED ON THE JOB SITE.
N. THIS CONTRACTOR SHALL BE PROPERLY LICENSED, BONDED AND INSURED AND CAPABLE OFPERFORMING QUALITY WORKMANSHIP ON THIS PROJECT.
O. REFER TO SHEET M0.1 FOR ADDITIONAL DEMOLITION NOTES AND GENERAL NOTES.
III. REGULATIONS AND CODES
A. ALL WORK PERFORMED UNDER THIS CONTRACT SHALL BE IN CONFORMANCE WITH ALLGOVERNING NATIONAL, STATE AND LOCAL CODES HAVING JURISDICTION.
B. ALL EQUIPMENT FURNISHED, AND ALL WORK PERFORMED UNDER THIS CONTRACT SHALL BE INSTRICT COMPLIANCE WITH CURRENT APPLICABLE STANDARDS AS SET FORTH BY THENATIONAL FIRE PROTECTION ASSOCIATION (NFPA), UNDERWRITERS LABORATORIES (UL), THEAMERICAN GAS ASSOCIATION (AGA), THE AMERICAN SOCIETY OF MECHANICAL ENGINEERS(ASME), THE AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR CONDITIONINGENGINEERS (ASHRAE), SHEET METAL AND AIR-CONDITIONING CONTRACTORS NATIONALASSOCIATION, INC. (SMACNA), AND OTHER NATIONAL STANDARDS WHERE APPLICABLE.
IV. MATERIALS AND EQUIPMENT
A. ALL EQUIPMENT INSTALLED UNDER THIS CONTRACT SHALL BE NEW, UNLESS OTHERWISESTATED HEREIN, OF BEST QUALITY NORMALLY USED FOR THE PURPOSE IN GOODCOMMERCIAL PRACTICE, AND FREE FROM DEFECTS.
B. ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'SRECOMMENDATION.
C. THIS CONTRACTOR IS REQUIRED TO BID AS SPECIFIED. NO MATERIAL OR EQUIPMENTSUBSTITUTIONS WILL BE CONSIDERED AFTER THE AWARD OF CONTRACT. THIS CONTRACTORSHALL, IF HE DESIRES TO SUBSTITUTE OTHER THAN SPECIFIED MATERIAL OR EQUIPMENT,SUBMIT IN ALTERNATE PROPOSAL FORM WITH HIS BID, A LIST OF SUCH ITEMS INDICATINGITEM, MANUFACTURER, MODEL NUMBER AND THAT AMOUNT TO BE ADDED TO OR DEDUCTEDFROM THE BASE BID. EACH SUCH MATERIAL OR EQUIPMENT SUBSTITUTION ITEM SHALL BELISTED SEPARATELY IN ORDER THAT PROPER CONSIDERATION MAY BE GIVEN. IN ANY EVENT,SPECIFIED MATERIALS ONLY SHALL BE PROPOSED UNDER THE BASE BID.
D. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR SCHEDULING THE PURCHASE, DELIVERY,RECEIVING, UNLOADING, UNCRATING, STORING, SETTING IN PLACE AND PROTECTING OF ALLNEW EQUIPMENT FURNISHED BY HIM OR TO HIM BY THE OWNER, AND SHALL SECURE SUCHEQUIPMENT FROM DAMAGE BY VANDALISM AND WEATHER DURING CONSTRUCTION AND UNTILTIME OF FINAL ACCEPTANCE BY THE OWNER.
E. THIS CONTRACTOR SHALL FURNISH AND INSTALL ALL STRUCTURAL STEEL MEMBERS, SLEEVESAND SHIMS REQUIRED TO LEVEL AND SUPPORT EQUIPMENT AND EQUIPMENT SUPPORTS.
F. ALL EQUIPMENT NOISE LEVELS SHALL NOT EXCEED 55 DB AT THE LOT LINE.
II. SHOP DRAWINGS, SUBMITTALS, AND AS-BUILTS
A. SHOP DRAWINGS, PRODUCT DATA, AND/OR SAMPLES SHALL BE SUBMITTED FOR ALLEQUIPMENT AS SPECIFIED OR SCHEDULED. SHOP DRAWING PLANS SHALL BE 1/4" SCALE ANDSHALL INDICATE LAYOUT OF ALL EQUIPMENT, DUCTS, DIFFUSERS, BOXES, PIPING,THERMOSTATS, AND ANY OTHER RELATED MECHANICAL ITEMS. SHOP DRAWING PLANS SHALLINCLUDE ALL DUCT AND PIPE SIZES, CFM, ETC.
B. SHOULD CONDITIONS NECESSITATE ANY REARRANGEMENTS, OR IF CONDUIT OR PIPING CANBE RUN TO BETTER ADVANTAGE, THIS CONTRACTOR SHALL PREPARE AND SUBMIT FORAPPROVAL SHOP DRAWINGS SHOWING SUCH CHANGES BEFORE PROCEEDING WITH THEWORK
C. THE CONTRACTOR SHALL, UPON BEING AWARDED THE CONTRACT, SUBMIT ELECTRONICCOPIES OF THE MANUFACTURER'S SUBMITTALS FOR ALL EQUIPMENT TO BE FURNISHEDUNDER THIS CONTRACT. THE CONTRACTOR SHALL PROCEED WITH THE PROCUREMENT ANDINSTALLATION OF EQUIPMENT ONLY AFTER RECEIVING APPROVED SUBMITTALS RELATIVE TOEACH ITEM.
D. THE CONTRACTOR SHALL FURNISH AS-BUILT DRAWINGS TO THE ENGINEER & OWNER BEFOREFINAL PAYMENT WILL BE ISSUED. THE AS-BUILT DRAWINGS SHALL BE SUBMITTED INREPRODUCIBLE FORM, AND AS AN ELECTRONIC FILE ON DISK (AUTOCAD 2004 OR LATER), ANDAS THREE BLUELINE COPIES.
E. THIS CONTRACTOR SHALL, DURING THE COURSE OF CONSTRUCTION, COLLECT AND COMPILEA COMPLETE BROCHURE OF ALL EQUIPMENT FURNISHED AND INSTALLED ON THIS PROJECT.THIS BROCHURE SHALL INCLUDE OPERATIONAL AND MAINTENANCE INSTRUCTIONS, PARTSLISTS, SUBMITTALS AND DESCRIPTIVE LITERATURE, ALL AS FURNISHED BY THE EQUIPMENTMANUFACTURER. CONTRACTOR SHALL FURNISH OWNER WITH THREE INSTRUCTION MANUALSIN BOUND FORM CONTAINING THIS DATA FOR ALL EQUIPMENT AND APPARATUS. MANUALSSHALL BE EDITED TO BE PRODUCT SPECIFIC FOR PRODUCTS ACTUALLY INSTALLED ON THEPROJECT.
V. EXISTING BUILDING MODIFICATIONS
A. THIS CONTRACTOR SHALL NOT REMOVE OR RELOCATE ANY EXISTING ITEMS OF OWNER'SEQUIPMENT, FOUND TO BE IN THE PATH OF NEW SYSTEMS TO BE INSTALLED, WITHOUT PRIORAPPROVAL BY THE OWNER, EXCEPT AS SPECIFICALLY INDICATED ON THE DRAWINGS. IFEXISTING EQUIPMENT IS FOUND TO BE IN THE WAY OF PROPOSED PIPE ROUTING, ETC., THEOWNER'S REPRESENTATIVE SHOULD BE ADVISED, AND HE SHALL MAKE THE DECISION AS TOWHETHER OR NOT THE SPECIFIC ITEM IS TO BE REMOVED AND RETAINED, REMOVED ANDDISPOSED OF, OR REMOVED AND RELOCATED.
B. ALL CUTTING, DRILLING AND PATCHING REQUIRED FOR THE INSTALLATION OF SYSTEMSHEREIN DESCRIBED, SHALL BE PROVIDED BY THIS CONTRACTOR. STRUCTURAL MEMBERSSHALL NOT BE DISTURBED WITHOUT PRIOR APPROVAL OF THE ENGINEER. ALL AREASDISTURBED BY WORK PERFORMED UNDER THIS CONTRACT SHALL BE NEATLY REPAIRED ANDREFINISHED TO THE CONDITION OF ADJOINING SURFACES IN A MANNER SUITABLE TO THEENGINEER. ROOF AND EXTERIOR WALLS TO REMAIN WEATHER TIGHT. INTERIOR WALLS TOMAINTAIN REQUIRED FIRE RATING.
VI. SCOPE AND GUARANTEE
A. THE WORK TO BE PERFORMED UNDER THIS CONTRACT SHALL INCLUDE THE INSTALLATION OFTHE VENTILATING, HEATING HYDRONIC WATER, CONTROL SYSTEMS AND COMPONENTS ASINDICATED ON THE DRAWINGS AND SPECIFIED HEREIN.
B. BY SIGNING THE CONTRACT, THIS CONTRACTOR ACKNOWLEDGES THAT HE HAS VISITED THESITE AND ACQUAINTED HIMSELF WITH THE CONDITIONS UNDER WHICH THE WORK IS TO BEPERFORMED, AND HE AGREES THAT HE WILL COMPLY WITH THE REQUIREMENTS AND INTENTOF ALL PERTINENT DOCUMENTS IN THE PERFORMANCE OF THE WORK.
C. THIS CONTRACTOR SHALL GUARANTEE THAT THE COMPLETE SYSTEMS AS INSTALLED UNDERTHIS CONTRACT SHALL BE FREE OF DEFECTS IN WORKMANSHIP AND MATERIALS FOR APERIOD OF ONE (1) YEAR FROM THE DATE OF JOB ACCEPTANCE BY THE OWNER. THIS SHALLINCLUDE A GUARANTEE OF FREE CIRCULATION OF AIR AND WATER THROUGH-OUT THEIRRESPECTIVE SYSTEMS, WITHOUT LEAKS OR UNDUE NOISE. IF DEFECTS OCCUR DURING THEONE YEAR GUARANTEE PERIOD, THIS CONTRACTOR SHALL REPAIR OR REPLACE WITH NEWEQUIPMENT, SUCH DEFECTS, AT NO EXPENSE TO THE OWNER AND TO THE SATISFACTION OFTHE ENGINEER.
VII. PIPING
A. GENERAL
1. ALL NEW PIPING SHALL BE SUPPORTED BY SPRING TYPE STEEL HANGERS OR BRACKETSAT SUFFICIENT INTERVALS TO MAINTAIN A STRAIGHT LINE, BUT NOT TO EXCEED 10'SPACING ON CENTERS OF HANGERS IN ANY CASE, WITH A SEPARATE HANGER FOR EACHBRANCH. SUPPORT PIPING IN ACCORDANCE WITH MANUFACTURER'S STANDARDIZATIONSOCIETY (MSS) GUIDES SP-58, 69, AND 89.
2. PIPING SUPPORT SHALL NOT BE FROM DUCTWORK, CONDUIT, OR OTHER PIPING BUTFROM THE PERMANENT BUILDING STRUCTURE OR EQUIPMENT SUPPORTS.
3. WHERE INSULATED PIPE IS SUPPORTED, PROVIDE SADDLES, BLOCKS OR OTHER METHODAPPROVED BY ENGINEER TO PROTECT INSULATION FROM BEING CRUSHED.
4. ALL PIPE SHALL BE CUT TO EXACT MEASURE. FULL LENGTHS OF PIPE SHALL BE USED.SHORT LENGTHS OF PIPING WITH COUPLINGS WILL NOT BE PERMITTED.
5. COMPLY WITH PROVISIONS OF ASME B31 SERIES "CODE FOR PRESSURE PIPING."
6. SEQUENCE, COORDINATE, AND INTEGRATE INSTALLATIONS OF MECHANICAL MATERIALSAND EQUIPMENT FOR EFFICIENT FLOW OF THE WORK. COORDINATE INSTALLATION OFLARGE EQUIPMENT WITH RELATED TRADES.
7. INSTALL PIPING AT A SLOPE DOWNWARDS TOWARDS DRAIN VALVE LOCATIONS LOCATEDWITHIN BUILDING TO ALLOW FOR COMPLETE SYSTEM DRAINING IF NECESSARY.
8. INSTALL COMPONENTS HAVING PRESSURE RATING EQUAL TO OR GREATER THAN SYSTEMOPERATING PRESSURE.
9. INSTALL EXPOSED INTERIOR AND EXTERIOR PIPING AT RIGHT ANGLES OR PARALLEL TOBUILDING WALLS. DIAGONAL RUNS ARE PROHIBITED, EXCEPT WHERE INDICATED.
10. INSTALL PIPING TO ALLOW APPLICATION OF INSULATION PLUS 1-INCH CLEARANCEAROUND INSULATION.
11. SUBJECT ALL NEW PIPING TO HYDROSTATIC PRESSURE TESTS THAT IS NOT LESS THAN 50PSIG AND 1.5 TIMES THE SYSTEM'S WORKING PRESSURE. TEST PRESSURE SHALL NOTEXCEED MAXIMUM PRESSURE FOR ANY VESSEL, PUMP, VALVE, OR OTHER COMPONENT INSYSTEM UNDER TEST. PRESSURE TEST UNDER SUPERVISION OF BUILDING ENGINEER.
B. BLACK STEEL PIPING AND FITTINGS
1. SIZE 3" AND LARGER: PIPE SHALL BE BLACK CARBON STEEL. ANSI/ASTM A-53 GRADE B,WITH BEVELED ENDS FOR WELDING.
2. EACH LENGTH OF PIPE SHALL BE LEGIBLY IDENTIFIED AT THE MILL BY PAINT, STENCILING,OR RAISED SYMBOLS IDENTIFYING THE MANUFACTURER AND CLASS OF PIPE.
3. ALL PIPE FOR THE FOLLOWING SERVICES SHALL BE SCHEDULE 40 BLACK STEEL FORPIPING 10 INCHES TO 3 INCHES SHALL HAVE A MINIMUM WALL THICKNESS OF 0.375 INCHESFOR PIPING 12" AND LARGER.
a. CHILLED WATER (EXCEPT WHERE SPECIFIED COPPER)
5. ALL FITTINGS IN BLACK CARBON STEEL PIPING 3" AND LARGER SHALL BE SHORT ORLONG PATTERN WELDED FITTINGS OF THE SAME WALL THICKNESS AND OF THE SAMEMATERIAL AS THE PIPE TO WHICH THEY ARE ATTACHED. THEY SHALL BE IDENTIFIED BYTHE MANUFACTURER BY PERMANENTLY ATTACHED TAGS, IMPRINTS, OR OTHERAPPROVED MEANS, INDICATING THE CLASS OF WALL THICKNESS AND MATERIAL.
6. LOW PRESSURE FITTINGS, FLANGES, AND UNIONS SHALL BE USED FOR THE FOLLOWINGSERVICES:
a. CHILLED WATER
7. LOW PRESSURE SCREWED FITTINGS SHALL BE BLACK CAST IRON, 125 LB. CLASS, INACCORDANCE WITH ANSI B 16.4 OR BLACK MALLEABLE IRON, 150 LB. CLASS INACCORDANCE WITH ANSI B 16.3.
8. LOW PRESSURE FLANGED FITTINGS SHALL BE CAST IRON, SHORT BODY, CLASS 125,BLACK, AND IN ACCORDANCE WITH ANSI B 16.1. GASKETS SHALL BE FULL FACE OF 1/8"MINIMUM THICKNESS AS HEREINAFTER SPECIFIED. FLANGE BOLTS SHALL BE HEXAGONHEAD MACHINE BOLTS WITH HEAVY SEMI-FINISHED HEXAGON HEAD NUTS, CADMIUMPLATED, HAVING DIMENSIONS IN ACCORDANCE WITH ANSI B 18.2.
9. WELD FITTINGS SHALL BE STEEL, STANDARD WEIGHTS, BLACK, AND IN ACCORDANCE WITHANSI B 16.9, ANSI B 16.25, ASTM A 234, ANSI B 16.5, OR ANSI B 16.11.
10. LOW PRESSURE UNIONS SHALL BE 150 PSIG MALLEABLE IRON BRASS TO IRON SEATGROUND JOINT UNIONS. (THE GROOVED PIPING METHOD FOR MECHANICALLY JOININGPIPE IS RECOGNIZED AS RELIABLE AND ECONOMICAL METHOD. HOWEVER IF YOU CHOOSENOT TO ACCEPT THIS METHOD, MAKE SURE TO DELETE ITEM NUMBER 11)
11. FITTINGS FOR GROOVED END PIPE MAY BE USED IN LIEU OF WELDED OR FLANGEDFITTINGS IN HOT WATER HEATING, CHILLED WATER, AND CONDENSER WATER PIPING 2-1/2"AND LARGER. FITTINGS SHALL BE COMPLETE WITH MALLEABLE IRON HOUSING, GASKET,AND BLACK STEEL BOLTS AND NUTS.
a. PIPE GROOVING SHALL BE IN ACCORDANCE WITH THE MANUFACTURER'SSPECIFICATIONS CONTAINED IN THE LATEST PUBLISHED LITERATURE.
b. BEFORE ASSEMBLY OF COUPLINGS, LIGHTLY COAT PIPE ENDS AND OUTSIDE OFGASKETS WITH WATER SOLUBLE TYPE LUBRICANT SUCH AS SILICONE SPRY, ETC. TOFACILITATE INSTALLATION.
c. MECHANICAL GROOVED COUPLINGS, INCLUDING GASKETS USED ON DRY PIPESYSTEMS FOR FIRE PROTECTION, SHALL BE LISTED FOR DRY-PIPE SERVICE IN "U.L.FIRE PROTECTION EQUIPMENT DIRECTORY."
C. COPPER PIPING AND FITTINGS
1. PIPE SHALL BE HARD TEMPERED, SEAMLESS COPPER TUBING, CONFORMING TO ASTMSPECIFICATION B-88. MANUFACTURER'S NAME OR TRADEMARK AND TYPE OF TUBINGSHALL BE INDENTED OR OTHERWISE IDENTIFIED AT 3'-0" INTERVALS.
a. FITTINGS IN COPPER TUBING 2-1/2" AND SMALLER SHALL BE WROUGHT SWEAT TYPEFITTINGS MANUFACTURED OF SEAMLESS TUBING FORGED BRONZE OR BRASS RODTO MEET THE STANDARDS OF ANSI/ASME B16.22. FITTINGS SHALL HAVE TUBINGSTOPS.
b. ALL FITTINGS IN COPPER TUBING 3" AND LARGER MAY BE CAST RED BRONZE SOLDERTYPE FITTINGS, MEETING THE STANDARDS OF ANSI B16.18 AND ASTM B-62. FITTINGSSHALL HAVE TUBING STOPS.
c. IN ALL CASES WHERE COPPER PIPE CONNECTIONS ARE MADE TO PIPING OR AN ITEMOF EQUIPMENT OF A DISSIMILAR METAL, PROVIDE DIELECTRIC FITTINGS AS HEREINSPECIFIED.
2. ALL PIPE FOR THE FOLLOWING SERVICE SHALL BE TYPE "L" COPPER.
a. CHILLED WATER SUPPLY AND RETURN RUNOUTS TO FAN COIL UNITS.b. CONDENSATE DRAIN LINES.
G. ALL EQUIPMENT PROVIDED UNDER THESE SPECIFICATIONS SHALL PERFORM WITH THE LEASTPOSSIBLE NOISE AND VIBRATION CONSISTENT WITH ITS DUTY. QUIETNESS OF OPERATION OFALL EQUIPMENT IS A REQUIREMENT. ANY EQUIPMENT, AS DETERMINED BY THE BUILDINGOWNER'S REPRESENTATIVE OR ENGINEER TO BE PRODUCING OBJECTIONABLE NOISE ORTRANSMITTING NOISE OR VIBRATION TO THE BUILDING SHALL BE REPAIRED OR REMOVED ANDREPLACED.
H. FURNISH AND INSTALL IDENTIFICATION LABELS ON ALL EQUIPMENT INSTALLED AS PART OFTHIS PROJECT. IDENTIFICATION LABELS SHALL BE FASTENED TO EQUIPMENT CLEARLY VISIBLE.LABELS SHALL BE ENGRAVED WITH EQUIPMENT TAG, MANUFACTURER'S NAME, ADDRESS,MODEL NUMBER, AND RATING.
I. CODE RATINGS, LABELS, OR OTHER DATA WHICH ARE DIE-STAMPED OR OTHERWISE AFFIXEDTO THE SURFACE OF THE EQUIPMENT SHALL BE IN A VISIBLE LOCATION.
J. REPLACE FILTERS ON ALL EQUIPMENT HAVING THEM AT PROJECT COMPLETION PRIOR TOTURNOVER.
KEY PLANKEY PLAN
N
10
9
8
67
111
3
5
4
2
19165
DESCRIPTIONDATEREV.
ISSUE/REVISION:
PROJECT NO:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
SCALE:
SHEET NO.
(708) 236-0330 FAX
Hillside, IL 60162
(708) 236-0300
30 N. Wolf Rd., Second Floor
PROJECT:
DRAWING TITLE:
333 WEST 35TH STREETCHICAGO, IL 60616
GUARANTEED RATE FIELD -HVAC / AHU RENOVATION -PHASE IX
10.07.2019 ISSUED FOR BID
ISSUED FOR BID
NOT FORCONSTRUCTION
10/07/2019
M4.01
MECHANICALSPECIFICATIONS
AS NOTED
AS
AS
MS
D. ALL FVNR MOTOR STARTERS SHALL BE COMBINATION TYPE WITH A FUSED LINE SIDEDISCONNECT. EACH STARTER SHALL BE NEMA RATED AND SHALL HAVE 120 VOLT CONTROLWITH INTEGRAL CONTROL TRANSFORMER, AND DOOR MOUNTED RUN & STOP PILOT LITES,AND HAND-OFF-AUTO SELECTOR SWITCH SHALL BE CUTLER-HAMMER, SQUARE D,ALLEN-BRADLEY, OR SIEMENS.
E. MOTORS THAT ARE NOT INSTALLED WITHIN THE LINE OF SIGHT OF THE MOTOR STARTERS ORVFDS WITH INTEGRAL DISCONNECTS SERVING THEM SHALL HAVE A LOCAL DISCONNECTINGMEANS.
F. EACH VFD DRIVE MOTOR THAT REQUIRES A LOCAL DISCONNECT SHALL BE EQUIPPED WITH ANAUXILIARY CONTACT THAT SHALL BE WIRED INTO THE STOP CIRCUIT OF THE DRIVE.
XII. SYSTEM START-UP, TESTING, ADJUSTING AND BALANCING
A. UPON COMPLETION OF THE SYSTEMS INSTALLATION, AND PRIOR TO ACCEPTANCE BY THEENGINEER AND OWNER, THIS CONTRACTOR SHALL MAKE GENERAL OPERATING TESTS TODEMONSTRATE THAT ALL EQUIPMENT AND SYSTEMS ARE IN PROPER WORKING ORDER, ANDARE FUNCTIONING IN CONFORMANCE WITH THE INTENT OF THE DRAWINGS ANDSPECIFICATIONS.
B. BEFORE OPERATING ANY ROTATING EQUIPMENT, THE ROTATION AND LUBRICATION SHALL BECHECKED AND THE PROPER QUANTITIES OF OIL AND GREASE SHALL BE ADDED AS REQUIREDFOR CORRECT OPERATION. EACH PART OF THE SYSTEM SHALL BE ADJUSTED TO INSUREPROPER FUNCTIONING OF ALL CONTROLS, PROPER AIR DISTRIBUTION, ELIMINATION OFDRAFTS, NOISE AND VIBRATION, AND THE ENTIRE SYSTEM SHALL BE LEFT IN FIRST-CLASSOPERATING CONDITION.
C. THIS CONTRACTOR SHALL FURNISH ALL EQUIPMENT AND PERSONNEL REQUIRED FOR THECOMPLETE AND COMPREHENSIVE TESTING, ADJUSTING, AND BALANCING OF THE SYSTEMSINSTALLED UNDER THIS CONTRACT AND TO THE EXTENT REQUIRED BY THE SEQUENCE OFOPERATION. THE OWNER AND ENGINEER SHALL BE NOTIFIED WHEN THE TESTS ARE TO TAKEPLACE, IN ORDER THAT HE OR HIS AUTHORIZED REPRESENTATIVE MAY BE IN ATTENDANCE IFDEEMED NECESSARY.
D. THIS CONTRACTOR TO RETURN EXISTING HEATING/COOLING SYSTEM TO EXISTING OPERATINGCONDITION INCLUDING BUT NOT LIMITED TO THE REFILL AND PURGE OF ALL AIR AS PART OFHEATING/COOLING SYSTEM START-UP.
E. A CERTIFIED TEST AND BALANCE CONTRACTOR (TABC) SHALL BE RESPONSIBLE FORBALANCING ALL NEW PIPING SYSTEMS TO THE EXTENT REQUIRED BY THESE DRAWINGS ANDTHE SEQUENCE OF OPERATION AND AS RELATED TO THE SPECIFIED WORK. SUCH BALANCINGSHALL BE PERFORMED BY A MEMBER OF THE NATIONAL ENVIRONMENTAL BALANCING BUREAU(NEBB), WHO SHALL SUBMIT THREE (3) COPIES OF THEIR NEBB CERTIFICATE PRIOR TOBALANCING AND THE BALANCING REPORT TO THE ENGINEER FOR APPROVAL. THE SCOPE OFWORK FOR THE TABC SHALL INCLUDE ALL AIR SUPPLY MAINS AND ALL WATER SUPPLY ANDRETURN MAINS, BRANCHES AND TERMINAL UNITS INSTALLED AS A PART OF THIS CONTRACT.ALL BALANCING WORK SHALL CONFORM TO NEBB STANDARDS AND SHALL BE REPORTED ONNEBB STANDARD FORMS. THE BALANCING CONTRACTOR SHALL IDENTIFY EACH AIR ANDWATER DEVICE BY LOCATION, TYPE AND SIZE, AND SHALL TEST AND ADJUST EACH AIR ANDWATER DEVICE TO WITHIN 10% OF DESIGN. THE SCOPE OF WORK FOR THE TABC ISDESCRIBED IN THE FOLLOWING PARAGRAPHS.
F. THE TABC CONTRACTOR SHALL BE KEPT INFORMED DURING THE CONSTRUCTION OF THEPROJECT OF ANY MAJOR CHANGES MADE TO THE HVAC SYSTEM. TABC CONTRACTOR SHALLBE PROVIDED WITH ONE (1) SET OF SHOP DRAWINGS ON ALL EQUIPMENT WHICH THEY WILL BEREQUIRED TO WORK ON WHEN BALANCING THE HVAC SYSTEM.
G. THE TABC CONTRACTOR SHALL BE REQUIRED TO WORK CLOSELY WITH THE MECHANICALCONTRACTOR AND ENGINEER IN ORDER TO ENSURE A PROPER INSTALLATION.
H. THIS CONTRACTOR SHALL PROVIDE COMPETENT PERSONNEL, TO INSTRUCT THE OWNER ORHIS REPRESENTATIVE, IN THE PROPER OPERATION OF THE SYSTEMS INSTALLED UNDER THISCONTRACT, FOR ONE FULL DAY DURING THE HEATING SEASON.
I. THIS CONTRACTOR SHALL COORDINATE WITH ENGINEER FOR FUNCTIONAL TESTING OFEQUIPMENT AND CONTROLS INSTALLED AS PART OF THIS PROJECT. THIS CONTRACTOR SHALLCORRECT DEFICIENCIES FOUND DURING FUNCTIONAL TESTING TO THE ACCEPTANCE OF THEENGINEER.
J. THE FINAL TEST RESULTS SHALL BE TABULATED AND FOUR (4) CERTIFIED COPIES SHALL BESUBMITTED TO THE ENGINEER FOR REVIEW. TWO (2) CERTIFIED COPIES SHALL BE SUBMITTEDTO THE BUILDING OWNER'S REPRESENTATIVE NO LATER THAN THIRTY (30) DAYS AFTERTENANT MOVE-IN. ALL EQUIPMENT SHOWN IN BALANCING REPORT SHALL HAVE AN EQUIPMENTID TAG WHICH SHALL CORRESPOND TO TAG SHOWN ON MECHANICAL AS-BUILT DRAWINS.G
K. AIR TESTING AND BALANCING
1. BALANCE EACH AIR SUPPLY AND EXHAUST SYSTEM TO WITH 10% OF QUANTITY SHOWN ONDRAWINGS.
2. BELTS AND SHEAVE CHANGES REQUIRED TO MEET SPECIFIED AIR VOLUMES SHALL BEDONE AT NO ADDITIONAL COST.
3. RECORD AMP DRAW FOR AC AND FAN COIL UNITS AND VERIFY UNIT CAPACITY.
4. RECORD DISCHARGE AIR TEMPERATURE AT UNIT.
5. RECORD THE “AS BALANCED” STATE OF THE SYSTEM ON REPORT FORMS FOR ALLTERMINALS AND DUCT APPARATUS.
6. VERIFY THE ACTION OF ALL FAN CONTROL DAMPERS, SHUT DOWN CONTROLS, ANDAIRFLOW SAFETY CONTROLS.
7. PREPARE THE REQUIRED REPORT FORMS AND SUBMIT AS REQUIRED.
8. TEST RESULTING GLYCOL PERCENTAGE AND ADJUST AS NECESSARY.
J. HYDRONIC SYSTEM TESTING AND BALANCING
1. CHECK TO SEE THAT ALL NECESSARY ELECTRICAL WIRING, TEMPERATURE CONTROLSYSTEMS, ALL RELATED HYDRONIC PIPING CIRCUITS AND ALL RELATED DUCT SYSTEMSARE FUNCTIONAL AND THAT ANY NECESSARY COMPENSATION FOR SEASONAL EFFECTSHAVE BEEN MADE.
2. DETERMINE THAT ALL HYDRONIC SYSTEMS HAVE BEEN CLEANED, FLUSHED, RE-FILLEDAND VENTED AS REQUIRED.
3. BALANCE ALL EQUIPMENT WITH CHILLED WATER FLOW TO THE GPM QUANTITY SHOWN ONTHE DRAWINGS AND SPECIFIED IN THE EQUIPMENT SCHEDULE.
4. AFTER ALL TAB WORK HAS BEEN COMPLETED AND THE SYSTEMS ARE OPERATING WITHINPLUS OR MINUS 10% OF DESIGN FLOW, MARK OR SCORE ALL BALANCING COCKS, GAUGES,AND THERMOMETERS AT FINAL SET POINTS AND/OR RANGE OF OPERATION.
5. VERIFY THE ACTION OF ALL WATER FLOW SAFETY SHUT DOWN CONTROLS
6. PREPARE ALL REPORT FORMS AND SUBMIT REQUIRED.
XIII. AUTOMATIC TEMPERATURE CONTROL SYSTEM
A. GENERAL
1. THE CONTROLS CONTRACTOR SHALL BE THE CONTROLS ENGINEER FOR THIS PROJECT,RESPONSIBLE FOR DESIGN AND ENGINEERING OF ALL CONTROL SYSTEMS TO OPERATEAS DESCRIBED IN THE SEQUENCE OF OPERATION, TO CONFORM WITH THE GOVERNINGBUILDING CODES, AND OPERATE IN A MANNER CONSISTENT WITH KNOWN GOODCONTROLS ENGINEERING PRACTICE.
2. THE BASC / CONTROLS ENGINEER SHALL IDENTIFY ANY POTENTIAL CONDITIONS THATCOULD BE CONSTRUED TO DEVIATE FROM GOOD CONTROLS ENGINEERING PRACTICEPRIOR TO BIDDING AND INCLUDE ALL ENGINEERING AND INSTALLATION WORK REQUIREDTO MAKE ALL HVAC SYSTEMS COMPLETE AND OPERATIONAL, IN CONFORMANCE WITHGOOD CONTROLS ENGINEERING PRACTICE, PRIOR TO SUBMITTING HIS BID.
3. THE DRAWINGS AND DOCUMENTS PREPARED FOR THIS PROJECT ARE DIAGRAMMATICAND THE SUCCESSFUL BASC MUST INCLUDE ALL EQUIPMENT, MATERIALS, LABOR, ANDRELATED WORK AS REQUIRED TO COMPLETE THE PROJECT OUTLINED HEREIN. THE BASCSHALL PROVIDE A COMPLETE SUBMITTAL PACKAGE FOR ALL HARDWARE DEVICES,SEQUENCE OF OPERATION WITH PROPOSED SET POINTS, ADJUSTABILITY, CONTROLDRAWINGS, AND PROGRAMMING TEXT BLOCKS FOR REVIEW AND APPROVAL BY ELARAENERGY SERVICES PRIOR TO PURCHASING AND INSTALLATION OF THE SAME.
4. THE BASC SHALL PROVIDE ALL CONTROL COMPONENTS, WIRING, INTERLOCKS,ELECTRICAL POWER, AND ALL OTHER DEVICES REQUIRED TO MAKE ALL HVAC EQUIPMENTINSTALLED UNDER THIS PROJECT COMPLETE AND FULLY OPERATIONAL PER THESEQUENCE OF OPERATION AND AS REQUIRED FOR SAFE AND ACCURATE CONTROL.
5. THE BASC SHALL PROVIDE ALL CONTROL VALVES AND ACTUATORS TO THE MECHANICALCONTRACTOR FOR INSTALLATION. THE BASC SHALL DIRECT THE MECHANICALCONTRACTOR AS TO THE PROPER LOCATION AND ORIENTATION OF ALL DEVICES TOACHIEVE A PROPER AND CORRECT CONTROL SEQUENCE.
6. ANY CONTROLS NO LONGER NECESSARY TO ACHIEVE THE SEQUENCES OF OPERATIONARE TO BE DEMOLISHED AND REMOVED.
7. PRIOR TO DISCONNECTING AND REMOVING ANY EXISTING CONTROLLERS, THE BASCSHALL VERIFY THAT REMOVAL WILL NOT NEGATIVELY IMPACT THE OPERATION OFEXISTING CONTROLLERS AND SYSTEMS OUTSIDE THE SCOPE OF THE PROJECT.
8. THE BASC SHALL PROVIDE THERMOSTATS FOR ALL CONTROLLED EQUIPMENT TOOPERATE AS DESCRIBED IN THE SEQUENCE OF OPERATION AND / OR PERMANUFACTURER'S REQUIREMENTS AND KNOWN STANDARDS OF GOOD CONTROLPRACTICE. INCLUDE ALL THERMOSTATS AS REQUIRED FOR EQUIPMENT TO BE COMPLETEAND FULLY OPERATIONAL, WHETHER SHOWN SPECIFICALLY ON THE PLANS OR NOT.
9. ALL TEMPERATURE SENSORS IN DUCTWORK, AIR HANDLING UNITS, AND PLENUMS SHALLBE OF AVERAGING TYPE. PROPERLY SUPPORT AVERAGING ELEMENT (MINIMUM TWENTYFOOT LENGTH) ACROSS A REPRESENTATIVE AREA TO ACHIEVE A TRUE AVERAGEREADING. SUPPORT SENSORS USING HEAVY CABLE AND / OR HALF INCH CONDUIT WITHNYLON WIRE TIES.
10. THE BASC SHALL SELECT ALL PRESSURE AND TEMPERATURE SENSORS WITH ANAPPROPRIATE SPAN AND RANGE FOR THE APPLICATION.
11. ALL TEMPERATURE AND PRESSURE SENSORS SHALL BE INSTALLED IN LOCATIONS SUCHTHAT THEY DO NOT MAKE FALSE READINGS. BASC SHALL REVIEW THE PLANS ANDIDENTIFY ANY SUCH POTENTIAL CAUSES FOR FALSE READINGS AND NOTIFY THEENGINEER IN WRITING THAT THESE SHOULD BE RELOCATED PRIOR TO ROUGH-IN ANDCONTROLS INSTALLATION. THE BASC SHALL RELOCATE ANY SENSORS INSTALLED INIMPROPER LOCATIONS AND GIVING FALSE READINGS AND HIS OWN EXPENSE.CONDITIONS TO BE AWARE OF INCLUDE, BUT ARE NOT LIMITED TO, LOCATIONS OFTHERMOSTATS BEHIND DOORS, OUTDOOR AIR SENSORS NEAR EXHAUST OPENINGS,STATIC PRESSURE SENSORS IN TURBULENT LOCATIONS, THERMOSTATS INSTALLEDADJACENT TO HEAT SOURCES SUCH AS COFFEE POTS, COMPUTERS, VENDING MACHINES,AND OTHER APPLIANCES, ETC.
12. THE BASC SHALL FURNISH AND INSTALL MANUAL RESET SAFETY DEVICES FOR ANY ANDALL CONDITIONS THAT COULD DAMAGE THE EQUIPMENT AND / OR REPRESENT A THREATTO HUMAN SAFETY. ALL WATER COILS SHALL BE PROTECTED BY AN AVERAGING ELEMENTFREEZE-STAT WITH A NON-ADJUSTABLE 40°F SET POINT, MANUAL RESET, AND HARDWIREDINTERLOCK TO SHUT DOWN THE ASSOCIATED FAN ANY TIME THE TEMPERATURE ACROSSANY 12" LENGTH OF THE AVERAGING ELEMENT FALLS BELOW 40°F. FREEZE-STATS SHALLBE INSTALLED DOWNSTREAM OF ALL WATER COILS.
13. ALL UNUSED HOLES IN EXISTING AND NEW CONTROL PANELS ARE TO BE CAPPED.
14. RE-USE OF EXISTING CONTROL CONDUIT, RACEWAYS, AND WIRING ACCEPTABLE IFCOMPATIBLE WITH NEW SYSTEM AND IF THE CONTRACTOR INCLUDES IN THE PROJECTWARRANTY.
15. THE BASC IS RESPONSIBLE FOR ALL LOW VOLTAGE CONTROL WIRING, POWER WIRING,AND CONDUIT ASSOCIATED WITH ALL CONTROL VALVES, ACTUATORS, CONTROLLERS,ETC., BEING INSTALLED AS A PART OF THIS PROJECT.
16. THE BASC MAY RE-USE ANY EXISTING RELAYS, CURRENT SENSING RELAYS, AND CURRENTTRANSDUCERS PROVIDED THEY ARE COMPATIBLE WITH THE NEW CONTROLLERS. ALLHARD WIRED CONTROL POINTS ARE TO BE MAPPED TO THE SYSTEM GRAPHICS FOR EASYVIEWING BY BUILDING STAFF. ANY CONDUIT, WIRING, SENSORS, OR SWITCHES THAT ARERE-USED BY THE BASC ARE TO BE TESTED PRIOR TO USE AND INCLUDED IN THE PROJECTWARRANTY.
17. WIRING IN OCCUPIED AREAS OF THE BUILDING SHALL BE CONCEALED IN WALL AND ABOVECEILINGS. EXPOSED WIRING AND CONDUIT IS NOT ACCEPTABLE IN OCCUPIED AREAS.
18. CONTRACTOR SHALL OBTAIN POWER FOR THE NEW DDC CONTROL SYSTEM FROM THENEAREST SOURCE.
19. THE BASC SHALL INCLUDE ADEQUATE TIME IN HIS BID FOR COMPLETE COMMISSIONING OFTHE MECHANICAL SYSTEMS, ON SITE IN COORDINATION WITH THE MECHANICALCONTRACTOR AND OTHER TRADES AS REQUIRED TO MAKE ALL EQUIPMENT COMPLETEAND FULLY OPERATIONAL.
20. REFER TO SCHEMATICS, SCHEDULES, AND SPECIFICATIONS FOR ADDITIONALINFORMATION.
B. SCOPE OF WORK
1. ALL WORK ASSOCIATED WITH THIS PROJECT SHALL BE INCORPORATED INTO THEEXISTING SIEMENS BUILDING AUTOMATION SYSTEM CURRENTLY IN OPERATION WITHINGUARANTEED RATE FIELD. THE SCOPE OF WORK SHALL BE AS FOLLOWS FOR EACHCOMPONENT ASSOCIATED WITH THIS PROJECT. ALL CONTROL ITEMS INDICATED BELOWSHALL BE PROVIDED IN GRAPHIC FORM ON THE BUILDING BAS SYSTEM.
2. REFER TO MECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION.
3. THE FOLLOWING SHALL BE A TYPICAL POINTS LIST FOR A FAN COIL UNIT:
AO-1: MODULATING CHILLED WATER VALVE CONTROLAI-1: FAN COIL DISCHARGE AIR TEMPERATUREDI-1: OCCUPIED WALL SWITCHDO-1: FAN COMMAND ON/OFFDO-2: ELECTRIC HEAT COIL COMMAND ON/OFFCOMM: THERMOSTAT
3. THE FOLLOWING SHALL BE A TYPICAL POINTS LIST FOR AN AIR HANDLING UNIT:
AO-1: MODULATING CHILLED WATER VALVE CONTROLAI-2: RETURN AIR TEMPERATUREAI-1: DISCHARGE AIR TEMPERATUREDO-1: FAN COMMAND ON/OFFCOMM: THERMOSTAT
4. FCU-1 IN ISFA CONFERENCE ROOM SHALL HAVE OUTDOOR AIR DUCTWORK ANDASSOCIATED MOTORIZED DAMPER INSTALLED. OA DAMPER SHALL ONLY OPEN TO CFMINDICATED AFTER PROOF OF FCU OPERATION.
5. THE ELECTRICAL CONTRACTOR SHALL FURNISH AND INSTALL SMOKE AND/OR HEATDETECTORS IN AIR SUPPLY SYSTEM OVER 2000 CFM. AN ADDRESSABLE FIRE ALARMRELAY SHALL BE FURNISHED AND INSTALLED BY THE ELECTRICAL CONTRACTOR . BASCONTRACTOR SHALL PICK UP SIGNAL FROM RELAY AND PROVIDE A PROGRAM TO STOPSUPPLY FAN INTERLOCKED WITH THE SYSTEM SENSING FIRE OR SMOKE. DDC PROGRAMSHALL ALSO SHOW FIRE IN UNIT ALARM AT TIME OF SHUT DOWN.
XIV. MECHANICAL / ELECTRICAL SCOPE OF WORK (FAN COIL UNITS)
A. GENERAL NOTES FOR STORAGE AND REPLACEMENT FOR ALL FAN COIL UNITS, AIR HANDLINGUNITS, FANS, AND RELATED EQUIPMENT
1. ALL CEILING OR ABOVE CEILING MOUNTED COMPONENTS REMOVED DURING DEMOLITION,INCLUDING BUT NOT LIMITED TO CEILING TILES, SUPPORT STRUCTURE, LIGHT FIXTURES,DUCT WORK, DIFFUSERS, GRILLES, FIRE ALARM DEVICES, AND SPEAKERS SHALL BESTORED FOR RE-INSTALLATION.
2. ALL FIRE PROTECTION DEVICES IN MOUNTED IN CEILING OR ABOVE CEILING, INCLUDINGBUT NOT LIMITED TO, SPRINKLER HEADS, PIPING, SUPPORTS, ETC., SHALL BE REMOVED,STORED, AND RE-INSTALLED.
3. ALL DUCT WORK CONNECTIONS TO FANS AND FAN COILS THAT IS DISCONNECTED ORREMOVED TO PERMIT THE INSTALLATION OF NEW EQUIPMENT SHALL BE STORED ORREPLACED AT THE TIME OF INSTALLATION OF THE NEW UNITS.
4. ALL DUCTWORK REMOVED TO PERMIT DEMOLITION AND STORED FOR RE-INSTALLATIONSHALL BE CLEANED PRIOR TO INSTALLATION OR REPLACEMENT.
5. EQUIPMENT OR COMPONENTS REMOVED DURING THE DEMOLITION PHASE AND FOUND TOBE DAMAGED OR UNSUITABLE FOR RE-INSTALLATION SHALL BE REPLACED WITHEQUIVALENT ITEMS TO MATCH THOSE REMOVED.
6. ALL EQUIPMENT OR COMPONENTS REMOVED AND STORED SHALL BE LABELED,INDICATING LOCATION, SERVICE, ROOM NUMBER, AND SYSTEM.
7. ALL MATERIALS SHALL BE STORED ON SITE AND PROTECTED FROM DAMAGE OR LOSS.SEE SPECIFICATIONS.
B. CHILLED WATER FAN COIL - GENERAL DEMOLITION
1. REMOVE CEILING TILE AND SUPPORT SYSTEM LOCATED UNDER UNIT AND DUCTWORK.
2. REMOVE LIGHTING, WIRE, AND CONDUIT LOCATED UNDER UNIT AND DUCTWORK. LIGHTINGTO BE RE-USED.
3. REMOVE FIRE PROTECTION PIPING, SPRINKLER HEADS, AND SUPPORTS LOCATED UNDERUNIT AND DUCTWORK.
4. REMOVE ALL SPEAKERS, GRILLES, DIFFUSERS, OR RELATED COMPONENTS UNDER UNITAND DUCTWORK.
5. RELOCATE MOVABLE EQUIPMENT AND MATERIALS UNDER UNIT AND DUCTWORK.
C. CHILLED WATER FAN COIL - DEMOLITION
1. REMOVE CHILLED WATER PIPING, INSULATION, VALVES, GAUGES, AND THERMOMETERS.REMOVE UNIT PIPING BACK TO MAIN OR BRANCH Y.
2. REMOVE CONDENSATE DRAIN PIPING AND INSULATION.
3. DISCONNECT ELECTRIC HEATING COIL CONDUIT AND WIRING TO PERMIT REMOVAL OF FANCOIL.
4. DISCONNECT AND REMOVE DUCTWORK AND FLEXIBLE CONNECTIONS.
5. REMOVE DUCT INSULATION REQUIRED FOR INSTALLATION OF NEW UNIT AND DUCTCONNECTIONS.
6. DISCONNECT AND REMOVE ELECTRICAL POWER WIRING FROM FCU. EXISTING WIRING,CONDUIT, AND COMPONENTS TO BE RE-USED.
7. DISCONNECT ALL TEMPERATURE CONTROL, WIRING, SENSORS, AND RELATEDCOMPONENTS.
8. DISCONNECT EXISTING DISCONNECT SWITCH SERVING FAN COIL UNIT. SWITCH TO BERE-USED.
9. REMOVE FAN COIL UNIT, HANGERS, SUPPORTS, AND RELATED COMPONENTS NOT BEINGRE-USED.
D. CHILLED WATER FAN COIL - GENERAL CONSTRUCTION NOTES
1. PROVIDE FIRE PROTECTION PIPING, SPRINKLER HEADS, AND SUPPORTS LOCATED UNDERUNIT AND DUCTWORK.
2. PROVIDE THE RE-INSTALLATION OF LIGHTING, WIRE, AND CONDUIT LOCATED UNDER THEUNIT AND DUCTWORK.
3. PROVIDE CEILING TILE AND SUPPORT SYSTEM LOCATED UNDER UNIT AND DUCTWORK.
E. CHILLED WATER FAN COIL - CONSTRUCTION
1. PROVIDE FAN COIL UNIT, HANGERS, SUPPORTS, AND RELATED COMPONENTS.
2. PROVIDE ALL TEMPERATURE CONTROL, WIRING, SENSORS, AND RELATED COMPONENTS.
3. PROVIDE ELECTRICAL POWER, WIRING, CONDUIT, AND COMPONENTS.
4. PROVIDE RE-CONNECTION OF ELECTRIC HEATING COIL FOR FAN COIL.
5. PROVIDE DUCTWORK CONNECTIONS FOR SUPPLY DUCTWORK AND FLEXIBLECONNECTIONS.
6. PROVIDE DUCT INSULATION FOR ALL NEW DUCTWORK AND DUCT CONNECTIONS TOEXISTING INSULATED DUCTWORK.
7. PROVIDE CHILLED WATER PIPING,VALVES, GAUGES, THERMOMETERS, AND INSULATIONFROM MAIN OR BRANCH PIPING.
8. PROVIDE CONDENSATE DRAIN PIPING, INSULATION, HANGERS, AND SUPPORTS.
9. PROVIDE LABELING OF UNIT, VFD PANELS, PIPING, AND VALVE TAGS.
10. PROVIDE TESTING AND BALANCING OF UNIT.
11. PROVIDE SECONDARY DRAIN PAIN WHERE INDICATED.
12. PROVIDE RETURN AIR FILTER GRILLE.
F. CHILLED WATER BRANCH PIPING ISOLATION VALVES AND PIPING DRAIN DOWN.
1. PROVIDE DRAIN DOWN OF CHILLED WATER SYSTEMS TO PERMIT THE INSTALLATION OFISOLATION VALVES.
2. REMOVE PIPING INSULATION TO PERMIT THE INSTALLATION OF ISOLATION VALVES.
3. REMOVE CEILING TILES, LIGHTING, CONDUIT, FIRE PROTECTION PIPING, AND HEADS TOPERMIT THE INSTALLATION OF ISOLATION VALVES.
4. PROVIDE ISOLATION VALVES FOR SUPPLY AND RETURN PIPING AT MAIN RISER OR BRANCHTO PERMIT REPLACEMENT OF FAN COIL UNIT.
5. PROVIDE HOLDING TANK OR TRUCK FOR CHILLED WATER DRAIN DOWN AND RETENTIONDURING FAN COIL REMOVAL AND REPLACEMENT. (TANK OR TRUCK CAPACITY TO BEDETERMINED BASED ON DRAIN DOWN REQUIRED).
6. PROVIDE TESTING OF CHILLED WATER FOR GLYCOL CONTENT. REFILLING OF SYSTEM ANDMAKE UP OF GLYCOL AS REQUIRED TO ACHIEVE 30% CONCENTRATION.
7. PROVIDE THE RE-INSTALLATION OF CEILING, LIGHTING, FIRE PROTECTION, CONDUIT, ANDPIPING.
KEY PLANKEY PLAN
N
10
9
8
67
111
3
5
4
2
19165
DESCRIPTIONDATEREV.
ISSUE/REVISION:
PROJECT NO:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
SCALE:
SHEET NO.
(708) 236-0330 FAX
Hillside, IL 60162
(708) 236-0300
30 N. Wolf Rd., Second Floor
PROJECT:
DRAWING TITLE:
333 WEST 35TH STREETCHICAGO, IL 60616
GUARANTEED RATE FIELD -HVAC / AHU RENOVATION -PHASE IX
10.07.2019 ISSUED FOR BID
ISSUED FOR BID
NOT FORCONSTRUCTION
10/07/2019
M4.02
MECHANICALSPECIFICATIONS
AS NOTED
AS
AS
MS