Facilities Project Managers Guide - Facilities Services - Cornell
G.Shirkov, Basic Facilities, 02.06.2005
-
Upload
blaine-curtis -
Category
Documents
-
view
37 -
download
5
description
Transcript of G.Shirkov, Basic Facilities, 02.06.2005
G.Shirkov, Basic Facilities, 02.06.2005
Status of the JINR Facilities
Operation and development in 2004-2005G.Shirkov
I. Overview of operation of JINR facilities
II. Basic Facilities
• Nuclotron • Cyclotrons and DRIBS • IBR-2 operation & refurbishment
III. LEPTA - Low Energy Positron Toroidal Accumulator (new facility)
IV. LINAC-800 (first stage of the DELSY project, not budgetary facility)
V. Phasotron (status after the fire accident)
VI. IREN - Intense REsonance Neutron source (under construction facility)
G.Shirkov, Basic Facilities, 02.06.2005
0
500
1000
1500
2000
2500
3000
3500
4000
4500
5000
NUCLOTRON IBR-2 U-400 U-400M PHASOTRON
OPERATION of BASIC FASILITIES in 2004 (hours)
PLANNED(2004)
ACTUAL
G.Shirkov, Basic Facilities, 02.06.2005
0
500
1000
1500
2000
2500
NUCLOTRON IBR-2 U-400 U-400M PHASOTRON
OPERATION of BASIC FACILITIES in January-May of 2005 (hours)
PLANNED(Jan-Apr)
ACTUAL (Jan-May)
G.Shirkov, Basic Facilities, 02.06.2005
Nuclotron of Baldin-Veksler Laboratory of High EnergyNuclotron of Baldin-Veksler Laboratory of High Energy
L
INA
C L
U-2
0
INJECTOR
NUCLOTRON
F-3MV-1
from NUCLOTRON
Ionsources
S
LON
Experimental Hall 205
TOTAL RUNNING TIME: 2004 - 2110 h 2005 – 2400 h (planned)
ACCELERATED BEAMS - p, d, He, C, B, Mg, N6+, N7+, Ar16+, Fe24+
BEAM ENERGIES - 0,5 - 3.0 GeV/u, (nuclei) 5.7 GeV (protons)
December 6, 2004: Deuteron beam energy 4.321 Gev/u.
NUMBER OF USER’S GROUPS - 14
OPERATION 2004 and 2005
RUN 28 (19.02 – 23.03.2004), RUN 29 (15.06-05.07), RUN 30 (05.11 – 20.12) RUN 31 (17.02 – 18.03.2005)
FLEROVLAB FLEROVLAB ACCELERATORSACCELERATORS
G.Shirkov, Basic Facilities, 02.06.2005
Main results in 2004:
1. New Movable Reflector 3 (MR-3)2. New Fuel Loading• manufacturing of fuel elements at
“Mayak” is completed• set of components of fuel assemblies
are made and delivered to JINR
I. Total running time of IBR-2: 1384 hours
II. Modernization of IBR-2
assembling of the MR-3
FRANK LABORATORY of NEUTRON PHYSICS
G.Shirkov, Basic Facilities, 02.06.2005
• NEW FUEL LOADING FOR THE IBR-2M• THE MAIN EQUIPMENT OF THE IBR-2M REACTOR (new reactor
vessel, rolling biological shieldings, stationary reflectors, etc. )• MONITORING, CONTROL AND PROTECTION SYSTEMS • MODERATORS (development of a mock-up of transport of moderator
substance (C9H12), new refrigerator facility KGU-700/15)
Total running time in 2005: 1650 hours
Main tasks for 2005:
Installation of the MR-3 on the regular place
Status of the LEPTA Project
27 July – kicker assembled and tested with e-beam,
10 September - first circulating electron beam was observed
Electron gun
Dzhelepov Laboratory for Nuclear Problems
General parameters of the LEPTACircumference, m 18.12
Positron & electron energy, keV 10.0
Solenoid magnetic field, G 400Residual gas pressure, Тоrr 110
Cooling e- beam current, A 0.5Ortho-Ps flux intensity, atom/sec 110
Angular spread, mrad 1Velocity spread 1104
Physics at LEPTAElectron cooling of positrons and Positronium (Ps) generationPhysics of Positroniume+e- recombination Life time measurement of Ortho- and para- states of Ps Rare and forbidden Ps decay channels studyPositronium spectroscopy
e+ / e- charge difference => the first and foremost experiment
Antihydrogen generation in-flight => CPT theorem test (future development)
Electron cooling with circulating electron beam in GeV particle energy range
0 2 4 6 8 100
5
10
15
20
25
Lif
e ti
me
[ms]
Energy [kev]
B = 350 GB = 510 GP = 710-8 Torr
March 2005
G.Shirkov, Basic Facilities, 02.06.2005
LINAC – 800 ( first stage of the DELSY project, not budgetary facility)LINAC-800 parameters:• energy – 800 MeV• average current – 50 mA
Applications of LINAC-800:• Free Electron Lasers• Material modification• Injector of Synchrotron Centre
Free Electron Lasers at LINAC-800 (Bld.118)
Dubna Synchrotron Centre with the JINR participation is the most promising way of synchrotron investigations and applications in the future.
First 20 MeV beam – the goal of 2005
G.Shirkov, Basic Facilities, 02.06.2005
Fundamental Investigations:• DUBTO - Resonant behaviour of the both the pp- and nn+ systems, produced in 4He interaction.• MUON – Investigation of the muon properties and the muon interactions with matter.• FAMILON - The study of the two-particle muon decay on an electron and golston's massless boson.• -CATALISIS- Measurements of muon catalyzed fusion cycling rate temperature dependence in a binary mixture D/T in the temperature range 40-300 K.
Phasotron - Dzhelepov Laboratory of Nuclear Problems(users’ request facility)
Applied investigations:
• Cancer therapy; (~100 patients per year)
• SAD- Subcritical Assembly Driven by Proton Accelerator
Fire accident in hall 4 on 09.04.2005
Phasotron and oncology facilities were not damaged at all!
G.Shirkov, Basic Facilities, 02.06.2005
Two ways:• restoration of existed oncology facilities (~ 750 k$, ≤ 12 months)• creation of a new facility (synchrotron) specialized for hadron therapy
(~10 M$ with existed buildings, oncology beams and cabins, ~5 years )
The main task: restoration of hadron oncology facilities at JINR as soon as possible
G.Shirkov, Basic Facilities, 02.06.2005
Working Plan to Restart the Hadron Therapy with Phasotron at DLNP
Type of Work Period Cost Estimate
• Halls Reconstruction 6 LNP (100 k$)
• Equipment Cleaning 1 1 and Painting LNP (35 k$)
• Halls Cleaning ? LNP (100 k$)
and Painting +100 k$
• Cables 6 LNP (100 k$)
Communications +100 k$
• Equipment 4 LNP (100 k$)
Repair +100 k$
• Accelerator 3 LNP (15 k$)
Restart Works
TOTAL 12 months LNP ( 450 k$)
+300 k$
G.Shirkov, Basic Facilities, 02.06.2005
IREN – Intense REsonance Neutron source (facility is under construction at FLNP)
IREN consists:• powerful (10KW) electron linac LUE-200• plutonium subcritical multiplied target
IREN project had been approved by JINR Scientific Council in June 1994
The first budget of the project was 3.7M$
It was planned to complete the project up to 1998.
G.Shirkov, Basic Facilities, 02.06.2005
First Priority Experimental Tasks Scheduled for IREN with Budget and ManpowerFirst Priority Experimental Tasks Scheduled for IREN with Budget and Manpower
G.Shirkov, Basic Facilities, 02.06.2005
It was produced and delivered to JINR main HT elements of the linac LUE-200:
• equipment for two RF modulators;
• two accelerating tubes with
accelerating rate 30 MeV/m;
• SLAC klystron 5045;
• SLED system and RF feeder;
• the vacuum system;
• the grid;
• diagnostic systems.
Electron gun testing
In addition:
• RF modulator was assembled;
• RF, vacuum systems were tested;
• the accelerator grid was precisely mounted ;
• the pulsed electron source was tested and mounted on the grid;
The metallic plutonium fuel for multiplying target was manufactured at “Mayak” and delivered to JINR in Dec. 2004
G.Shirkov, Basic Facilities, 02.06.2005
Section grids of LUE-200
MoU between Kurchatov Institute and JINR was signed in February, 2005. KI is ready:• contribute to the IREN project (~100k$/year);• to apply jointly with JINR to the Russian Government for a special grant (~1M$)
The budget of the IREN project
1994 - 3.7M$2005 ≥ 4.5 M$ due to:• inflation of US dollar• increasing of material cost • increasing of manpower cost
It had been invested now ~ 2.25 M$ including ~ 950k$ in 2000-2004
The rate of project financing ~ 300 k$/yearThe estimated time for startup the facility: 2012
Cooperation with KI is the most promising way for completion of IREN in 2008