GTPE 04/06/15 L. Scibile 04/06/2015 1 EDMS: 1515929.
-
Upload
hilary-lyons -
Category
Documents
-
view
215 -
download
0
Transcript of GTPE 04/06/15 L. Scibile 04/06/2015 1 EDMS: 1515929.
EDMS: 1515929 1
GTPE 04/06/15
L. Scibile
04/06/2015
EDMS: 1515929 2
Items
• IPP Status• Parking 4-5• NEWS – Ex BP station• NEWS - Mobility Centre• NEWS – On-going projects
04/06/2015
EDMS: 1515929
IPP Process status
04/06/2015 3
EDMS: 1515929 4
IPP Status: Approved for study
• The two projects clearly identified as having safety implications:– IPP-2015-01: Relocation of the coating laboratory to a more adequate working area on the first floor
of Bldg 101. (X)– IPP-2015-05: Replacement of Bldg 195 and refurbishment work on associated buildings (196 and 232)
and infrastructure
• Two projects with consolidation implications:– IPP-2015-04: RAMSES Office, storage and laboratory space– IPP-2015-07: Refurbishment of Bldg 156
• And seven new projects: – IPP-2015-02: Second network hub (X)– IPP-2015-03: Extension of radioactive equipment storage building capacity (X)– IPP-2015-06: Modification of Bldg 238 and tank for gensets (X)– IPP-2015-08: New building for metallurgy laboratory.– IPP-2015-11: Conversion and refurbishment of chemical laboratories in Bldg 3 for the safe handling of
nano-materials.– IPP-2015-13: ALICE R&D O2 lab. (X)– IPP-2015-15: ALICE visitor space in Point 2.
04/06/2015
EDMS: 1515929 5
IPP Status: Not approved
• Projects not considered for this round of IPP:– IPP-2015-09 Storage building for rewinding line, cables and connectors– IPP-2015-10 Construction of a New Assembly Hall in Prévessin near Building 867– IPP-2015-12 New Training Centre Prevessin– IPP-2015-14 CMS 3585 Annexe (Workshops and Tooling storage)– IPP-2015-16 Building 287 Extension – IPP-2015-17 866 Building Annex
04/06/2015
EDMS: 1515929 6
Parking 4-5
04/06/2015
EDMS: 1515929 7
PARKING (Consolidation program) Safety
For Pedestrians and cyclists For kids from the kindergarten For car traffic on and around the parking (entrance, exit, junction)
Continuous sidewalk from Entrance A & Building 33 to main building No reduction of number of parking spots Dedicated parking spots for kindergarten drop-off (3m wide instead of 2.5) Dedicated car sharing parking spots Disabled parking spots Emergency services road marking Energy saving and high performing led lighting
ENTRANCE A (security & mobility program) Access control for cars, pedestrians and cyclists Car plate reader for in- and out-going cars Fully automated gates (car, bike, pedestrians)
Program
04/06/2015
EDMS: 1515929 8
Existing parking layout
04/06/2015
EDMS: 1515929 9
New parking layout
04/06/2015
EDMS: 1515929 10
PARKING 234 parking spots 6.000+ m2 of parking surface 500+ ml of sidewalk 9 high-rise lighting masts on car park 10 low-rise lighting masts along sidewalk
ENTRANCE A 2 automated turnstiles for bikes and pedestrians 2 automated gates and barriers for cars 2 car plate readers Surveillance cameras 1 high-rise lighting masts
Technical specification
04/06/2015
EDMS: 1515929 11
Phased execution
Phase 1
Phase 2
Phase 1’or 2’
04/06/2015
EDMS: 1515929 12
Planning
Option 1 – Requiring early supply of automated equipment Start of work Phase 1 & 1’: 6-07 End of work Phase 1: 28-08 Start of work Phase 2: 31-08 End of work Phase 1’: 15-09 End of work Phase 2: 30-10
Option 2 – If early supply of automated equipment not possible Start of work Phase 1: 6-07 End of work Phase 1: 28-08 Start of work Phase 2 & 2’: 31-08 End of work Phase 2’: 16-10 End of work Phase 2: 30-10
04/06/2015
EDMS: 1515929 13
Ex BP station
04/06/2015
EDMS: 1515929 14
Ex BP station
• Agreement to use the space as is (not blacktop)
04/06/2015
EDMS: 1515929 15
Mobility Centre
04/06/2015
EDMS: 1515929 16
CERN Mobility Centre
• Pole échange multimodale• Trams, navettes, voitures, vélos
• Réception voiture location
• Stations à vélo
04/06/2015
EDMS: 1515929 17
Overview
04/06/2015
EDMS: 1515929 18
On-going projects
04/06/2015
EDMS: 1515929 19
On-going projects
• PolimerLab– CE tenders out, HVAC and EL should be published this week.
• Bat 311– CE detailed studies on-going for call for tender as planned.
• Extension ENH1 - CENF extension– Works on-going as planned.
• Globe renovation– Globe closed and preparatory works started.
• Bat 107– Building closed, final resolutions with previous contractor to be presented at next FC. Being passed new contracts for
engineering support.
• Bat 245 - LIU Injectors– CE construction contract passed and works starting next week.
• Bat. 3852– CE tenders out.
04/06/2015