GSAT-3 (EDUSAT)

download GSAT-3  (EDUSAT)

of 24

Transcript of GSAT-3 (EDUSAT)

  • 7/27/2019 GSAT-3 (EDUSAT)

    1/24

    BIRLA INSTITUTE OF

    TECHNOLOGY AND SCIENCE,PILANI

  • 7/27/2019 GSAT-3 (EDUSAT)

    2/24

    Satellite

    Communication System

    Edusat (GSAT-3)-Indias first exclusiveeducational satellite.

  • 7/27/2019 GSAT-3 (EDUSAT)

    3/24

    Edusat (GSAT-3)

    Abbreviated forEducational Satellite ,EDUSAT was Indias firstExclusive Educational

    Satellite. Owned by the Ministry of

    Education of India.

    Mainly intended to meetthe demand for aninteractive satellite-based distanceeducation system for thecountry.

  • 7/27/2019 GSAT-3 (EDUSAT)

    4/24

    Launch..

    EduSAT was launchedon 20 September 2004 bythe Indian SpaceResearch Organisation.

    It was launched intoa GeosynchronousTransfer Orbit on the firstoperational launch ofthe GeosynchronousSatellite LaunchVehicle, (GSLV (F04)

    rocket) at Satish DhawanSpace Centre inSriharikota.

  • 7/27/2019 GSAT-3 (EDUSAT)

    5/24

    Orbit, Apogee and Period !

    EDUSAT was initiallyplaced into a transferorbit with

    a perigee of 180kilometres (110 mi)and an apogee of35,985 kilometres(22,360 mi)

    It has a period of 10.5hours, inclined at 19.2degrees to theequator.

  • 7/27/2019 GSAT-3 (EDUSAT)

    6/24

    Other Basic Info :-

    Payload: GramSat. Mass: 1,950 kg (4,290 lb).

    Nation: India

    Agency: ISRO Program: Insat.

    Class: Communications

    Type: Civilian communications satellite.Spacecraft: Gsat .

    USAF Sat Cat: 28417 .

    COSPAR: 2004-036A.

    Apogee: 35,801 km (22,245 mi).

    Perigee: 35,772 km (22,227 mi). Inclination: 0.1000 deg.

    Period: 1,436.10 min.

  • 7/27/2019 GSAT-3 (EDUSAT)

    7/24

    Purpose :-

    Edusat was the first Indian satellite builtexclusively for the educational sector. It wasmainly intended to meet the demand for an

    interactive satellite based distanceeducation system for India.

    One of the main objectives is the RajivGandhi Project for EDUSAT SupportedElementary Education (RGPEEE)

  • 7/27/2019 GSAT-3 (EDUSAT)

    8/24

    Supported by

    The project is supported by MHRDISROIGNOU.

    The role of ISRO was to set up the technicalinfrastructure

    While IGNOU shared the responsibility todevelop the content and train teachers forthis mode of distance education.

    MHRD

    IGNOUISRO

  • 7/27/2019 GSAT-3 (EDUSAT)

    9/24

    Benefitted by this project..

    Visveswaraiah Technical University (VTU) isone of the main beneficiary of this pilotproject.

    Under this project, all Engg. Colleges of

    VTU are being networked with 1000nodes.

  • 7/27/2019 GSAT-3 (EDUSAT)

    10/24

    New Innovations UsedCompared to earlier satellites in the Insat

    series, Edusat used several newtechnologies.

    The spacecraft was built around the I-2K

    standardised spacecraft bus.

  • 7/27/2019 GSAT-3 (EDUSAT)

    11/24

    New Innovations Used It had a Multiple Spot Beam Antenna with a

    1.2 m reflector to direct Ku band spotbeams

  • 7/27/2019 GSAT-3 (EDUSAT)

    12/24

    New Innovations UsedA dual core bent heat pipe for thermal

    control

  • 7/27/2019 GSAT-3 (EDUSAT)

    13/24

    Other New Innovations in EduSatcontd.

    High efficiency multi-junction solar cellsand an improved thruster configuration

    for optimised propellant use for orbit andorientation maintenance.

    The satellite also used radiatively cooledKu-band Travelling Wave Tube Amplifiers

    And a dielectrically loaded C-banddemultiplexer for its communicationpayloads.

  • 7/27/2019 GSAT-3 (EDUSAT)

    14/24

    Payload

    Edusat carried five Ku-band transpondersproviding spot beams.

    One Ku-band transponder providing anational beam

    Six Extended C-band transponders with anational coverage beam.

    It was to join the Insat system that alreadyprovided more than 130 transponders in C-band, Extended C-band and Ku-band for avariety of telecommunication and televisionservices.

  • 7/27/2019 GSAT-3 (EDUSAT)

    15/24

    Latest Status

    First operational flight of launch vehicle.Launch delayed from July, August and

    September 10.

    Dry mass 820 kg. As of 2007 Mar 9 locatedat 73.92E drifting at 0.006W degrees perday.

  • 7/27/2019 GSAT-3 (EDUSAT)

    16/24

    Network Configuration The RGPEEE Network configuration consist of

    3.8 m Ku-Band Hub at PSM college Jabalpur(MP) and more than 700 Receive OnlyTerminals (ROTs) installed in Sidhi District of MP,and around 50 ROTs installed in HindiSpeaking states.

    This network is basically a DTH type of networkbut the unique feature of the network is thatall the ROTs are Solar powered keeping inmind the power problem in villages.

  • 7/27/2019 GSAT-3 (EDUSAT)

    17/24

    Configuration of ROT for

    RGPEEE network The transmission scheme adopted for thenetwork is digital video broadcasting (DVB)based on the MPEG-2 video compression.

  • 7/27/2019 GSAT-3 (EDUSAT)

    18/24

    Management of the network

    Management is done at a Two Tier System.

    1. The Apex Committee, which consists of

    representatives of ISRO, MHRD, Participatingstate Governments; IGNOU; Indian Institute ofInformation Technology, Jabalpur, and RaniDurgavati University, Jabalpur,takes care ofpolicy decisions .

    2. Standing committee takes care of day-to-day affairs of the network.

  • 7/27/2019 GSAT-3 (EDUSAT)

    19/24

    UtilizationAt present the network with around 1000 ROTs

    is being utilized for 2 h per day for transmissionof educational programs for primary andsecondary schools of Hindi states.

    Contents developed: 600

    Days of transmission: 382

    Transmission hours: 1354

    Teachers trained: 1599

    Students benefited: 200 000.

  • 7/27/2019 GSAT-3 (EDUSAT)

    20/24

  • 7/27/2019 GSAT-3 (EDUSAT)

    21/24

    Challenges:Feedback and Monitoring

    Daily transmission record of schools;

    monitoring of meeting of cluster resourcecentre coordinators (CRCCs); monitoringof meetings of block resource centrecoordinators (BRCCs);

    consolidation/review at District Institute ofEducation and Training (DIET); Interactiveresponse by Project Director, Jabalpur.

  • 7/27/2019 GSAT-3 (EDUSAT)

    22/24

    Layout of the Program

  • 7/27/2019 GSAT-3 (EDUSAT)

    23/24

    Vision

    The future vision for this successful project is:-

    To increase the number of terminals as well as

    the increase in duration of transmission.

    At least 1000 ROTs should be installed and

    commissioned in each of participated Hindi

    Speaking States in 23 years.

    The 1012 h of transmission is visualized in 23

    years.

    The 2 hr broadcasts should be allotted toeach of the states based on their curriculum.

  • 7/27/2019 GSAT-3 (EDUSAT)

    24/24

    Conclusion

    The EduSat or the GSAT-3 has beensuccessful in its mission because of thesuccess of the teaching project across the

    lengths and breadths of the central India. The new innovative technologies used herein

    have helped in its timely operations andhave enabled it to operate more than its

    estimated lifetime (i.e. 7 years). This paved the path to future technologies

    scope of Satellite Communication inEducation.